LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     July 1, 2009 through September 30, 2009

  1       AUDITOR GENERAL - OFFICE OF THE                           

                                                                                                                                   Filed:         8/7/2009

  To properly conduct the statutorily required audits of the Southeastern Illinois Economic Authority for

  the periods ended June 30,  2009, 2008, 2007, 2006 the audit needs to begin as soon as possible. 

  Following internal discussions, it was determined we did not have sufficient internal staff resources to

  conduct this engagement.  Insufficient time exists to conduct the usual request for proposals competitive

   selection process prior to September 1, 2009.  A fair and reasonable price was negotiated with Schorb

  & Schmersahl LLC which has experience with the Auditor General's program and has sufficient staff and

   expertise to perform these audits and begin work within the necessary timeframe to avoid serious

  disruption in OAG audit services.

   Signed By: Bruce Bullard, Director

      Vendor:  Schorb & Schmersahl LLC                                                     Notary Date:             8/7/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $28,415.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

 

  2       AUDITOR GENERAL -  OFFICE OF THE                           

                                                                                                                                   Filed:         7/1/2009

  To properly conduct the statutorily required audits of the Illinois Criminal Justice Information

  Authority for the period ended June 30, 2009,  the audit needs to begin as soon as possible. 

  Following internal discussions, it was determined we did not have sufficient internal staff resources to

  conduct this engagement.  Insufficient time exists to conduct the usual request for proposals competitive

   selection process prior to July 9th.  A fair and reasonable price was negotiated with Bronner

  Professional Services which has experience with the Auditor General's program and has sufficient staff

  and expertise to perform these audits and begin work within the necessary timeframe to avoid serious

  disruption in OAG audit services.

   Signed By: Bruce Bullard, Director

      Vendor:  Bronner Professional Services                                                 Notary Date:             7/1/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $56,200.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

10/9/2009                                                            rptQuarterlyW                                                         Page 1 of  23


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     July 1, 2009 through September 30, 2009

  3       AUDITOR GENERAL -  OFFICE OF THE                           

                                                                                                                                   Filed:       8/24/2009

  To properly conduct the statutorily required audit of the Illinois Power Agency for the period ended

  June 30, 2009 the audit needs to begin as soon as possible.  Following internal discussions, it was

  determined we did not have sufficient internal staff resources to conduct this engagement.  Insufficient

  time exists to conduct the usual request for proposals competitive selection process prior to August 26,

  2009.  A fair and reasonable price was negotiated with this firm which has experience with the Auditor

  General's program and has sufficient staff and expertise to perform these audits and begin work within

  the necessary timeframe to avoid serious disruption in OAG audit services.

   Signed By: Bruce Bullard, Director

      Vendor:  Kerber Eck & Braeckel                                                          Notary Date:           8/24/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $28,058.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

 

 

  4       TREASURER - FISCAL OFFICER                                 

                                                                                                                                   Filed:       7/14/2009

  To continue providing credit, debit and other merchant processing services for State and local

  government agencies with their current vendor.  Unanticipated difficulties occurred precluding the

  transfer of all State and local agencies before the expiration of the contract.

   Signed By: Ed Buckles, Chief Procurement Officer

      Vendor:  National City Merchant                                                           Notary Date:           7/10/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $30,000.00                      $0.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

10/9/2009                                                            rptQuarterlyW                                                         Page 2 of  23


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     July 1, 2009 through September 30, 2009

  5       TREASURER - FISCAL OFFICER                                 

                                                                                                                                   Filed:         8/3/2009

  To continue to provide lockbox services and various electronic data files to State agencies.  To include

  processing invoice and payments for applying to take the GED test managed by the Illinois Community

   College Board and for requesting criminal background checks through the Illinois State Police.

   Signed By: Ed Buckles, Chief Procurement Officer

      Vendor:  International Bank of Chicago                                                 Notary Date:           7/30/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $400,000.00                      $0.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

 

 

  6       AGRICULTURE -  GENERAL OFFICE                              

                                                                                                                                   Filed:       7/22/2009

  Professional stagehand services are needed immediately to cover the Western Horse Shows taking place

  on the Illinois State Fairgrounds for the 2009 Illinois State Fair.  The Bureau had planned to

  competitively bid the professional stagehand services.  The Bureau utilizes the contract riders from

  booked grandstand entertainers to determine the number of stagehands and hours that will be needed. 

  Due to the delay in receiving all entertainment riders, there is not adequate time to competitively bid or

   utilize a sole source method for the procurement of these services.  Stagehands must be members of the

  professional stagehands union to provide services as required in entertainer contracts.  Theatrical

  Services, Inc. is the only provider of these services in Central Illinois who can cover the needs of the

  Illinois State Fair.

 

  A letter was received dated September 22, 2009 reporting the Actual cost as $135,263.54.

   Signed By: Laurie Leuenberger, Acting SPO

      Vendor:  Theatrical Services Inc.                                                          Notary Date:           7/21/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $149,000.00             $135,263.54                                                 10               1

     Federal Cost                    $0.00                      $0.00

10/9/2009                                                            rptQuarterlyW                                                         Page 3 of  23


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     July 1, 2009 through September 30, 2009

  7       CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:         7/1/2009

  The Department is giving notice of an Emergency Contract entered into with Concurrent Computer

  Corporation for hardware maintenance.  Term is 90 days (7-1-09 - 9-28-09) to provide sufficient time to

  conduct a competitive procurement.  The current contract expires 6-30-09.

   Signed By: Gwyn Gurgens, Acting SPO

      Vendor:  Concurrent Computer Corp.                                                    Notary Date:           6/30/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00             $397,146.48                                                 10               1

     Federal Cost                    $0.00                      $0.00

 

 

  8       CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:         7/1/2009

  Unit #108.  The fire alarm system was installed in 1988 and is obsolete.  At this time the strobe and

  horns for the fire alarm system is non operational.  The Honeywell repairman is unable to obtain parts

  for repair.  The fire alarm control panels pull stations, smoke detectors, heat detectors, horn/strobe along

   with the public address system and speakers need replaced.

   Signed By: Nedra Chandler, Warden

      Vendor:  Honeywell & Building Control                                                 Notary Date:           5/19/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00             $560,000.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

10/9/2009                                                            rptQuarterlyW                                                         Page 4 of  23


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     July 1, 2009 through September 30, 2009

  9       CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       8/20/2009

  Illinois Correctional Industries provides Illinois Department of Corrections with men's boxer shorts. 

  They are cut from the garment shop located at Sheridan Correctional Center and sewn at Centralia

  Correctional Industries.  The contracted vendor could not meet the weight specifications on the contract

  until the latter part of July or early August.  The current inventory of boxers would be depleted by this

  time, causing the IDOC to purchase boxers at a higher price from a street vendor.

   Signed By: James Clinton, Public Service Admin.

      Vendor:  Unitex International Inc.                                                          Notary Date:             5/8/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $48,990.00                      $0.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

 

 

  10     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       8/28/2009

  To establish an emergency purchase for various collagen casings in order to fulfill ICI's commitment to

  current and future orders with the Department of Corrections and throughout the State of Illinois.  The

  master contract expired on 5-31-09 and the draft contract is being reviewed and will be put out for bid in

   the near future.  FY 09 budget constraints did not allow for purchasing inventory quantities to sustain

  the contract lapse time.

   Signed By: Donna Lindemulder, Senior Public Serv. Admin.

      Vendor:  Inter. Collagen Resource LLC                                                 Notary Date:           8/14/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $53,400.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

10/9/2009                                                            rptQuarterlyW                                                         Page 5 of  23


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     July 1, 2009 through September 30, 2009

  11     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       9/11/2009

  A 60 inch diameter HDPE storm drain piping was installed in CDB project 120-175-118 due to the

  damage caused by a flash flood in 2007.  On May 8, 2009, a large amount of rain fell in a short period

  of time causing this new drain to back up and flood the adjacent area.  Due to the large amount of water

  that enters the pipe, tree limbs and brush were swept into the pipe and caused it to clog.  It has been

  recommended by CDB that the new piping should be removed, any debris cleared from the piping, and

  reset.

   Signed By: Donald Gaetz, Warden

      Vendor:  Unknown                                                                               Notary Date:             9/2/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $67,125.00                      $0.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

 

 

  12     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       9/24/2009

  To establish an emergency purchase for repair of existing LiveScan equipment.  The existing livescan

  units are failing and are in need of repair.  These units are not under warranty or maintenance and there

  is no money allocated for replacement at this time.  The agency has a Meritorious Good Time Push

  initiative that was implemented September 1.  Offenders are fingerprinted at the Stateville Northern

  Reception Center (NRC) upon admission and release.  The new push process has increased the

  LiveScan use at the NRC so immediate repair is critical to the agency.

   Signed By: Larry Moritz, Senior Public Serv. Admin.

      Vendor:  MorphoTrak                                                                           Notary Date:           9/14/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $33,100.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

10/9/2009                                                            rptQuarterlyW                                                         Page 6 of  23


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     July 1, 2009 through September 30, 2009

  13     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:         7/1/2009

  Choate MH & DC is in need of replacement equipment for the ash silo, which is no longer working

  properly to the detriment of the facility.  In its condition now, debris, ash, and burning bi-products

  must be removed manually using man-power and man-hours better used in other areas of the facility. 

  Ash removal manually must be done every 36 hours and requires a minimum of 12 man-hours of work.

   Manually removing the ash is very dangerous.  The original equipment is 37 years old.  Only this

  company is able to fabricate the necessary replacement parts needed to make the repairs.

   Signed By: Curtis Thompson, SPO

      Vendor:  Beaumont Burch                                                                    Notary Date:           5/27/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $80,000.00                      $0.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

 

 

  14     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:       8/19/2009

  Due to the delay in the approval of PBC #09-43969, the replacement contract has not been executed,

  therefore this emergency procurement is needed to avoid the interruption in needed services.

   Signed By: Curtis Thompson, SPO

      Vendor:  United Parcel Service                                                             Notary Date:           8/13/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $105,315.00                      $0.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

10/9/2009                                                            rptQuarterlyW                                                         Page 7 of  23


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     July 1, 2009 through September 30, 2009

  15     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:       8/19/2009

  The impact of this equipment not working would put the agency out of compliance.  There were no

  bidders that responded to Solicitation #22017266 so it has to be reposted.  Given the number of

  machines involved and the mandated mail dates that must be met, failure to have this contract would

  seriously jeopardize the Agency's ability to process mandated client notices and would result in the loss

   of significant postal discounts.  An emergency contract is needed for services until a new contract is

   Signed By: Curtis Thompson, State Purchasing Officer

      Vendor:  Bowe Bell and Howell                                                            Notary Date:           8/13/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $59,811.00                      $0.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

 

 

 

  16     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:       8/19/2009

  The quality of the conditioned air being supplied to the living units of patients at Chester Mental

  Health Center is such that, in the high humidity months, mold grows on the cinder block walls of the

  bedroom and living unit hallways.  Patients and staff with allergy problems are experiencing health

  complications from this situation.  This is a life safety issue.  Also, the moisture in the air is such that

  the floors become moist and damp and are slippery to walk on.  This is a serious safety issue.  A

  survey of the facility HVAC system must be completed to determine the changes necessary to the

  system in order to correct the conditions mentioned above.

   Signed By: Curtis Thompson, State Purchasing Officer

      Vendor:  Unknown                                                                               Notary Date:           8/13/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $100,000.00                      $0.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

10/9/2009                                                            rptQuarterlyW                                                         Page 8 of  23


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     July 1, 2009 through September 30, 2009

  17     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:       8/19/2009

  Choate MH&DC is in need of the immediate replacement of the roof of the Administration Building. 

  The roof and its underlying decking have suffered significant deterioration over the life of the roof, which

   is now approximately 25 years old.  A significant amount of additional damage was inflicted upon the

  roof and shingles by strong winds.  The roof now has three identified leaks, which are allowing water

  into the structure.  The leaks, if allowed to persist will result in major structural damage to State

  supported property.

   Signed By: Curtis Thompson, State Purchasing Officer

      Vendor:  Unknown                                                                               Notary Date:           8/14/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $55,000.00                      $0.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

 

 

 

  18     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:       8/19/2009

  Cooling Coil for Unit CS developed a series of leaks over the course of the winter and can no longer be

  utilized to provide a comfortable and cool environment for patient care.  The coil cannot be repaired.  A

  replacement-cooling coil needs to be installed.  Patients are being housed in a temporary unit that is not

   designed for the number of patients affected.  This has left the facility without an overflow/emergency

  swing unit.

   Signed By: Curtis Thompson, State Purchasing Officer

      Vendor:  Anchor Mechanical Inc.                                                          Notary Date:           8/14/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $64,290.00                      $0.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

10/9/2009                                                            rptQuarterlyW                                                         Page 9 of  23


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     July 1, 2009 through September 30, 2009

  19     HEALTHCARE AND FAMILY SERVICES, DEPT OF

                                                                                                                                   Filed:         7/6/2009

  HFS is extending its contract with Westside Youth Network, Inc. for nine months, effective July 1,

  2009, to continue the administration of the single centralized point of access for Screening, Assessment

  and Support Services Program.

   Signed By: Thomas Sestak, SPO

      Vendor:  Westside Youth Network Inc.                                                 Notary Date:           6/29/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $483,291.00                      $0.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

 

 

 

  20     PUBLIC HEALTH, DEPARTMENT OF                               

                                                                                                                                   Filed:         7/9/2009

  The current contract for CHIC services expires on June 30, 2009 and the Department of Public Health

  seeks this emergency purchase to prevent the 200+ enrolled individuals from losing critical health

  insurance coverage by ensuring that their monthly health insurance premiums will continue to be paid

  without delay.

   Signed By: Alan Biggerstaff, Deputy Director

      Vendor:  Illinois Public Health Assn.                                                      Notary Date:             7/7/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $210,000.00                      $0.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

10/9/2009                                                            rptQuarterlyW                                                       Page 10 of  23


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     July 1, 2009 through September 30, 2009

  21     PUBLIC HEALTH, DEPARTMENT OF                               

                                                                                                                                   Filed:       9/28/2009

  Due to the threat of seasonal influenza and H1N1 flu, it is imperative that the Department inform the

  citizens of Illinois about the importance of protecting oneself from the flu.  As part of the agency's

  strategy, the Director is to travel to all media markets in the state to stress the message to get

  vaccinated and follow good hygiene habits.  In order to coordinate that effort in a very short period of

  time, the Department is in need of outside assistance to handle logistics, planning, messaging and

  coordination.  The state has only recently been made aware it will be the recipient of federal funding to

  assist with the challenges of this upcoming flu season.

   Signed By: Winfred Rawls, Deputy Director

      Vendor:  Jasculca/Terman & Associates                                               Notary Date:           9/23/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $90,000.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

 

 

 

  22     REVENUE, DEPARTMENT OF

                                                                                                                                   Filed:       7/15/2009

  The Customer Relations Management software that we currently have through Right Now Technologies

   hosts a knowledge base on our web site and provides taxpayers to look up questions through this

  system instead of calling our Customer Service 800 telephone line.

   Signed By: Norma Sutton, SPO

      Vendor:  Right Now Technologies                                                         Notary Date:             7/9/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $19,118.50                                                 10               1

     Federal Cost                    $0.00                      $0.00

10/9/2009                                                            rptQuarterlyW                                                       Page 11 of  23


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     July 1, 2009 through September 30, 2009

  23     STATE POLICE, DEPARTMENT OF                                

                                                                                                                                   Filed:       7/29/2009

  The ballasted roof at the District 14 Headquarters is in dire need of replacement as many tears and loose

  membrane seams are present.  The roof deck and underlayment are regularly wet resulting in a mossy

  roof growth and interior leaking throughout the facility.  The roof is approximately 30-years old and has

   been patched in excess of 15 times during the last few years.  Immediate replacement to the

  Headquarters roof is required in order to protect State property from further damage and prevent the

  serious disruption in State services provided by District 14 personnel.

   Signed By: Jonathon Monken, Director

      Vendor:  Unknown                                                                               Notary Date:           7/23/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $150,000.00                      $0.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

 

 

 

  24     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       7/24/2009

  With the passage of the ARRA federal initiative, the Division is expecting to fund several new or

  expanded public transportation facilities for our rural Section 5311 public transportation providers. 

  Under ARRA, the Division must assess whether the project qualifies as "shovel ready" and if so apply

  for the federal funds by January 1, 2010.  However, before the Division can apply for these federal funds,

  we must undertake a federally mandated "environmental assessment" of each facility.

   Signed By: Joseph Clary, Director

      Vendor:  AECOM                                                                                Notary Date:             7/7/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00                      $0.00                                                 10               1

     Federal Cost          $245,000.00                      $0.00

10/9/2009                                                            rptQuarterlyW                                                       Page 12 of  23


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     July 1, 2009 through September 30, 2009

  25     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       7/24/2009

  With the passage of the ARRA federal initiative, the Division is expecting to fund several new or

  expanded public transportation facilities for our rural Section 5311 public transportation providers. 

  Under ARRA, the Division must assess whether the project qualifies as "shovel ready" and if so apply

  for the federal funds by January 1, 2010.  However, before the Division can apply for these federal funds,

  we must undertake a federally mandated "environmental assessment" of each facility.

   Signed By: Joseph Clary, Director

      Vendor:  TranSystems                                                                          Notary Date:             7/7/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00                      $0.00                                                 10               1

     Federal Cost          $175,000.00                      $0.00

 

 

 

  26     TRANSPORTATION, DEPARTMENT OF                               

                                                                                                                                   Filed:       7/21/2009

  The States of Missouri and Illinois have entered into a bi-state agreement to construct a New

  Mississippi River Bridge in the vicinity of downtown St. Louis, Missouri including associated

  roadways and structures easterly into Illinois and westerly into Missouri, to alleviate traffic congestion

  on the existing Mississippi River bridges.  The Missouri Department of Transportation is the lead

  agency for the jointly funded main river bridge span and the approach structures located in the respective

   jurisdictions of the States.  Each State is responsible for the connections for the overall project located

   Signed By: Lawrence Parrish, Interim Director

      Vendor:  Mason Tillman Associates, Ltd.                                               Notary Date:           7/20/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $250,000.00                      $0.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

10/9/2009                                                            rptQuarterlyW                                                       Page 13 of  23


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     July 1, 2009 through September 30, 2009

  27     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:         9/4/2009

  Failure of the water system at the North and South I-57 Rest Areas.  This is a danger to public health. 

  The Department has been issued violations by the Will County Department of Public Health.

   Signed By: Diane O'Keefe, Deputy Director

      Vendor:  Will County Well & Pump Co.                                                 Notary Date:           8/27/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $18,500.00                      $0.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

 

 

 

  28     VETERANS' AFFAIRS, LASALLE VETERANS' HOME         

                                                                                                                                   Filed:       8/25/2009

  The boilers and chillers at the Veterans' Home are not merely for the health and comfort of the residents

  but are critical life safety devices.  The boiler supporting the original portion of the Home is leaking and

   has  been found to be fouled by mineral deposits.  Chemicals are to be put into the system to break

  down the deposits and may result in additional leaks in other pipes, tubes and/or the vessel.  The

  conditions of the boiler must be assessed and repairs made before the winter.  Additionally, two

  compressors for the chiller equipment for the original addition have failed and must be replaced.  These

  two failures occurred over the weekend of August 9th and the local contractor responded.  Kettman is

  waiting to be told to go forward with this project before they request shipment of the one condenser they

   located in Ohio; the other condenser will have to be built by the factory.  They have been told not to

  go forward and the equipment in Ohio may not be available for very long.

   Signed By: Deborah Miller, Chief Fiscal Officer

      Vendor:  Unknown                                                                               Notary Date:           8/25/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $75,000.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

10/9/2009                                                            rptQuarterlyW                                                       Page 14 of  23


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     July 1, 2009 through September 30, 2009

  29     VETERANS' AFFAIRS - GENERAL OFFICE                         

                                                                                                                                   Filed:       9/14/2009

  The Chiller Alarm system went off in the facility informing security the chiller system was releasing

  freon in the facility which was a life threatening situation.  The chiller system is the original equipment

  from when the facility was built in 1990.  The chillers system has sprung leaks in the system, a

  compressor unit was burned out and a second compressor barely operating.  This situation turned into a

   life and safety issue for the facility when the facility temperatures were approaching 80 degrees in the

  facility.  The chillers are not merely for the health and comfort of our residents, but are critical life safety

   Signed By: Deborah Miller, Chief Fiscal Officer

      Vendor:  Kettman Heating & Plumbing Inc                                            Notary Date:           9/11/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $33,955.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

 

 

 

  30     HISTORIC PRESERVATION AGENCY                               

                                                                                                                                   Filed:       8/13/2009

  Repair and/or re-construct Menard Home chimneys.

   Signed By: Karen Euringham, Executive Director

      Vendor:  Unknown                                                                               Notary Date:             8/6/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $14,000.00                      $0.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

10/9/2009                                                            rptQuarterlyW                                                       Page 15 of  23


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     July 1, 2009 through September 30, 2009

  31     TOLL HIGHWAY AUTHORITY, ILLINOIS STATE              

                                                                                                                                   Filed:       8/31/2009

  A two-part low volatile organic compound epoxy paint which will be used to refurbish the snow plows

  and equipment to protect them from the corrosive environment during the winter season.  This project

  is required due to the limited time remaining to complete the refurbishment before the winter season and

   needed to serve in the interim of a new contract.

   Signed By: Albert Murillo, Chief of Procurement

      Vendor:  PPG Architectural Finishes Inc                                                Notary Date:             8/5/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $44,838.25                                                 10               1

     Federal Cost                    $0.00                      $0.00

 

 

 

  32     GOVERNORS STATE UNIVERSITY                                 

                                                                                                                                   Filed:       9/25/2009

  The application for newly available, federal stimulus dollars requires immediate research, planning and

  schematic design of an architectural firm.  Failure to hire a firm immediately would prevent the

  university from submittal for this potential federal award for renovations.  Applications including the

  outcome of this contract requires internal review and federal application in coming weeks.

   Signed By: Tracy Sullivan, SPO Designee

      Vendor:  LCM Architects                                                                     Notary Date:           9/25/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $53,500.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

10/9/2009                                                            rptQuarterlyW                                                       Page 16 of  23


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     July 1, 2009 through September 30, 2009

  33     ILLINOIS STATE UNIVERSITY                                  

                                                                                                                                   Filed:       9/29/2009

  Due to a roof leak, the wooden gym floor at the University High School was damaged.  The emergency

  repair is the result of possible additional growth of mold and mildew in the sub floor and the lack of use

   of the gym, which is the only gym in the High School.  The health and safety of the student residents

  in this structure is of major concern and the disruption and loss of services of the facility warrants an

  expedited repair of the facility.

   Signed By: Judy Johnson, Director

      Vendor:  Stalker Flooring                                                                      Notary Date:           9/28/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $80,471.85                      $0.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

 

 

 

  34     SOUTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:       7/17/2009

  Flooding of the wood floor in the Vadalabene Center have left it unsuitable and unsafe for use as

  instructional space or for athletic training or competition.  Time is of the essence in reclaiming use of

  this facility.

   Signed By: Nancy Ufert Fairless, Director

      Vendor:  Missouri Floor Company                                                         Notary Date:           7/13/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00             $247,000.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

10/9/2009                                                            rptQuarterlyW                                                       Page 17 of  23


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     July 1, 2009 through September 30, 2009

  35     SOUTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:       7/17/2009

  The Bluff Hall chiller was found damaged during this cooling season.  The damage occurred as a result

  of winter freeze protection failing.  Consequently two stages of the existing chiller were damaged,

  resulting in the unit only operating at limited capacity.  Immediate replacement is critical because the

  remaining operating stage has incurred recent problems and the building remains in occupancy.  If the

  existing unit were to go out permanently, the building would be without cooling and residents would

  have to be relocated.

   Signed By: Nancy Ufert Fairless, Director

      Vendor:  Thermal Mechanics Inc.                                                         Notary Date:           7/10/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00             $113,310.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

 

 

  36     SOUTHERN ILLINOIS UNIVERSITY - PHYSICIANS &

                                                                                                                                   Filed:       7/13/2009

  The finding of mold spores within the heating, ventilating and air conditioning ductwork in the 801

  Medical Instructional Facility requires immediate action to enlist the professional services of a

  mechanical engineer to survey all ductwork including air supply and return ducts and prepare

  remediation specification documents for six air handling systems within the facility.  Remediation and

  any building system modification will be done according to standard bidding and procurement

   Signed By: Pamela Speer, SPO

      Vendor:  BRiC Partnership LLC                                                           Notary Date:             7/9/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $163,600.00                      $0.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

10/9/2009                                                            rptQuarterlyW                                                       Page 18 of  23


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     July 1, 2009 through September 30, 2009

  37     SOUTHERN ILLINOIS UNIVERSITY - PHYSICIANS &

                                                                                                                                   Filed:         7/1/2009

  Due to employee health related complaints and unusual odors, air quality testing was completed under a

   previous DAS contract.  Mold conditions were identified in the air ducts in a research laboratory wing

  housing five laboratories.  Multiple varieties of mold exist and as a result, it is imperative that we

  promptly maintain continuity and retain professional services in developing specifications and a

  remediation work plan and additional air quality testing.

   Signed By: Pamela Speer, SPO

      Vendor:  DAS Consulting Services LLC                                                Notary Date:           6/26/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                 $9,725.00                      $0.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

 

 

  38     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       7/16/2009

  This emergency expenditure is for the purchase of multi-parameter water quality meters in order to allow

   the Illinois State Water Survey to monitor water quality for two 7-day periods at approximately 300

  sites for each year 2009-2011.  The purpose of the monitoring is to provide benchmark water quality

  data to the Illinois EPA.

   Signed By: Mike Devocelle, SPO Designee

      Vendor:  SonTek/YSI Incorporated                                                       Notary Date:           7/14/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00             $222,288.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

10/9/2009                                                            rptQuarterlyW                                                       Page 19 of  23


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     July 1, 2009 through September 30, 2009

  39     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       7/13/2009

  This service is required to replace and re-gasket the Chiller bearing for the College of Urban Planning

  and Public Affairs Hall at 412 South Peoria Street due to mechanical failure between June 20-21, 2009.

   Signed By: Heather Haberaecker, Exec. Asst. VP

      Vendor:  Kroeschell, Inc.                                                                      Notary Date:             7/8/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $59,500.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

 

  40     SECRETARY OF STATE                                         

                                                                                                                                   Filed:      12/22/2008

  A letter was received dated July 31, 2009 reporting the Actual cost of item #4 in our January 15, 2009

  report as $251,670.09.

   Signed By: Donna Fitts, Director

      Vendor:  Capitol Sales LLC                                                                  Notary Date:         11/13/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $65,100.00             $251,670.09                                                 10               1

     Federal Cost                    $0.00                      $0.00

 

  41     AGRICULTURE -  GENERAL OFFICE                              

                                                                                                                                   Filed:      12/30/2008

  A letter was received dated July 24, 2009 reporting the Actual cost of item #5 in our January 15, 2009

  report as $146,293.

   Signed By: Thomas Jennings, Executive Director

      Vendor:  Unknown                                                                               Notary Date:         12/30/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $160,000.00             $146,293.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

10/9/2009                                                            rptQuarterlyW                                                       Page 20 of  23


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     July 1, 2009 through September 30, 2009

  42     CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:       4/21/2009

  A letter was received dated August 11, 2009 reporting the Actual cost of item #2 in our July 15, 2009

  report as $500,000.

   Signed By: Shirley Webb, Contract Compliance Manager

      Vendor:  Crowe Horwath LLP                                                              Notary Date:           4/20/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $500,000.00             $500,000.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

 

  43     REVENUE, DEPARTMENT OF

                                                                                                                                   Filed:         1/9/2009

  A letter was received dated September 10, 2009 reporting item #11 in our April 15, 2009 report was

  cancelled.

   Signed By: Norma Sutton, SPO

      Vendor:  AT&T                                                                                   Notary Date:             1/8/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $12,510.00                      $0.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

 

  44     REVENUE, DEPARTMENT OF

                                                                                                                                   Filed:         1/9/2009

  A letter was received dated September 10, 2009 reporting the Actual cost of item #12 in our April 15,

  2009 report as $5,375.

   Signed By: Norma Sutton, SPO

      Vendor:  Aspect Software Inc.                                                              Notary Date:             1/8/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $11,250.00                $5,375.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

10/9/2009                                                            rptQuarterlyW                                                       Page 21 of  23


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     July 1, 2009 through September 30, 2009

  45     HISTORIC PRESERVATION AGENCY                               

                                                                                                                                   Filed:       1/24/2008

  A letter was received dated July 23, 2009 reporting the Actual cost of item #34 in our April 15, 2008

  report as $46,470.

   Signed By: Jennifer Tirey, Acting Director

      Vendor:  Unknown                                                                               Notary Date:           1/22/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $65,000.00              $46,470.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

 

  46     NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:       1/20/2009

  A letter was received dated July 27, 2009 reporting the Actual cost of item #20 in our April 15, 2009

  report as $33,719.27.

   Signed By: Eddie Williams, Executive VP

      Vendor:  Stamats, Inc.                                                                          Notary Date:           1/15/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $35,300.00              $33,719.27                                                 10               1

     Federal Cost                    $0.00                      $0.00

 

  47     NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:       11/7/2008

  A letter was received dated July 20, 2009 reporting an amended Actual amount for item #40 in our

  January 15, 2009 report as $198,855.08.

   Signed By: Eddie Williams, Exec. VP

      Vendor:  Oracle USA, Inc.                                                                   Notary Date:         10/31/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $56,448.00             $198,855.08                                                 10               1

     Federal Cost                    $0.00                      $0.00

10/9/2009                                                            rptQuarterlyW                                                       Page 22 of  23


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                     July 1, 2009 through September 30, 2009

  48     NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:         6/8/2009

  A letter was received dated August 31, 2009 reporting the Actual cost of item #28 in our July 15, 2009

  report as $69,682.20.

   Signed By: Eddie Williams, Executive VP

      Vendor:  FASTLITE                                                                            Notary Date:             6/4/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $67,774.00              $69,682.20                                                 10               1

     Federal Cost                    $0.00                      $0.00

 

 

  49     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       8/11/2008

  A letter was received dated July 9, 2009 reporting the Actual cost of item #58 in our October 15, 2008

  report as $1,550,292.

   Signed By: Philip Abruzzi, SPO Designee

      Vendor:  Coca Cola Enterprises Inc.                                                      Notary Date:             8/6/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:           $1,500,000.00          $1,550,292.00                                                 10               1

     Federal Cost                    $0.00                      $0.00

10/9/2009                                                            rptQuarterlyW                                                       Page 23 of  23