LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     January 1, 2009 through March 31, 2009

  1       AGRICULTURE - GENERAL OFFICE                              

                                                                                                                                   Filed:       2/11/2009

  The State will lose the booking of Watershow Productions Inc. for their "All American High Dive

  Show for the 2009 Illinois State Fair if they do not have a signed contract.  The Department of

  Agriculture planned to procure these services as a sole source procurement.  This method was not

  approved by CMS as it has otherwise been approved in the past.  CMS Legal informed the Department

  that the remaining options for contracting with a high dive show were either an emergency procurement

  or the bid process.  The Department does not have adequate time to bid these services for the 2009

  Illinois State Fair.  Standard venues for this type of entertainment begin booking their acts months in

  advance.  The Department of Agriculture, Bureau of Illinois State Fair will formally bid the high dive

  entertainment show as an RFP for the 2010 Illinois State Fair.

   Signed By: Laurie Leuenberger, Acting SPO

      Vendor:  Watershow Productions Inc.                                                   Notary Date:             2/9/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $37,000.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  2       CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:         2/4/2009

  There are three Solar Turbine generators installed at the Central Computer Facility that provide back-up

   power supplies in the event of a power outage.  These generators are original to the facility and as such

  have required more extensive repair than was originally anticipated.  CMS holds a preventive

  maintenance contract with Solar Turbines Incorporated that provides for minor repairs in addition to

  maintenance.  There have been several critical equipment failures in the last five months that required

  immediate repair or replacement of parts satisfied through a small purchase.  CMS Property

  Management authorized the repairs that were necessary to prevent the loss of irretrievable data and the

  potential damage of the computer servers that are the backbone of the many State agencies whose

  equipment resides in this center.  Loss of the equipment and/or the data would result in the disruption

   Signed By: Gwyn Gurgens, SPO

      Vendor:  Solar Turbines Incorporated                                                    Notary Date:             2/3/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $70,000.00                      $0.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

4/14/2009                                                            rptQuarterlyW                                                         Page 1 of  25


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     January 1, 2009 through March 31, 2009

  3       CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:

  The emergency procurement of network services voice and data communications from Sprint, for the 8

  1/2 month period of April 1, 2009 through December 15, 2009, is necessary due to the fact that the

  solicitation for a new Statewide Telecom Network Voice and Data Services contract is currently in

  process.  Notice 22016517 was published to Illinois Procurement Bulletin on 3-25-09 using estimated

  cost.  Network services voice and data are essential to State government business.  This emergency

  procurement will allow time for the award of the Statewide Telecom Network Voice and Data Services

  RFP and execution of contract.

   Signed By: Gwyn Gurgens, Acting SPO

      Vendor:  Sprint                                                                                     Notary Date:           3/25/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:           $2,635,000.00                      $0.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  4       NATURAL RESOURCES, DEPARTMENT OF                         

                                                                                                                                   Filed:       1/27/2009

  This emergency procurement is for remedial action to repair a leaking dam at Red Hills State Park. 

  After spring rains subsided, it was observed that the tower structure was leaking.  The water is leaking

  through the concrete tower around the gate.  The leaking appears to be getting worse and could result in

   the failure of the concrete tower and ultimately, damage or failure to the dam itself.

   Signed By: Norm Dixon, SPO

      Vendor:  Kieffer Brothers Const. Co.                                                    Notary Date:           1/23/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $46,371.00                      $0.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

4/14/2009                                                            rptQuarterlyW                                                         Page 2 of  25


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     January 1, 2009 through March 31, 2009

  5       NATURAL RESOURCES, DEPARTMENT OF                         

                                                                                                                                   Filed:       2/26/2009

  The Lingenfelter #407 well is leaking causing oil, saltwater to the land surface which is endangering the

   environment and the public health and safety.  Plugging this well will eliminate the contamination and

   danger and complies with the requirements of the Illinois Oil and Gas Act.

   Signed By: Norm Dixon, SPO

      Vendor:  Cross Oil and Well Service                                                      Notary Date:           2/24/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $39,956.50                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

  6       NATURAL RESOURCES, DEPARTMENT OF                         

                                                                                                                                   Filed:       3/11/2009

  On 1-26-09 a major ice storm moved through Southern Illinois which caused extensive damage

  throughout the region.  State Parks including but not limited to Fort Massac State Park, Cave-in-Rock

  State Park, Mermet State Fish and Wildlife Area, Union County Conservation Area, Cache River

  Natural Area and Tunnel Hill State Trail suffered significant tree damage throughout.  Much of the

  damage exists in areas of public use, including day use areas, camping areas, visitor centers and hiking

   Signed By: Norm Dixon, SPO

      Vendor:  Various                                                                                  Notary Date:             3/6/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $500,000.00                      $0.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

4/14/2009                                                            rptQuarterlyW                                                         Page 3 of  25


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     January 1, 2009 through March 31, 2009

  7       CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       2/27/2009

  The roofing for Vocational Building #C-3041 is unrepairable allowing water leakage to numerous

  classrooms and computer labs.  Ceiling tiles have collapsed allowing exposed insulation to become

  saturated with moisture which has created possible mold and fungus growth if roof is not replaced. 

  Several ceiling tiles have fallen on computer units and classroom equipment.  Interior walls have been

  damaged by water leakage and can not be repaired until roof has been replaced.  A total of three

  computer labs are currently at jeopardy and are required to cover electrical and computer units daily with

   plastic materials.  This roof was submitted seven years ago through the CDB agency and was

  estimated for replacement along with all inspections required for replacement at that time.

   Signed By: Tod VanWolvelaere, Assist. Warden

      Vendor:  Unknown                                                                               Notary Date:             2/4/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $275,000.00                      $0.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  8       CORRECTIONS - GENERAL OFFICE                                

                                                                                                                                   Filed:       2/27/2009

  At the present Menard Correctional Center has a 5 day supply of 3 compartment foam trays.  This

  supply will last for 5 days under normal operation, only 2 1/2 days under Institutional lockdown. 

  Master Contract vendor, Industrial Soap has informed the facility that it is on non delivery status at this

   time.  We feel it is necessary that we purchase the Styrofoam trays in order to provide the offenders

   Signed By: Donald Gaetz, Acting Warden

      Vendor:  Unknown                                                                               Notary Date:             2/9/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $32,520.00                      $0.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

4/14/2009                                                            rptQuarterlyW                                                         Page 4 of  25


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     January 1, 2009 through March 31, 2009

  9       CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       3/26/2009

  The administration building EPDM roof membrane is leaking terrible.  West side parapel walls are

  leaning inward due to wind shear allowing rain water to enter under the roof.  The condition is causing

  severe damage to ceiling, walls, flooring and office equipment.  This needed to be addressed as soon as

   Signed By: Frank Shaw, Warden

      Vendor:  Crowther Roofing & Sheet Metal                                            Notary Date:             2/9/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00             $574,897.24                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  10     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:         2/4/2009

  This is a matter of public health and safety for the welfare of the patients at Howe Developmental

  Center.  External monitoring is needed to address concerns with the number and nature of incidents that

   have occurred and continue to occur at the Center.  The Division of Developmental Disabilities is

  initiating this procurement to provide external monitoring that includes unannounced site-visits at

  various times and days, in an effort to shore-up Divisional efforts to ensure the quality of care of

   Signed By: Curtis Thompson, SPO

      Vendor:  The Columbus Organization                                                     Notary Date:           1/29/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $91,120.00                      $0.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

4/14/2009                                                            rptQuarterlyW                                                         Page 5 of  25


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     January 1, 2009 through March 31, 2009

  11     REVENUE, DEPARTMENT OF

                                                                                                                                   Filed:         1/9/2009

  Professional services are being procured from AT&T to design and implement a Spanish prompt in the

  IVR application software.  The uninterrupted operation of the call center IVR is crucial to tax

  compliance, as it provides live and automated assistance to the taxpayers of Illinois.  Taxpayers

  absolutely must have undeterred access to tax information 24 hours at day, 7 days a week .  The

  implementation of this service must be completed by 12-31-08, before the start of the tax season on 1-1-

  09.  This will minimize serious disruption to State services and revenues.

   Signed By: Norma Sutton, SPO

      Vendor:  AT&T                                                                                   Notary Date:             1/8/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $12,510.00                      $0.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  12     REVENUE, DEPARTMENT OF

                                                                                                                                   Filed:         1/9/2009

  The uninterrupted operation of the call center ACD is crucial to tax compliance, as it provides live and

  automated assistance to the taxpayers of Illinois.  Taxpayers absolutely must have access to tax

  information 24 hours a day, 7 days a week.  Aspect Software, Inc. will provide professional services,

  review and assist with the implementation of new agent queues and reports in the Spectrum ACD

  application software.  The implementation of this service must be completed by 12-31-08 before the

  start of tax season on 1-1-09.  This will minimize serious disruption to State services and revenues.

   Signed By: Norma Sutton, SPO

      Vendor:  Aspect Software Inc.                                                              Notary Date:             1/8/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $11,250.00                      $0.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

4/14/2009                                                            rptQuarterlyW                                                         Page 6 of  25


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     January 1, 2009 through March 31, 2009

  13     STATE POLICE, DEPARTMENT OF                                

                                                                                                                                   Filed:       2/10/2009

  The roof at the Joliet Forensic Laboratory is failing and in imminent need of replacement.  The roof is

  nineteen years old and has been patched approximately ten times in the last two years.  Currently,

  forensic evidence must be covered with plastic to protect it from water damage.  Immediate replacement

  is necessary to protect State property from further damage and to prevent the serious disruption in State

  services provided by the Joliet Laboratory.

   Signed By: Larry Trent, Director

      Vendor:  Unknown                                                                               Notary Date:             2/6/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $250,000.00                      $0.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  14     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       1/23/2009

  Salt availability for the winter season of 2008-2009 has been a major concern for Illinois and the

  Midwest.  The northern part of the State especially has experienced many storms, low temperatures and

  icy conditions.  The Illinois Department of Transportation Region 1/District 1 is facing a road salt

  depletion situation, if storms and temperatures continue for the remainder of the winter season as they

  have so far.  The Department has searched for additional salt supplies that could be purchased if no more

   would be available after salt under contract through CMS was ordered.  International Salt has offered

  8,900 tons for $138.52 per ton delivered to the Department.  The Department needs the salt to safely

  de-ice roadways in this six-county area that includes Chicago.

   Signed By: Christine Reed, Director

      Vendor:  International Salt Company                                                      Notary Date:           1/21/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00          $1,232,828.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

4/14/2009                                                            rptQuarterlyW                                                         Page 7 of  25


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     January 1, 2009 through March 31, 2009

  15     EDUCATION, STATE BOARD OF                                  

                                                                                                                                   Filed:       3/27/2009

  The regular testing window for the ISAT Spring 2009 assessment begins March 2, 2009.  Critical

  scoring and range-finding services are urgently needed to ensure that reporting of Writing aligns with

  the other assessment test subjects, and that this assessment is scored in a manner that meets Illinois

  state testing standards.  The late receipt of Writing scores creates a serious disruption of State services,

  because school districts will not be able to make the timely strategic decisions that are based on these

  assessment scores.  In addition, if the hard copy reports of ISAT scores have to be bifurcated because of

  late Writing scores, the State will incur significant increase in production, printing and shipping costs.

   Measurement, Inc. has the necessary tools in place to help ensure that the writing scores are delivered

   Signed By: Linda Riley Mitchell, Chief Fiscal Officer

      Vendor:  Measurement Incorporated                                                     Notary Date:           3/26/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00          $2,994,917.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  16     ILLINOIS WORKERS' COMPENSATION COMMISSION

                                                                                                                                   Filed:       1/30/2009

  Due to a hospital coding change by the federal government, the IWCC Medical Fee Schedule needs to

  be converted from DRG to MSDRG coding immediately.  Vendor will be responsible for updating

  IWCC website by converting coding to MSDRG, updating and adding schedules and adjusting rates

  based on the Consumer Price Index (CPI).  Emergency services are necessary in order to maintain

  IWCC medical fee schedule, comply with P.A. 94-277 and minimize disruption to State services.

   Signed By: Katherine Devereaux, SPO

      Vendor:  Ingenix, Inc.                                                                           Notary Date:           1/30/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $63,000.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

4/14/2009                                                            rptQuarterlyW                                                         Page 8 of  25


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     January 1, 2009 through March 31, 2009

  17     TOLL HIGHWAY AUTHORITY, ILLINOIS STATE              

                                                                                                                                   Filed:         2/2/2009

  Full depth cracks have developed in the executive garage of the Tollway Central Administration

  building.  Water is permeating through the cracks onto the high voltage electrical systems and HVAC

  electrical circuits located in the sub-level directly below the executive garage.  Failure to repair the

  garage flooring can result in extensive damage to the electrical systems and building shutdown.

   Signed By: Tracey Smith, Chief of Administration

      Vendor:  National Restoration Systems                                                  Notary Date:             1/6/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $35,675.00                      $0.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  18     CHICAGO STATE UNIVERSITY                                   

                                                                                                                                   Filed:       1/26/2009

  The University is responsible for the insurance needs of its student athletes and the University is part of

  NCAA.  NCAA has recommended the use of Summit America Insurance Services for coverage of its

  student athletes.  Insurance coverage with Summit ended in July of 2008; the University experienced

  funding issues for the first quarter of its academic year and management turnover, which seriously

  hampered its ability to acquire the necessary coverage in a timely manner.  In order to participate in the

  various sporting activities the need for insurance services to protect the University's student athlete's

  interests is immediate and use of other competitive source selection procedures under the Code and this

  Part cannot be accomplished without significant risk of causing disadvantages to the University. 

  Therefore, the University has made this emergency purchase.

   Signed By: Dean Justmann, Interim VP

      Vendor:  Summit America Insurance Ser.                                              Notary Date:           1/15/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $69,500.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

4/14/2009                                                            rptQuarterlyW                                                         Page 9 of  25


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     January 1, 2009 through March 31, 2009

  19     CHICAGO STATE UNIVERSITY                                   

                                                                                                                                   Filed:       1/26/2009

  Chicago State University Athletics has used the Summit League for the last several years to administer

  the scheduling and payment of officials for various home contests.  The Summit League has been a

  NCAA Division I conference for 27 years.  They have the expertise and resources to obtain qualified

  NCAA officials.  If this emergency funding is not provided, CSU Athletics will not have officials for

  their upcoming home contests on 1-17-09 and 1-20-09.  This would result in penalties from the

  visiting teams for failure to compete in these contests and could jeopardize CSU Athletics Division I

  status with the NCAA.

   Signed By: Dean Justmann, Interim VP

      Vendor:  Summit League                                                                      Notary Date:           1/15/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $78,000.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  20     NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:       1/20/2009

  Stamats is an educational consultant which the university has hired to develop a survey, conduct

  fieldwork and analysis, and prepare findings in connection with prospective student markets.  In order

  for this project to have relevance for the fall recruitment and registration schedule, it was imperative that

  the vendor begin work immediately so that the results of the project can be provided to the university

  by the end of February 2009.

   Signed By: Eddie Williams, Executive VP

      Vendor:  Stamats, Inc.                                                                          Notary Date:           1/15/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $35,300.00                      $0.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

4/14/2009                                                            rptQuarterlyW                                                       Page 10 of  25


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     January 1, 2009 through March 31, 2009

  21     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:

  This emergency expenditure is for hotel accommodations and catering services for the University of

  Illinois at Urbana-Champaign men's basketball team while playing in the NCAA tournament in

  Portland, Oregon.  Notification of the site for the tournament was not received soon enough for a

  competitive selection process.  Without this transaction, the men's basketball team would not have

  lodging.  The NCAA chose the site and assigned the hotel.  The University had no choice in location.

   The costs are considered reasonable and acceptable.

   Signed By: Philip Abruzzi, SPO Designee

      Vendor:  Fifth Alder Associates LP                                                       Notary Date:           3/17/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $91,169.00                      $0.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  22     ARCHITECT OF THE CAPITOL (11500)                           

                                                                                                                                   Filed:       7/27/2006

  A letter was received dated February 18, 2009 reporting the actual cost of item #2 in our October 13,

  2006 report as $173,706.73.

   Signed By: Dean McGeath, Executive Director

      Vendor:  Unknown                                                                               Notary Date:           7/25/2006

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $200,000.00             $173,706.73                                                  9                3

     Federal Cost                    $0.00                      $0.00

4/14/2009                                                            rptQuarterlyW                                                       Page 11 of  25


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     January 1, 2009 through March 31, 2009

  23     SUPREME COURT                                              

                                                                                                                                   Filed:         2/4/2003

  A letter was received dated February 4, 2009 reporting the actual cost of item #1 in our April 15, 2003

  report as $101,763.78.

   Signed By: Robert Bylina, Capital Projects Coordinator

      Vendor:  Unknown                                                                               Notary Date:             2/3/2003

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $169,000.00             $101,763.78                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  24     SUPREME COURT                                              

                                                                                                                                   Filed:       7/23/2004

  A letter was received dated February 4, 2009 reporting the actual cost of item #1 in our October 15,

  2004 report as $20,700.

   Signed By: Robert Bylina, Capital Project Coordinator

      Vendor:  B & B Electric                                                                       Notary Date:           7/22/2004

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $10,745.00              $20,700.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  25     SUPREME COURT                                              

                                                                                                                                   Filed:       7/26/2005

  A letter was received dated February 4, 2009 reporting the actual cost of item #2 in our October 14,

  2005 report as $15,266.77.

   Signed By: Kathleen Gazda, Executive Director

      Vendor:  Unknown                                                                               Notary Date:           4/25/2005

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $10,500.00              $15,266.77                                                  9                3

     Federal Cost                    $0.00                      $0.00

4/14/2009                                                            rptQuarterlyW                                                       Page 12 of  25


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     January 1, 2009 through March 31, 2009

  26     SUPREME COURT                                              

                                                                                                                                   Filed:       3/31/2006

  A letter was received dated February 4, 2009 reporting the actual cost of item #5 in our April 14, 2006

  report as $114,300.30.

   Signed By: Kathleen Gazda, Assistant Director

      Vendor:  Unknown Vendor                                                                   Notary Date:           3/28/2006

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $60,000.00             $114,300.30                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  27     GOVERNOR, OFFICE OF THE                                    

                                                                                                                                   Filed:         7/7/2008

  A letter was received from the Capital Development Board dated September 25, 2008 reporting the

  actual cost of item #2 in our October 15, 2008 report as $9,433.

   Signed By: Dave Bourland, Executive Director

      Vendor:  Unknown                                                                               Notary Date:             7/7/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $100,000.00                $9,433.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  28     AGRICULTURE -  GENERAL OFFICE                              

                                                                                                                                   Filed:       4/15/2008

  A letter was received dated January 29, 2009 reporting the actual cost of item #10 in our July 15, 2008

  report as $82,972.20.

   Signed By: Thomas Jennings, Acting Exec. Director

      Vendor:  Unknown                                                                               Notary Date:           4/15/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $90,000.00              $82,972.20                                                  9                3

     Federal Cost                    $0.00                      $0.00

4/14/2009                                                            rptQuarterlyW                                                       Page 13 of  25


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     January 1, 2009 through March 31, 2009

  29     CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:       12/3/2008

  A letter was received dated February 2, 2009 reporting the actual cost of item #6 in our January 15,

  2009 report as $37,374.92.

   Signed By: Gwyn Gurgens, Acting SPO

      Vendor:  SEPS                                                                                     Notary Date:           12/2/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $51,200.00              $37,374.92                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  30     CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:       6/16/2008

  A letter was received dated March 3, 2009 reporting the actual cost of item #16 in our July 15, 2008

  report as $600,569.74.

   Signed By: Gwyn Gurgens, Acting SPO

      Vendor:  Sprint/Nextel                                                                          Notary Date:           6/13/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $630,000.00             $600,569.74                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  31     CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:       6/16/2008

  A letter was received dated March 3, 2009 reporting the actual cost of item #13 in our July 15, 2008

  report as $3,666,348.09.

   Signed By: Gwyn Gurgens, Acting SPO

      Vendor:  Verizon Wireless                                                                    Notary Date:           6/13/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:           $4,000,000.00          $3,666,348.09                                                  9                3

     Federal Cost                    $0.00                      $0.00

4/14/2009                                                            rptQuarterlyW                                                       Page 14 of  25


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     January 1, 2009 through March 31, 2009

  32     CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:       6/16/2008

  A letter was received dated March 3, 2009 reporting the actual cost of item #15 in our July 15, 2008

  report as $114,342.51.

   Signed By: Gwyn Gurgens, Acting SPO

      Vendor:  AT&T                                                                                   Notary Date:           6/13/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $96,000.00             $114,342.51                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  33     CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:       6/16/2008

  A letter was received dated March 3, 2009 reporting the actual cost of item #14 in our July 15, 2008

  report as $17,793.

   Signed By: Gwyn Gurgens, Acting SPO

      Vendor:  Illinois Valley Cellular                                                             Notary Date:           6/13/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $26,000.00              $17,793.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  34     CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:      11/20/2008

  A letter was received dated March 3, 2009 reporting the actual cost of item #7 in our January 15, 2009

  report as $154,320.31.

   Signed By: Lynn Carter, Deputy General Counsel

      Vendor:  First Southwest Leasing Co.                                                    Notary Date:         11/14/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $60,000.00             $154,320.31                                                  9                3

     Federal Cost                    $0.00                      $0.00

4/14/2009                                                            rptQuarterlyW                                                       Page 15 of  25


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     January 1, 2009 through March 31, 2009

  35     CORRECTIONS, CORRECTIONAL CENTER - STATEVILLE

                                                                                                                                   Filed:       7/26/2007

  A letter was received dated February 2, 2009 reporting the actual cost of item #14 in our October 15,

  2007 report as $574,897.70.

   Signed By: Terry McCann, Warden

      Vendor:  Unknown                                                                               Notary Date:           7/20/2007

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $300,000.00             $574,897.70                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  36     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       3/25/2008

  A letter was received dated February 2, 2009 reporting the actual cost of item #24 in our April 15, 2008

   report as $364,742.76.

   Signed By: John Evans, Warden

      Vendor:  Unknown                                                                               Notary Date:           2/19/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $231,000.00             $364,742.76                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  37     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       6/16/2008

  A letter was received dated February 2, 2009 reporting the actual cost of item #24 in our July 15, 2008

  report as $32,770.37.

   Signed By: Jody Hathaway, Warden

      Vendor:  Various                                                                                  Notary Date:             6/2/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $34,000.00              $32,770.37                                                  9                3

     Federal Cost                    $0.00                      $0.00

4/14/2009                                                            rptQuarterlyW                                                       Page 16 of  25


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     January 1, 2009 through March 31, 2009

  38     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       6/12/2008

  A letter was received dated February 2, 2009 reporting the actual cost of item #25 in our July 15, 2008

  report as $27,782.

   Signed By: Jay Merchant, Warden

      Vendor:  McGuire Sales Co.                                                                 Notary Date:             6/2/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $32,000.00              $27,782.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  39     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       6/24/2008

  A letter was received dated February 2, 2009 reporting the actual cost of item #26 in our July 15, 2008

  report as $26,533.10.

   Signed By: Lee Ryker, Warden

      Vendor:  Various                                                                                  Notary Date:           6/18/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $35,000.00              $26,533.10                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  40     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       6/26/2008

  A letter was received dated February 2, 2009 reporting the actual cost of item #27 in our July 15, 2008

  report as $118,581.

   Signed By: Lee Ryker, Warden

      Vendor:  Unknown                                                                               Notary Date:           6/16/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $126,000.00             $118,581.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

4/14/2009                                                            rptQuarterlyW                                                       Page 17 of  25


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     January 1, 2009 through March 31, 2009

  41     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       8/25/2008

  A letter was received dated February 2, 2009 reporting the actual cost of item #9 in our October 15,

  2008 report as $125,500.

   Signed By: Joseph Mathy, A/W Operations

      Vendor:  Various                                                                                  Notary Date:             8/6/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $100,000.00             $125,500.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  42     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       8/29/2008

  A letter was received dated February 2, 2009 reporting the actual cost of item #12 in our October 15,

  2008 report as $35,030.

   Signed By: Nedra Chandler, Warden

      Vendor:  Dixon Commercial Electric                                                      Notary Date:           8/14/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $35,030.00              $35,030.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  43     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:         9/5/2008

  A letter was received dated February 2, 2009 reporting the actual cost of item #14 in our October 15,

  2008 report as $39,740.

   Signed By: Donna Lindenmulder, Acting CEO

      Vendor:  Modern Optical Ltd.                                                               Notary Date:           8/28/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $45,000.00              $39,740.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

4/14/2009                                                            rptQuarterlyW                                                       Page 18 of  25


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     January 1, 2009 through March 31, 2009

  44     MILITARY AFFAIRS, DEPARTMENT OF                            

                                                                                                                                   Filed:         7/3/2008

  A letter was received dated January 23, 2009 reporting the actual cost of item #19 in our October 15,

  2008 report as $34,077.50.

   Signed By: Leesa Mays, SPO

      Vendor:  TRANE                                                                                 Notary Date:             7/2/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $37,079.00              $34,077.50                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  45     TOLL HIGHWAY AUTHORITY, ILLINOIS STATE              

                                                                                                                                   Filed:      12/24/2007

  A letter was received dated February 10, 2009 reporting the actual cost of item #21 in our January 15,

  2008 report as $385,764.42.

   Signed By: Tracey Smith, Chief of Administration

      Vendor:  Precision Control Systems                                                       Notary Date:         12/19/2007

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $386,100.00             $385,764.42                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  46     TOLL HIGHWAY AUTHORITY, ILLINOIS STATE              

                                                                                                                                   Filed:       4/23/2008

  A letter was received dated February 10, 2009 reporting the actual cost of item #32 in our July 15, 2008

   report as $140,426.50.

   Signed By: Paul Kovacs, Chief Engineer

      Vendor:  Plote Construction, Inc.                                                           Notary Date:           2/18/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $225,000.00             $140,426.50                                                  9                3

     Federal Cost                    $0.00                      $0.00

4/14/2009                                                            rptQuarterlyW                                                       Page 19 of  25


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     January 1, 2009 through March 31, 2009

  47     TOLL HIGHWAY AUTHORITY, ILLINOIS STATE              

                                                                                                                                   Filed:       12/1/2008

  A letter was received dated February 17, 2009 reporting the actual cost of item #34 in our January 15,

  2009 report as $36,600.

   Signed By: Tracey Smith, Chief of Administration

      Vendor:  Sauer & Sons Caulking                                                           Notary Date:         11/20/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $37,800.00              $36,600.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  48     GOVERNORS STATE UNIVERSITY                                 

                                                                                                                                   Filed:       9/23/2008

  A letter was received dated September 22, 2008 reporting the actual cost of item #40 in our October 15,

   2008 report as $41,006.25.

   Signed By: Tracy Sullivan, SPO Designee

      Vendor:  Sanchez Paving                                                                      Notary Date:           9/22/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $47,000.00              $41,006.25                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  49     GOVERNORS STATE UNIVERSITY                                 

                                                                                                                                   Filed:       9/23/2008

  A letter was received dated December 19, 2008 reporting the actual cost of item #41 in our October 15,

  2008 report as $36,344.99.

   Signed By: Tracy Sullivan, SPO Designee

      Vendor:  ECI Mechanical                                                                     Notary Date:           9/22/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $36,344.99              $36,344.99                                                  9                3

     Federal Cost                    $0.00                      $0.00

4/14/2009                                                            rptQuarterlyW                                                       Page 20 of  25


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     January 1, 2009 through March 31, 2009

  50     NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:      12/17/2008

  A letter was received dated January 15, 2009 reporting the actual cost of item #41 in our January 15,

  2009 report as $115,428.00.

   Signed By: Eddie Williams, Exec. VP

      Vendor:  Air Planning LLC                                                                   Notary Date:         12/15/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $130,000.00             $115,428.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  51     NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:      12/22/2008

  A letter was received dated January 15, 2009 reporting the actual cost of item #42 in our January 15,

  2009 report as $144,257.49.

   Signed By: Eddie Williams, Exec. VP

      Vendor:  Clarion Hotel Shreveport                                                         Notary Date:         12/17/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $150,000.00             $144,257.49                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  52     SOUTHERN ILLINOIS UNIVERSITY                                

                                                                                                                                   Filed:      11/14/2005

  A letter was received dated January 22, 2009 reporting the actual cost of item #43 in our January 13,

  2006 report as $1,332.742.25.

   Signed By: Kenn Neher, Vice Chancellor

      Vendor:  Various                                                                                  Notary Date:           11/2/2005

                                      Estimate                  Actual                                                  FY             QT

     State Cost:           $1,200,000.00          $1,332,742.25                                                  9                3

     Federal Cost                    $0.00                      $0.00

4/14/2009                                                            rptQuarterlyW                                                       Page 21 of  25


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     January 1, 2009 through March 31, 2009

  53     SOUTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:       1/22/2008

  A letter was received dated February 4, 2009 reporting the actual cost of item #45 in our April 15, 2008

   report as $28,352.38.

   Signed By: Pamela Speer, State Purchasing Officer

      Vendor:  Alpha Environmental Incorporated                                           Notary Date:           1/10/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $28,775.00              $28,352.38                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  54     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:      11/17/2008

  A letter was received dated March 19, 2009 reporting that a change was required to increase item # 44

  in our January 15, 2009 report to $99,900.

   Signed By: Heather Haberaecker, Exec. Asst. VP

      Vendor:  Cochlear Americas Corp.                                                        Notary Date:         11/12/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $78,300.00              $99,900.00                                                  9                3

     Federal Cost                                                  $0.00

 

 

  55     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       2/29/2008

  A letter was received dated March 19, 2009 reporting the actual cost of item #54 in our April 15, 2008

  report as $145,830.

   Signed By: Healther Haberaecker, Exec. Asst. Vice President

      Vendor:  Anchor Mechanical, Inc.                                                         Notary Date:           2/25/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $145,830.00             $145,830.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

4/14/2009                                                            rptQuarterlyW                                                       Page 22 of  25


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     January 1, 2009 through March 31, 2009

  56     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:         4/1/2008

  A letter was received dated March 19, 2009 reporting the actual cost of item #57 in our April 15, 2008

  report as $100,401.18.

   Signed By: Heather Haberaecker, Exec. Asst. VP

      Vendor:  Ontrack Data Recovery, Inc.                                                  Notary Date:             4/1/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $99,000.00             $100,401.18                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  57     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:         4/1/2008

  A letter was received dated March 19, 2009 reporting the actual cost of item #58 in our April 15, 2008

  report as $43,857.

   Signed By: Heather Haberaecker, Asst. VP

      Vendor:  Gehrke Technology Group                                                       Notary Date:             4/1/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $47,569.80              $43,857.00                                                  9                3

     Federal Cost                    $0.00                      $0.00

 

 

  58     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:         4/4/2008

  A letter was received dated March 19, 2009 reporting the actual cost of item #45 in our July 15, 2008

  report as $40,200.

   Signed By: Heather Haberaecker, Exec. Asst. VP

      Vendor