LIST OF EMERGENCY PURCHASE AFFIDAVITS
FILED WITH THE OFFICE OF THE AUDITOR GENERAL
October 1, 2007 through December 31, 2007
1 GOVERNOR, OFFICE OF THE
Filed: 11/26/2007
Damage to the ballroom ceiling caused by
water leaking from private apartment above.
Ceiling pieces falling on
ballroom floor, water dripping down ballroom
wall, if not repaired will damage walnut paneled library next to
ballroom.
The water in the Governor's apartment has to be shut off until the
problem is fixed. The ballroom will
be
closed to the public and events for safety reasons if the leak is not fixed and
water damages the library
walnut walls, the cost to repair will be
much higher.
Signed By: David Bourland, Director
Vendor: Unknown Notary Date: 11/2/2007
Estimate Actual FY QTR
State Cost: $55,000.00 $0.00 8 2
Federal Cost $0.00 $0.00
2 CENTRAL MANAGEMENT SERVICES
Filed: 11/2/2007
To allow for proper evaluation and review
of solicitation, protest period, award and execution of a new contract.
Signed By: Cassie Dierkes, Executive I
Vendor: Thomson West Notary Date: 10/31/2007
Estimate Actual FY QTR
State Cost: $0.00 $130,000.00 8 2
Federal Cost $0.00 $0.00
3 CORRECTIONS - GENERAL OFFICE
Filed: 10/31/2007
Current backup software is two revisions
behind with no support available. The
week of October 15, 2007,
the current software went into
catastrophic failure and no Department of Corrections data was backed up.
Central Management Services (CMS) does not
have a master contract for this software, so most cost effective
price was obtained from a CMS recommended
vendor. The situation is not repairable
without bringing the
software to current levels. This would involve an investment of taxpayer
dollars equal to purchase of new. The
Department of Corrections data backup is
critical to the security and operation of agency.
Signed By: Larry Moritz, Acting Inf. Serv. Mgr.
Vendor: SEA Group Inc. Notary Date: 10/24/2007
Estimate Actual FY QTR
State Cost: $0.00 $88,179.07 8 2
Federal Cost $0.00 $0.00
4 CORRECTIONS, CORRECTIONAL CENTER -
PONTIAC
Filed: 11/28/2007
On November 7, 2007 a major steam leak was discovered in the
kitchen at the Medium Security Unit of the
Pontiac Correctional Center. The piping in question supplies the steam
needed to prepare all food for the MSU
and
also the quick chill operation for all of the Maximum Security Unit. Every day that the steam is off it will
cost the facility extra money in order to
feed the inmates. The steam is spraying
into a wall where there is
electricity that feeds the 480 volt
ovens. This could be potentially
dangerous situation. It is also a tremendous
safety and health concern for all staff
and inmates who work in the kitchen.
This needs to be repaired as soon
as possible and we will need to utilize
outside contractors to do the steam piping, replace the ceramic tile floor
that needs to be removed, and to rebuild
the glazed block wall that will need to be torn down in order to
replace the piping. We will also need an insulating contractor to
insulate the new piping. We will also
need to
rework the electrical feeds to the ovens.
Signed By: Eddie Jones, Warden
Vendor: Various Notary Date: 11/19/2007
Estimate Actual FY QTR
State Cost: $65,000.00 $0.00 8 2
Federal Cost $0.00 $0.00
5 CORRECTIONS, CORRECTIONAL CENTER - SHAWNEE
Filed: 11/15/2007
An emergency need exists to purchase two
generators. One to replace the
Administration Building generator
and one to replace the generator for
Housing Unit 4. The generator for the
Administration Building provides
emergency power to the Administration
Building, Health Care Unit and Segregation Unit. At this time, this
generator is beyond repair and will not
provide emergency power. The generator
for Housing Unit 4 needs to
be replaced due to the age and ability to
start up and produce power.
A letter was received dated October 12,
2007 reporting the actual cost as $82,467.00.
Signed By: Daniel Austin, Warden
Vendor: Evapar Notary Date: 2/21/2007
Estimate Actual FY QTR
State Cost: $100,000.00 $82,467.00 8 2
Federal Cost $0.00 $0.00
6 CORRECTIONS, CORRECTIONAL INDUSTRIES
Filed: 11/28/2007
Repair the TETRA PAK machine. No vendor contract in place. Items to be purchased are as follows: The
service man will make two visits at
$5,769.00 a piece and estimated $20,000 for service and parts $31,538.
Signed By: James Underrwood, Sr. Public Serv. Adv.
Vendor: TETRA PAK Notary Date: 11/19/2007
Estimate Actual FY QTR
State Cost: $31,538.00 $0.00 8 2
Federal Cost $0.00 $0.00
7 CORRECTIONS, ILLINOIS YOUTH CENTER -
Filed: 12/4/2007
We are seeking an emergency purchase for a
water heater replacement and a turbo power heater module. We
have two water heaters, one is completely
down and the other is cracked and leaking.
A pressurized vessel
which leaks is a violation of State fire
marshal safety code and a health hazard.
In addition, if the unit that is
running goes out, we will be without hot
water.
Signed By: William Kilquist, Superintendent
Vendor: Unknown Notary Date: 11/16/2007
Estimate Actual FY QTR
State Cost: $55,000.00 $0.00 8 2
Federal Cost $0.00 $0.00
8 CORRECTIONS, ILLINOIS YOUTH CENTER - ST. CHARLES
Filed: 12/13/2007
The chimney stack adjacent to the power
plant has deteriorated due to its age, and has been previously hit by
lightning.
Masonry bricks and debris have fallen onto adjacent roofs and
buildings. The area around the stack
has been isolated with visual barriers to
protect residents and staff. Exposure to
the elements has advanced the
deterioration such that overall integrity
is indeterminate because staff can not inspect the stack due to over all
height.
Failure to remedy or complete repairs will continue to damage adjacent
structures and may impede
powerhouse operations thereby causing
significant expense and disruption in state services.
Signed By: Bobby Moore, Superintendent
Vendor: Various Notary Date: 12/4/2007
Estimate Actual FY QTR
State Cost: $80,000.00 $0.00 8 2
Federal Cost $0.00 $0.00
9 EMPLOYMENT SECURITY, DEPARTMENT OF
Filed: 11/16/2007
The U.S. Department of Labor recently
notified IDES that it would allow the rollover of about $60,000 from
federal fiscal year 2007 for the purchase
of replacement phone notification systems but that the money is
required to be spent by December 31. Based on this information, the Department
attempted to promptly
purchase the PNS equipment.
Signed By: Barry Isaacson, State Purchasing Officer
Vendor: US Netcom Corp Notary Date: 11/14/2007
Estimate Actual FY QTR
State Cost: $0.00 $0.00 8 2
Federal Cost $0.00 $38,637.00
10 HUMAN SERVICES, DEPARTMENT OF
Filed: 10/22/2007
The facility was noted on July 27, 2007
that we were awarded a federal grant - Violent Offender
Incarceration/True In Sentencing Grant,
the stipulation in receiving this grant is - all work must be completed by
September 30, 2007. Environmental Control Solutions Inc. has set
up and maintains the present heating/air
conditioning systems at the facility. All temperature controls are computerized and
maintained and controlled in
the Engineering Office for the entire
facility. In order to renovate Douglas
Hall, residential unit, it is necessary
that all the control wiring be pulled
above the ceilings, as well as the control valves, duct sensors and
relays. All
the
control wiring needs to be pulled back to the mechanical room from 17 different
locations throughout the
building.
This is a number of valves to be wired, which does not include duct
sensors, temperature sensors, etc.
Due to time constraints to complete this project, we are requesting
emergency procurement status.
Signed By: Curtis Thompson, Acting State Purchasing Office
Vendor: Environmental Control Solution Notary Date: 10/18/2007
Estimate Actual FY QTR
State Cost: $0.00 $92,645.00 8 2
Federal Cost $0.00 $0.00
11 HUMAN SERVICES, DEPARTMENT OF
Filed: 10/22/2007
The facility was notified on July 27, 2007
that we were awarded a federal grant - Violent Offender
Incarceration/True in Sentencing Grant,
the stipulation in receiving this grant is - all work must be completed by
September 30, 2007. Cumming's Carpet One was the only vendor to
submit a bid for carpeting for this
project.
After the bids were opened it discovered that Cumming's Carpet One was
not a certified small
business.
This vendor had now submitted application to CMS and is a certified
small business, but due to the
time constraints to complete this project
by September 30, 2007, McFarland does not have time to start the
Invitation for Bid process over.
Signed By: Curtis Thompson, Acting State Purch.
Officer
Vendor: Cumming's Carpet One Notary Date: 10/18/2007
Estimate Actual FY QTR
State Cost: $0.00 $84,090.00 8 2
Federal Cost $0.00 $0.00
12 HUMAN SERVICES, DEPARTMENT OF
Filed: 10/22/2007
The facility was notified on July 27, 2007
that we were awarded a federal grant - Violent Offender
Incarceration/True in Sentencing Grant the
stipulation in receiving this grant is - all work must be completed by
September 30, 2007. Vancil Contracting Inc., who has the
carpentry contract for FY 08, is familiar with
structure and carpentry requirements at
McFarland. In order to renovate Douglas
Hall, residential unit, it is
necessary that the carpenters remove old
cabinets, walls around nurse and technicians stations and med room to
receive new cabinets. Remove old metal pan ceiling. Install new suspended drywall ceiling for the
safety and
security of the patients. Install new cabinets, install acoustical
sound boards over non-fire rated wood paneling
and install six security doors. Due to time constraints to complete this
project, was are requesting Emergency
Procurement status.
Signed By: Curtis Thompson, Acting State Purch.
Officer
Vendor: Vancil Contracting Inc. Notary Date: 10/18/2007
Estimate Actual FY QTR
State Cost: $0.00 $143,700.00 8 2
Federal Cost $0.00 $0.00
13 HUMAN SERVICES, DEPARTMENT OF
Filed: 10/22/2007
The facility was notified on July 27, 2007
that we were awarded a federal grant - Violent Offender
Incarceration/True in Sentencing Grant,
the stipulation in receiving this grant is - all work must be completed by
September 30, 2007. Progressive Electric Inc., who has the
electrical contract for FY 08, and has completed
all electrical work at McFarland for the
last ten years, is doing the electrical work for this project as he is
familiar with all electrical systems. In order to renovate Douglas Hall,
residential unit, it is necessary that the
electricians pull cable and install
camera/monitoring system and the keyless door security. Retro fit all light
fixtures, new LAN lines for 25
computers. Install ceiling fans and
track lighting. Due to time constraints
to
complete this project, was are requesting
emergency procurement status.
Signed By: Curtis Thompson, Acting State Purch.
Officer
Vendor: Progressive Electric Inc. Notary Date: 10/18/2007
Estimate Actual FY QTR
State Cost: $0.00 $151,896.00 8 2
Federal Cost $0.00 $0.00
14 PUBLIC HEALTH, DEPARTMENT OF
Filed: 10/1/2007
Compliance with the Illinois Plumbing Act
and Code are paramount to ensuring the safety of potable water for
all residents of the state. Recently, the Department was made aware of
alleged discrepancies in grading the
licensing exams administered by the State
Board of Plumbing Examiners. In order to
ensure the integrity of the
plumbing licenses issued in the state of
Illinois, the Department is seeking an emergency contract for the review
and audit of the Plumbing Program
licensing procedures and examinations.
The Department informally
solicitated Statements of Qualification
from 3 professional architectural/engineering firms with extensive
experience in plumbing system design for
commercial and/or residential buildings in order to identify the
contractor referenced above. This contractor was selected based on their
extensive experience and the
availability of sufficient staffing
resources to complete the audit and review as soon as possible.
Signed By: Gary Robinson, State Purchasing Officer
Vendor: Crawford, Murphy & Tilly, Inc. Notary Date: 9/27/2007
Estimate Actual FY QTR
State Cost: $35,000.00 $0.00 8 2
Federal Cost $0.00 $0.00
15 TRANSPORTATION, DEPARTMENT OF
Filed: 11/8/2007
Emergency repairs to S.N. 046-0065,
carrying IL Route 102 over Rock Creek, located 6.5 miles northwest of
Bourbonnais, in Kankakee County Illinois. The bridge rail was impacted on the south
side of the bridge in the
center span of the three span bridge by an
unknown motorist. Repairs need to be
expedited as winter is
approaching and the bridge rail will be
unable to withstand another impact without failure. The roadway at
center span is approximately 50' above the
Rock Creek. Repairs consist of removal
and replacement of
damaged bridge rail and associated
concrete curb to which the rail is attached.
Work will be performed under
traffic control consisting of temporary
traffic signals and concrete barrier wall.
Signed By: George Ryan, Deputy Director
Vendor: Kankakee Valley Construction Notary Date: 10/18/2007
Estimate Actual FY QTR
State Cost: $100,000.00 $0.00 8 2
Federal Cost $0.00 $0.00
16 TRANSPORTATION, DEPARTMENT OF
Filed: 10/23/2007
Emergency repairs to S.N. 046-0108,
located 0.2 miles west of Buckingham, Illinois on Illinois Route 115,
which consist of bridge rail replacement
and the outside fascia precast prestressed box beam that was
compromised in the hit by an unknown
motorist. These repairs need to be done
quickly so the shoulder of the
bridge can be opened up before winter as
well as the bridge railing replaced for the safety of the motoring
public and to prevent any possible further
damage to adjacent beams of the structure.
Tobey's Construction
and Cartage Inc. was chosen as the
contractor to do the repairs because of their knowledge and expertise in
highway and bridge construction.
Signed By: George Ryan, Deputy Director
Vendor: Tobey's Const. & Cartage Inc. Notary Date: 10/4/2007
Estimate Actual FY QTR
State Cost: $150,000.00 $0.00 8 2
Federal Cost $0.00 $0.00
17 TRANSPORTATION, DEPARTMENT OF
Filed: 11/19/2007
On May 11, 2007, the Illinois Department
of Central Management Services procured, through an IFB, 315 HP
3380 printers to be used by the Department of
Transportation. The IFB stated that
these printers were to be
"new, unused, or most recent
manufacture". It has been
determined that all 315 printers were refurbished. The
printers have been placed in secure
locations pending legal action. Since
the resolution of this issue may take an
extended amount of time. It has been determined that an emergency
procurement is necessary. It is critical
that a minimum of 100 HP 3380 be
procured. The award was made to the low
bidder meeting our delivery
requirements.
A letter was received dated November 19,
2007 reporting the actual cost as $55,500.
Signed By: Ann Schneider, Director
Vendor: Koi Computers Notary Date: 11/16/2007
Estimate Actual FY QTR
State Cost: $75,000.00 $55,500.00 8 2
Federal Cost $0.00 $0.00
18 HOUSING DEVELOPMENT AUTHORITY, ILLINOIS
Filed: 11/28/2007
On 8-21-07 the Governor signed into law an
amendment to the Illinois Procurement Code that allows the
Illinois Housing Development Authority to
enter into contracts for bond or mortgage insurance for any period of
time less than or equal to the maximum period
of time that the subject bond or mortgage remains outstanding.
With respect to the Housing Bond Trust
Indenture, the Authority sought credit enhancements for up to
$250,000,000 of the Authority's Housing
Bonds through the purchase of bond insurance from bond insurers;
such credit enhancements lower costs to
the Authority of issuing the Housing Bonds.
If the Authority were to
continue to purchase bond insurance
through FGIC, it would raise the Authority's costs of issuing Housing
Bonds; however, purchasing bond insurance
from FSA would allow the Authority to receive the lowest cost of
issuance from Housing Bonds.
Signed By: James Kregor, Controller
Vendor: Financial Security Assurance Notary Date: 11/21/2007
Estimate Actual FY QTR
State Cost: $0.00 $14,329.50 8 2
Federal Cost $0.00 $0.00
19 TOLL HIGHWAY AUTHORITY, ILLINOIS
STATE
Filed: 10/29/2007
The soundwall at the Lincoln Oasis was
damaged in an accident. It is
recommended that one panel be replaced
at
this time.
Signed By: Jeffery Dailey, Chief Engineer
Vendor: Prestress Engineering Corp. Notary Date: 10/2/2007
Estimate Actual FY QTR
State Cost: $15,614.00 $0.00 8 2
Federal Cost $0.00 $0.00
20 TOLL HIGHWAY AUTHORITY, ILLINOIS
STATE
Filed: 10/29/2007
Repairs are needed for significantly
deteriorated arch corrugated metal pipes on the Northwest Tollway from
milepost 29.98 to 31.35 (from west of IL
72 to east of IL47). The collapse of 18
to 20 feet in length of a 48"
culvert recently occurred (8-8-07) on the
shoulder of the WB I-90 parallel to Genoa Road.
Signed By: Jeffery Dailey, Chief Engineer
Vendor: Rockford Blacktop Construction Notary Date: 10/16/2007
Estimate Actual FY QTR
State Cost: $476,576.00 $0.00 8 2
Federal Cost $0.00 $0.00
21 TOLL HIGHWAY AUTHORITY, ILLINOIS STATE
Filed: 12/24/2007
The existing VAV boxes are controlled by
pneumatic thermostats and pneumatic volume controllers. The
controls are over 17 years old and are in
dire need of repair and calibration. The
building engineers are
controlling the system manually since
there is very little automatic control and automatic sequencing between the
air handling units and the tenant
spaces. The perimeter radiation is
controlled by self contained thermostat
radiation valves that are also in need of
repair.
Signed By: Tracey Smith, Chief of Administration
Vendor: Precision Control Systems Notary Date: 12/19/2007
Estimate Actual FY QTR
State Cost: $386,100.00 $0.00 8 2
Federal Cost $0.00 $0.00
22 CHICAGO STATE UNIVERSITY
Filed: 12/27/2007
The Vice President of Administration and
Financial Affairs resigned without notice.
This executive officer of the
University serves as the university's
treasurer and chief advisor to the President on financial matters. This
position is responsible for the general
supervision of the administrative and finance functions and for the fiscal
management of the university's
resources. This individual is also
responsible for providing leadership,
management and administration for the
following departments: Accounts Payable,
Cashier, Accounts
Receivable, Auxiliary Services, Mail
Operations, Central Stores, Payroll, Purchasing, Property Management,
Bursar and Accounting. In addition, the Vice President has
operational responsibilities for operating, capital
and financial services, contracting and
purchasing services, financial services, maintaining an internal control
system, development and preparation of
monthly financial reports, fiscal policy development, direct financial
investments and bond funding. This position also serves as the university's
liaison with legal counsel, investment
advisors and external auditors and as a
member of the President's Executive Council.
Signed By: Elnora Daniel, Executive Director
Vendor: Youngblood Executive Search Notary Date: 12/18/2007
Estimate Actual FY QTR
State Cost: $42,000.00 $0.00 8 2
Federal Cost $0.00 $0.00
23 NORTHERN ILLINOIS UNIVERSITY
Filed: 12/27/2007
Oracle is offering a discounted price for
PeopleSoft ePerformance and PeopleSoft eProfile including
maintenance and support through December
31, 2007. After that date the discounted
price and the existing
contract terms will no longer be
available.
Signed By: Eddie Williams, Executive Vice President
Vendor: Oracle USA Notary Date: 12/18/2007
Estimate Actual FY QTR
State Cost: $0.00 $101,060.00 8 2
Federal Cost $0.00 $0.00
24 ILLINOIS STATE UNIVERSITY
Filed: 12/8/2007
The existing recycling truck completely
broke down during the bidding process for a replacement truck. The
replacement recycling truck is needed
quickly to avoid unhealthy accumulation of recycle materials at Resident
Halls.
Until a replacement truck is obtained, the University is renting a truck
to fill the current void. The lowest
bidder was not able to provide a truck
immediately. To avoid health issues and
to avoid additional rental costs,
the University purchased from the second lowest
bidder as an emergency purchase.
Signed By: Judy Johnson, Director of Purchases
Vendor: Barker Motor Company Notary Date: 12/29/2007
Estimate Actual FY QTR
State Cost: $0.00 $35,570.16 8 2
Federal Cost $0.00 $0.00
25 SOUTHERN ILLINOIS UNIVERSITY
Filed: 12/27/2007
Provision for material and labor for
installation of carbon monoxide detectors on the 400 side at Cougar Village.
The carbon monoxide project has been determined to be an emergency
project in an effort to properly
monitor the 400 side apartments which
utilize natural gas appliances. Current
laws require that carbon
monoxide detectors be installed in living
units utilizing natural gas.
Signed By: Larry Hinton, Director of Purchasing
Vendor: Edwards Electrical Contracting Notary Date: 12/11/2007
Estimate Actual FY QTR
State Cost: $0.00 $108,000.00 8 2
Federal Cost $0.00 $0.00
26 UNIVERSITY OF ILLINOIS
Filed: 12/21/2007
This emergency expenditure is for 2008
Rose Bowl Hospitality Tent Rental for the Chancellor's reception.
PrimeSport has been selected to serve as
the single strategic partner in providing services for the Official Rose
Bowl Corporate Hospitality Tent Village
located just outside the Rose Bowl Stadium.
Therefore they are the
only vendor providing services within the
"Tent Village". The cost is
considered reasonable and acceptable.
Signed By: Thomas Delanty, State Purch. Officer Des.
Vendor: PrimeSport Notary Date: 12/19/2007
Estimate Actual FY QTR
State Cost: $68,750.00 $0.00 8 2
Federal Cost $0.00 $0.00
27 UNIVERSITY OF ILLINOIS
Filed: 12/27/2007
The used truck is available for a limited
time and by definition is a spot market purchase. Delay in issuing the
purchase order for this transaction could
seriously put the University at a disadvantage either price wise or
prevent the University from acquiring the
much needed truck. The department has
indicated that the purchase
of the equipment at this time is a good
business decision.
Signed By: Thomas Delanty, State Purchasing Officer Des.
Vendor: Prairie International Trucks Notary Date: 12/13/2007
Estimate Actual FY QTR
State Cost: $0.00 $43,000.00 8 2
Federal Cost $0.00 $0.00
28 SECRETARY OF STATE
Filed: 6/14/2005
A letter was received dated December 5,
2007 reporting the actual cost of item #3 in our July 15, 2005 report
as $881,474.13.
Signed By: Cecil Turner, Director
Vendor: Unknown Notary Date: 6/6/2005
Estimate Actual FY QTR
State Cost: $250,000.00 $881,474.13 8 2
Federal Cost $0.00 $0.00
29 SECRETARY OF STATE
Filed: 6/6/2006
A letter was received dated December 20,
2007 reporting a revised actual amount for item #6 in our July 14,
2006 report as $627,630.00.
Signed By: Donna Fitts, Acting Director
Vendor: Unknown Notary Date: 6/5/2006
Estimate Actual FY QTR
State Cost: $770,000.00 $627,630.00 8 2
Federal Cost $0.00 $0.00
30 NATURAL RESOURCES, DEPARTMENT OF
Filed: 4/5/2007
A letter was received dated November 9,
2007 reporting the actual cost of item #14 in our July 13, 2007
report as $40,002.25.
Signed By: Ellen King Pietrzak, Chief Fiscal Officer
Vendor: Stork's Catering Notary Date: 4/3/2007
Estimate Actual FY QTR
State Cost: $42,375.00 $40,002.25 8 2
Federal Cost $0.00 $0.00
31 NATURAL RESOURCES, DEPARTMENT OF
Filed: 4/5/2007
A letter was received dated November 9,
2007 reporting the actual cost of item #31 in our July 13, 2007
report as $58,344.50.
Signed By: Ellen King Pietrzak, Chief Fiscal Officer
Vendor: Unknown Notary Date: 4/2/2007
Estimate Actual FY QTR
State Cost: $50,000.00 $58,344.50 8 2
Federal Cost $0.00 $0.00
32 NATURAL RESOURCES, DEPARTMENT OF
Filed: 4/5/2007
A letter was received dated November 9,
2007 reporting the actual cost of item #16 in our July 13, 2007
report as $12,750.
Signed By: Ellen King Pietrzak, Chief Fiscal Officer
Vendor: Calumet City Plumbing Notary Date: 4/2/2007
Estimate Actual FY QTR
State Cost: $12,750.00 $12,750.00 8 2
Federal Cost $0.00 $0.00
33 CORRECTIONS, CORRECTIONAL CENTER -
STATEVILLE
Filed: 4/5/2006
A letter was received dated October 12,
2007 reporting the actual cost of item #18 in our July 14, 2006 report
as
$695,067.20.
Signed By: Dee Battaglia, Warden
Vendor: Unknown Notary Date: 3/22/2006
Estimate Actual FY QTR
State Cost: $500,000.00 $695,067.20 8 2
Federal Cost $0.00 $0.00
34 CORRECTIONS, CORRECTIONAL CENTER -
TAYLORVILLE
Filed: 2/28/2007
A letter was received dated October 12,
2007 reporting the actual cost of item #6 in our April 13, 2007 report
as $59,312.74.
Signed By: Gregory Sims, Warden
Vendor: Various Notary Date: 12/5/2006
Estimate Actual FY QTR
State Cost: $50,000.00 $59,312.74 8 2
Federal Cost $0.00 $0.00
35 HUMAN SERVICES, DEPARTMENT OF
Filed: 4/29/2004
A letter was received dated August 3, 2005
reporting the actual cost of item #20 in our July 15, 2004 report as
$84,375.
Signed By: Dina Arrigo, State Purchasing Officer
Vendor: Freeman Energy Notary Date: 4/29/2004
Estimate Actual FY QTR
State Cost: $84,375.00 $84,375.00 8 2
Federal Cost $0.00 $0.00
36 HUMAN SERVICES, DEPARTMENT OF
Filed: 8/8/2005
A letter was received dated November 23,
2005 reporting the actual cost of item #28 in our October 14, 2005
report as $62,226.00.
Signed By: Dina Arrigo, Executive Director
Vendor: TRANE Corporation Notary Date: 8/4/2005
Estimate Actual FY QTR
State Cost: $68,000.00 $62,226.00 8 2
Federal Cost $0.00 $0.00
37 HUMAN SERVICES, DEPARTMENT OF
Filed: 8/2/2005
A letter was received dated August 31,
2005 reporting the actual cost of item #30 in our October 14, 2005
report as $60,070.25.
Signed By: Dina Arrigo, State Purchasing Officer
Vendor: Various Notary Date: 7/27/2005
Estimate Actual FY QTR
State Cost: $59,958.75 $60,070.25 8 2
Federal Cost $0.00 $0.00
38 HUMAN SERVICES, DEPARTMENT OF
Filed: 10/11/2005
A letter was received dated February 7,
2006 reporting the actual cost of item #10 in our January 13, 2006
report as $66,480.75.
Signed By: Dina Arrigo, State Purchasing Officer
Vendor: Health Facility Staffing Notary Date: 10/7/2005
Estimate Actual FY QTR
State Cost: $486,700.00 $66,480.75 8 2
Federal Cost $0.00 $0.00
39 HUMAN SERVICES, DEPARTMENT OF
Filed: 10/11/2005
A letter was received dated February 7,
2006 reporting the actual cost of item #11 in our January 13, 2006
report as $71,966.10.
Signed By: Dina Arrigo, State Purchasing Officer
Vendor: Julia's Banquet Center Notary Date: 10/7/2005
Estimate Actual FY QTR
State Cost: $589,065.00 $71,966.10 8 2
Federal Cost $0.00 $0.00
40 HUMAN SERVICES, DEPARTMENT OF
Filed: 10/11/2005
A letter was received dated February 7,
2006 reporting the actual cost of item #12 in our January 13, 2006
report as $48,126.50.
Signed By: Dina Arrigo, State Purchasing Officer
Vendor: V. Wackenhut Corporation Notary Date: 10/7/2005
Estimate Actual FY QTR
State Cost: $250,800.00 $48,126.50 8 2
Federal Cost $0.00 $0.00
41 HUMAN SERVICES, DEPARTMENT OF
Filed: 10/11/2005
A letter was received dated February 7,
2006 reporting the actual cost of item #13 in our January 13, 2006
report as $5,234.26.
Signed By: Dina Arrigo, State Purchasing Officer
Vendor: American Maid Cleaning Service Notary Date: 10/7/2005
Estimate Actual FY QTR
State Cost: $45,192.00 $5,234.26 8 2
Federal Cost $0.00 $0.00
42 HUMAN SERVICES, DEPARTMENT OF
Filed: 10/11/2005
A letter was received dated February 7,
2006 reporting the actual cost of item #14 in our January 13, 2006
report as $4,654.14.
Signed By: Dina Arrigo, State Purchasing Officer
Vendor: Kane Mechanical Inc. Notary Date: 10/7/2005
Estimate Actual FY QTR
State Cost: $20,000.00 $4,654.14 8 2
Federal Cost $0.00 $0.00
43 HUMAN SERVICES, DEPARTMENT OF
Filed: 10/11/2005
A letter was received dated February 7,
2006 reporting the actual cost of item #41 in our January 13, 2006
report as $4,949.92.
Signed By: Dina Arrigo, State Purchasing Officer
Vendor: Long Elevator & Machine Notary Date: 10/7/2005
Estimate Actual FY QTR
State Cost: $10,000.00 $4,949.92 8 2
Federal Cost $0.00 $0.00
44 HEALTHCARE AND FAMILY SERVICES, DEPT OF
Filed: 12/29/2006
A letter was received dated December 17,
2007 reporting the actual cost of item #14 in our January 12, 2007
report as $2,171,738.58.
Signed By: Thomas Meirink, State Purchasing Officer
Vendor: First Transit, Inc. Notary Date: 12/28/2006
Estimate Actual FY QTR
State Cost: $2,058,394.00 $2,171,738.58 8 2
Federal Cost $0.00 $0.00
45 STATE POLICE, DEPARTMENT OF
Filed: 9/1/2006
A letter was received dated November 5,
2007 reporting the actual cost of item #26 as $72,617.09.
Signed By: Larry Trent, Director
Vendor: Illinois National Bank Notary Date: 6/29/2006
Estimate Actual FY QTR
State Cost: $190,000.00 $72,617.09 8 2
Federal Cost $0.00 $0.00
46 STATE POLICE, DEPARTMENT OF
Filed: 2/15/2005
A letter was received dated November 28,
2007 reporting a revised actual amount for item #23 in our April
15, 2005 report as $863,916.79.
Signed By: Larry Trent, Director
Vendor: Unknown Notary Date: 2/9/2005
Estimate Actual FY QTR
State Cost: $1,200,000.00 $863,916.79 8 2
Federal Cost $0.00 $0.00
47 TRANSPORTATION, DEPARTMENT OF
Filed: 5/9/2006
A letter was received dated June 12, 2007
reporting the actual cost of item #32 in our July 14, 2006 report as
$95,578.09.
Signed By: Diane O'Keefe, Regional Engineer
Vendor: Illinois Constructors Corp. Notary Date: 4/19/2006
Estimate Actual FY QTR
State Cost: $125,000.00 $95,578.09 8 2
Federal Cost $0.00 $0.00
48 TRANSPORTATION, DEPARTMENT OF
Filed: 2/16/2007
A letter was received dated June 12, 2007
reporting the actual cost of item #10 in our April 13, 2007 report as
$10,273.50.
Signed By: Christine Reed, Deputy Director
Vendor: Bodine Environmental Notary Date: 2/9/2007
Estimate Actual FY QTR
State Cost: $25,000.00 $10,273.50 8 2
Federal Cost $0.00 $0.00
49 TRANSPORTATION, DEPARTMENT OF
Filed: 7/12/2007
A letter was received dated October 19,
2007 reporting the actual cost of item #36 in our October 15, 2007
report as $130,000.00.
Signed By: George Ryan, Deputy Director
Vendor: Unknown Notary Date: 7/10/2007
Estimate Actual FY QTR
State Cost: $400,000.00 $130,000.00 8 2
Federal Cost $0.00 $0.00
50 TRANSPORTATION, DEPARTMENT OF
Filed: 9/28/2007
A letter was received dated December 19,
2007 reporting the actual cost of item #37 in our October 15, 2007
as $49,694.43.
Signed By: George Ryan, Regional Engineer
Vendor: Civil Constructors Notary Date: 9/14/2007
Estimate Actual FY QTR
State Cost: $50,000.00 $49,694.43 8 2
Federal Cost $0.00 $0.00
51 TRANSPORTATION, DEPARTMENT OF
Filed: 7/25/2007
A letter was received dated December 19,
2007 reporting the actual cost of item #35 in our October 15, 2007
report as $836,038.32.
Signed By: Joseph Crowe, Deputy Director
Vendor: Various Notary Date: 7/16/2007
Estimate Actual FY QTR
State Cost: $1,100,000.00 $836,038.32 8 2
Federal Cost $0.00 $0.00
52 TOLL HIGHWAY AUTHORITY, ILLINOIS
STATE
Filed: 3/21/2007
A letter was received dated November 1,
2007 reporting the actual cost of item #17 in our April 13, 2007
report as $271,970.16.
Signed By: Jeff Dailey, Chief Engineer
Vendor: D.L. Austin Steel Supply Corp. Notary Date: 2/20/2007
Estimate Actual FY QTR
State Cost: $274,000.00 $271,970.16 8 2
Federal Cost $0.00 $0.00
53 NORTHERN ILLINOIS UNIVERSITY
Filed: 9/1/2007
A letter was received dated October 24,
2007 reporting the actual cost of item #49 in our October 15, 2007
report as $30,228.84.
Signed By: Eddie Williams, Exec. VP
Vendor: Hilton Chicago Notary Date: 8/22/2007
Estimate Actual FY QTR
State Cost: $40,000.00 $30,228.84 8 2
Federal Cost $0.00 $0.00
54 NORTHERN ILLINOIS UNIVERSITY
Filed: 8/22/2007
A letter was received dated October 31,
2007 reporting the actual cost of item #48 in our October 15, 2007
report as $122,597.00.
Signed By: Eddie Williams, Exec. VP
Vendor: Otto Baum Company, Inc. Notary Date: 8/20/2007
Estimate Actual FY QTR
State Cost: $113,523.00 $122,597.00 8 2
Federal Cost $0.00 $0.00
55 WESTERN ILLINOIS UNIVERSITY
Filed: 5/16/2007
A letter was received dated November 5,
2007 reporting the actual cost of item #36 in our July 13, 2007
report as $243,928.31.
Signed By: Jackie Thompson, Vice President
Vendor: NuTemp Notary Date: 5/17/2007
Estimate Actual FY QTR
State Cost: $212,800.00 $243,928.31 8 2
Federal Cost $0.00 $0.00