LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  1       AUDITOR GENERAL -  OFFICE OF THE                           

                                                                                                                                   Filed:    11/26/2012

  Actual Cost for Conducting an audit the the Illinois Power Agency

   Signed By:  Bruce Bullard, Director

      Vendor:  Borschnack Pelletier & Co                                                    Notary Date:      11/26/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00            $65,000.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  2       AGING, DEPARTMENT ON                                       

                                                                                                                                   Filed:    11/30/2012

  The Department of Revenue created and still today maintains the processing and support of the Circuit Breaker

  application. IDOR has now indicated that Aging must move all application information and processes from their

  mainframe system by the end of the calendar year. IDoR will not extend the time to allow IDoA to remain on

  their systems starting January 1, 2013. In addition, the general assembly voted to defund and eliminate two of

  the five benefits within the program. Therefore IDoA has been working to create a more cost effective, user

  friendly and internet only application. However due to loss of two supervisors and CFO of key staff within the

  IT department , IDoA is not able to meet this time frame internally. If this procurement is not completed,

  persons with disabilities and seniors would not be able to apply for and receive these benefits, putting their

  health and safety at risk.

   Signed By:  ,

      Vendor:  Capitol Strategies                                                                  Notary Date:      11/28/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $397,500.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                      Page 1 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  3       CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:      10/3/2012

  This lease space houses a DHS Division of Rehabilitation Services office and the current lease expires 9-30-12.

   AN RFI was published, the solicitation produced only one offer, which was deemed non-responsive due to

  deficiencies in required documentation. After further discussion with DHS, we intend to process a new five year

   lease (under 10,000 sq ft and $100K per year). This proposed emergency lease will bridge the gap while we

  process the 5 year lease.

   Signed By:  Rosalind Cook, Leasing Rep

      Vendor:  Chicago Title Land Trust Co                                                 Notary Date:        9/27/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00            $22,498.51                                                 13               2

     Federal Cost                   $0.00                     $0.00

  4       CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:    10/10/2012

  This lease space houses an Adult Transition/Work Release Center foe the Dept of Corrections. The existing

  lease expires Sept 30, 2012. CMS published and RFI, only one offer was received from the incumbent

  landlord and that offer was deemed non-responsive due to deficiencies in the required ownership

  documents.The emergency lease will provide for continued occupancy and payment of rent while CMS

  publishes another Solicitation.

   Signed By:  Bing Tie, Leasing Rep with CMS Property

      Vendor:  Old Second Nat Bank Trust 9635                                         Notary Date:        10/4/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00            $48,513.66                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                      Page 2 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  5       CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:    10/15/2012

  STARCOM 21 was commissioned by the state of IL as a groundbreaking public/private partnership with

  Motorola Inc. This is a statewide, 700/800 MHz, Project 25 compliant, digital, trunked, public safety voice

  radio network that is open to all public safety and public service agencies in IL that enables seamless

  interoperable communications among State, local and federal government users. The STARCOM21 network

  primarily focuses on the day to day 2 way radio communication needs of its subscribers.

   Signed By:  Tiffany Power, IT

      Vendor:  Motorola                                                                               Notary Date:      10/12/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00            $25,500.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  6       CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:    10/26/2012

  An emergency contract for carpentry services is needed at the JR Thompson Ctr., Michael Bilandic Bldg and

  the Chicago Medial Ctr. Our incumbent vendor is not able to adhere to all the terms and conditions set forth in

  the contract; most notably the section mandating two (2) hour response time for emergencies. Given the high

  volume of people that visit these locations, it is critical that we have a carpentry vendor on contract that is

  responsive to our needs in an attempt to minimize threats to public safety and to ensure State operations are not

  disputed.

   Signed By:  Jeremy Bliss, Facilities Manager

      Vendor:  Exclusive Construction                                                         Notary Date:      10/18/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $85,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                      Page 3 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  7       CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:      11/8/2012

  This lease space provides secure evidence storage for ISP Chicago Forensics Lab.

   Signed By:  Rosalind Cook, Leasing Rep

      Vendor:  Chicago Land Trust Co #24995                                            Notary Date:        10/4/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00                 $573.33                                                 13               2

     Federal Cost                   $0.00                     $0.00

  8       CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:      12/6/2012

  This leased facility houses a Dept of Employment Security Office. The existing lease expires on November 30,

  2012. In April of 2012, CMS published RFI #6478 for this facility. Two offers were received, the lowest-cost

  offer was selected and a lease award was published. The incumbent Lessor then submitted a protest which was

  upheld. The lease award was cancelled and CMS has published a new solicitation with offers due on Dec 12,

  2012. This emergency lease is needed to prevent holdover and to allow time to process the RFI.

   Signed By:  Rosalind Cook, Leasing Rep

      Vendor:  Mainsource Bank                                                                  Notary Date:      11/30/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $16,434.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                      Page 4 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  9       CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:    12/17/2012

  The State Of Illinois does not currently have a contract for Lubricants, Grease & Oil. A previous invitation for

  bid did not yield any responsive vendors. An emergency contract will be established until the state can put a

  contract in place.

   Signed By:  Dante Watson, Strategic Manager

      Vendor:  D A Lubricants                                                                     Notary Date:      11/29/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $90,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  10     NATURAL RESOURCES, DEPARTMENT OF                           

                                                                                                                                   Filed:    10/25/2012

  DNR requires an emergency procurement for 3 sewage grinder pumps, starter motors, flange adapters and

  phase monitors for the sewage treatment plant at Starved Rock State Park. Two of the three pumps have failed

  and with the load currently placed on the third pump, failure of the third pump is imminent. The vendor selected

  provided for and installed the existing pumps and components when the STP was rehabilitated from 2000-2002

   under a $1.4 million capital development project. The vendor selected has access to multiple manufactures and

  can provide the best and most economically feasible pump type to meet the criteria at the STP.

   Signed By:  Melissa Orrill, State Purch Officer

      Vendor:  Gasvoda and Assoc.                                                             Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $57,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                      Page 5 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  11     NATURAL RESOURCES, DEPARTMENT OF                           

                                                                                                                                   Filed:      11/9/2012

  DNR procured roofing services for the Clinton Lake State Recreation Area, Camp Quest Shelter and the

  Maintenance Building utilizing the small purchase method in the amount of $36,000. Undiscovered conditions

  have been revealed during the project by the contractor and the exposed structures require remedy to prevent

  further damage from weather elements. An amendment is necessary which shall increase the cost of the

  procurement over the small purchase threshold by $13,751.75.

   Signed By:  Karen Rueter, Acting Purchasing Officer

      Vendor:  Triple K Konstruction Co.                                                     Notary Date:        11/8/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $13,751.75                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  12     NATURAL RESOURCES, DEPARTMENT OF                           

                                                                                                                                   Filed:    12/21/2012

  DNR with the Assistance of DOT procured construction services to eliminate the severe public safety hazards

  presented by mine subsidence that is impacting the east bound lane of IL Rt 15. It was procured as a small

  purchase on the amount of $35,086.44. Another 4-8 inches of sunsidence has not occurred. The additional

  work required is estimated at $25,000.

   Signed By:  Karen Rueter, Acting Purch Officer

      Vendor:  Keeley and Sons                                                                   Notary Date:      12/20/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $25,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                      Page 6 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  13     DEPARTMENT OF JUVENILE JUSTICE

                                                                                                                                   Filed:    10/12/2012

  A 90 day extension is necessary to avoid loss of Federal funding and to ensure that there will be no gap in

  delivery of substance abuse treatment services to juvenile females at IYC Warrenville. Wells Center has the

  required DASA licensure as a provider of Substance Abuse treatment services.

   Signed By:  Debra Miller, PSA

      Vendor:  Wells Center                                                                         Notary Date:      10/14/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $52,282.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  14     DEPARTMENT OF JUVENILE JUSTICE

                                                                                                                                   Filed:    10/12/2012

  A 90 day emergency extension is necessary to avoid loss of Federal funding, to ensure that there will be no gap

  in delivery of clinical post release case management services to juvenile male inmates, and to allow the IDJJ

  sufficient time to rebid this contract. The extension is necessary because a contract renewal award notice was

  not posted to the IL Procurement Bulletin prior to contract start date. TASC is the current case management

  services vendor for the grant-funded Juvenile Male Reentry Program at IYC-Chicago. TASC is also the only

  vendor in IL with the required DASA designated program licensure for clinical post release case management

  services.

   Signed By:  Debra Miller, PSA

      Vendor:  TASC                                                                                    Notary Date:        10/3/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $98,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                      Page 7 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  15     DEPARTMENT OF JUVENILE JUSTICE

                                                                                                                                   Filed:      11/1/2012

  Setlenhouse and Teen Center buildings roofs are leaking and are causing interior damage to the buildings and

  soon result in severe damages to the State Assets. The Setlenhouse which is where all of the Records Office

  records are stored and the other building is the Teen Center where they do Youth Commissary, Youth Rec

  activities. These roofs need to be replaced quickly before winter weather sets and replacement will be

  impossible because of the steep pitch to each of the roofs. The Contractor will supply labor and material to

  remove and replace the roof for both buildings and install extensions to the down spout to move away from the

  building to prevent water damage.  A follow-up was rec'd on Dec. 12, 2012 reporting an actual cost of

  $99,030.00.

   Signed By:  Michael Steward, Sup @ IYC St Charles

      Vendor:  Elens & Maichin Roofing                                                     Notary Date:      10/25/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $100,000.00            $99,030.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  16     DEPARTMENT OF JUVENILE JUSTICE

                                                                                                                                   Filed:    11/26/2012

  The original vendor contract allowed for 3 one-year renewals. The renewal scheduled for 11/13/12 was not

  signed and executed prior to the expiration of the previous renewal on 11/12/12. Approval of the renewal was

  not received from the grant funding agency, the IL Criminal Justice Information Authority in time. A 90 day

  emergency extension is necessary to avoid loss of Federal funding and to ensure that there will be no gap in

  delivery of direct services to youth in the pre and post release Parole Readjustment Program.

   Signed By:  Debra Miller, PSA

      Vendor:  TASC, Inc.                                                                            Notary Date:      11/15/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $60,367.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                      Page 8 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  17     DEPARTMENT OF JUVENILE JUSTICE

                                                                                                                                   Filed:    12/19/2012

  The originial contract allowed for (3) 1 year renewals. The renewal scheduled for 10-1-12 was rejected by

  PPB. A 90 day emergency extension is necessary to avoid loss of Federal Funding and to ensure that there will

  be no gap in delivery of substance abuse screening and assessment service for juvenile males at IYC St Charles

  intake.

 

  This is for the time period of 10-1-2 to 12-29-12

   Signed By:  Deborah Miller, PSA

      Vendor:  Wells Center                                                                         Notary Date:        10/4/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $20,432.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  18     DEPARTMENT OF JUVENILE JUSTICE

                                                                                                                                   Filed:    12/19/2012

  The originial contract allowed for (3) 1 year renewals. The renewal scheduled for 10-1-12 was rejected by

  PPB. A 90 day emergency extension is necessary to avoid loss of Federal Funding and to ensure that there will

  be no gap in delivery of substance abuse screening and assessment service for juvenile males at IYC St Charles

  intake.

  This is for the time period of 12-30-12 - 3-29-13" This is the Second 90 day extension

   Signed By:  Debra Miller, PSA

      Vendor:  Wells Center                                                                         Notary Date:      12/18/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $20,432.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                      Page 9 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  19     DEPARTMENT OF JUVENILE JUSTICE

                                                                                                                                   Filed:    12/19/2012

  The originial contract allowed for (3) 1 year renewals. The renewal scheduled for 10-1-12 was rejected by

  PPB. A 90 day emergency extension is necessary to avoid loss of Federal Funding and to ensure that there will

  be no gap in delivery of substance abuse screening and assessment service for juvenile female offenders at the

  Warrenville IYC. This is for the time period of 12-30-12 to 3-29-13

   Signed By:  Debra Miller, PSA

      Vendor:  Wells Center                                                                         Notary Date:      12/18/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $52,282.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  20     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:    10/12/2012

  This Emergency Purchase is covering the purchase of clinical pre-release and post-release case management

  services for adult female offenders. The prior vendors contract expired on 9/30/12. A renewal option was

  available but the renewal was not posted to the IL Procurement Bulletin prior to the expiration date and the

  contract will need to be re-bid.

   Signed By:  Debra Miller, PSA

      Vendor:  TASC                                                                                    Notary Date:        10/3/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $35,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 10 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  21     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:    10/12/2012

  This Emergency Purchase is to cover the purchase of clinical pre-release and post-release case management

  services for adult male offenders. The prior contract expired on 9/30/12. A renewal option was available but

  the renewal was not posted to the IL Procurement Bulletin prior to the expiration date and the contract will

  need to be re bid.

   Signed By:  Debra Miller, PSA

      Vendor:  TASC                                                                                    Notary Date:        10/3/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $51,216.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  22     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:    10/21/2012

  A 90 day emergency extension is necessary to avoid loss of Federal funding, to ensure that will be no gap in

  delivery of substance abuse treatment services to adult male inmates and to allow IDOC time to rebid the

  contract. Healthcare Alternative Systems (HAS) is the current substance abuse treatment vendor for the grant-

  funded Adult Male reentry program at the Westside Adult Transition Center. HAS also has the required DASA

   licensure as a provider of substance abuse treatment services.

   Signed By:  Debra Miller, PSA

      Vendor:  Healthcare Alternative Systems                                             Notary Date:        10/3/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $62,241.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 11 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  23     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:    10/29/2012

  CMS State Contract for Casings and Cook Bags Contract expired 6-24-12. CMS is unable to provide a

  Estimated date for having a contract in place. Walsroder Packaging LLC was the low bidder.

   Signed By:  Rich Mautino, Acting CEO

      Vendor:  Walsroder Packaging LC                                                       Notary Date:      10/24/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $62,100.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  24     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:    10/29/2012

  This is to extend the Contract 8807015 which expired on 10/14/12. The contract is to provide support for

  Sheridan Corr Center clients upon re-entry into the community. The contract had another renewal clause for 3

  years which was missed. Target has been providing services since 10/15/06. Services are provided are a fixed

  monthly rate per a Schedule D.

   Signed By:  Jim Utley, Asst Warden

      Vendor:  Target Area Development                                                     Notary Date:      10/18/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $45,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 12 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  25     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:    10/29/2012

  Contract 8807099 expired on 10/14/12 as a Purchase of Care contract providing support for Sheridan CC

  clients upon re-entry into the community. The contract had another renewal clause for 3 years which was

  missed. This contract is a CSAC aiding clients upon re-entry into the community. Westside has been providing

  services since 10/15/06. Services are provided at a fixed monthly rate. This is a continuation of services

  allowing for a new contract to be fully implemented.

   Signed By:  Jim Utley, Asst Warden

      Vendor:  Westside Health Authority                                                    Notary Date:      10/18/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $45,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  26     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:    10/29/2012

  CMS State Contract for casings and cook bags expired 6/24/12. CMS is unable to provide a estimated date

  for having a contract in place. Walsroder Packaging was the low bidder.Reference # 22029140

   Signed By:  Rich Mautino, Acting CEO ICI

      Vendor:  Walsroder Packaging LC                                                       Notary Date:      10/24/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $55,884.50                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 13 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  27     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      11/1/2012

  Menard ICI Meat plant is requesting to make an emergency purchase of a meat chipper/roto crawl machine.

  The current machine , which is approximately 20 years old, has broken down and is non repairable. This piece

  of machinery is critical to the day to day operation of the meat plant, and without this piece of equipment

  productions will stop.

   Signed By:  Rich Mautino, Acting CEO of ICI

      Vendor:  REISER                                                                                 Notary Date:      10/30/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $55,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  28     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      11/1/2012

  Due to the severe drought in So Illinois, the lake that supplies water to Vienna Corr Ctr and Shawnee Corr Ctr

  is desperately low and the pumps at the lower levels are not operational. If the pumps are not repaired or

  replaced the potential of Vienna Corr Ctr running out of water is eminent. EPA has identified additional

  problems with the Water Treatment Plant that will be addressed and corrected with the installation/repair to

  ensure the proper treatment of the institutional water supply. IDNR will install the valves, but the remainder of

  the installation/repairs will be in-house.

   Signed By:  Randy Davis, Warden

      Vendor:  Siemens Building Technologies                                            Notary Date:      10/15/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $42,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 14 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  29     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      11/8/2012

  Contract 4017096 & 4017097 expired due to signature issues during the contract renewal process. We will

  now need to seek new bids for these lenses as we are without a contract. This 90 day emergency contract will

  allow us to continue production of eye glasses and build inventory for the next 6-9 months while new contracts

  are put into place and inventory ordered from vendors. Dixon Corr Ind provides prescription eyewear for

  HFS,DHS, IDOC, IDJJ. Dixon produces approx 1,600 pair of glasses daily.

   Signed By:  Lisa Devert, Acting Superintendent

      Vendor:  Various                                                                                 Notary Date:      10/31/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $320,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  30     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:    11/12/2012

  A 90 day extension is necessary to avoid loss of Federal funding and to ensure that there will be no gap in

  delivery of substance abuse treatment services to female offenders at Dwight Correctional Center. Wells Center

   has the required DASA licensure as a provider of substance abuse treatment services and meets the

  requirements for staff having or receiving CADC certification within the required timeline.

   Signed By:  Debra Miller, PSA

      Vendor:  Wells Center                                                                         Notary Date:        11/4/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $50,092.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 15 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  31     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:    11/15/2012

  The dishwasher at Stateville Corr Ctr located at the Reception and Classification unit needs to be replaced. It is

   no longer feasible to constantly repair the existing dishwasher as there are several concerns with it. Some of the

   concerns are, the dishwasher does not always drain properly, the conveyer needs to be repaired on a routine

  basis, the soap dispenser does not always work properly, the water is not heated adequately to clean and 

  sanitize the food trays and/or dietary items.

   Signed By:  Marcus Hardy, Warden

      Vendor:  Orbis Construction Co                                                          Notary Date:        11/8/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $103,957.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  32     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:    11/26/2012

  Menard ICI Broom Shop needs to purchase 15,000 lbs of loop mop material to complete back orders and

  meet future demands. The current contract is expired, Ragold the previous vendor has the specifications and

  dimensions of the loop mop material, this is both needed and requested. We urgently need to order product to

  meet the backorder requirements and sustain production for 3rd and 4th quarter orders of FY13.  A follow-up

  letter was rec'd on Dec. 5, 2012 reporting the actual cost of $39,750.00.

   Signed By:  Rich Mautino, Acting CEO of IL Corr Indust.

      Vendor:  Ragold, Corp                                                                         Notary Date:      11/13/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $40,000.00            $39,750.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 16 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  33     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:    11/26/2012

  This Emergency Purchase is covering the emergency purchase of wheat and white flour (1,593,750 pounds)

  31,875 Bags. Illinois Correctional Industries Bakery provides bread, buns and other food staples to various

  local school districts and State agencies including the Department of human Services, Department of

  Corrections, Department of Juvenile justice and the Department of Veterans Affairs. There is no master

  contract in place and ICI will be unable to fill current orders without these raw materials.

   Signed By:  Rich Mautino, SPSA

      Vendor:  Bianchi Milling                                                                     Notary Date:      11/19/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $420,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  34     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:    11/26/2012

  This Emergency Purchase is covering the emergency purchase for Mineral Oil (4,400 gallons) 80 Drums. Illinois

   Correctional Industries Bakery provides bread, buns and other food staples to various local school districts

  and State agencies including the Department of human Services, Department of Corrections, Department of

  Juvenile justice and the Department of Veterans Affairs. There is no master contract in place and ICI will be

  unable to fill current orders without these raw materials.

   Signed By:  Rich Mautino, SPSA

      Vendor:  M. J. Kellner Co.                                                                   Notary Date:      11/19/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $40,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 17 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  35     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:    11/26/2012

  This Emergency Purchase is covering the emergency purchase for Dry Yeast (35,000 pounds) 700 boxes. 

  Illinois Correctional Industries Bakery provides bread, buns and other food staples to various local school

  districts and State agencies including the Department of human Services, Department of Corrections,

  Department of Juvenile justice and the Department of Veterans Affairs. There is no master contract in place and

   ICI will be unable to fill current orders without these raw materials.

   Signed By:  Rich Mautino, SPSA

      Vendor:  Bianchi Milling, Inc                                                              Notary Date:      11/19/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $66,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  36     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:    11/26/2012

  Stateville Correctional Center needs to purchase bulk fuel for their State vehicles without a State Contract. The

  State Contract (#4016449) expired on October 12, 2012 and it could be up to 30 days or longer before a new

   contract is in place. This emergency Purchase request is to prevent or minimize serious disruption in critical

  State services. If the facility has no bulk fuel then State vehicles will have to be filled up at local gas stations.

  This will not only require additional staffing hours, but also the unit cost for gas will be higher as opposed to

  purchasing the fuel in bulk.

   Signed By:  Marcus Hardy, Warden

      Vendor:  Conserve FS                                                                          Notary Date:      11/15/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $65,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 18 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  37     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      12/5/2012

  The equipment in the Vocational Building at Danville Correctional Center has deteriorated to the point where

  they are unable to heat the building. Therefore, the equipment will need to be replaced immediately to avoid

  further damage to State property and to reduce the threat to public health and safety.

   Signed By:  Keith Anglin, Warden of Danville

      Vendor:  A & R Mechanical                                                                Notary Date:      11/13/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $120,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  38     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:    12/10/2012

  Illinois Correctional Industries produces a variety of goods that are supplied to State agencies and local school

  districts. The UPS contract has expired and the new contract is not yet in place. With out a vendor to provide

  shipping, ICI will be unable to fill orders for products such as cleaning supplies, food staples and eyeglasses.

   Signed By:  Rich Mautino, SPSA

      Vendor:  United Parcel Service                                                            Notary Date:        12/5/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $100,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 19 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  39     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:    12/10/2012

  The tanks and heating tubes for the domestic hot water heaters are deteriorated and causing the water to be

  discolored or rusty. The heaters are 20 years old and are still in service at this time. The units need to be

  replaced.

   Signed By:  Zachary Roeckeman, WardeY

      Vendor:  Green Boiler Technologies                                                    Notary Date:      11/21/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $60,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  40     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:    12/14/2012

  Menard Correctional Center is declaring an emergency to rent 8 refrigerated trailers. This is necessary due to a

  leak in the roof of the cold storage building. During a storm the roof leaked profusely, causing a flood in the cold

   storage freezers. This roof will be replaced/repaired as a CDB project. It is necessary  to rent refrigerated

  trailers to store Menard's frozen foods. Menard has contacted a vendor to supply refrigerated trailers. It will

  cost approximately $3,000 per month for each trailer plus fuel costs. Trailer rental is $72,000 for 90 days, Fuel

  cost could run as high as $75,000 for 90 days.

   Signed By:  Michael Atchison, Warden

      Vendor:  PLM Trailer & Cooling Concepts                                          Notary Date:        12/7/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $204,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 20 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  41     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:    12/14/2012

  Due to the fire that occurred at Hardin County Work Camp's Kitchen, it is necessary to lease a portable

  kitchen in order to prepare meals for the residents that reside at the facility in a safe and timely manner. This

  lease will be necessary until the previous kitchen is repaired or until other accommodations have been decided.

   Signed By:  Allan Martin, Warden

      Vendor:  Kitchens to Go                                                                      Notary Date:      11/16/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $38,500.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  42     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:    12/19/2012

  Menard Correctional Center went on Level 1 lock down August 27, 2012. The use of foam trays greatly

  increased during the lock down due to inmates being fed in their cells and not being able to use the reusable

  trays. It is necessary to purchase the foam trays in order to provide the offenders with daily meals while on level

   1 lock down.

   Signed By:  Michael Atchison, Warden

      Vendor:  Industrial Soap Company                                                      Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00          $102,470.40                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 21 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  43     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:    12/19/2012

  The originial contract allowed for (3) 1 year renewals. The renewal scheduled for 10-1-12 was rejected by

  PPB. A 90 day emergency extension is necessary to avoid loss of Federal Funding and to ensure that there will

  be no gap in delivery of substance abuse screening and assessment service for adult female offenders at the

  Dwight Correctional Center. This is for the time period of 12-30-12 to 3-29-13

   Signed By:  Debra Miller, PSA

      Vendor:  Wells Center                                                                         Notary Date:      12/18/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $50,092.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  44     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:    12/19/2012

  Contract expired due to signature issues during the contract renewal process. Seeking new bids for these lenses

   as there is no contract. The  90 day emergency contract will allow us to continue production of eye glasses and

   build inventory for the next 6-9 months while a new contracts are put into place and inventory orders from

  vendors. Dixon Corr Industries provides prescription eye ware for HFS, DHS, IDOC IDJJ. Dixon ICI

  produces 1,600 pair of glasses daily.

   Signed By:  Lisa Devert, Acting Sup at Dixon

      Vendor:  various vendors                                                                    Notary Date:      12/11/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $470,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 22 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  45     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:      10/9/2012

  On Sept 16, 2012 an existing water line that affects the entire Choate facility ruptured. This caused the pipe to

  discharge more than a million gallons of water into the subterranean area of the facility, particularly the tunnel

  system that holds water lines, electrical lines, sewage lines and components of the elevator systems. The water

  itself created a sink hole more than 35 feet in diameter. Special equipment and machinery will be required to

  remove the several tons of dirt and debris from the utility tunnels. Heavy dirt removing equipment was required

  to unearth all sections of the water line that were corrupted by the line break.  A follow-up letter rec'd on Nov.

  30, 2012 stated the actual cost was $24,198.91.

   Signed By:  Cheryl Muckley, Facility Director

      Vendor:  Jones Hydroblast - Choate                                                    Notary Date:        9/18/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $50,000.00            $24,198.91                                                 13               2

     Federal Cost                   $0.00                     $0.00

  46     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:      10/9/2012

  Sewer backup in the general store area of the facility, where food, paper goods and medical supplies are

  stored.  A follow-up letter rec'd on Dec. 14, 2012 stated the actual cost was $13,302.00.

  68 feet of existing concrete, rock and dirt must be removed in order to expose the sewer line. Then concrete

  will be poured and finished to match the existing floor.

   Signed By:  Sarah Imhoff, Bus Administrator

      Vendor:  New Concept Construction, Inc.                                           Notary Date:        9/25/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $20,000.00            $13,302.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 23 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  47     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:      10/9/2012

  The emergency call system at ICRE-Roosevelt is operating poorly, is obsolete and no vendors are currently

  repairing the system or replacing broken units. Because the system is no longer serviced by industries, the ICRE

   Roosevelt IT staff re-programmed and repaired each unit. The new recommended system is Phillips

  CAREPOINT it is a state of the art emergency call system that fits the need of the facility.   A follow-up letter

  rec'd on Dec.12, 2012 stated the actual cost was $54,890.77.

   Signed By:  Therese Manerino, Superintendent

      Vendor:  Philips Lifeline                                                                      Notary Date:        9/26/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $54,890.77            $54,890.77                                                 13               2

     Federal Cost                   $0.00                     $0.00

  48     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:    10/29/2012

  Four separate floor drains broke in dietary. To make repairs this will involve building temporary walls to insolate

   the concrete dust from the cooking area, saw cutting the floor and jack-hammering up the floor to replace the

  broken traps. Replace the bad sections of pipe and traps and open-site drains. Back filling the holes with gravel

  and dirt and pouring new concrete. When the cement is dry the tile needs to be replaced. It is very hard to put

  and exact number on work based on what is buried under cement that you can not see.  A Follow-up letter was

   rec'd on Nov. 8, 2012 reporting the actual cost for $38,920.00.

   Signed By:  Edith Newman, Hosp Administrator

      Vendor:  AMI-SGL Corp                                                                     Notary Date:      10/11/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $68,000.00            $38,920.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 24 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  49     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:    10/29/2012

  The E. Ludeman Center will require and emergency purchase to establish contracts and purchases associated

  with the relocation of the Main Kitchen located at the Tinley Park Mental Health Center to the temporary

  location of the former Oak Forest Hospital kitchen. The Ludeman kitchen has been ordered to be moved from

  the Tinley Park location by November 1, 2012 by DHS Senior Management and Gov's Office. A new kitchen

  at Ludeman is in the process of being procured. Three weeks ago, DHS found the Oak Forest Hospital and

  discussed with them the possibility of renting space for the kitchen. The agreement was executed on Oct 1,

  2012 DHS has to find a temporary location for the kitchen to continue to provide food services for the residents

   of the Ludeman Center. The services required listed are required in order to maintain proper nutrition services

  for the Ludeman Center.

   Signed By:  Glenda Corbett, Acting Center Director

      Vendor:  3 Vendors                                                                             Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $54,600.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  50     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:    10/29/2012

  The existing fire component panels are beginning to degrade causing system failure to 4 out 14 buildings on the

  ISD campus. This results in a life safety issue for our students and staff not having the buildings being monitored

  for fires and server weather. This system also controls our blue light weather alerts for our students and staff.

  Currently, 4 panels have degraded and we do not have a contract to cover the repairs over $10,000. Generally

  we spend under $10,000 annually with Simplex to monitor and repair our fire panels. The current panels we

  have are now at 12 years old and have reached the point where they are now degrading and failing. The 10

  remaining buildings that have not been repaired with new components are showing failures also. The

  components are supplied by Simplex but must be installed by and electrician and Ingram Electric is out current

  contractor for repair and maintenance.

   Signed By:  Joan Forney, Acting Superintendent

      Vendor:  Simplex and Ingram Elec                                                      Notary Date:      10/18/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $163,400.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 25 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  51     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:    11/20/2012

  This Affidavit covers two Vendors. 1) Hellmuth Obata & Kassabaum@ $625,000 2) Walsh Construction Co.

  @ $6,215,000. They have been selected to do the expansion of the Rushville TDF facility. The population has

  quickly been rising since Jan 2010 with an increase from 379 residents to currently 501 residents. The maximum

   clinical number of residents recommended to be 482. the Max capacity is 510. Expansion at the facility is more

   cost effective than the alternative of building or housing residents at another location. If additional capacity is

  not added, the IDHS will be in violation of the state law requiring DHS to house and provide treatment to

  persons deemed by the courts. The TDF has additional land that could be utilized for the expansion of another

  housing unit and would allow continued use of existing services at the facility without disruption to the treatment

  of residents. TDF is requesting an expansion of the current facility, which includes 50 units and related

  infrastructure by July 31, 2013.

  HOK has been selected to design and oversee construction and Walsh Construction has been recommended to

   order and construct the units.

   Signed By:  Gus Behnke, Chief Fiscal Officer

      Vendor:  Hellmuth Obata & Kassabaum; Walsh                                  Notary Date:      11/19/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:        $6,840,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 26 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  52     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:    11/21/2012

  On July 6, 2012 at approximately 8pm, the chiller in the Elgin Mental Health Center's Forensic Treatment

  Program shut down.The repair and maintenance vendor, Exclusive Construction, was called out to diagnose

  and restart the chiller.  The vendor's staff worked on the chiller Friday night into Saturday trying several different

   methos to get the solution pump running so the chiller would operate and cool.  They were not able to get the

  chiller restarted.  The temperaraure was close to 100 degrees.  It was decided to bring in a temporary chiller

  unit to provide temporary cooling to the building.  Unfortunately, it could not get here until Monday and Hospital

   officials to move patients to temporary quarters.  Conserve FS will provide diesel fuel to the generator to run

  the temporary chiller.   A follow-up letter was received letter was received on Nov 21, 2012 stating that no

  funds were expended, and would be funded through another method.

   Signed By:  Paul Brock, Hospital Administrator

      Vendor:  Various                                                                                 Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  53     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:    11/26/2012

  The quote is for labor and Materials for the project. Last night around 8pm a water main started leaking outside

   of pavilion #5. The water flowed into the patient living area and flooded the basement. Exclusive Construction

  was called to have a plumber on site ASAP with a machine to dig. When the plumbing is repaired, cement will

  have to be poured. The basement still needs to be checked for damage.

   Signed By:  Edith Newman, Hosp Administrator

      Vendor:  Exclusive Construction Serv.                                                Notary Date:      11/16/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $22,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 27 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  54     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:    12/12/2012

  The Elisbeth Ludeman Center will require an emergency purchase to establish a contract with a vendor to install

   eight large temporary electric heaters including labor and materials for the Stores Warehouse located at the

  Tinley Park Mental Health Center. The Center has closed and the Main Kitchen at the TPMHC has moved to

  the temporary location of the Former Oak Forest Hospital kitchen until the procurement of a permanent

  kitchen, which will be located at the Ludeman Center is complete. There is not adequate storage space at the

  Oak Forest kitchen for the food and paper products located at the Stores Warehouse. A temporary warehouse

   space was located that the Ludemen Center wanted to rent. However, on 11/15/12 negotiations between the

  landlord and the State were unsuccessful. The Stores Warehouse at TPMHC will remain operational until a

  contract for the rental of warehouse space is finalized.

   Signed By:  Glenda Corbett, Acting Center Director

      Vendor:  Anchor Mechanical                                                               Notary Date:        12/3/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $50,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  55     MILITARY AFFAIRS, DEPARTMENT OF                            

                                                                                                                                   Filed:      10/9/2012

  The Dept of Military Affairs, Marseilles Training Area, requires the purchase of an all terrain toolcat to replace

  their current one that has aged. Equipment is required to oversee Range Training and Billeting Area maintenance

   operations, to include but limited to, safety, security and environmental concerns.

   Signed By:  Leesa Mays, Procurement Officer

      Vendor:  Stoller International                                                               Notary Date:        9/21/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00            $40,800.62                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 28 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  56     HEALTHCARE AND FAMILY SERVICES, DEPT OF

                                                                                                                                   Filed:    11/19/2012

  Datamation Imaging Services will be conducting scanning services for the All Kids Program. There are 60,000

  case files with each file having 150 pages. Failure to demonstrate significant progress toward grant objectives by

   February 2013 will result in the loss of roughly $800,00 in grant funds. The emergency contract will be

  estimated for 90 days, however, depending on the progress made on this project, and the remaining funds and

  time available, the total length of this emergency may require more or fewer than 90 days.

   Signed By:  Brett Cox, St Purchasing Officer

      Vendor:  Datamation Imaging Services                                                Notary Date:      11/15/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:        $1,000,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  57     PUBLIC HEALTH, DEPARTMENT OF                               

                                                                                                                                   Filed:      11/9/2012

  The Office of Health Care Regulation maintains the Health Care Workers Registration. This emergency

  procurement is for assistance with the modification of this web-based application. This procurement is critical to

   the health and safety of residents in health care facilities. The Health Care Worker Registry application is

  accessed by health care facilities across the State of Illinois. This application's purpose is related to the

  performance of background checks on potential employees in health care settings to see if they have been

  convicted of specific crimes that would make them ineligible to work in that environment.

   Signed By:  Tolnette Colon, Dep Dir

      Vendor:  Capital Strategies Consulting                                                 Notary Date:        11/1/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $100,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 29 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  58     PUBLIC HEALTH, DEPARTMENT OF                               

                                                                                                                                   Filed:    12/19/2012

  This emergency procurement is for assistance with the modification of this web-based application. The

  healthcare Worker Registry application is accessed by health care facilities across the State of Illinois. This

  application's purpose is related to the performance of background checks on potential employees in health care

  settings. This is used to see if they have been convicted of specific crimes that would make them ineligible for

  working in the health care field.

   Signed By:  Toinette Colon, Deputy Director

      Vendor:  Capitol Strategies Consulting                                                 Notary Date:      12/13/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $125,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  59     REVENUE, DEPARTMENT OF

                                                                                                                                   Filed:      12/7/2012

  The Illinois Department of Revenue will be the lead agency and procure, along with the Illinois Healthcare and

  Family Services agency, a one-time Threat Assessment Program review of the CMS computer and network

  environment to identify active or dormant threats present on State Computer systems and networks.

  The review includes an assessment of the State Agency's computer systems and a review of network traffic

  transiting between Agency networks and the Internet. Software and Hardware technologies developed for these

   purposes will be provided by MANIDIANT.

   Signed By:  Brad Boroff, Chief Info Sec Officer

      Vendor:  MANDIANT Corp                                                                Notary Date:        12/3/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $80,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 30 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  60     STATE POLICE, DEPARTMENT OF                                

                                                                                                                                   Filed:      11/8/2012

  The laboratories of the Illinois State Police, Division of Forensic Services cannot wait any longer to place orders

   for supplies that are necessary to process evidence in criminal cases. If laboratories do to receive theses

  supplies casework will stop. The consequences are, criminals may be allowed to go free and innocent people

  may remain incarcerated. The vendor selected is the same vendor with whom the State previously had a Master

   Contract.

   Signed By:  Hiram Grau, Dir of St Police

      Vendor:  Fisher Scientific Co.                                                              Notary Date:        11/2/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $240,200.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  61     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:    10/12/2012

  During a routine inspection, critical defects were discovered on the bridge caring IL 199/106 over the Illinois

  River between Scott and Pike Counties, just east of Florence, IL. It was noted that one of the lift bridge's

  sheaves was not aligned properly and was cutting into the adjacent steel support tower. The bridge was

  immediately closed in the up position and an evaluation began to determine the cause and extent of the failure.

   Signed By:  Roger Driskell, Region 4 Engr

      Vendor:  2 Vendors                                                                             Notary Date:      10/10/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $406,993.12                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 31 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  62     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:    10/17/2012

  Funks Grove Rest Area on I-55 south of Bloomington recently had to be closed due to a major failure of it's

  drinking water treatment plant. Failure of this plant has left the rest area with no water for drinking, hand

  washing or flushing toilets. With an estimated 1.4 million visitors utilizing this facility annually it is imperative that

  these repairs be made as soon as possible.

   Signed By:  Aaron Weatherholt, Deputy Director

      Vendor:  GA Rich and Sons                                                                Notary Date:      10/17/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $45,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  63     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:    10/23/2012

  On August 21, 2012 is was discovered that a significant length of guardrail along both sides of US Rt 45, south

  of I-80, in Will County was moving away from the roadway shoulder and sliding down the embankment. In

  addition, significant erosion was observed along the roadway at this location. Since the initial discovery, the

  erosion and guardrail failures have worsened. The displaced guardrail can no longer provide protection to the

  traveling public. Additionally, there has been a vast increase in the slopes erosion. The erosion is threatening to

  undermine the shoulder. The department has closed the shoulder of US Rt 45 to ensure the safety of the

  motoring public. Immediate action is necessary to protect the life, health and safety of the traveling public and to

   prevent further loss of State property.

   Signed By:  John Fortmann, Acting Deputy Director

      Vendor:  D Construction                                                                      Notary Date:      10/18/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $300,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 32 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  64     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:      12/6/2012

  The Department recently lost critical staff due to employees retiring or entering private sector. These positions

  are very technical and require specialized qualifications. The Agency is in need of a personnel service to locate

  candidates who qualify for these critical and unique positions to continue to meet  the Agency's responsibilities.

  If these positions are not filled with qualified employees, it could cause serious disruption to State services that

  affect the safety of the citizens and cause a loss of federal funding. The Agency is in the process of issuing a

  RFP for consulting services to address critical technical operations issues. Capitol Strategies is a local business

  that provides expert level services to Government agencies.

   Signed By:  Matt Hughes, Dir of Fin and Admin

      Vendor:  Capitol Strategies                                                                  Notary Date:        12/6/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $200,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  65     VETERANS' AFFAIRS - GENERAL OFFICE                         

                                                                                                                                   Filed:      10/9/2012

  The second quarter food survey bid was received at a much higher dollar amount than has ever been bid in the

  past. The bid was not accepted. Since no bids were awarded as of Oct 2, 2012 by CMS and are not expected

   to be awarded this quarter, we need to get the Emergency Contract in place to ensure the health of our

  Veterans.

   Signed By:  Deborah Miller, Chief Fiscal Officer

      Vendor:  Prairie Farms                                                                         Notary Date:        10/5/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $43,919.73                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 33 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  66     VETERANS' AFFAIRS - GENERAL OFFICE                         

                                                                                                                                   Filed:      11/8/2012

  The last state contract expired on 8-15-12, we are trying to establish an Emergency contract for a three month

  period to purchase incontinent products as needed during this period. In many cases residents heath issues

  require incontinent briefs in various sizes, and cleansing wipes to comply with Medicare and Medicaid services

  F315 guidelines. To preserve the personal dignity and prevention of skin degradation and decubitus ulcers. We

  are contracting with the last vendor to have the CMS master contract. Previously the Illinois Veteran's Homes

  were meet under a State Master contract PSD4015843, which expired on 8-15-12. No new contract has been

   established with CMS.

   Signed By:  Deborah Miller, Chief Fiscal Officer

      Vendor:  Seneca Medical, Inc.                                                             Notary Date:        11/7/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $146,738.85                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  67     VETERANS' AFFAIRS - GENERAL OFFICE                         

                                                                                                                                   Filed:      11/8/2012

  This procurement is necessary to provide a rooftop replacement AC/Heating unit at the facility to keep

  temperatures at a comfortable and safe level for the members of the Anna Veterans Home, and be incompliance

   with State and Federal Regulations.

   Signed By:  Leasa Ewing, Fiscal Supervisor

      Vendor:  Heartland Mechanical                                                           Notary Date:        11/5/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $17,400.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 34 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  68     VETERANS' AFFAIRS - GENERAL OFFICE                         

                                                                                                                                   Filed:    11/13/2012

  The procurement is for examination gloves at the IL Veteran's Homes. The commodities required are sized

  specific gloves that are used by clinical care staff. The last CMS State Master Contract has expired.

   Signed By:  Deborah Miller, Chief Fiscal Officer

      Vendor:  Globe Medical Surgical Supply                                             Notary Date:        11/8/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $191,626.60                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  69     VETERANS' AFFAIRS - GENERAL OFFICE                         

                                                                                                                                   Filed:    12/14/2012

  Medical supplies for the four IDVA homes. The current state master contract bid out 182 items on the

  solicitation and CMS only awarded 14 of the 182 lines. This procurement is necessary to the Life, Health and

  safety of the residents.

   Signed By:  Deborah Miller, CFO

      Vendor:  Medline Industries                                                                Notary Date:      12/12/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $32,798.19                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 35 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  70     VETERANS' AFFAIRS - GENERAL OFFICE                         

                                                                                                                                   Filed:    12/17/2012

  Aladdin Plastic tray inserts must be used to fit the food trays used to deliver food to the nursing units throughout

  the campus. Other plastic tray inserts have been tried but do not work well with the Aladdin products.

   Signed By:  Deborah Miller, Chief Fiscal Officer

      Vendor:  Aladdin Temp Rite LLC                                                        Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $25,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  71     CAPITAL DEVELOPMENT BOARD                                  

                                                                                                                                   Filed:      9/28/2012

  The roof on the Cold Storage Building at the Menard Correctional Center has failed and is leaking to the extent

  that when it rains, water leaks into the small crawl space where is freezes. As the day heats up, the ice in the

  crawl space melts and the water leaks through the freezer's ceiling and light fixtures causing ice to build up on

  the interior. Theses leaks have also compromised the roofing structure causing it to completely fail. DOC has

  rented temporary freezers and coolers in the interim.

   Signed By:  Gus Behnke, Chief Fiscal Officer

      Vendor:  Baysinger and Jim Taylor                                                     Notary Date:        9/25/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $500,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 36 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  72     CAPITAL DEVELOPMENT BOARD                                  

                                                                                                                                   Filed:    11/20/2012

  The roofs of the Visiting Room and Records Storage building have failed and are leaking causing interior and

  content damage. Bothe of these roofs are beyond repair and requirement replacement to make them watertight

  and limit further interior and content damage.

   Signed By:  Gus Behnke, CFO

      Vendor:  Designed Roofing Systems, Inc.                                           Notary Date:      11/19/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $91,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  73     HOUSING DEVELOPMENT AUTHORITY, ILLINOIS                   

                                                                                                                                   Filed:    10/24/2012

  IL HDA is entering into emergency contracts with three vendors for litigation, real estate, employment and tax

  counsel services. The Authority had issued an RFP for these services with a due date of August 23, 2012

  however, due to a low response rate the Authority chose to cancel the solicitation and re-issue the RFP,

  Responses to the subsequent solicitation are due Oct 23, 2012. The Authority intends to finalize an award

  through the RFP process prior to the expiration of this emergency term which is 11/1/12-1/29-13.

   Signed By:  Amanda Carone, Legal Administrator

      Vendor:  3 Vendors                                                                             Notary Date:      10/18/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $90,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 37 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  74     TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                                                   Filed:    11/16/2012

  Material is need for the Fall Crack Seal Program. Asphalt Crack Seal is critical in the Tollway's preventative

  maintenance program to preserve the life of roadway pavement. Without crack sealing, these cracks would lead

   to asphalt deterioration and decay, eventually resulting in entire road replacement.

   Signed By:  John Donato, Chief of Proc for IL Tollway

      Vendor:  Crafco, Inc.                                                                           Notary Date:      11/13/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $65,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  75     TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                                                   Filed:    12/21/2012

   This request is an emergency purchase of two types of engine oil, and  one type of transmission fluid and two

  types of chassis grease. There is no master contract in place at this time.The commodities to be purchased on

  this contract are used in Tollway vehicles and heavy equipment.

   Signed By:  John Donato, Chief of Procurement

      Vendor:  Progressive Industries Inc.                                                    Notary Date:      12/17/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $70,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 38 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  76     CHICAGO STATE UNIVERSITY                                   

                                                                                                                                   Filed:      11/5/2012

  The University is currently without a vendor to provide support for its telephone and adjunct systems that enable

   communications internally and externally. The state of this circumstance puts the University at risk and offers a

  liability because the University is unable to offer telecommunications service to its customers, staff, or students in

   the event of a system, line, or service outage. In addition, the University is incapable of rendering requests for

  change or new telecommunications service. The University was not able to get an extension on the emergency

  procurement done on 8-1-2012 due to technical difficulties that occurred in the Chief Procurement Officer's

  office.

   Signed By:  Glenn Meeks, VP of Admin

      Vendor:  AT & T                                                                                 Notary Date:        11/5/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $125,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  77     NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:      10/1/2012

  The services of sterling Commercial Roofing, Inc. were engaged to repair a roofing membrane system on Reavis

   Hall following a failure of that system.

   Signed By:  Al Mueller, Purchasing Dir

      Vendor:  Sterling Commercial Roofing                                                Notary Date:        9/25/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $140,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 39 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  78     NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:    11/13/2012

  Services of Sterling were engaged to repair a portion of a roofing membrane system on the NIU Music

  Building. Temporary repairs to the building roof unexpectedly failed under unusual weather conditions recently

  experienced. The scheduled classes at these locations cannot be relocated without serious disruption. The

  immediate work is necessary to ensure safety to the public.

   Signed By:  Al Mueller, Purchasing Dir

      Vendor:  Sterling Commercial Roofing                                                Notary Date:        11/5/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $220,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  79     SOUTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:        8/6/2012

  Expansion of our wireless network to the rest of campus, replacement of our core networking switches that are

  at the end of their useful lifecycle. Both projects require extensive purchases of Cisco equipment. By far the best

   time of year to purchase Cisco products is in July because the end of July is the end of Cisco's fiscal year.

  Because of this, Cisco is able to offer pricing discounts to their suppliers beyond what is available during the rest

   of the year.

   Signed By:  Debbie Abell, Interim Director

      Vendor:  World Wide Technology                                                       Notary Date:        7/26/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00          $492,598.90                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 40 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  80     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:      11/8/2012

  1,100 gallons of aqueous sodium iodine solution needs to be purchased as an emergency for several unforseen

  events and circumstances beyond the control of the University.

   Signed By:  Janet Milbrandt, Dir of Purchasing

      Vendor:  Ioditech, Inc.                                                                         Notary Date:        11/2/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00          $294,822.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  81     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:    11/14/2012

  On November 5, 2012 University Facilities staff at the College of Medicine at Peoria could not locate the origin

   of an underground pipe leak somewhere between the Mechanical Room and the outside Chiller Unit. The

  decision was made to request evaluation/assessment from an external Contractor. There is only one company,

  Illinois Piping Corp, located in Peoria that could assist with this problem immediately. On the morning of Nov 6,

   2012 IL Piping Corp. did perform the evaluation and generated a quote the next day. This quote was accepted

   by the UIC Chancellor of Admin Serv. The accepted quote includes excavation, new ductile iron piping,

  bedding, backfill, concrete and reseeding of hillside.

   Signed By:  Kevin Fair, Dir of Purchasing

      Vendor:  Illinois Piping Corporation                                                    Notary Date:        11/8/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $61,680.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 41 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  82     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:    11/14/2012

  On October 25, 2012 a fire alarm was set off in Thomas Beckman Hall (TBH). Nine apartments and some

  common area space in two hallways had water damage from two sprinkler heads that were set off during a fire

  in the TBH kitchen. Item effected where walls, flooring, ceiling, carpeting, kitchen appliance baseboard couches

   closet and bedroom doors. The vendor chosen is an expert in quick flood clean up and has working experience

   with UIC Campus housing.

  Final Cost - $80,139.05

   Signed By:  Kevin Fair, Interim Director

      Vendor:  Flood Specialist                                                                     Notary Date:        11/9/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00            $80,139.05                                                 13               2

     Federal Cost                   $0.00                     $0.00

  83     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:    12/20/2012

  The University awarded a contract for an Agilent Technologies Demonstration model Infrared Spectroscopic

  Imaging syste.  This unit will be utilized for start-up research by Dr. Michael Walsh.

   Signed By:  Kevin Fair, Dir of Purchasing

      Vendor:  Agilent Technologies                                                            Notary Date:      12/13/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00          $203,566.37                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 42 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  84     AGRICULTURE -  GENERAL OFFICE                              

                                                                                                                                   Filed:        8/9/2012

  A letter was received on October 9, 2012 for FY 13-1 Item #10. This Procurement generated Revenue of

  $23,704.17.  There was no actual cost to the State.

   Signed By:  Laurel Leuenberger, Procurement Officer

      Vendor:  Alongis since 1933                                                               Notary Date:          8/7/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $66,233.91                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  85     AGRICULTURE -  GENERAL OFFICE                              

                                                                                                                                   Filed:    10/17/2012

  A letter dated October 16, 2012 for the Final Cost of FY-13-1 Item #11 for $81,200.

   Signed By:  Laurel Leuenberger, Procurement Officer

      Vendor:  Ventana Medical Systems                                                     Notary Date:      10/16/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $80,000.00            $81,200.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  86     NATURAL RESOURCES, DEPARTMENT OF                           

                                                                                                                                   Filed:      11/1/2012

  A letter was received on October 1 2012 for FY 13-1 Item #22.  This was a Revenue generated procurement.

   $50,513.56.  There was no actual cost to the State.

   Signed By:  Melissa Orrill, State Purchasing Officer

      Vendor:  Beach Watch Lifeguard and Lake                                         Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $47,710.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 43 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  87     NATURAL RESOURCES, DEPARTMENT OF                           

                                                                                                                                   Filed:    12/10/2012

  A letter was received on December 10, 2012 for the Final Cost of FY 13-1 #23 for $36,347.

   Signed By:  Karen Reuter, Procurement Manager

      Vendor:  Linden & Co                                                                         Notary Date:        12/6/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $41,950.00            $36,347.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  88     NATURAL RESOURCES, DEPARTMENT OF                           

                                                                                                                                   Filed:    12/13/2012

  A letter was received on December 13, 2012 for FY 12-3 Item #7.  This procurement generated revenue of

  $455,353.87 during March 2012 to Oct 2012.  There was no actual cost to the State.

   Signed By:  Melissa Orrill, State Purchasing Officer

      Vendor:  17th Street Bar and Grill                                                       Notary Date:          3/8/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                      $0.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  89     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      12/3/2012

  A letter was received on December 3, 2012 for the Final Cost of FY 12-3  Item #11 for $72,283.20.

   Signed By:  Gary Lopac, Superintendent - Dixon

      Vendor:  Modern Optical LTD                                                             Notary Date:        11/9/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $70,000.00            $72,283.20                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 44 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  90     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      12/3/2012

  A letter was received on December 3, 2012 for the Final Cost  FY 12-3 Item #12 for $142,681.

   Signed By:  Gary Lopac, Superintendent - Dixon

      Vendor:  Korrect Optical                                                                     Notary Date:          1/3/2013

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $170,000.00          $142,681.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  91     EMPLOYMENT SECURITY, DEPARTMENT OF                         

                                                                                                                                   Filed:    10/18/2012

  A letter was received on October 18, 2012 for the Final Cost of FY 12-4 Item #21 for $327,117.80.

   Signed By:  Barry Isaacson, Procurement Officer

      Vendor:  Diversified Serv & Electronic                                               Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $544,947.00          $327,117.80                                                 13               2

     Federal Cost                   $0.00                     $0.00

  92     EMPLOYMENT SECURITY, DEPARTMENT OF                         

                                                                                                                                   Filed:    10/18/2012

  A letter was received on  October 18 2012 for the Final Cost of FY 12-3 Item #27 for $488,365.81.

   Signed By:  Barry Isaacson, Purchasing Officer

      Vendor:  Diversified Serv & Elec Knowle                                           Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $544,947.00          $488,365.81                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 45 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  93     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:      10/9/2012

  A letter was received on October 1, 2012 for the Final Cost of FY 11-4 Item #34 of $262,501.50.

   Signed By:  Doug Kasamis, CIO for IDHS

      Vendor:  Capitol Strategies Consulting                                                 Notary Date:        9/13/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $408,720.00          $262,501.50                                                 13               2

     Federal Cost                   $0.00                     $0.00

  94     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:      10/9/2012

  A letter was received on October 1, 2012 for the Final Cost of FY 12-4 Item #25 of $89,831.88.

   Signed By:  Paul Brock, Hospital Administrator

      Vendor:  2 Vendors                                                                             Notary Date:        9/19/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $106,200.00            $89,831.88                                                 13               2

     Federal Cost                   $0.00                     $0.00

  95     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:      10/9/2012

  A letter was received on October 5, 2012 for the Final Cost of FY 12-3 Item #32 of $52,827.50.

   Signed By:  James Veach, Facility Dir

      Vendor:  Harborside Rehab/ Ready Nurse                                           Notary Date:        9/20/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $273,600.00            $52,827.50                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 46 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  96     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:    10/22/2012

  A letter was received on October 12, 2012, Final Cost of FY 12-3 Item #29. State cost was $0.00, the

  procurement was cancelled. No State money was expended.

   Signed By:  Dan Blair, Manager

      Vendor:  Community Resources Assoc.                                              Notary Date:        10/5/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $450,000.00                     $0.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  97     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:      11/2/2012

  A letter was received on November 2, 2012 for the Final Cost of FY 10-2 Item #26 for $158,240.

   Signed By:  Edith Newman, Hosp Admin

      Vendor:  Anchor Mechanical                                                               Notary Date:      10/12/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $32,100.00          $158,240.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  98     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:      11/2/2012

  A letter was received on November 2, 2012 and dated on October 9, 2012 for the Final Cost of FY 13-1

  Item #47 for $19,620.13.

   Signed By:  Maurice Grafton, Business Admin

      Vendor:  Various                                                                                 Notary Date:        10/4/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $82,000.00            $19,620.13                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 47 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  99     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:      11/2/2012

  A letter was received on November 2, 2012  for the Final Cost of FY 12-3 Item #30 for $164,465.13.

   Signed By:  Randall Waselewski, Acting Bus Admin

      Vendor:  Harborside Rehab                                                                 Notary Date:        9/20/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $464,600.00          $164,465.13                                                 13               2

     Federal Cost                   $0.00                     $0.00

  100   PUBLIC HEALTH, DEPARTMENT OF                               

                                                                                                                                   Filed:    12/14/2012

  A letter was received for the Final Cost FY 13-1 Item #53 for $126,857.53.

   Signed By:  Gary Robinson, Dep Dir

      Vendor:  United Parcel Serv                                                                Notary Date:        12/6/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $127,500.00          $126,857.53                                                 13               2

     Federal Cost                   $0.00                     $0.00

  101   STATE POLICE, DEPARTMENT OF                                

                                                                                                                                   Filed:    12/25/2012

  A letter dated on October 24, 2012 with the Final Cost for FY 12-4 Item #33 of $77,625.

   Signed By:  Hiram Grau, Director

      Vendor:  MC Electric                                                                           Notary Date:      10/18/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $78,000.00            $77,625.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 48 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  102   TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:      10/9/2012

  A letter dated October 5, 2012 for the Final Cost of FY 12-2 Item #51 of $262,589.10.

   Signed By:  John Webber, Interim Dir

      Vendor:  Mid-America Advertising                                                      Notary Date:        10/4/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $375,000.00          $262,589.10                                                 13               2

     Federal Cost                   $0.00                     $0.00

  103   TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:      10/9/2012

  A letter was received and dated on October 4, 2012 for the Final Cost of FY 12-2 Item# 55 of $65,249.

   Signed By:  Joseph Shacter, Director

      Vendor:  Transit Resource Center                                                        Notary Date:        10/3/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $150,000.00            $62,249.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  104   TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:    10/11/2012

  A letter dated October 10, 2012 with the Final Cost of FY 12-1 Item #58 of $51,205.

   Signed By:  Aaron Weatherholt, Dep Dir

      Vendor:  Telvent DTN                                                                         Notary Date:      10/10/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $90,000.00            $51,205.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 49 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  105   TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:    10/23/2012

  A letter was received and date for October 23, 2012 for the Final Cost of FY13-1 Item #63 of $174,615.40.

   Signed By:  Omer Osman, Dep Director

      Vendor:  Illini Excavation & Reclamatio                                             Notary Date:      10/22/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $195,000.00          $174,615.40                                                 13               2

     Federal Cost                   $0.00                     $0.00

  106   TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:    10/26/2012

  A letter dated October 26, 2012 with the Final Cost for FY13-1 #58 is $62,373.75.

   Signed By:  William Frey, Acting Director

      Vendor:  Capitol Strategies                                                                  Notary Date:      10/25/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $50,000.00            $62,373.75                                                 13               2

     Federal Cost                   $0.00                     $0.00

  107   CAPITAL DEVELOPMENT BOARD                                  

                                                                                                                                   Filed:      8/30/2012

  A letter was received on May 2 2012 for the Final Cost of FY 11-4 #59 for $1,085,875.38.

   Signed By:  Gus Behnke, Chief Fiscal Officer

      Vendor:  A & R Mechanical Contractors                                             Notary Date:        4/13/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $875,000.00       $1,085,875.38                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 50 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  108   HOUSING DEVELOPMENT AUTHORITY, ILLINOIS                   

                                                                                                                                   Filed:    10/16/2012

  A letter dated October 11, 2012 for the Final Cost of FY 13-1 Item #74 of $27,500.

   Signed By:  Amanda Carone, Purchasing Officer

      Vendor:  U. S. Bank                                                                            Notary Date:      10/10/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $27,500.00            $27,500.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  109   HOUSING DEVELOPMENT AUTHORITY, ILLINOIS                   

                                                                                                                                   Filed:      12/7/2012

  A letter was received and dated for December 4, 2012 indicating the Final Cost of FY 13-1 Item # 76 as

  $292,302.

   Signed By:  Amanda Carone, Legal Dept

      Vendor:  Various Investment Bankers                                                 Notary Date:        12/3/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $461,250.00          $292,302.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  110   TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                                                   Filed:      11/8/2012

  A letter dated October 23, 2012 for the Final Cost of FY 12-4 Item #51 of $561,595.90.

   Signed By:  John Donato, Chief of Procurement

      Vendor:  IGOR                                                                                    Notary Date:        10/1/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $853,050.00          $561,595.90                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 51 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  111   TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                                                   Filed:    11/27/2012

  A letter was received on November 27 for the Final Cost of FY12-3 Item #77 for a total of $5,812.50.

   Signed By:  John Donato, Chief of Procurement

      Vendor:  Marcie Claus                                                                         Notary Date:        10/1/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $9,900.00              $5,812.50                                                 13               2

     Federal Cost                   $0.00                     $0.00

  112   TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                                                   Filed:    11/27/2012

  A letter was received on November 27, 2012 for the Final Cost  FY 12-3 Item #85 for $275.

   Signed By:  John Donato, Chief of Procurement

      Vendor:  Lorri A Scott                                                                         Notary Date:        10/1/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                  $412.50                 $275.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  113   TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                                                   Filed:    11/27/2012

  A letter was received on November 27 for the Final Cost of FY 12-3 Item #80 and FY12-4 Item #47 for a

  total of $4,650.

   Signed By:  John Donato, Chief of Procurement

      Vendor:  Lawrence Necheles                                                               Notary Date:        10/1/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $9,632.50              $4,650.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 52 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  114   TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                                                   Filed:    11/27/2012

  A letter was received on November 27, 2012 for the Final Cost of FY 12-3 Item #78 and FY12-4 Item #71

  for a total of $3,212.50.

   Signed By:  John Donato, Chief of Procurement

      Vendor:  Frederick DePasquale                                                           Notary Date:        10/1/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $5,715.50              $3,212.50                                                 13               2

     Federal Cost                   $0.00                     $0.00

  115   TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                                                   Filed:    11/27/2012

  A letter was received on November 27, 2012 for the Final Cost of FY 12-3 Item #84 and FY12-4 Item #72

  for $2,037.50.

   Signed By:  John Donato, Chief of Procurement

      Vendor:  Carl Isermann                                                                       Notary Date:        10/1/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $8,400.00              $2,037.50                                                 13               2

     Federal Cost                   $0.00                     $0.00

  116   TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                                                   Filed:    12/17/2012

  A letter was received on December 17, 2012 for the Final Cost of FY 12-3 Item #95 and FY 13-1 Item #81

  for $2,243,895.99.

   Signed By:  ,

      Vendor:  TransCore LP                                                                        Notary Date:        10/1/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:        $5,310,000.00       $2,243,895.99                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 53 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  117   CHICAGO STATE UNIVERSITY                                   

                                                                                                                                   Filed:    10/17/2012

  A letter was received on October 17, 2012 for the Final Cost of FY 12-2 Item #70 for $14,945.

   Signed By:  Glenn Meeks, VP of Admin

      Vendor:  Business Only Broadband                                                     Notary Date:      10/16/2012

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $8,967.00            $14,945.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  118   NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:    10/15/2012

  A letter was received on October 10, 2012 for the Final Cost of FY 12-3 Item #101 of $243,343.

   Signed By:  Al Mueller, Dir. Of Procurement Services

      Vendor:  Pepper Construction                                                              Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $249,000.00          $234,343.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  119   NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:    10/15/2012

  A letter was received on October 5, 2012 for the Final Cost of FY 12-3 Item #100 of $25,000.

   Signed By:  Al Mueller, Dir. Of Procurement Services

      Vendor:  IMEX Restoration                                                                 Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $25,000.00            $25,000.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 54 of  55


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2012 through December 31, 2012

  120   NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:    11/30/2012

  A letter was received on November 30, 2012 for the Final Cost of FY 12-4 Item #56 for $99,365.

   Signed By:  Al Mueller, Purchasing Dir

      Vendor:  Otto Baum Co                                                                       Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $99,465.00            $99,365.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

  121   NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:    11/30/2012

  A letter was received on November 26, 2012 for the Final Cost of FY 12-4 Item #55 for $231,447.47.

   Signed By:  Al Mueller, Purchasing Dir

      Vendor:  Blackboard                                                                           Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $240,000.00          $231,447.47                                                 13               2

     Federal Cost                   $0.00                     $0.00

  122   UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:      10/4/2012

  A letter was received on October 1, 2012 for the Final Cost of FY 13-1 Item #85 of $100,000.

   Signed By:  Al Mueller, Dir. Of Procurement Services

      Vendor:  Kroeschell Services                                                               Notary Date:

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $100,000.00          $100,000.00                                                 13               2

     Federal Cost                   $0.00                     $0.00

1/11/2013                                                          rptQuarterlyWeb                                                    Page 55 of  55