  1       AUDITOR GENERAL -  OFFICE OF THE                           

                                                                                                                                   Filed:        8/1/2012

  To properly complete the financial audit of the Regional Office of Education #55 Whiteside County. The OAG

  issued a RFP in an attempt to procure these services through a competitive selection process. However, no

  proposals were submitted in response to our RFP solicitation process. The firm of McGreal & Co. negotiated a

   fair and reasonable price and has sufficient staff and expertise to perform this engagement.

   Signed By:  James Schlouch, Director

      Vendor:  McGreal & Co                                                                      Notary Date:        7/31/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00            $29,040.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  2       AUDITOR GENERAL -  OFFICE OF THE                           

                                                                                                                                   Filed:      8/17/2012

  It was determined by the OAG on 7-5-12 that a separate audit would be needed for a corporate outgrowth,

  the IL Housing Authority LLC which was created by the IL Housing Dev Authority. The financial statements

  and the audit for the IL Housing Authority LLC will need to be completed prior to the issuance of the financial

  audit for the IL Housing Dev Authority.

   Signed By:  Bruce Bullard, Director

      Vendor:  McGladrey, LLP                                                                   Notary Date:        8/16/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00            $46,798.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                      Page 1 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  3       COMPTROLLER - GAAP FINANCIALS                              

                                                                                                                                   Filed:      8/27/2012

  The IOC implemented a new online WEDGE 2.0 financial reporting system for fiscal year 2011. This system

  was developed with the assistance of Metmox, Inc. On Sept 16, 2011 the non-shared agency/fund packages

  were deployed for use by state agency users. The system subsequently developed excessive lag time and

  timeouts. To compound the problem, albeit unrelated to WEDGE 2.0, the IOC experienced a failure in the

  network CISCO Catalyst 6509 Switch. This resulted in network downtime, which further impacted the

  WEDGE 2.0 system availability.

   Signed By:  Steve Valasek, Asst Comptroller

      Vendor:  Metmox, Inc.                                                                        Notary Date:        8/30/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $120,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  4       COMPTROLLER - GAAP FINANCIALS                              

                                                                                                                                   Filed:      8/27/2012

  The IOC contracted with Metmox, Inc. incorporated to implement a new online WEDGE 2.0 financial

  reporting system. This emergency extension is to extend the contract for an additional 90 days with no change in

   compensation or scope.

   Signed By:  Steve Valasek, Asst Comptroller

      Vendor:  Metmox, Inc                                                                         Notary Date:      12/13/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                      Page 2 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  5       COMPTROLLER - GAAP FINANCIALS                              

                                                                                                                                   Filed:      8/27/2012

  The IOC contracted with Metmox, Inc. incorporated to implement a new online WEDGE 2.0 financial

  reporting system. This emergency extension is to extend the contract for an additional 90 days with no change in

   compensation or scope.

   Signed By:  Steve Valasek, Asst Comptroller

      Vendor:  Metmox, Inc.                                                                        Notary Date:        3/28/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00                                                                               13               1

     Federal Cost                   $0.00                     $0.00

  6       COMPTROLLER - GAAP FINANCIALS                              

                                                                                                                                   Filed:      8/27/2012

  The IOC contracted with Metmox, Inc. incorporated to implement a new online WEDGE 2.0 financial

  reporting system. This emergency extension is to extend the contract for an additional 90 days with no change in

   compensation or scope.

   Signed By:  Steve Valasek, Asst. Comptroller

      Vendor:  Metmox, Inc.                                                                        Notary Date:        5/14/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00            $70,000.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                      Page 3 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  7       COMPTROLLER - GAAP FINANCIALS                              

                                                                                                                                   Filed:      8/27/2012

  The IOC contracted with Metmox, Inc. incorporated to implement a new online WEDGE 2.0 financial

  reporting system. This emergency extension is to extend the contract for an additional 90 days with no change in

   compensation or scope.

   Signed By:  Steve Valasek, Asst. Comptroller

      Vendor:  Metmox, Inc.                                                                        Notary Date:        6/29/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  8       SECRETARY OF STATE                                         

                                                                                                                                   Filed:      7/26/2012

  On June 25th an SOS officer noticed some plaster on the Floor of the Memorial Hall of Flags. On  June 26th

  an area of 20 by 36 feet of the ornamental plaster ceiling located on the east side of the Hall of Flags in the

  Michael Hewlett building fell to the floor. Scaffolding was erected that evening to shore up the ceiling and to

  protect the floor below at a cost of $15,986.33, or a 28 day rental. Additional scaffolding was erected at the

  NW entrance as the plaster ceiling above this area was of the same age and material. This was an estimated

  cost of 15, 404.90, also a 28 day rental.

   Signed By:  Amanda Trimmer, Chief Deputy Director

      Vendor:  Safway Scaffolding, Inc.                                                      Notary Date:        7/26/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $45,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                      Page 4 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  9       AGRICULTURE -  GENERAL OFFICE                              

                                                                                                                                   Filed:      7/16/2012

  The IL Dept of Agriculture is conducting an emergency procurement to improve the safety of spectators in the

  Grandstand during car races and related motor events. Install safety posts and five rows of safety cable on 600

  linear feet of grandstand prior to the 2012 IL State Fair starting Aug 10, 2012.  It’s been determined that the

  current safety mechanisms at the IL State Fair Grandstand are inadequate or non-existent on the mile track at

  the Fairgrounds.

   Signed By:  Laurel Leuenberger, Procurement Officer

      Vendor:  KMS Inc.                                                                              Notary Date:        7/12/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $49,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  10     AGRICULTURE -  GENERAL OFFICE                              

                                                                                                                                   Filed:        8/9/2012

  The IL Dept of Agriculture is conducting an emergency procurement for the 2012 DuQuoin State Fair beer

  sales at the Grandstand and beer tent.

   Signed By:  Laurel Leuenberger, Procurement Officer

      Vendor:  Alongis since 1933                                                               Notary Date:          8/7/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $66,233.91                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                      Page 5 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  11     AGRICULTURE -  GENERAL OFFICE                              

                                                                                                                                   Filed:      9/20/2012

  IL Dept of Ag recently closed its Centralia laboratory at the end of August which was performing Scrapie and

  Chronic Wasting Disease testing. The Galesburg lab has assumed the contract with the USDA for scrapie

  testing and also a contract with DNR for CWD testing on deer samples. The testing equipment from Centralia is

   obsolete and new equipment purchase is necessary. Without the equipment purchase the loss of revenue can

  be as much as $5,000 a month during the hunting season.

   Signed By:  Laurel Leuenberger, Procurement Officer

      Vendor:  Ventana Medical Systems                                                     Notary Date:        9/18/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $80,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  12     CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:      8/15/2012

  DOC inmates are residents of the DJJ pay for Phone Services. The state receives commissions, the State would

   loose millions of dollars in revenue. If the inmates would go without phone services this could possibly lead to

  public safety issues.

  This is a revenue generating contract, there is no cost to the State.

   Signed By:  James Ellenberg, Strategic Manager

      Vendor:  Consolidated Communications                                             Notary Date:        8/14/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                      Page 6 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  13     CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:      8/15/2012

  The statewide master contract needs to be extended so all agencies can continue to purchase commercial

  envelopes on an ass needed basis until a contract is in place.

   Signed By:  Dante Watson, Strategic Manager

      Vendor:  CENVO                                                                                Notary Date:          8/9/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $104,343.75                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  14     CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:      8/23/2012

  Smith Maintenance Co. has been providing janitorial services at the Bilandic Building, the contract expired on

  June 30, 2012. Smith was chosen for this contract because they are familiar with all necessary tasks that need

  accomplished.

   Signed By:  Jeremy Bliss, Facilities Manager

      Vendor:  Smith Maintenance Co.                                                         Notary Date:        8/17/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00            $61,572.36                                                 13               1

     Federal Cost                   $0.00                     $0.00

  15     CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:      8/27/2012

  This is an extension but has moved from HFS to CMS FY 12-4 # 29

  To allow continued healthcare coverage to enrollees while the Supplemental HMO RFP is concluded.

   Signed By:  Brett Cox, State Purchasing Officer

      Vendor:  Health Alliance Illinois                                                         Notary Date:        8/22/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:        $1,303,374.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                      Page 7 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  16     CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:      8/27/2012

  This is an extension, it has moved from HFS to CMS 12-4 # 30. To allow continued healthcare coverage to

  enrollees while the Supplemental HMO RFP is concluded.

   Signed By:  Brett Cox, State Purchasing Officer

      Vendor:  Coventry Healthcare of Illinois                                             Notary Date:        8/22/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:        $45,747,711.0                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  17     CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:      8/27/2012

  This is an extension it has moved from HFS to CMS for FY12-4 # 28, to allow continued healthcare coverage

  to enrollees while the Supplemental HMO RFP is concluded.

   Signed By:  Brett Cox, St. Purchasing Officer

      Vendor:  Health Alliance Med Plans                                                    Notary Date:        8/22/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:        $334,132,245.                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  18     CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:        9/5/2012

  A 90 day emergency contract is requested due to the time frame needed to complete the RFP and award

  process and complexity of the vendor's need to engineer and integrate connectivity to the State's DMS100

  switches and GX17  line cards.

   Signed By:  James Ellenberg, Strategic Manager

      Vendor:  Consolidated Call Center Service                                          Notary Date:          9/4/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $35,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                      Page 8 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  19     CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:      9/17/2012

  CMS needs two (2) Mainframe Developers to provide specialized technical services with specific experience in

   mainframe applications. Without the technical knowledge and expertise provided by the requested sources,

  BCCS will not be able to complete these projects by their mandated due dates, thus putting the State in a

  position of non-compliance with State and Federal law.

   Signed By:  James Ellenberg, Strategic Manager

      Vendor:  Capital Strategies, Inc.                                                           Notary Date:        9/14/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $108,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  20     CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:      9/24/2012

  This is a request to pursue a 90 day emergency contract for hardware maintenance and services currently

  provided under the IBM Technical Services program which expires 6/30/12.

 

  This is an extension of the Affidavit that was from 7-1-12 - 9-28-12, this current extension is for 9-29-12 to

  12-27-12

   Signed By:  James Ellenberg, Strategic Manager

      Vendor:  IBM Extension of 12-4 # 9                                                   Notary Date:          9/7/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:        $6,000,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                      Page 9 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  21     COMMERCE AND ECONOMIC OPPORTUNITY,

                                                                                                                                   Filed:

  This emergency purchase is necessary to ensure compliance with the Davis Bacon requirements in our

  American Recovery and Reinvestment Act State energy Program award. Without this contract, DCEO will be

  found in Non-compliance of the State Energy Program ARRA award, with jeopardizes the entire

  $101,321,000 SEP award.

   Signed By:  Warren Ribley, Director of IDCEO

      Vendor:  Hill International Inc.                                                            Notary Date:      11/16/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00            $84,500.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  22     NATURAL RESOURCES, DEPARTMENT OF                           

                                                                                                                                   Filed:        7/9/2012

  DNR requires concession services for the operation of the lifeguard controlled beach, shower building, vending

  services and boat rental.

   Signed By:  Melissa Orrill, St Purchasing Officer

      Vendor:  Beach Watch Life Guard & Lake                                          Notary Date:          7/2/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 10 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  23     NATURAL RESOURCES, DEPARTMENT OF                           

                                                                                                                                   Filed:      9/24/2012

  Due to the drought the Illinois River has been experiencing low water conditions. These conditions make it

  impossible to pump water from the river with the equipment that is in place at Rice Lake. A portable pump will

  provide for adequate water levels in the transmission water ditch at Rice Lake. Once the transmission ditch is

  full of water DNR can operate the DNR pumps as standard practice.

   Signed By:  Melissa Orrill, St. Purchasing Officer

      Vendor:  Linden & Co.                                                                        Notary Date:        9/19/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $41,950.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  24     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:

  Menard Corr. Center is declaring an emergency to purchase 2 ice cube machines. The facility is required to

  provide additional ice and water to the inmates when the heat index reaches 95 degrees. We will need an

  additional 4400 lbs of ice per day for each day the heat index is 95 degrees or more. The ice machine currently

  on hand cannot keep up to meet this demand.

   Signed By:  ,

      Vendor:  B & B Distributors                                                                Notary Date:        7/20/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00            $36,662.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 11 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  25     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      7/10/2012

  On 6/29/12 a severe storm caused a power outage to old and worn generators that sustained significant damage.

 

  Five Housing Units and the Facility warehouse are without generator backup.

 

  Letter was received on August 28, 2012 for a Final Cost $52,009

   Signed By:  Nedra Chandler, Warden of Dixon Corr.

      Vendor:  Patten Energy System                                                            Notary Date:          7/5/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $56,000.00            $52,009.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  26     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      7/10/2012

  The X-House is a maximum security housing unit that has its own sewage digester (Muffin Monster) Connector

   to process and transfer waste to the facility sewage treatment plant. During the storm, the Muffin Monster was

  completely submerged in wastewater sewage due to a faulty contactor. The faulty contactor did not allow the

  Muffin Monster to operate on emergency generator power. Consequently, the Muffin Monster needs to be

  replaced or the sewage will have to be manually pumped from the receptor in to a nearby sewer.

  * Letter received on Aug 29, 2012 for work completed, actual cost $32973.00 Work completed within the

  same

  FY 12 13-1 Quarter.

   Signed By:  Nedra Chandler, Warden

      Vendor:  Mechanical Inc.                                                                    Notary Date:          7/5/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $35,000.00            $32,973.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 12 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  27     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      7/12/2012

  The new frames contract is not complete, it's target completion was April, however it just opened bidding

  5/31/12. This will not allow enough lead time by the time contracts are awarded to get the volume of the frames

  needed in house and frame kits assembled and distributed before the existing contract expires on 7/14/12. This

  90 day emergency contract will allow us to continue production of eye glasses while new contracts are put into

  place and inventory ordered from vendors. Dixon Correctional Industries provides prescription eye ware for

  DHS, IDOC, IDJJ, Dixon ICI expects to produce 395,000 pairs of glasses in FY12.

   Signed By:  Gary Lopac, Superintendent

      Vendor:  Modern Optical                                                                     Notary Date:        6/27/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $250,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  28     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      7/12/2012

  The new frames contract is not complete, it's target completion was April, however it just opened bidding

  5/31/12. This will not allow enough lead time by the time contracts are awarded to get the volume of the frames

  needed in house and frame kits assembled and distributed before the existing contract expires on 7/14/12. This

  90 day emergency contract will allow us to continue production of eye glasses while new contracts are put into

  place and inventory ordered from vendors. Dixon Correctional Industries provides prescription eye ware for

  DHS, IDOC, IDJJ, Dixon ICI expects to produce 395,000 pairs of glasses in FY12.

   Signed By:  Gary Lopac, Superintendent

      Vendor:  Capri Optics                                                                          Notary Date:        6/27/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $45,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 13 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  29     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      7/20/2012

  The compressor unit that supplies cooling capabilities to Housing Unit Three has failed.

  HU3 is considered a closed environment since all windows are completely sealed. In order to maintain the ten

  degree ambient air temperature, the side doors must be opened causing a potential breach of security waiting to

  occur

   Signed By:  Randy Grounds, Warden of Robinson

      Vendor:  Gibson Services                                                                    Notary Date:        7/12/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $48,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  30     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      7/30/2012

  The looming deadline for converting Logan CC to women necessitates this emergency request for installation of

  fencing for protective custody yard and segregation yard to ensure inmate and staff safety.

 

  Letter was received on Sept 17, 2012 for actual cost of $46,316.00. The emergency is closed and completed

  within the FY13-1 quarter.

   Signed By:  Guy Pierce, Warden of Logan

      Vendor:  Goodman Fence                                                                    Notary Date:        7/24/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $39,653.00            $46,316.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 14 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  31     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      7/30/2012

  CMS state contract for 75% lean beef trim expired on 6/23/12. CMS in unable to provide a estimated date for

  having a contract in place. Advanced commodities provided the lowest bid for this commodity.

   Signed By:  Tim Gleason, CEO of IL Corr. Industries

      Vendor:  Advanced Commodities                                                        Notary Date:        7/26/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $172,800.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  32     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      7/30/2012

  CMS State Contract for Chicken Trim expired 7/7/12, CMS is unable to provide a estimated date for having a

  contract in place. Advanced Commodities provided the lowest bid for this commodity.

   Signed By:  Tim Gleason, CEO of Corr. Industries

      Vendor:  Advanced Commodities                                                        Notary Date:        7/26/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $368,800.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  33     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      8/17/2012

  To purchase Wheat and White flour 1,593,750 pounds, in order to meet Corr. Industries needs. It is required to

   provide IL Dept of Corrections, IL Dept of Human Services, Il Dept of Juv Justice and IL Dept of Veterans

  Affairs, various local school districts the bread they need to prepare meals.

   Signed By:  Tim Gleason, SPSA

      Vendor:  Bianchi Milling, Inc.                                                             Notary Date:        8/13/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $420,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 15 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  34     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:        9/4/2012

  The Dunham-Bush chiller stage two compressor servicing the Administration Building is inoperable. The

  administration Building houses all of the Local Area Network Computer System components, the Telephone

  System and Security Electronics System components in addition to administration Offices. Replacement of the

  chiller unit is needed to avoid potential damage and costly repairs to these vital systems which must be

  maintained in a climate controlled environment.

   Signed By:  Marc Hodge, Warden

      Vendor:  Johnson Controls                                                                  Notary Date:        8/24/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $130,124.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  35     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      9/18/2012

  Menard Correctional Center is declaring an emergency to rent 8 refrigerated trailers. This is necessary due to a

  leak in the roof of the Cold Storage building. During a storm the roof leaked profusely, causing a flood in the

  cold storage freezers. It is necessary to rent refrigerated trailers to store Menard's frozen foods. It will cost

  approximately $3,000 per month per trailer plus fuel.

   Signed By:  Michael Atchison, Warden at Menard

      Vendor:  PLM Trailer Leasing                                                              Notary Date:        9/12/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $147,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 16 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  36     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      9/18/2012

  The sewer line under the dish machine in the Dietary Building has collapsed. Dietary is needed to prepare food

  for 1000 inmates. Size and scope of work required vendor with Knowledge and experience to complete

  project in timely manner.

   Signed By:  Glen Austin, Warden @ JCC

      Vendor:  Doyle Plumbing & Heating                                                   Notary Date:        9/11/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $50,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  37     CORRECTIONS, CORRECTIONAL CENTER - CENTRALIA      

                                                                                                                                   Filed:      7/20/2012

  Due to the closure of facilities and subsequent transfer of inmates to other facilities the receiving facilities do not

  have enough mattresses to house incoming inmates. Centralia Correctional Industries manufactures mattresses

  but has insufficient materials for production. The prior master contract for non-woven polyester was allowed to

  expire and CMS is estimating that a replacement contract will not be in place until Oct 2012.

   Signed By:  Mark Beckmann, Superintendent of Centralia

      Vendor:  Indratech of Indiana, LLC                                                    Notary Date:        7/13/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $40,566.76                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 17 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  38     CORRECTIONS, CORRECTIONAL CENTER - MENARD           

                                                                                                                                   Filed:      7/24/2012

  There is no master contract for Black & Gray Fleece material. The portion of the contract that contained the

  fleece product was not awarded and has not yet been put out for re-bid. These materials are required by IL

  Correctional Industries to manufacture Sweatpants and Sweatshirts supplied to inmates in the IL Dept of

  Corrections.

   Signed By:  Bill Westfall, ICI Supervisor

      Vendor:  Volunteer Knit Apparel FLEECE                                          Notary Date:        7/17/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $197,979.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  39     CORRECTIONS, CORRECTIONAL CENTER - MENARD           

                                                                                                                                   Filed:      7/24/2012

  There is no Master Contract for White Jersey and Rib Knit. These materials are required by IL Correctional

  Industries to manufacture T-Shirts and briefs that are supplied to inmates in the Dept of Corrections

   Signed By:  Bill Westfall, ICI Supervisor

      Vendor:  Volunteer Knit Apparel JERSEY                                          Notary Date:        7/17/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $89,621.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 18 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  40     LOTTERY, DEPARTMENT OF THE                                 

                                                                                                                                   Filed:        7/3/2012

  This emergency contract is for the provision of verifying audit services for the Illinois Lottery's midday drawings

  while it restructures its drawing observation contracts and issues a new Invitation for bids.

   Signed By:  Maye Kelsey, St Purchasing Officer

      Vendor:  E. C. Ortiz & Co. LLP                                                           Notary Date:        6/20/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $25,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  41     LOTTERY, DEPARTMENT OF THE                                 

                                                                                                                                   Filed:        7/3/2012

  This emergency contract is for the provision of verifying audit services for the Illinois Lottery's midday drawings

  while it restructures its drawing observation contracts and issues a new Invitation for bids.

   Signed By:  Maye Kelsey, St Purchasing Officer

      Vendor:  Mitchell & Titus LLP                                                            Notary Date:        6/20/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $25,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  42     LOTTERY, DEPARTMENT OF THE                                 

                                                                                                                                   Filed:      9/24/2012

  The Agency seeks an emergency contract with its current contractor E. C. Ortiz for the provision of primary

  audit services for the IL Lottery's Midday game drawings while it restructures its drawing observation contracts

  and issues a new Invitation for Bids. The current contract expires on 6/30/12.

   Signed By:  Maye Kelsey, State Purchasing Officer

      Vendor:  E. C. Ortiz & Co LLP                                                            Notary Date:        6/20/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $25,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 19 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  43     LOTTERY, DEPARTMENT OF THE                                 

                                                                                                                                   Filed:      9/25/2012

  The Agency seeks an emergency contract with its current contractor Mitchell & Titus for the provision of

  verifying audit services for the Illinois Lottery's midday game drawings while it restructures its drawing

  observation contracts and issues a new Invitation for Bids. The current contract with Mitchell & Titus will expire

   on 6/30/12

   Signed By:  Maye Kelsey, State Purchasing Officer

      Vendor:  Mitchell & Titus LLP                                                            Notary Date:        6/20/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $25,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  44     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:      7/17/2012

  The Central Dietary air conditioning is broke and inoperable. The air conditioning is necessary due to the high

  temperatures in the Dietary department. This contractor is able to provide prompt service. The health and safety

   of the employees that work in the Central Dietary department are at risk if this remains unresolved.

 

  * Letter received for Actual Cost $24,387.20, work was completed within the FY 13 13-1 Quarter

   Signed By:  Kenneth Crutcher, State Purchasing Officer

      Vendor:  Precision Piping, Inc.                                                            Notary Date:          7/9/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $32,500.00            $24,387.20                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 20 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  45     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:      7/17/2012

  On July 6, 2012 at approximately 8 pm the chiller in the Forensic Treatment Program shut down. The repair

  and maintenance vendor Exclusive Construction was called out to diagnose and re-start the chiller. The vendor's

   staff worked on the chiller Fri night into Sat trying several different methods to get the solution pump running so

  the chiller would operate and cool. They were not able to get the chiller re-started. It was decided to bring in a

  temporary chiller unit to provide temporary cooling to the building. Conserv FS will be providing diesel fuel for

  the generator to run the temporary chiller until the Forensic chiller is repaired.

   Signed By:  Kenneth Crutcher, State Purchasing Officer

      Vendor:  Various Vendors                                                                   Notary Date:        7/11/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $147,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  46     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:        8/2/2012

  Due to the delay in the execution of the contract being procured from PBC 12-67650, initiated by HFS, this

  emergency procurement is needed to avoid the interruption in needed services.

   Signed By:  Melissa Wright, Director

      Vendor:  UPS                                                                                       Notary Date:        7/24/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $100,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 21 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  47     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:        8/3/2012

  Severe weather resulted in damage to high-power electrical switching equipment supplying power to the facility,

   resulting in the need to utilize the high-capacity Caterpillar generator to supply electricity on a temporary basis.

   Signed By:  Alfreda Kibby, Hosp Administrator

      Vendor:  Various                                                                                 Notary Date:        7/31/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $82,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  48     MILITARY AFFAIRS, DEPARTMENT OF                            

                                                                                                                                   Filed:      7/16/2012

  This project is to abate tiles in the Northwest Armory, where the mastic contains asbestos. This was solicited as

   a small purchase to registered small business and NES was the lowest, responsive registered vendor. It was

  believed that the asbestos was non-friable, however after the vendor began the project it was discovered that a

  section was friable. This unforeseen situation resulted in a higher cost as there are additional requirements to

  abate friable versus non-friable asbestos. Additional dollars put the contract over the small purchase threshold

  and due to the nature of the project immediate action was necessary.

  ** Work completed, letter submitted on 8-17-12

   Signed By:  Dannie Stanberry, Northern Area Facilities Offic

      Vendor:  NES, Inc.                                                                              Notary Date:        7/16/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $38,710.00            $38,710.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 22 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  49     HEALTHCARE AND FAMILY SERVICES, DEPT OF

                                                                                                                                   Filed:        7/3/2012

  This procurement is critical to the life, health and/or safety of the citizens of Illinois. HFS needs to continue this

  service so that medical clients and providers may receive forms required to comply with federal and state laws.

  And regulations. This is for courier service to pickup and deliver Newborn Metabolic Screening Specimens to

  the IDPH lab within 24 hours after collection.

  On June 27th 2012, an extension for this contract was received. Original affidavit was for July 1, 2012 to Sept

  28, 2012.

  The extension is for September 29th to December 27th, 2012. $76,250 is the additional amount estimated.

   Signed By:  Brett Cox, St. Purc Officer

      Vendor:  United Parcel Services                                                          Notary Date:        6/20/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $76,250.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  50     HEALTHCARE AND FAMILY SERVICES, DEPT OF

                                                                                                                                   Filed:        7/3/2012

  Extending the current contract as an emergency for an additional 90 days will allow time to continue

  development of the RFP and minimize serious disruption to client services.

 

  On Sept 12, 2012 an affidavit was received extending the original affidavit to December 31, 2013

   Signed By:  Brett Cox, St Purchasing Officer

      Vendor:  Automated Health Systems, Inc.                                           Notary Date:        6/20/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:        $29,232,408.6                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 23 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  51     HEALTHCARE AND FAMILY SERVICES, DEPT OF

                                                                                                                                   Filed:        7/3/2012

  The Department is in the process of implementing several programs that require actuarially developed rates.

  These include: Medicare/Medicaid Dual Capitation (rates due by July 31, 2012. Along with several others.

 

  On Sept 12, 2012,  an affidavit was received to extend the original contract until March 31, 2013

   Signed By:  Brett Cox, St Purchasing Officer

      Vendor:  Milliman, Inc.                                                                       Notary Date:        6/20/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $150,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  52     HEALTHCARE AND FAMILY SERVICES, DEPT OF

                                                                                                                                   Filed:      9/12/2012

  Maintaining the current contract under a 94 day emergency extension, See 12-4 # 31 for original affidavit.

  The Extension ensures that the enrollment Services offered to clients under the current contract are not

  disrupted.

  A new RFP for these services has been issued and contract was awarded on 8/23/12. Until a new contract is in

   effect and transition activities completed, if necessary, extension of the current contract vendor is in the best

  interest of the State.

   Signed By:  Brett Cox, State Purchasing Officer

      Vendor:  Automated Health Systems                                                   Notary Date:          9/6/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:        $1,200,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 24 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  53     PUBLIC HEALTH, DEPARTMENT OF                               

                                                                                                                                   Filed:        7/3/2012

  Extending an existing contract for such period of time as is needed to conduct a competitive bid. The

  Department continues to need a method of sending ground blood samples to labs for genetic testing of new

  born infants.

   Signed By:  Gary Robinson, Dep Director

      Vendor:  United Parcel Service                                                            Notary Date:        6/28/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $127,500.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  54     PUBLIC HEALTH, DEPARTMENT OF                               

                                                                                                                                   Filed:      9/21/2012

  The Dept of Public Health Lab does not currently have a contract for purchasing supplies for testing. Routinely,

  the laboratories purchase supplies well over the threshold for contract procurement. While CMS is procuring a

  multi-agency laboratory supplies contract, the laboratories are unable to purchase supplies. This is currently

  causing the laboratories to discontinue some testing for bio-terrorism and food borne outbreaks.

   Signed By:  David Culp, Deputy Dir

      Vendor:  Fisher Scientific Co.                                                              Notary Date:        9/12/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $300,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 25 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  55     STATE POLICE, DEPARTMENT OF                                

                                                                                                                                   Filed:      7/12/2012

  This is to extend the current contract for 3 months of the existing contract for FOID Fee Remittance. The 3

  month contract was approved but this addendum is needed for the IPB posting to match the total value of the

  Awarded contract. The previous affidavit only reported the $15,000 estimated for the ISP which is 40 percent

  of the total. The Dept of Natural resources has also co-signed this contract. Their portion represents 60 percent

   of the total or $22,500. The total reflected in this affidavit is $37,500.

   Signed By:  Hiram Grau, Dir of State Police

      Vendor:  Illinois National Bank                                                           Notary Date:          7/9/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $37,500.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  56     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:        7/2/2012

  The provisions of rock salt contract #4016218 require the Department to purchase at minimum 80% of the

  estimated contract quantity.

   Signed By:  William Frey, Dir of Div Highways

      Vendor:  Cargill Salt Division                                                              Notary Date:        6/29/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $24,708.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 26 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  57     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:        7/2/2012

  The provisions of rock salt contract #4016217 require the Dept to purchase at Minimum 80% of the estimated

  contract quantity.

   Signed By:  William Frey, Dir of Div of Highways

      Vendor:  North Amer Salt Co                                                              Notary Date:        6/29/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $24,708.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  58     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:        7/3/2012

  The process for selecting a vendor for a new ARRA/FFATA contract for FY13 is not complete and the 2012

  Q2 1512 ARRA reports are required to be submitted to federal reporting.gov on July 10, 2012. Federal

  ARRA funds would be lost if these repots are not submitted on time.

   Signed By:  William Frey, Acting Dir. Of Highways

      Vendor:  Capitol Strategies, Inc.                                                          Notary Date:          7/3/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $50,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 27 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  59     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:      7/10/2012

  This is extending the contract from 12-4 item Number #35 from July 15, 2012 - December 14, 2012.

 

  This is for rental of a paver and roller to provide equipment to meet the operational needs.

   Signed By:  Justan Mann, Bureau Chief

      Vendor:  Various                                                                                 Notary Date:          7/9/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00            $80,000.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  60     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:      7/18/2012

  The provisions of rock salt contracts require the Department to purchase at minimum 80% of the estimated

  contract quantity. The department does not have adequate facilities for Storage of the excess material

  approximately 130,000 tons. The material must be covered to prevent damage to the material and damage to

  the environment. Tarping is the most economical method for covering this salt which will be stored for future

  use. Rayner Covering Systems was the only vendor we were able to locate that provides this type of service in

  Illinois. The material to be tarped is located throughout the state at various IDOT facilities.

   Signed By:  Aaron Weatherholt, Dep Dir of Highways

      Vendor:  Rayner Covering Systems, Inc.                                             Notary Date:        7/17/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $200,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 28 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  61     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:      8/16/2012

  This is an extension of 12-4 # 39, IDOT paid to have the vendor conduct aerial surveys of the entire state of

  Illinois. If we do not take immediate action, the project will not be completed in a timely fashion and the federal

  funds will be lost.

   Signed By:  Aaron Weatherholt, Dept Director

      Vendor:  AeroMetric                                                                            Notary Date:        8/14/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:        $1,250,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  62     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:      9/14/2012

  Rental of a Snooper to perform bridge inspections to meet the Federal Code of Regulations 23, National

  Bridge Inspection Standards. The rental is required because the state owned vehicle that was used to handle

  these inspections was destroyed in an accident and cannot be fixed due to the possibility of spoilization of

  evidence in the courts. It takes anywhere from 12 to 18 months to replace the bridge inspection crane once the

  bid is secured and approved.

   Signed By:  D. Carl Puzey, Engineer of Bridges

      Vendor:  McClain & Co.                                                                      Notary Date:        8/30/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00            $35,640.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 29 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  63     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:      9/25/2012

  The District is in need of repair of Motorist Caused Highway Damage to guardrail and cable median throughout

   the district and currently has no means to authorize these repairs within limits of procurement rules as renewal

  of the current contract is not yet fully executed and still pending.

   Signed By:  Omer Osman, Deputy Director

      Vendor:  Illini Excavation and Reclamat                                             Notary Date:        7/24/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $195,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  64     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:      9/26/2012

  A slope stability problem had developed along IL 141 in White County. Approximately 2.7 miles of

  embankment on both sides of the roadway show signs of settlement and shoulder separation. The settlement

  was noticed after a heavy rain on 9-5-12 and appears to be still moving in many areas. The slopes are 2:1 and

  located through the Wabash River flood plan. The shoulder has separated from the edge of the pavement and

  dropped vertically 4'-6' over much of this area.

   Signed By:  Omer Osman, Deputy Director

      Vendor:  E. T. Simonds                                                                       Notary Date:        9/24/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $649,350.07                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 30 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  65     CAPITAL DEVELOPMENT BOARD                                  

                                                                                                                                   Filed:      11/2/2011

  The Department of Juvenile Justice is requesting immediate assistance with the abatement and removal of all of

  the floor tile and mastic in the Adams and Lincoln cottages. The cottages suffered flooding from the youth toilets

   that have caused the existing vinyl floor tiles to separate and expose the asbestos adhesive mastic.

   Signed By:  Gus Behnke, Chief Fiscal Officer

      Vendor:  United Analytical Services                                                    Notary Date:      10/27/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $100,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  66     CAPITAL DEVELOPMENT BOARD                                  

                                                                                                                                   Filed:      7/11/2012

  On June 29, 2012, a severe storm caused significant physical damage to the DCC. As a result, at least 10

  buildings sustained roof damage and require repair and or replacement. Roof top HVAC units on a housing unit

  were damaged and or blown from the roof of the building and need to be repaired or replaced. 2 Vendors for

  this job.

  #1 Sterling Commercial Roofing, Inc. is repairing and replacing the damaged roofs.

  #2 Loescher Heating and Air Conditioning, is evaluating and repairing/replacing the housing unit roof to HVAC

  units.

   Signed By:  Gus Behnke, Chief Fiscal Officer

      Vendor:  Various Vendors                                                                   Notary Date:        7/10/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $300,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 31 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  67     CAPITAL DEVELOPMENT BOARD                                  

                                                                                                                                   Filed:        8/1/2012

  The Governor has determined that IYC - Joliet will close by Oct 31, 2012. The DJJ therefore must make

  emergency preparations to relocate maximum security residents from Joliet to IYC- St Charles. Based on the

  accelerated schedule presented by the A/E on the renovation and upgrade project already underway, the

  project will not be completed with the six cottages ready to occupy until February 2013. Every additional

  month that IYC-Joliet would have to remain open requires up to an additional 1.7 million in operating funds that

  are not available. GOMB has indicated that there is funding in the budget to keep IYC-Joliet open until the end

  of 2012.

   Signed By:  Gus Behnke, Chief Fiscal Officer

      Vendor:  Various Vendors                                                                   Notary Date:        7/30/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:        $4,091,939.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  68     CAPITAL DEVELOPMENT BOARD                                  

                                                                                                                                   Filed:        8/3/2012

  On June 29 a severe storm caused physical damage to the Dixon Corr. Ctr. As a result at least 10 buildings

  sustained roof damage and require repair or replacement. Roof to HVAC units on a housing unit were damaged

   and or blown from the roof of the building and need to be repaired or replaced.

   Signed By:  Gus Behnke, Chief Fiscal Officer

      Vendor:  Various                                                                                 Notary Date:          8/1/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $350,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 32 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  69     CAPITAL DEVELOPMENT BOARD                                  

                                                                                                                                   Filed:        9/4/2012

  The Fourth District appellate Court Waterway transformer is failing. It is leaking fluid and is incorrectly wired.

  The transformer is no longer capable of providing adequate and reliable service to the Fourth District Appellate

  Courthouse and is the only source of electricity to the building. The oil supply in this transformer cannot be

  readily replenished, and the extensive oil leaks have led to overheating, with melting and peeling of nearby paint.

   When in session Appellate Court judges maintain residency in the building.

   Signed By:  Gus Behnke, Chief Fiscal Officer

      Vendor:  B & B Electric                                                                       Notary Date:        8/30/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $50,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  70     CAPITAL DEVELOPMENT BOARD                                  

                                                                                                                                   Filed:      9/18/2012

  The sanitary force main, northeast of Kelso Hollow is very fragile, failed and is exposed at several locations

  within at least 2 ravines. The existing sanitary systems is over 40 years old and due to the age and condition of

  the pipe, additional breaks may occur in different locations creating serious environmental and public health

  concerns. The scope provides for replacing the force main sewage pipe lift station to the Village sewer system.

  Also replacing one nonfunctioning force main pump and if necessary installing storm water culverts.

   Signed By:  Gus Behnke, Chief Fiscal Officer

      Vendor:  Petersburg Plumbing                                                             Notary Date:        9/14/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $50,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 33 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  71     CAPITAL DEVELOPMENT BOARD                                  

                                                                                                                                   Filed:      9/18/2012

  The roof at the Power House building at the East Moline Correctional Center has extensive damage and is in

  non-repairable condition. The Power House provides the heating, air conditioning, domestic hot water and

  steam for the entire facility. The roof needs replacement prior to the winter season to insure the integrity of the

  building's contents.

   Signed By:  Gus Behnke, Chief Fiscal Officer

      Vendor:  Various Vendors                                                                   Notary Date:        9/14/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $300,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  72     ILLINOIS POWER AGENCY

                                                                                                                                   Filed:      9/11/2012

  The deadline to renew this contract was overlooked. In order for the Agency to meet the September 2012 filing

   deadlines for required GAAP packages and financial statements to the Comptroller, this contract is in need of

  an extension. Additionally, the Agency is working with the vendor to complete the Operations & Reporting

  Manuals by the expected end date.

   Signed By:  Kristene Callanta, CFO

      Vendor:  Crowe Horwath, LLP                                                            Notary Date:        8/31/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $30,500.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 34 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  73     ENVIRONMENTAL PROTECTION AGENCY                             

                                                                                                                                   Filed:      8/31/2012

  The Agency is seeking to extend the Master Contract #4015354. The contract expires on August 31, 2012.

  This contract allows the agency to purchase known chemical standards that are utilized for comparison against

  samples that are taken from drinking water, waste water, hazardous waste, rivers and streams. The known

  chemical standards are used to compare the samples to known compounds for identification and concentration.

 

  This contract extension is needed to allow for the continuation of successful sampling and testing, Successful

  testing is ct=critical to the health and safety of the citizens of the state.

   Signed By:  John Kim, Interim Director

      Vendor:  Absolute Standard, Inc.                                                         Notary Date:        8/31/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $15,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  74     HOUSING DEVELOPMENT AUTHORITY, ILLINOIS                   

                                                                                                                                   Filed:      7/20/2012

  The Authority and US Bank are still in the process of negotiating the new contract and will not have negotiations

   finalized by the expiration of the emergency contract on July 11, 2012. To avoid serious disruption to State

  services the Authority needs to extend the emergency contract an additional 90 calendar days. This additional

  time will allow for the Authority and US Bank to conclude negotiations and enter into a new contract.

   Signed By:  Amanda Carone, Legal Dept Admin

      Vendor:  US Bank                                                                               Notary Date:        7/11/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $275,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 35 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  75     HOUSING DEVELOPMENT AUTHORITY, ILLINOIS                   

                                                                                                                                   Filed:      8/17/2012

  This is an extension of the Emergency Affidavit 12-4 # 45. The authority is in need of an extension of its

  emergency contract for the Services for an additional 90 days to provide sufficient time to complete the RFP

  process.

   Signed By:  Amanda Carone, Legal Dept Administrator

      Vendor:  McGuireWoods and IL Gov Consul                                      Notary Date:          8/9/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00            $30,000.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  76     HOUSING DEVELOPMENT AUTHORITY, ILLINOIS                   

                                                                                                                                   Filed:      8/31/2012

  The Authority requires the services of Municipal Housing Investment Banking firms to issue a sell debt and

  purchase and settle mortgage-backed securities. Through the issuance and sale of debt along with settlement of

  securities, the Authority and the State will be able to accomplish its mission of providing decent, safe and

  sanitary housing for persons and families of low and moderate income and residential mortgages.

   Signed By:  Amanda Carone, Legal Dept Administrator

      Vendor:  Various Vendors                                                                   Notary Date:        8/27/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $461,250.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 36 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  77     TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                                                   Filed:        4/2/2012

  The Tollway requires a supplement to this existing contract since there are not sufficient dollars to complete

  acquisition of approximately 1 billion dollars worth of real estate, resulting from the approval of the "Move

  Illinois" program.

   Signed By:  John Donato, Chief of Procurement

      Vendor:  Civiltech Engineering, Inc.                                                    Notary Date:        3/23/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00            $50,000.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  78     TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                                                   Filed:      7/11/2012

  Toll Plaza 61 is a 24 hour manned collection center. Currently three critical HVAX systems are in need of

  repair. Without cooling inside the booths, temps can reach unsafe levels. Two of the three systems supply

  cooling for the tollbooths that are staffed. The third system is a back-up systems that supports Toll way

  communications equipment. Without this back-up system, communications equipment could malfunction or be

  destroyed due to the extreme heat should the primary HVAC fail. Communications equipment is vital to

  providing service, as it is required to dispatch ISP and Toll way emergency equipment that operate system wide.

   Signed By:  John Donato, Chief of Procurement

      Vendor:  Complete Temperature Systems                                            Notary Date:          7/3/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00            $47,500.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 37 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  79     TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                                                   Filed:        8/1/2012

  The original Emergency Purchase Affidavit was for June 1, 2012 - August 29, 2012 with an estimated cost of

  $853,050.00. This new affidavit is a for a 7 month extension at a cost of $1,137,400 for a total of $1,990,450.

 

 

  This is for FY 12 4th Qtr and FY13 Qtr 1

   Signed By:  John Donato, Chief Procurement

      Vendor:  IGOR the WatchDog                                                             Notary Date:        7/10/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:        $1,990,450.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  80     TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                                                   Filed:      8/15/2012

  On May 18, 2012 the Tollway was notified by its construction manager, Dynasty Group that the salt dome

  located at the M-8 maintenance yard displayed elements of structural deterioration. It was recommended the

  salt dome superstructure be demolished and replaced with a new salt dome.

   Signed By:  John Donato, Chief of Procurement

      Vendor:  Penn Services, LLC                                                               Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                                         $470,000.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 38 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  81     TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                                                   Filed:        9/7/2012

  This is a six month extension of Emergency Purchase Affidavit 12-3 #95, the estimated cost is now

  $5,310,000.00.

  This is to provide a means for uninterrupted call center operations, to ensure continuous services and associated

   revenue for Illinois Tollway customers.

   Signed By:  ,

      Vendor:  TransCore LP                                                                        Notary Date:        8/15/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:        $5,310,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  82     CHICAGO STATE UNIVERSITY                                   

                                                                                                                                   Filed:      8/10/2012

  The University is currently without a vendor to provide support for its telephone and adjunct systems that enable

   communications internally and externally. This puts the University at risk and offers a liability because the

  University is unable to offer Telecommunications service to customers, staff or students.

   Signed By:  Glenn Meeks, VP of Administration

      Vendor:  AT & T                                                                                 Notary Date:          8/7/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $75,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 39 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  83     CHICAGO STATE UNIVERSITY                                   

                                                                                                                                   Filed:      8/13/2012

  The institution requires the emergency purchase of NCAA Group Basic Accident Medical insurance coverage

  for student-athletes which is necessary to continue operation of its intercollegiate athletics program in a manner

  that mitigates significant health and financial risks and is in the best interest of the institution.

   Signed By:  Glenn Meeks, VP of Admin

      Vendor:  Summit America Insurance                                                   Notary Date:          8/9/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $79,100.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  84     SOUTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:      7/26/2012

  Due to misinterpretation of the original contract the renewal date has passed. The LMS is the primary source

  for all of our online courses, as well as a resource for approximately 85% of on-campus courses. We cannot

  meet the teaching needs of the University in the interim without an LMS, which provides course-work, testing,

  surveys, ePortfolios.

   Signed By:  Debbie Abell, Interim Dir of Procurement Ser

      Vendor:  Desire 2 Learn                                                                      Notary Date:        7/24/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00            $78,294.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 40 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  85     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:

  On Aug 3, 2012 the underground High temperature water piping began to leak from the 728 W. Roosevelt

  building. This vendor is familiar with the University campus.

   Signed By:  Kevin Fair, Interim Director

      Vendor:  Kroeschell Service                                                                Notary Date:          8/9/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $100,000.00                                                                               13               1

     Federal Cost                   $0.00                     $0.00

  86     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:        7/5/2012

  OK Enterprises has for sale a used forage harvester and heads that would be configured to our specifications

  for cut length and discharge method to meet our research needs. Time is of the essence, this machine will not be

   on the market long enough to institute a formal procurement process.

   Signed By:  Janet Milbrandt, Interim Director

      Vendor:  OK Enterprises, LLC                                                             Notary Date:          7/2/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00          $101,000.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 41 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  87     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:      7/10/2012

  The old chiller system for the Student Service Auxiliary Building at 1200 W. Harrison St, Chicago, IL started to

   fail.

  On June 27th the Purchase order P0646130 was approved to provide the emergency rental (one month) of a

  40 ton portable trailer chiller and the labor associated to tie the temporary chiller into the building chilled water

  system.

   Signed By:  Kevin Fair, Dir of Purchasing

      Vendor:  Kroeschell Services, Inc.                                                       Notary Date:        6/28/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $100,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  88     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:      7/16/2012

  A contract was negotiated in 2004 with the University of Chicago Hospitals to provide Radiation Oncology

  services as the University of Illinois Hospital at Chicago does not employ Specialized personnel. The services

  include Four full time attending Physicians, Tow Full time PhD Medical Physicists and Five Resident Physicians.

   These personnel services are to be available 24/7 for all 365 days per year for onsite impatient and outpatient

  Radiation Oncology services.

   Signed By:  Kevin Fair, Interim Dir of Purchasing

      Vendor:  University of Chicago                                                           Notary Date:        7/12/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $639,350.75                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 42 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  89     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:      9/17/2012

  A contract was negotiated in 2009 with the Center for Children's Digestive Health to provide Gastroenterology

  services to the Pediatric Unit of the U of I Hospital and Health Sciences System. The contract expires on Sept

  15, 2012. This emergency procurement will provide uninterrupted Gastroenterology service coverage until a

  formal solicitation process is completed.

   Signed By:  Kevin Fair, Dir of Purchasing U of I Chicago

      Vendor:  Center for Children's Digestiv                                               Notary Date:        9/13/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $100,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  90     WESTERN ILLINOIS UNIVERSITY                                

                                                                                                                                   Filed:      7/13/2012

  The existing Trane centrifugal chiller at Currens Hall was damaged in a fire on June 28, 2012. Offices and

  classes had to be relocated while the building was closed due to lack of cooling during the extremely high

  temperatures. A temporary rental chiller was installed allowing the building to be open for business on July 2,

  2012. The University awarded a contract to the chiller manufacturer for the necessary parts and repair service

  to get the existing chiller back up and running.

   Signed By:  Lora Lidaywa, Purchasing Officer

      Vendor:  Trane, Inc.                                                                            Notary Date:        7/11/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00            $96,638.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 43 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  91     AGRICULTURE -  GENERAL OFFICE                              

                                                                                                                                   Filed:      8/31/2012

  A letter was received dated August 30, 2012 reporting the actual cost of item # 25 of 13-1 reported as

  $52,000.

   Signed By:  Laurel Leuenberger, Agency Procurement Officer

      Vendor:  KMS Promotions                                                                   Notary Date:        8/30/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00            $52,000.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  92     CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:        8/2/2012

  A letter was received on  Aug 1, 2012 for an actual cost of $779,361, from 1/1/12 - 3/3/12 then extended

  from 3/3112 - 7/28/12 with a letter dated  Aug 22, 2012 for an actual cost of $2,143,706.27. For a final actual

   cost of $2,923,067.41.

   Signed By:  Jan Morrow, COO

      Vendor:  Fisher Scientific Co.                                                              Notary Date:        8/15/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $979,361.14       $2,923,067.41                                                 13               1

     Federal Cost                   $0.00                     $0.00

  93     CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:      9/10/2012

  A letter was received dated Sept 7, 2012 reporting the actual cost of Item# 8 FY12 Quarter 4 as

  $1,057,230.00.

   Signed By:  James Ellenberg, Manager

      Vendor:  Sprint Communications                                                         Notary Date:          9/7/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $935,598.72       $1,057,230.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 44 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  94     COMMERCE AND ECONOMIC OPPORTUNITY,

                                                                                                                                   Filed:      5/18/2012

  Letter was received on May 17, 2012 for a Final Cost of $191,305.51 Item # 10 in FY 12-1

   Signed By:  David Vaught, Acting Dir of DCEO

      Vendor:  Daniel Edetman                                                                    Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $224,000.00          $191,305.51                                                 13               1

     Federal Cost                   $0.00                     $0.00

  95     DEPARTMENT OF JUVENILE JUSTICE

                                                                                                                                   Filed:      8/17/2012

  A letter was received on August 15, 2012 for the actual cost of Item # 14, FY 12-4, final cost $60,000.

   Signed By:  Michael Steward, Superintendent

      Vendor:  Exclusive Construction Service                                             Notary Date:          8/9/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $60,000.00            $60,000.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  96     DEPARTMENT OF JUVENILE JUSTICE

                                                                                                                                   Filed:      8/29/2012

  A letter was received on August 22, 2012 for Item # 19 FY11-4, Item #16 FY12-1, Item # 22 FY 12-2

  Item# 12-3 #22

  Original Affidavit had a start date of 4-20-11 to 7-18-11, contract extension for 7-19-11 to 10-15-11,

  contract extension 10-16-11 to 1-13-12, contract extension 1-14-12 to 4-12-12 for a total of $161,840.45.

   Signed By:  ,

      Vendor:  Wells Center                                                                         Notary Date:          4/5/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00          $161,840.45                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 45 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  97     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:        5/2/2012

  A letter was received on May 1, 2012 with a final cost of $63,781.76 for item # 12 FY 11-2

   Signed By:  Nicki Patterson, Deputy Chief Procurement Offic

      Vendor:  Various                                                                                 Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $200,000.00            $63,781.76                                                 13               1

     Federal Cost                   $0.00                     $0.00

  98     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:        9/4/2012

  A letter was received on August 28, 2012 for Item# 16 FY 13-1, for a Final cost of $52,009.00

   Signed By:  Nedra Chandler, Warden at Dixon

      Vendor:  Patten Energy System                                                            Notary Date:        8/23/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $56,000.00            $52,009.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  99     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:        9/4/2012

  Letter was received on August 29, 2012 for Item # 25 for FY12-2, actual cost $115,522.50

   Signed By:  Marcus Hardy, Warden At Stateville

      Vendor:  Retrieval Business Systems                                                   Notary Date:        8/24/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $36,720.00          $115,522.50                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 46 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  100   CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:        9/4/2012

  A letter was received on August 28, 2012 for Item # 33 FY12-2 and Item# 9 FY12-3 for a final cost of

  $174,925.47

  Item# 9 FY12-3 was a contract extension.

   Signed By:  Shelith Hansbro, Warden of Decatur

      Vendor:  Wells Center                                                                         Notary Date:        8/22/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $183,068.82          $174,925.47                                                 13               1

     Federal Cost                   $0.00                     $0.00

  101   CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:        9/4/2012

  A letter was received on August 29, 2012 for the final cost of item # 32 FY 21-2 @ $148,634.50

   Signed By:  James Clinton, Acting Superintendent

      Vendor:  Various Vendors                                                                   Notary Date:        8/22/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $163,687.50          $148,634.50                                                 13               1

     Federal Cost                   $0.00                     $0.00

  102   CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:        9/4/2012

  A letter was received for the actual cost of item # 28 FY 12-2 @ $51,350

   Signed By:  Marcus Hardy, Warden @ Stateville

      Vendor:  Marcus Food Co.                                                                  Notary Date:        8/24/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $51,350.00            $51,350.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 47 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  103   CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:        9/5/2012

  A letter was received on August 30,2012 for item # 4 FY10-3 for a final cost of $174,620.80

   Signed By:  Donald Gaetz, Warden at Menard

      Vendor:  Kehrer Bros Const Co.                                                          Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $450,000.00          $174,620.80                                                 13               1

     Federal Cost                   $0.00                     $0.00

  104   CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:        9/5/2012

  A letter was received on August 27, 2012 for a final cost of Item# 12 FY10-4, $36,443.31

   Signed By:  Jody Hathaway, Warden

      Vendor:  Heartland Mechanical                                                           Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $229,500.00            $36,443.31                                                 13               1

     Federal Cost                   $0.00                     $0.00

  105   CORRECTIONS, CORRECTIONAL CENTER - HILL                    

                                                                                                                                   Filed:        6/1/2012

  A letter was received on May 31, 2012 for an actual cost of item# 22 FY12-2 @ $14,997.21

   Signed By:  Tim Gleason, Chief Executive Officer

      Vendor:  Mechanical Services                                                             Notary Date:        5/17/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $40,000.00            $14,997.21                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 48 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  106   CORRECTIONS, CORRECTIONAL CENTER - JACKSONVILLE

                                                                                                                                   Filed:      8/29/2012

  A letter was received on August 22,2012 for the actual cost of item # 30 FY12-2 @ $67,734.44

   Signed By:  Glen Austin, Warden

      Vendor:  Civigenics                                                                             Notary Date:        8/17/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $68,832.54            $67,734.44                                                 13               1

     Federal Cost                   $0.00                     $0.00

  107   CORRECTIONS, CORRECTIONAL CENTER - MENARD           

                                                                                                                                   Filed:      7/24/2012

  There is no master contract for Terry Cloth material. This material is required by Illinois Correctional Industries

  to manufacture Terry Towels, Terry Washcloths and Bibs that are supplies to residents in State mental health

  facilities, residents in the Illinois Department of Juvenile Justice centers and inmates in the Illinois Department of

  Corrections. Without this material Menard Correctional Industries will be unable to meet current and back

  orders.

  A replacement contract is not due to be in place until at least October.

 

  A letter was received on September 24 for the Final Cost $167,670.09

   Signed By:  Bill Westfall, ICI Supervisor

      Vendor:  J. Weinstein & Sons, Inc.                                                      Notary Date:        7/17/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $167,750.00          $167,670.09                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 49 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  108   CORRECTIONS, CORRECTIONAL CENTER - MENARD           

                                                                                                                                   Filed:      7/24/2012

  Illinois Correctional Industries manufactures pillowcases and sheets which are provided to State mental health

  centers and residents in the IL Dept of Juv Justice centers and inmates in the IL Dept of Corrections.

  There is no master contract for 66' wide sheet material.

 

  A letter was received on Sept 24, 2012 for a Final Cost $ 92,000.00

   Signed By:  Bill Westfall, ICI Supervisor

      Vendor:  American Textiles Systems                                                   Notary Date:        7/17/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $92,000.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  109   CORRECTIONS, CORRECTIONAL CENTER - STATEVILLE     

                                                                                                                                   Filed:        9/4/2012

  A letter was received on August 29, 2012 for item # 18 FY 12-3 @ $52,192.71

   Signed By:  Marcus Hardy, Warden

      Vendor:  Black Dog Chicago Corp                                                      Notary Date:        8/24/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $52,200.00            $52,192.71                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 50 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  110   LOTTERY, DEPARTMENT OF THE                                 

                                                                                                                                   Filed:      9/17/2012

  A letter was received on Sept 12, 2012 for actual cost for Item# 38- FY 12-2 @ $32,461.25

  Contract period was from 12/14/11 to 3/9/12

   Signed By:  Maye Kelsey, State Purchasing Officer

      Vendor:  Express Services                                                                   Notary Date:          9/9/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $38,000.00            $32,461.25                                                 13               1

     Federal Cost                   $0.00                     $0.00

  111   LOTTERY, DEPARTMENT OF THE                                 

                                                                                                                                   Filed:      9/21/2012

  A letter was received on September 12, 2012 for the actual cost of an extended contract Item# 38 FY 12-2.

  Contract period was 12/14/11 to 3/9/12

  The actual cost of this item# 28 FY 12-3 for $26,788.56

  Contract period was 3/10/12 to 5/23/12

   Signed By:  Maye Kelsey, State Purchasing Officer

      Vendor:  Express Services                                                                   Notary Date:          9/9/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $33,781.12            $26,788.56                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 51 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  112   MENTAL HEALTH CENTER - CHICAGO READ                        

                                                                                                                                   Filed:      8/30/2012

  A letter was received on August 23, 2012 for the actual cost of Item# 27 FY 12-4 for $46,573.00

   Signed By:  Ellen Otomo, Hospital Administrator

      Vendor:  Fox Valley Fire and Safety                                                   Notary Date:          8/3/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $55,000.00            $46,573.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  113   REVENUE, DEPARTMENT OF

                                                                                                                                   Filed:      9/13/2012

  A letter was received for Item# 32 FY 12-4 for an actual cost. There was no cost affiliated with the Affidavit,

  emergency was not needed.

   Signed By:  Michelle Casey, State Purchasing Officer

      Vendor:  Manpower                                                                             Notary Date:        9/12/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00                     $0.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  114   TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:      7/20/2012

  A letter was received on July 19, 2012 for Item # 38 FY 12-4 for a final cost of $71,000

   Signed By:  Bill Grumloh, Chief Procurement Officer

      Vendor:  K-Five Construction                                                              Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $71,000.00            $71,000.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 52 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  115   TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:      7/24/2012

  A letter was received on July 23, 2012 for Item # 41 Fy 12-3 for a actual cost of $209,485.61

   Signed By:  Omer Osman, Deputy Director

      Vendor:  Mike's Inc.                                                                            Notary Date:        7/23/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $210,000.00          $209,485.61                                                 13               1

     Federal Cost                   $0.00                     $0.00

  116   TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:      7/24/2012

  A letter was received on July 23, 2012 for Item# 37 FY 12-4 for an actual cost of $68,193.00

   Signed By:  Omer Osman, Deputy Dir., Region 5

      Vendor:  Heartland Pump Rental and Sale                                           Notary Date:        7/23/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $70,000.00            $68,193.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  117   TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:      8/16/2012

  A letter was received on August 15, 2012 for the final cost of Item # 49 Fy12-1. Final Cost $628,422.29

   Signed By:  Susan Shea, Dir of Aeronautics

      Vendor:  Hanson Professional Services                                               Notary Date:        8/15/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:        $1,036,650.15          $628,422.29                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 53 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  118   TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:      8/17/2012

  A letter was received on August 16, 2012 for an actual cost for Item3 50 FY 12-1, Actual Cost $ $64,715.20

   Signed By:  Roger Driskell, Deputy Dir of Highways

      Vendor:  R & S Construction                                                               Notary Date:        8/15/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $60,000.00            $64,715.20                                                 13               1

     Federal Cost                   $0.00                     $0.00

  119   TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:      8/29/2012

  A letter was received on August 28,2012 for the actual cost of Item# 65 FY 12-4 @ $88,295.55

   Signed By:  Lori Campbell, Interim Bureau Chief

      Vendor:  McGladrey & Pullen LLP                                                      Notary Date:        8/24/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $95,000.00            $88,295.55                                                 13               1

     Federal Cost                   $0.00                     $0.00

  120   TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:      8/30/2012

  A letter was received for an actual cost of item# 36 FY 12-4 for $129,043.41

   Signed By:  ,

      Vendor:  Stark Excavating                                                                   Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $250,000.00          $129,043.41                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 54 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  121   TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:        9/6/2012

  A letter was received on September 5, 2012 for an actual cost of Item# 48 FY 12-1 for and actual cost of

  $44,784.58

   Signed By:  Aaron Weatherholt, Deputy Director

      Vendor:  Walz Scales                                                                           Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $47,500.00            $44,784.58                                                 13               1

     Federal Cost                   $0.00                     $0.00

  122   TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:        9/6/2012

  A letter was received on September 5, 2012 for item# 57 FY12-1 for $60,000

   Signed By:  Aaron Weatherholt, Deputy Director

      Vendor:  SAIC                                                                                     Notary Date:          9/4/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $60,000.00            $60,000.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  123   TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:      9/21/2012

  A letter was received on Sept 20, 2012 for Item # 39 FY 12-4 for an actual cost of $325,000.

   Signed By:  William Frey, Interim Director

      Vendor:  AeroMetric                                                                            Notary Date:        9/19/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $585,000.00          $325,000.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 55 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  124   CAPITAL DEVELOPMENT BOARD                                  

                                                                                                                                   Filed:

  A letter was received on May 1, 2012 for Item# 46 FY 12-3 for a Final Cost of #32,100

   Signed By:  Nicki Patterson, Deputy Chief Procurement Offic

      Vendor:  Span Systems                                                                        Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $50,000.00            $23,100.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  125   CAPITAL DEVELOPMENT BOARD                                  

                                                                                                                                   Filed:        5/2/2012

  A letter was received on May 1, 2012 for Actual Cost of Item# 58 FY 11-4 for $198,631.53

   Signed By:  Nicki Patterson, Deputy Chief Procurement Offic

      Vendor:  Commercial Mechanical                                                       Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $316,582.00          $198,631.53                                                 13               1

     Federal Cost                   $0.00                     $0.00

  126   CAPITAL DEVELOPMENT BOARD                                  

                                                                                                                                   Filed:        5/3/2012

  A letter was received on May 2, 2012 for the actual cost of Item # 65 12-1 for an Actual Cost of $75,980

   Signed By:  Nicki Patterson, Deputy Chief Procurement Offic

      Vendor:  Elens & Maichin Roofing                                                     Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $90,000.00            $75,980.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 56 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  127   CAPITAL DEVELOPMENT BOARD                                  

                                                                                                                                   Filed:        8/2/2012

  A letter was received on August 1, 2012 for the Actual Cost of Item# 59 FY 12-2 is $74,830

   Signed By:  Nicki Patterson, Deputy Chief Procurement Offic

      Vendor:  Elens Maichin Roofing                                                         Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $90,000.00            $74,830.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  128   CAPITAL DEVELOPMENT BOARD                                  

                                                                                                                                   Filed:        8/3/2012

  A letter was received on August 1, 2012 for Item# 63 FY 12-1 for Actual Costs Total $62,392

  Heartland Medical Est - $36,742 Actual - $31,437.42

  Geissler Roofing Est - $12,500 Actual - $5,881.00

  Lee's Tree Service Est - $8,000 Actual $9,500

  Martin Electrical Est - $30,398 Actual $15,574

   Signed By:  Nicki Patterson,

      Vendor:  Various Vendors                                                                   Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $87,640.00            $62,392.42                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 57 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  129   CAPITAL DEVELOPMENT BOARD                                  

                                                                                                                                   Filed:      8/20/2012

  A letter was received on August 17, 2012 for Item# 63 FY 12-1 for the Actual Cost $1,343,771.24

   Signed By:  Nicki Patterson, Deputy Chief Procurement Offic

      Vendor:  Various Vendors                                                                   Notary Date:        7/12/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:        $1,000,000.00       $1,343,771.24                                                 13               1

     Federal Cost                   $0.00                     $0.00

  130   CAPITAL DEVELOPMENT BOARD                                  

                                                                                                                                   Filed:      8/31/2012

  A letter was received on August 27, 2012 for Item# 48 FY 12-3 for an Actual Cost of $630,449.18

   Signed By:  Nicki Patterson, Deputy Chief Procurement Offic

      Vendor:  Span Systems                                                                        Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $700,000.00          $630,449.18                                                 13               1

     Federal Cost                   $0.00                     $0.00

  131   CAPITAL DEVELOPMENT BOARD                                  

                                                                                                                                   Filed:        9/5/2012

  A letter was received on August 27, 2012 for Item # 27 FY10-4 for an Actual Cost of $529,283.66

   Signed By:  Nicki Patterson,

      Vendor:  Henson Robinson Co                                                            Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $650,000.00          $529,283.66                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 58 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  132   CAPITAL DEVELOPMENT BOARD                                  

                                                                                                                                   Filed:        9/5/2012

  A letter was received for Item # 62 FY 12-1 for a Actual Cost of $28,310.61

   Signed By:  Nicki Patterson, Deputy Chief Procurement Offic

      Vendor:  Jim Taylor                                                                             Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $87,640.00            $28,310.61                                                 13               1

     Federal Cost                   $0.00                     $0.00

  133   ENVIRONMENTAL PROTECTION AGENCY                            

                                                                                                                                   Filed:      7/19/2012

  A letter was received on July 18, 2012 for final cost of Item# 43 FY 12-4 @ $62,690.97

   Signed By:  Tricia Leezer,

      Vendor:  Extra Mile Public Relations                                                   Notary Date:        7/18/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $65,000.00            $62,690.97                                                 13               1

     Federal Cost                   $0.00                     $0.00

  134   ENVIRONMENTAL PROTECTION AGENCY                            

                                                                                                                                   Filed:        8/9/2012

  A letter was received on August 6, 2012

  This is the Final Cost for Item # 63 FY12-2 and the extension of Item # 54 FY12-3 Final - $35,167.25

   Signed By:  Tricia Leezer,

      Vendor:  Bodine Environmental                                                          Notary Date:          8/3/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $89,067.73            $35,167.25                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 59 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  135   ENVIRONMENTAL PROTECTION AGENCY                            

                                                                                                                                   Filed:        8/9/2012

  A letter was received on August 6, 2012

  This is the Final Cost for Item # 62 FY12-2 and the extension of Item # 53 FY12-3 Final - $54,359.02

   Signed By:  Tricia Leezer,

      Vendor:  Bodine Environmental                                                          Notary Date:          8/3/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $91,729.30            $54,359.02                                                 13               1

     Federal Cost                   $0.00                     $0.00

  136   ENVIRONMENTAL PROTECTION AGENCY                            

                                                                                                                                   Filed:        8/9/2012

  A letter was received on August 6, 2012

  This is the Final Cost for Item # 61 FY12-2 and the extension of Item # 52 FY12-3 Final - 156,277.70

   Signed By:  Tricia Leezer, State Purchasing Officer

      Vendor:  Bodine Environmental Services                                            Notary Date:          8/3/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $221,774.55          $156,277.70                                                 13               1

     Federal Cost                   $0.00                     $0.00

  137   HISTORIC PRESERVATION AGENCY                               

                                                                                                                                   Filed:        9/5/2012

  A letter was received on August 27, 2012 for Item# 32 FY10-2 for a final cost $264,619.88

   Signed By:  Nicki Patterson, Deputy Chief Procurement Offic

      Vendor:  Designed Roofing Systems                                                   Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $325,000.00          $264,619.88                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 60 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  138   HOUSING DEVELOPMENT AUTHORITY, ILLINOIS                   

                                                                                                                                   Filed:      8/14/2012

  A letter was received on August 10, 2012 for Item# 44 FY 12-3 for a Final Cost of $27,500

   Signed By:  Brian Quinn, State Purchasing Officer

      Vendor:  U.S. Bank                                                                             Notary Date:          8/9/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $27,500.00            $27,500.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  139   ILLINOIS MEDICAL DISTRICT COMMISSION                       

                                                                                                                                   Filed:      9/18/2012

  A letter was received on Sept 18, 2012, for the Final Cost of Item# 46 FY 12-4 @ $22,890.15

   Signed By:  Mark Jamil, Chief Legal Counsel

      Vendor:  Borschnack. Pelletier                                                            Notary Date:        9/13/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $30,000.00            $22,890.15                                                 13               1

     Federal Cost                   $0.00                     $0.00

  140   TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                                                   Filed:      9/11/2012

  A letter was received on Sept 11, 2012 for the Final Cost of item# 66 FY12-3 for $1,263.00

   Signed By:  ,

      Vendor:  Carl Isermann                                                                       Notary Date:        9/10/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $90,500.00              $1,263.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 61 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  141   TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                                                   Filed:      9/11/2012

  A letter was received on Sept 11, 2012 for the Final Cost of item# 63 FY 12-3 for $1,900

   Signed By:  ,

      Vendor:  Lawrence Necheles                                                               Notary Date:        9/10/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $103,320.50              $1,900.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  142   TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                                                   Filed:      9/11/2012

  A letter was received on Sept 11, 2012 for item# 65 FY 12-3 for the Final Cost - $788.00

   Signed By:  ,

      Vendor:  Frederick Depasquale                                                           Notary Date:        9/10/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $5,712.50                 $788.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  143   TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                                                   Filed:      9/11/2012

  A letter was received on Sept 11, 2012 for the Final Cost of item # 61 FY 12-3 for $2,813.00

   Signed By:  ,

      Vendor:  Marcie Claus                                                                         Notary Date:        9/10/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $10,725.00              $2,813.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 62 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  144   NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:      7/19/2012

  A letter was received on July 19, 2012 for the Final Cost of item# 73 FY12-1 for $103,729.15

   Signed By:  Ben Bagby,

      Vendor:  Travelex International                                                           Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $78,000.00          $103,729.15                                                 13               1

     Federal Cost                   $0.00                     $0.00

  144   NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:        7/3/2012

  A letter was received on July 3, 2012 for the Final Cost of item# 76 FY 12-2 @ $145,412.05

   Signed By:  Al Mueller, Director of Procurement

      Vendor:  Marriott Hotel in Mobile, AL                                                Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $160,000.00          $145,412.05                                                 13               1

     Federal Cost                   $0.00                     $0.00

  145   NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:      7/19/2012

  A letter was received on July 19, 2012 for item # 73 FY 12-1 @ $103,729.15

   Signed By:  Ben Bagby, Chief Procurement Officer

      Vendor:  Travelex International                                                           Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $78,000.00          $103,729.15                                                 13               1

     Federal Cost                   $0.00                     $0.00

10/16/2012                                                         rptQuarterlyWeb                                                    Page 63 of  64


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                    July 1, 2012 through September 30, 2012

  146   SOUTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:        7/5/2012

  The order to Dryer is for Labor, Tools, Equipment and material required to provide new code compliant wet

  pipe sprinkler protection for existing system in the existing Art and Design Building. Needs to be completed

  before classes in August.

 

  Letter received during same quarter for Final cost item  FY13-1 $137,330.00

   Signed By:  Nancy Fairless, Dir of Purchasing

      Vendor:  Dreyer Investment Corp.                                                       Notary Date:        6/28/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $142,300.00          $137,330.00                                                 13               1

     Federal Cost                   $0.00                     $0.00

  147   UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:      8/20/2012

  A letter was received on July 20, 2012 for the Actual Cost of item # 103 FY 12-3 @ $107,898.02

   Signed By:  Janet Milbrandt, Interim Director of Purchasing

      Vendor:  Weatherby Locums, Inc.                                                       Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $450,000.00          $107,898.02                                                 13               1

     Federal Cost                   $0.00                     $0.00