  1       SUPREME COURT                                              

                                                                                                                                   Filed:       9/26/2008

  Water infiltration in a limited area of the courtroom has been a problem at the 5th District Appellate

  Courthouse in Mt. Vernon in recent years.  During the last 4 weeks, the area of significant water

  infiltration and resulting interior damage has expanded to include all exterior walls of the Judges

  Chambers adjacent to the courtroom and some portions of the private residential areas on the lower

  level.  Some of the moisture damage has been caused by water infiltration in the chimney area, while

  other problems have occurred as a result of failures of the masonry and its protective coatings.  Some of

  the wood windows have suffered significant water damage and allow water to enter the building.

   Signed By: Cynthia Cobbs, Administrative Director

      Vendor:  Unknown                                                                               Notary Date:           9/24/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $400,000.00                      $0.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

  2       GOVERNOR, OFFICE OF THE                                    

                                                                                                                                   Filed:         7/7/2008

  The existing A/C compressor has failed beyond repair and requires replacement in kind.  The mansion

  at this time has no means of environmental control and will require several scheduled events to be

  cancelled until such time the compressor is repaired or replaced.

   Signed By: Dave Bourland, Executive Director

      Vendor:  Unknown                                                                               Notary Date:             7/7/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $100,000.00                      $0.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

                                       

  3       AGRICULTURE -  GENERAL OFFICE                              

                                                                                                                                   Filed:       9/11/2008

  To repair the brick turrets of the Administration Building.  To repair leaks on the roof of the

  Administration Building and the replacement of the fire station roof.

   Signed By: Thomas Jennings, Executive Director

      Vendor:  Unknown                                                                               Notary Date:           9/11/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $250,000.00                      $0.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  4       CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:         8/7/2008

  Emergency response deployment due to unexpected power disruption adversely affecting old leaking

  battery banks.  Battery power is necessary to ensure proper operation of Data Center.

   Signed By: Marcia Armstrong, Acting Deputy Director

      Vendor:  J T Packard & Associates                                                      Notary Date:             8/6/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $94,798.00              $94,798.00                                                  9                1

     Federal Cost                    $0.00                      $0.00


                                      

  5       CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:         9/8/2008

  Central Management Services issued a rebid for numerous Chicagoland locations that did not receive

  any bid offers from the initial bid issued on July 25th.  The rebid that opened on August 12, 2008

  revealed that no bid offers were made for locations within Lake and McHenry counties. Multiple vendors

   were contacted to try and determine a resource to meet the unmet needs in Lake and McHenry counties.

    International Salt Company offered a fixed price, indicated the ability to meet the needs of the

  communities, and agreed to hold a reserve of salt to allow for us to define community needs at the price

  point.  Other vendors surveyed either offered a higher price point, preferred to sell only to the State, or

  were seeking timeliness of decision that could not be met.

   Signed By: Gwyn Gurgens, Portfolio Manager

      Vendor:  International Salt Company                                                      Notary Date:             9/4/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00          $8,597,382.32                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  6       CONSERVATION - NATURAL RESOURCES                           

                                                                                                                                   Filed:         8/2/2008

  This procurement is for the assessment of 20 a/c units at the World Shooting and Recreational

  Complex, Vendor Buildings 1-5 (4 a/c units per building).  The units have required constant repair

  since the Complex opened two years ago.

   Signed By: Norm Dixon, State Purchasing Officer

      Vendor:  Bric Partnership LLC                                                             Notary Date:           8/22/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $20,000.00                      $0.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  7       CONSERVATION - NATURAL RESOURCES                           

                                                                                                                                   Filed:       8/22/2008

  This contract is to remove and dispose of debris lodged against the piers of the Fox River Aqueduct. 

  Flood waters in August 2007 caused debris to accumulate around the piers of the Fox River Aqueduct

  thus restricting water flow and posting a threat to cause damage to the structure and upstream flooding

  on private properties in the event of more flooding.

   Signed By: Norm Dixon, State Purchasing Officer

      Vendor:  Pro-Dive, Inc.                                                                        Notary Date:           8/21/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $38,900.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  8       CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       7/25/2008

  The conditions and circumstances requiring this emergency purchase are the result of flooding that

  occurred (is occurring) in Lawrence County, Illinois which resulted in the disruption of the water

  system transporting potable water to the institution.  The conditions resulting included a shut off of

  water to the housing units, dietary operations and laundry operations.

   Signed By: Lee Ryker, Warden

      Vendor:  Various                                                                                  Notary Date:           6/18/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $24,500.00                      $0.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 


  9       CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       8/25/2008

  We are considering this situation in our steam tunnels to be an emergency because of sanitation issues

  and also because of damage being done to State of Illinois property.  On the weekend of August 2nd and

   3rd, the sewer system became plugged up and began to backup into the facility.  This was not

  discovered until Monday, August 4th at 7:30 a.m.  The sewer backed up into the steam tunnel and

  covered the insulation on the steam, hot water and condensate lines.  The sewer water has contaminated

   the insulation on the pipes.  We needed to turn the steam off to the kitchen and the laundry because of

  the water covering the pipes.  The insulation is now contaminated and by turning the steam on the

  toxic fumes and odor could cause health issues to staff and inmates.  In order to rectify the situation all

  of the contaminated insulation needs to be removed and replaced.

   Signed By: Joseph Mathy, A/W Operations

      Vendor:  Various                                                                                  Notary Date:             8/6/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $100,000.00             $125,500.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

  10     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       7/30/2008

  McDaniel Fire Systems - St. Louis has the contract for inspecting the facility fire alarm and sprinkler

  systems as required by the State of Illinois Fire Marshal Office.  During their initial inspection, it was

  found that the existing fire alarm systems for the North 1 Cell House, South Cell House, East/West

  Cell House and North 2 Annex are not functioning due to age and environmental conditions and require

   replacement.  If these systems are not replaced the cell houses do not have any fire or smoke detection.

   Signed By: Donald Hulick, Warden

      Vendor:  McDaniel Fire Systems - St. Lo                                               Notary Date:           7/16/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $600,000.00                      $0.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  11     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       8/29/2008

  The facilities generator that powers the Administration Building, which houses, administration offices,

  clinical, school district, library, dietary, gyms, teen center, training center, visitors center, treatment,

  confinement and healthcare.  This generator also services housing units, four, five and six at the facility.

    Not having this generator on line to cover a power outage could be catastrophic.  IYC Kewanee is the

  designated infirmary for the Department of Juvenile Justice and currently has in our infirmary a youth

  that is severely asthmatic and must be kept in a stable air conditioned environment.  If the facility

  would be subjected to a power failure, this youth's health could be severely jeopardized.

   Signed By: Lisa Nordstrom, Superintendent

      Vendor:  Patton Power Systems                                                            Notary Date:           8/25/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $800,000.00                      $0.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  12     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       8/29/2008

  On 8-12-08 it was reported that housing unit buildings had no electrical power to the buildings.  The

  Dixon Correctional Center electrician was called in and found the problem to be the underground

  electrical feeder cable to the above buildings failed.  The proposal is to remove three electrical feeder

  cables and install 3 500 mcm copper tape shield 5kv and 1 4/0 ground cables total length 600 feet,

  termination of all connections, high potting and final connections for electrical power operation.

   Signed By: Nedra Chandler, Warden

      Vendor:  Dixon Commercial Electric                                                      Notary Date:           8/14/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $35,030.00              $35,030.00                                                  9                1

     Federal Cost                    $0.00                      $0.00


                              

  13     CORRECTIONS - GENERAL OFFICE                                

                                                                                                                                   Filed:       8/29/2008

  Building #3117 has had an electrical switch malfunction causing the building to be without power. 

  This building is a residential building that houses 96 residents along with five offices for Civigenics. 

  The Civigenics program is ran out of this building which is a drug rehabilitation unit.  Currently, we

  have temporary power to this building to keep it operable.  However, this temporary power is not

  adequate to operate the entire building.  A new switch takes twenty weeks to be made.

   Signed By: Andy Ott, Warden

      Vendor:  Wissehr Electric                                                                     Notary Date:           8/21/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $74,735.00                      $0.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

  14     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:         9/5/2008

  Correctional Industries Optical Eyewear Unit located at Dixon Correctional Center facilitates production

   of eyewear to all DOC inmates as well as all recipients of public aid services within the State of Illinois

   Medicaid system.  This emergency purchase is for eyeglass frames that are put into display frame kits

  that are sent out to eye doctors throughout Illinois that provide Medicaid services.  The company that

  ICI wishes to purchase these frames from will be the selected vendor from a bid offering recently

  conducted and awarded.  The contract is not due to begin until October 1st and if ICI waits for the

  beginning of the contract, it will severely delay the time that the frames are available for choice to

  patients.  This would severely restrict ICI's production capacity and would result in a loss of a large

  amount of budgeted revenue for the current fiscal year.

   Signed By: Donna Lindenmulder, Acting CEO

      Vendor:  Modern Optical Ltd.                                                               Notary Date:           8/28/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $45,000.00              $39,740.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 


  15     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       9/23/2008

  The dietary building flat roof is leaking into the dry storage and cooler/freezer area.  Replace the flat roof

   over the cooler, freezer and dry storage.

   Signed By: Karen McKinney, Superintendent

      Vendor:  Unknown                                                                               Notary Date:             9/8/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $57,600.00              $36,300.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  16     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:         7/1/2008

  The vendor's SFY 08 contract is being extended for 31 days to avoid a disruption in services while a

  competitive process to select new vendors is completed.

   Signed By: Curtis Thompson, Acting SPO

      Vendor:  Prevention First, Inc.                                                               Notary Date:           6/26/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00             $281,315.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  17     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:         7/1/2008

  The vendor's SFY 08 contract is being extended for 31 days to avoid a disruption in services while a

  competitive process to select new vendors is being completed.

   Signed By: Curtis Thompson, Acting SPO

      Vendor:  Youth Network Council                                                          Notary Date:           6/26/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00             $167,728.00                                                  9                1

     Federal Cost                    $0.00                      $0.00


                                        

  18     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:         7/1/2008

  The vendors SFY 08 contract is being extended for 31 days to avoid a disruption in services while a

  competitive process to select new vendors is completed.

   Signed By: Curtis Thompson, Acting SPO

      Vendor:  The Ounce of Prevention Fund                                                Notary Date:           6/26/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $52,787.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  19     MILITARY AFFAIRS, DEPARTMENT OF                            

                                                                                                                                   Filed:         7/3/2008

  We are requesting an emergency purchase for rental of a portable chiller for a minimum of 3 months. 

  This is significantly important due to these 3 months being June, July and August.  Lincoln's

  Challenge cooperative agreement funds will be used for the rental.

   Signed By: Leesa Mays, SPO

      Vendor:  TRANE                                                                                 Notary Date:             7/2/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $37,079.00              $34,077.50                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  20     HEALTHCARE AND FAMILY SERVICES, DEPT OF

                                                                                                                                   Filed:       7/11/2008

  The Department is entering into an emergency six-month contract with E.L. Johnson Investigations,

  Inc.  This emergency purchase was procured in accordance with the Illinois Procurement Code and the

  Standard Procurement Rules:  immediate action is needed to prevent or minimize serious disruption in

  State services and:  the circumstances will not permit the delay required to r-solicit competitive sealed

  bids and emergency conditions exist after an unsuccessful attempt to use competitive sealed bidding.

   Signed By: Thomas Sestak, SPO

      Vendor:  E.L. Johnson Investigations                                                     Notary Date:             7/9/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $216,000.00                      $0.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  21     REVENUE, DEPARTMENT OF

                                                                                                                                   Filed:       7/14/2008

  Emergency contract for Boland Enterprises, Inc. for the key entry and verifying of the IL-1040 tax

  returns.  This contract resulted when two small business vendors that had been awarded the contract

  were unable to perform (their contracts were subsequently terminated).  In order for the Department to

  meet the State requirements and deadlines our only choice was to enter into an emergency contract.  

  The prior SPO inadvertently failed to file an Emergency Purchase Affidavit with CMS/CPO and the

  OAG as required by the Code in December, 2007.  The current SPO is filing this affidavit on July 10,

  2008 and has already filed a final emergency expenditure report for this contract, as required, with OAG

   Signed By: Norma Sutton, SPO

      Vendor:  Boland Enterprises, Inc.                                                          Notary Date:           7/10/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00             $165,965.29                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  22     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       7/18/2008

  Mississippi River flooding occurring in Hancock County on and around 06-15-08 requiring District 4

  to contract for trucking to relocate existing State property (concrete barrier wall) from Edwards IL to

  Hamilton IL on Sunday, June 15, 2008 to protect Keokuk bridge approach.  Vendor was selected based

  upon equipment and personnel availability for immediate response.

   Signed By: Joseph Crowe, Deputy Director

      Vendor:  Kennel Trucking                                                                     Notary Date:           6/25/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $11,780.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  23     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       8/14/2008

  Flooding of the Mississippi River basin caused the overtopping of the US 136 roadway approach to the

  Mississippi River bridge between Hamilton, Illinois and Keokuk, Iowa.  This expenditure is for

  furnishing labor and material to construct a temporary roadway to keep US 136 open to traffic.  The

  work included furnishing of materials for delivery and placement on US 136.

   Signed By: Roger Driskell, Regional 4 Engineer

      Vendor:  W.L. Miller                                                                            Notary Date:             8/6/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $375,000.00             $343,205.15                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  24     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       8/14/2008

  Mississippi River flooding occurring in Henderson County has effectively closed contiguous access to

  US 34 since roadway became overwhelmed by waters on 6-15-08.  Due to this interruption of services,

  a severe economic distress has been experienced by citizens relying on US 34.  Subsequently the

  Department has been asked to expedite renewed access to US 34 via the most efficient means possible

  without waiting for natural floodwater recession.

 

  A letter was received dated August 19, 2008 reporting the Actual cost as $28,560.89.

   Signed By: Joseph Crowe, Deputy Director

      Vendor:  Twomey & Cessford Companies                                             Notary Date:           7/31/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $34,700.00              $28,560.89                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  25     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       8/28/2008

  Rising water elevations on the Mississippi River during the June Flood of 2008 necessitated a

  temporary grade raise of IL Route 100 to maintain services.  Determination of funding source between

  IEMA/FEMA/FHWA resulted in the delay of this emergency affidavit submittal for signature/filing. 

  The proposed work consisted of hauling aggregate and constructing a compacted aggregate embankment

   on top of the existing pavement from approximately 700 feet west of Main Street west to Williams

  Street in the City of Alton to raise the grade.  Once the water receded, IDOT District 8 Bureau of

  Operations utilized its forces to remove the grade raise, clean up the pavement, and restore the roadway

   Signed By: Mary Lamie, Deputy Director

      Vendor:  Keller Companies                                                                   Notary Date:           8/14/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $25,221.95                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  26     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:         9/5/2008

  As a result of the magnitude of the June 2008 flood, seventeen structures in District 7 were damaged to

  scour.  The protective defenses on these structures were eroded leaving them extremely vulnerable to

  future flooding.  Several of the structures experienced exposure of their foundations.  Others have

  experienced a lowering of the streambed to below footing elevations.

   Signed By: Roger Driskell, Deputy Director

      Vendor:  Unknown                                                                               Notary Date:           8/18/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:           $3,500,000.00                      $0.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  27     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       8/29/2008

  The Department of Central Management Services issued a re-bid solicitation for rock salt for roadway

  de-icing purposes.  Subsequently a solicitation addendum was issued by CMS.  On August 12, 2008 it

  was revealed that no bidders submitted an offer for rock salt needed in Lake and McHenry counties

  located in the department's Region 1.  International Salt Company in response to the addendum, offered

   60,600 tons to the Department's Northside maintenance facility/Cook County at $138.52 per ton.

   Signed By: Christine Reed, Director of Highways

      Vendor:  International Salt Company                                                      Notary Date:           8/27/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00          $8,394,312.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  28     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       8/27/2008

  During the recession of the water elevations on the Mississippi River during the June Flood of 2008,

  multiple pavement holes were observed drawing water through the pavement over the twin corrugated

  metal pipes.  Upon inspection of the twin 10 foot diameter pipes, several holes/tears with sand

  infiltrating the pipes was observed and the pipes appear deteriorated beyond repair.  Both pipes have

  deformed and resulting distress is reflected through to the roadway and on the rip rap at the pipe

   Signed By: Mary Lamie, Deputy Director

      Vendor:  Keeley and Sons, Inc.                                                             Notary Date:           8/14/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $750,000.00                      $0.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  29     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       9/29/2008

  The bridges carrying Interstate 57 over 147th Street have extensive web cracking at the bottom of many

  of the web stiffeners in the main spans.  Any growth in these cracks would force the immediate closure

  of lanes on Interstate 57, as well as implementation of load posting that would require truck detours. 

  During cold weather, cracks can propagate quickly - therefore repairs to the webs of these beams must be

   done quickly, and cannot wait for the normal contracting procedures.

   Signed By: Diane O'Keefe, Deputy Director

      Vendor:  Areatha Construction                                                              Notary Date:             9/8/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $700,000.00                      $0.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  30     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       9/15/2008

  Due to abnormally wet conditions and high temperatures this summer, portions of the hot mix asphalt

  overlay on I-57/70 around Effingham, IL have failed.  The pavement is severely rutted and has

  experienced stripping in the lower binder lifts on the driving lanes of the interstate.  This problem has

  occurred in four locations on the route, three northbound and one southbound.

   Signed By: Roger Driskell, Region 4 Engineer

      Vendor:  Unknown                                                                               Notary Date:           8/29/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $400,000.00             $299,636.87                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  31     VETERANS' AFFAIRS - GENERAL OFFICE                         

                                                                                                                                   Filed:       9/17/2008

  The door locks and the WanderGuard system installed at the facility in 2002-2003 are failing.  Exterior

  doors do not latch, which prevents the staff from being able to properly secure the building and

  potentially allowing unauthorized persons access to the facility during non-visiting/business hours. 

  Failure of the WanderGuard System has resulted in confused residents, who wear the "alert bracelets"

  designed to set off the audible alarm, to exit the building undetected by nursing staff and placing them

   Signed By: Deborah Miller, Chief Fiscal Officer

      Vendor:  Unknown                                                                               Notary Date:           9/16/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:         $85,000,000.00                      $0.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  32     HISTORIC PRESERVATION AGENCY                               

                                                                                                                                   Filed:       9/23/2008

  Lincoln Log Cabin State Historic Site, 400 South Lincoln Way, Lerna, IL.  Replace site water lines

  and service.

   Signed By: Janet Grimes, Executive Director

      Vendor:  Unknown                                                                               Notary Date:           9/23/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $300,000.00                      $0.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  33     ILLINOIS WORKERS' COMPENSATION COMMISSION

                                                                                                                                   Filed:         7/7/2008

  The agency requires the immediate and uninterrupted services of vendor to complete the IWCC

  Workers' Compensation Medical Fee Schedule, a workers' compensation reform mandated by P.A. 94-

  277 in order to address rising medical costs.

   Signed By: Katherine Deveraux, SPO

      Vendor:  True Course Medical Data Analy                                            Notary Date:             7/2/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $60,000.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  34     ILLINOIS MEDICAL DISTRICT COMMISSION                    

                                                                                                                                   Filed:       7/31/2008

  The Illinois Medical District Commission is in need of services provided by the subject vendor relative

   to various legal and administrative services that are critical to District operations and services.

   Signed By: Samuel Pruett, Executive Director

      Vendor:  Kenneth E. Scheiwe                                                               Notary Date:             7/1/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $50,000.00                      $0.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

  35     ILLINOIS MEDICAL DISTRICT COMMISSION                    

                                                                                                                                   Filed:       7/31/2008

  The Illinois Medical District Commission is is need of services provided by the subject vendor relative

  to pending litigation.

   Signed By: Samuel Pruett, Executive Director

      Vendor:  Hinshaw & Culbertson LLP                                                    Notary Date:             7/1/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $50,000.00                      $0.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  36     TOLL HIGHWAY AUTHORITY, ILLINOIS STATE              

                                                                                                                                   Filed:         8/7/2008

  To repair the noise abatement wall on the Tri-State that was damaged by an accident on January 17. 

  Please see the attached memo for details and the attached estimate for costs.

 

  A letter was received dated August 1, 2008 reporting the Actual amount as $91.250.00.

   Signed By: Paul Kovacs, Chief Engineer

      Vendor:  Albin Carlson & Co.                                                               Notary Date:           1/25/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $86,250.00              $91,250.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  37     TOLL HIGHWAY AUTHORITY, ILLINOIS STATE              

                                                                                                                                   Filed:         9/2/2008

  The Dept. of Central Management Services issued a re-bid solicitation for rock salt for roadway deicing

  purposes.  Subsequently, a solicitation addendum was issued by CMS.  On August 12, 2008 it was

  revealed that no bidders submitted an offer for rock salt needed in Lake County.  International Salt Co.

  in response to the addendum offered 12,200 tons to be delivered to the Tollway M-04 and Edens Spur

  facilities at an estimated price of 140.00 per ton.  To address our record low inventories and satisfy rock

   salt demands for safely deicing this portion of the Tollway during the upcoming winter season, the

  tonnage is necessary.  CMS has advised the Tollway that in order to exercise the option to procure this

  tonnage, an emergency affidavit is required.  International Salt Company was chosen because they

  offered the only solution for the required rock salt.

   Signed By: Paul Kovacs, Chief Engineer

      Vendor:  International Salt Company                                                      Notary Date:             9/2/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:           $1,708,000.00                      $0.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  38     TOLL HIGHWAY AUTHORITY, ILLINOIS STATE              

                                                                                                                                   Filed:       9/25/2008

  The Dept. of Central Management Services issued a re-bid solicitation for rock salt for roadway deicing

  purposes.  Subsequently, a solicitation addendum was issued by CMS.  It was determined that no bids

  would be accepted due to poor quality or excessive pricing of 170.65 per ton.  International Salt Co. in

  response to the addendum offered 7,500 tons to be delivered to the Tollway M-07 at an estimated price

  of 151.52 per ton.  To address our record low inventories and satisfy rock salt demands for safely

  deicing this portion of the Tollway during the upcoming winter season, the tonnage is necessary.  CMS

   has advised the Tollway that in order to exercise the option to procure this tonnage, an emergency

  affidavit is required.  International Salt Company was chosen because they offered the only solution for

   Signed By: Paul Kovacs, Chief Engineer

      Vendor:  International Salt Company                                                      Notary Date:             9/8/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:           $1,136,400.00                      $0.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  39     CHICAGO STATE UNIVERSITY                                   

                                                                                                                                   Filed:         7/3/2008

  The purchase and installation of this security and surveillance equipment is an emergency due to the

  increasing prevalence of theft in the Jones Convocation Center.  Over $20,000 of athletic equipment has

  recently been stolen.  With the increased value of equipment that is now being stored and installed into

  the Convocation Center daily, this expensive equipment is in jeopardy of being stolen, to which the

  University is neither funded nor capable of replacing such equipment.

   Signed By: Elnora Daniel, President

      Vendor:  Eagle Eye Surveillance Chicago                                               Notary Date:             6/2/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $94,665.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  40     GOVERNORS STATE UNIVERSITY                                 

                                                                                                                                   Filed:       9/23/2008

  The driveway and parking area leading to the north door of the OTS building was in need of repair and

  expansion.  Due to construction, additional parking is required.

   Signed By: Tracy Sullivan, SPO Designee

      Vendor:  Sanchez Paving                                                                      Notary Date:           9/22/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $47,000.00              $41,006.25                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  41     GOVERNORS STATE UNIVERSITY                                 

                                                                                                                                   Filed:       9/23/2008

  Immediate repair to the hot and cold coils of an air handler for the HVAC system is required to control

  temperature within the zone assigned within the facility.

   Signed By: Tracy Sullivan, SPO Designee

      Vendor:  ECI Mechanical                                                                     Notary Date:           9/22/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $36,344.99              $36,344.99                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  42     ILLINOIS STATE UNIVERSITY                                  

                                                                                                                                   Filed:       7/23/2008

  The exterior facade brick work collapsed and exposed a portion of the exterior of the Turner Hall

  Building.  In addition, the collapse made other exterior portions of the building unstable and increased

  the risk of additional failures.  The emergency procurement/repair is needed to ensure the building is

  repaired in the most efficient and deliberate method and to avoid any health and safety issues for the

  public, students and University employees.

   Signed By: Judy Johnson, Director

      Vendor:  J.J. Braker                                                                             Notary Date:           7/21/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $95,500.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  43     ILLINOIS STATE UNIVERSITY                                  

                                                                                                                                   Filed:       8/14/2008

  The chiller for the University's south campus location has failed and prevents the use of air conditioning

   in four residence halls that house over 1400 students and the south campus dining facility.  The failure

  of the chiller and the available air conditioning during the student move in and one of the potentially

  hottest periods of the year, has resulted in this repair being classified as an emergency procurement.

   Signed By: Greg Alt, Comptroller

      Vendor:  Hunzeker Trane Company                                                      Notary Date:           8/13/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $69,999.60                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  44     SOUTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:         7/3/2008

  The hydraulic cylinder in the elevator in Trueblood Dining Hall, has failed and a new cylinder is

  required to restore elevator service.  This elevator is the sole elevator in the building and is essential for

   ADA and safety compliance.  To ensure due diligence, the University obtained two informal quotes to

  determine a reasonable cost analysis.  The quote chosen is based on the lowest cost and repair schedule

  to minimize disruption of services affecting public safety.

   Signed By: Debbie Abell, Executive Director

      Vendor:  Kone Incorporated                                                                  Notary Date:           6/30/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $43,021.00              $49,895.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  45     SOUTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:       7/21/2008

  Emergency purchase to procure a 170 ton chiller for the main campus computer center in Dunham Hall.

   This location is served by a single chiller.  This chiller has become increasingly unreliable. The loss

  of the chiller when campus chilled water is not available would result in the shutdown of the campus

  computer center.  This would result in the loss of all campus e-mail, internet access, payroll, academic

  labs and other critical academic and business systems.

   Signed By: Nancy Ufert, Director

      Vendor:  Trane US Incorporated                                                           Notary Date:           7/18/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $88,890.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  46     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       7/25/2008

  This is a change order to the original services required due to the fire in the College of Pharmacy

  Building and failure of the heating system of the Molecular Biology Research Building, both occurring

  on January 19, 2008.  Current estimate of the time required by MARSH USA personnel to continue

  their tasks have increased because the claim has grown in scope, especially given the potential impact of

   lost/postponed grant revenue.

   Signed By: Heather Haberaecker, Exec. Asst. VP

      Vendor:  MARSH USA Inc.                                                                 Notary Date:           7/21/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $600,000.00                      $0.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  47     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       7/14/2008

  The Department requires special tools for research and instruction.  The Department researched the

  availability and price for this type of quadrupole/time-of-flight mass spectrometer system and became

  aware of an auction where the opportunity to save considerable funds presented itself.  The total cost to

  the University for these particular types of spectroscopy systems would range in price from $300,000 for

   used/re-furbished to $600,000 for new equipment.  The University paid $41,812.79.  The purchase of

  the equipment at this time, in the Department's opinion was a good business decision.

   Signed By: Philip Abruzzi, SPO Designee

      Vendor:  Dovebid, Inc.                                                                          Notary Date:             7/9/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $41,812.79                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  48     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       7/21/2008

  This service is required to supply labor and material to repair the sprinkler system over the escalators

  that were damaged during the fire on January 19, 2008 at the College of Pharmacy Building.  Because

  of the critical nature of getting the building back to operation as quickly as possible, time did not

  permit the solicitation of additional quotes.  The contractor was asked to begin work immediately in

  order to not delay the re-construction of the escalator staircases.

   Signed By: Heather Haberaecker, Exec. Asst. VP

      Vendor:  C.L. Doucette, Inc.                                                                 Notary Date:           7/16/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $50,400.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  49     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       7/21/2008

  This emergency service is required due to the fire at the College of Pharmacy.  This service will provide

   labor and material necessary for the laboratory gas and ductwork installation to restore two laboratories

  and two adjacent offices that were in the 4th floor burn zone of Building 924.  The department requested

   quotes from 3 different vendors for this service and has selected the lowest price.

   Signed By: Heather Haberaecker, Exec. Asst. VP

      Vendor:  Kroeschell, Inc.                                                                      Notary Date:           7/16/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $52,925.00                      $0.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  50     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       7/21/2008

  This emergency purchase is required due to the fire at the College of Pharmacy Research Building.  The

   miniDAWN TREOS is needed to replace a Wyatt Technology miniDAWN.  The powerful instrument

   provides powerful triple-angle light scattering detection for the measurement of absolute molecular

  weight, size, and conformation of macromolecules in solution.  The manufacturer is offering a generous

  discount with the trade in of the miniDAWN.

   Signed By: Heather Haberaecker, Exec. Asst. VP

      Vendor:  Wyatt Technology Corporation                                                Notary Date:           7/16/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $34,838.42                      $0.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  51     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:         7/3/2008

  This emergency purchase is required due to the fire at the College of Pharmacy Building.  This service

  will provide labor and material for repair and reconstructive work to HVAC systems, laboratory gas

  systems and heating process piping.  Because of the critical nature of getting the repairs done as quickly

   as possible, time did not permit the solicitation of multiple quotes.

   Signed By: Heather Haberaecker, Exec. Asst. VP

      Vendor:  Kroeschell, Inc.                                                                      Notary Date:           5/29/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $245,321.00                      $0.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  52     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:         7/3/2008

  This emergency purchase is required due to the fire at the College of Pharmacy Research Building on

  January 19, 2008 and is necessary to restore research productivity and resume progress on a number of

  key research projects that have halted due to the fire.  The original instruments were internally and

  externally serviced as part of the restoration process of damaged equipment, but were found to be un-

  repairable.  This vendor is the original equipment manufacturer.

   Signed By: Heather Haberaecker, Exec. Asst. VP

      Vendor:  Shimadzu Scientific Corp.                                                        Notary Date:             7/1/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00             $151,500.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  53     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:         7/3/2008

  This emergency is due to the fire at the College of Pharmacy.  This service will replace/repair the

  chemical fume hood alarms in the College of Pharmacy. The alarms were found during testing and

  reconditioning to have electrical power present but without response to low flow and no flow exhaust

  conditions in the hood.  Because of the critical nature of getting this work done as quickly as possible,

  time did not permit the solicitation of multiple quotes.

   Signed By: Heather Haberaecker, Exec. Asst. VP

      Vendor:  J-MAC Associates Ltd.                                                          Notary Date:             7/1/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $74,195.00                      $0.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  54     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:         7/3/2008

  This emergency is due to the failure of the heating system of the Molecular Biology Research Building.

    This service will replace/repair the chemical fume hood alarms in MBRB.  The alarms were found

  during testing and reconditioning to have electrical power present but without response to low flow and

  no flow exhaust conditions in the hood.  Because of the critical nature of getting this work done as

  quickly as possible, time did not permit the solicitation of multiple quotes.

   Signed By: Heather Haberaecker, Exec. Asst. VP

      Vendor:  J-MAC Associates, Ltd.                                                         Notary Date:             7/1/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $130,868.79                      $0.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  55     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:         7/7/2008

  This emergency purchase is required due to the fire at the College of Pharmacy Building.  The

  emergency service provided labor and material to replace and/or repair ceiling tiles, ceiling grids,

  drywall, windows, walls, and construct barriers as requested.  Because of the critical nature of the work,

  time did not permit the solicitation of multiple quotes.

   Signed By: Heather Haberaecker, Exec. Asst. VP

      Vendor:  J-MAC Associates Ltd.                                                          Notary Date:             7/2/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00             $262,850.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  56     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:         7/7/2008

  The emergency service was required due to the failure of the heating system at the Molecular Biology

  Research Building.  This service will provide labor and material to replace the outside air intake

  dampers serving the main fan system of the building.

   Signed By: Heather Haberaecker, Exec. Asst. VP

      Vendor:  Kroeschell, Inc.                                                                      Notary Date:             7/2/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $243,600.00                      $0.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  57     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       8/11/2008

  This emergency expenditure is for soft drink equipment for the Division of Intercollegiate Athletics for

  students, faculty, staff and visitors to the University Memorial Stadium.  The State of Illinois issued an

   RFP for a soft drink prime vendor contract for the State in FY 07.  State has requested that the

  University participate in the prime vendor contract once it is awarded.  The RFP evaluation process

  took longer than anticipated putting the State behind schedule in final decision to select Pepsi Cola as

   Signed By: Philip Abruzzi, SPO Designee

      Vendor:  Advanced Beverage Solution                                                   Notary Date:             8/6/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00             $144,767.12                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  58     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       8/11/2008

  This emergency expenditure is for soft drink equipment for the Division of Intercollegiate Athletics for

  students, faculty, staff and visitors to the University Memorial Stadium.  The State of Illinois issued an

   RFP for a soft drink prime vendor contract for the State in FY 07.  State has requested that the

  University participate in the prime vendor contract once it is awarded.  The RFP evaluation process

  took longer than anticipated putting the State behind schedule in final decision to select Pepsi Cola as

   Signed By: Philip Abruzzi, SPO Designee

      Vendor:  Coca Cola Enterprises Inc.                                                      Notary Date:             8/6/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:           $1,500,000.00                      $0.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  59     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       7/31/2008

  This emergency expenditure is for plaques, donor signage for halls, classrooms, study halls and a donor

   wall for the Business Instructional Facility to be designed, completed and installed by October 9,

  2008.  AD Johnson has created the donor signage in Wohler's Hall.  Since the Business Instructional

  Facility was designed to complement Wohler's Hall, the donor signage must be compatible with the

  signage in Wohler's Hall.  Only AD Johnson can provide a consistent, relational appearance that

  complements existing donor signage as well as complement Pelli's building design with the

  consistency of uniqueness and the highest quality signage campus wide.

   Signed By: Philip Abruzzi, SPO Designee

      Vendor:  A D Johnson                                                                          Notary Date:           7/28/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $365,400.00             $365,400.00                                                  9                1

     Federal Cost                    $0.00                      $0.00

 

 

  60     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       7/31/2008

  The University of Illinois Extension conducts the McLean County 4-H Fair annually at the McLean

  County Fairgrounds which is owned by the McLean County Fair Association.  The fair is scheduled for

   the period July 28, 2008 through August 6, 2008.  Since time does not allow this transaction to be

  posted on the Procurement Bulletin as a sole source, which it is, immediate action is needed to prevent

  or minimize serious disruption of University services.

   Signed By: Philip Abruzzi, SPO Designee

      Vendor:  McLean County Fair Association                                             Notary Date:           7/28/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $90,706.00                                                  9                1

     Federal Cost                    $0.00                      $0.00