LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                              April 1, 2013 through June 30, 2013

  1      AUDITOR GENERAL - OFFICE OF THE                           

                                                                                                             Filed:                                                                                                             5/15/2013

  To properly complete the compliance examination of the Illinois Department of Public Health for the two years

  ending June 30, 2013, the engagement needs to begin as soon as possible.  Following internal discussions, it was

  determined we did not have sufficient internal staff resources to conduct this engagement.  Insufficient time exists to

  conduct the usual request for proposals competitive selection process prior to May 20, 2013.  A fair and

  reasonable price was negotiated with Crowe Horwath LLP, who has experience with the Auditor General's

  program and has sufficient staff and expertise to perform this engagement and begin work within the necessary

  timeframe to avoid serious disruption in OAG audit services.

  Signed By:  Bruce Bullard, Director, Financial & Compliance

     Vendor:  Crowe Horwath LLP                                                    Notary Date: 5/13/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $468,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  2      AUDITOR GENERAL - OFFICE OF THE                           

                                                                                                             Filed:                                                                                                             5/15/2013

  To properly complete the compliance examination of the Illinois Department of Labor for the two years ended June

   30, 2013, the engagement needs to begin as soon as possible.  Following internal discussion, it was determined we

   did not have sufficient internal staff resources to conduct this engagement.  Insufficient time exists to conduct the

  usual request for proposals competitive selection process prior to May 21, 2013.  A fair and reasonable price was

  negotiated with CliftonLarsonAllen LLP who has experience with the Auditor General's program and has sufficient

  staff and expertise to perform this engagement and begin work within the necessary timeframe to avoid serious

  disruption in the OAG audit services.

  Signed By:  Bruce Bullard, Director, Compliance Audits

     Vendor:  Clifton Larson Allen LLP                                               Notary Date: 5/13/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:                    $0.00          $162,800.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                            Page 1 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                              April 1, 2013 through June 30, 2013

  3      AUDITOR GENERAL -  OFFICE OF THE                           

                                                                                                             Filed:                                                                                                             5/15/2013

  To properly complete the compliance examination of the Illinois Guardianship and Advocacy Commission for the

  two years ended June 30, 2013, the engagement needs to begin as soon as possible.  Following internal

  discussions, it was determined we did not have sufficient internal staff resources to conduct this engagement. 

  Insufficient time exists to conduct the usual request for proposals competitive selection process prior to May 20,

  2013.  A fair and reasonable price was negotiated with Kyle E. McGinnis, CPA, who has experience with the

  Auditor General's program and has sufficient staff and expertise to perform this engagement and begin work within

  the necessary timeframe to avoid serious disruption in OAG audit services.

  Signed By:  Bruce Bullard, Director, Compliance Audits

     Vendor:  Kyle E. McGinnis, CPA                                                Notary Date: 5/14/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:                    $0.00           $57,040.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  4      CENTRAL MANAGEMENT SERVICES                                

                                                                                                             Filed:                                                                                                             3/12/2013

  A letter was received on April 16, 2013 extending the lease for an additional 2 months, no estimate of cost was

  provided. Lease is for May 1, 2013 - June 30, 2013

  Signed By:  Rosalind Cook, Leasing Rep w/CMS Property Mgmt.

     Vendor:  32 W. Randolph St. Ltd. Partnership                                 Notary Date:  3/6/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:                    $0.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                            Page 2 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                              April 1, 2013 through June 30, 2013

  5      CENTRAL MANAGEMENT SERVICES                                

                                                                                                             Filed:                                                                                                             4/1/2013

  Contract 4014168 for staff uniforms for the IDOC does not allow for additional renewals. Under union contract

  agreement, the St. of IL is responsible for providing for its corrections security staff. It is particularly important for

  new security staff to be issued uniforms before they begin work so that they can be easily recognizable to the

  inmates and to other correctional center staff. This contract is for 3-30-2013- 6-27-2013. This is not an extension,

  prior affidavits have been paid.

  Signed By:  Jan Morrow, COO

     Vendor:  Uniformity                                                                Notary Date:  3/7/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $90,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  6      CENTRAL MANAGEMENT SERVICES                                

                                                                                                             Filed:                                                                                                             4/9/2013

  This lease space houses a DHS Family Community Resource Center serving Fulton County. The Using Agency has

   occupied this location since 1990 and the existing lease expires March 31, 2013. CMS has been looking for

  potential consolidation options for this lease for some time but no such sites are currently viable. Solicitation

  documents are in development and this space will be put out for RFIs in the near future. This proposed emergency

  lease will prevent holdover and provide for continued occupancy for DHS and its clients while CMS pursues the

  solicitation process.

  Signed By:  Jim Adams, Leasing Rep

     Vendor:  Larry and Tammy Webb                                                Notary Date: 3/27/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:                    $0.00           $16,391.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                            Page 3 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                              April 1, 2013 through June 30, 2013

  7      CENTRAL MANAGEMENT SERVICES                                

                                                                                                             Filed:                                                                                                             4/9/2013

  A letter was received on June 12, 2013 to extend the current emergency lease for 93 days for continued

  occupancy.

  An actual cost for the previous EP in FY 13-4 # 5 gave an actual amount of $16,831.95.

 

  This extension is for June 30, 2013 - Sept 30, 2013

  Signed By:  Jim Adams, Leasing Rep

     Vendor:  Larry and Tammy Webb                                                Notary Date: 3/27/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:                    $0.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  8      CENTRAL MANAGEMENT SERVICES                                

                                                                                                             Filed:                                                                                                             5/1/2013

  This leased space houses a DCFS client-service office; the Using Agency has occupied this location since 1999.

  CMS has published two RFI Solicitations for this space, most recently in December 2011 and DCFS will relocate

  to new space under the new RFI lease. Due to permitting issues, build out at the new location has been temporarily

  halted. This emergency lease will provide continued occupancy at the current location, as well as ample time for any

   issues to be resolved and the improvements completed.

  Signed By:  Jeffrey Miller, Leasing Rep with CMS

     Vendor:  Pittmann Enterprises, Inc.                                              Notary Date: 4/23/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:                    $0.00           $82,769.88                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                            Page 4 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                              April 1, 2013 through June 30, 2013

  9      CENTRAL MANAGEMENT SERVICES                                

                                                                                                             Filed:                                                                                                             6/4/2013

  This lease will provide temporary space for a central processing unit for the implementation of the Illinois Medicaid

  Redetermination Project as required by the SMART Act. Permanent housing in this building will be provided via

  expansion space offered under pending RFI Lease #6461, which will be posted in the near future. It is imperative

  that this new program be up and running as quickly as possible to avoid federal penalty.

  Signed By:  Bing Tie, Leasing Rep

     Vendor:  Klairmont Enterprises, Inc.                                             Notary Date: 5/30/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:                    $0.00           $42,134.81                                         13          4

    Federal Cost                  $0.00                  $0.00

  10     CENTRAL MANAGEMENT SERVICES                                

                                                                                                             Filed:                                                                                                             6/6/2013

  This affidavit is in order to allow Corrections to continue to purchase the corrugated sheets at current contract

  pricing and satisfy their current order obligations. ICC has been supplying the majority of the State's packing and

  storage boxes but is planning to discontinue box making operations.

  Signed By:  Lance Traynor, Strategic Sourcing Manager

     Vendor:  International Paper Co.                                                  Notary Date:  6/4/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $150,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                            Page 5 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                              April 1, 2013 through June 30, 2013

  11     CENTRAL MANAGEMENT SERVICES                                

                                                                                                             Filed:                                                                                                             6/12/2013

  CMS requires a vendor to provide fiber locating services at all times for our Statewide Fiber Network. This

  services is required as part of the Statewide Fiber Networks. CMS, BCCS maintains fiber networks that require a

  vendor to locate fiber on an as needed basis. Not having a vendor under contract to do this work will result in state

   owned fiber infrastructure not being located and therefore at risk for being damaged and disrupting critical data

  network communications for long periods of time. Damages fiber would also result in costly repairs that could be

  avoided by correctly locating the fiber infrastructure.

  Signed By:  James Ellenberg, IT/Telecom Procurement Manager

     Vendor:  G4S                                                                         Notary Date: 6/10/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $49,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  12     COMMERCE AND ECONOMIC OPPORTUNITY,

                                                                                                             Filed:                                                                                                             4/4/2013

  Social Policy Research Assoc. (SPRA) is the selected vendor through a competitive RFP process. Two (2)

  vendors responded to solicitation. At the time of SPRA's response to this solicitation, neither they nor the 2nd place

   vendor (IMPQ International) had been certified with the Illinois State Board of Elections. This omission would

  normally result in both vendors being deemed non-responsive to this solicitation. The agency is requesting that

  Social Policy Research Assoc. be awarded an emergency contract due to the immediate need to procure the

  services outlined. Any delay in the execution of this contract may lead to a loss of US Depart of Labor grant funds.

  Signed By:  Adam Pollet, Acting Director

     Vendor:  Social Policy Research Associates                                    Notary Date:  4/3/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $100,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                            Page 6 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                              April 1, 2013 through June 30, 2013

  13     COMMERCE AND ECONOMIC OPPORTUNITY,

                                                                                                             Filed:                                                                                                             5/24/2013

  Social Policy Research Associates (SPRA) is the selected vendor through a competitive RFP process.  (IFB

  Reference #22028604)  Two (2) vendors responded to solicitation.  At the time of SPRA's response to this

  solicitation, neither they nor the 2nd place vendor (IMPAQ International) had been certified with the Illinois State

  Board of Elections.  This omission would normally result in both vendors being deemed non-responsive to this

  solicitation.  The Agency requested and was approved to award a 90 day emergency contract to Social Policy

  Research Associates due to the immediate need to procure the services outlined in IPB 22028604.  The Agency is

  now requesting an extension to the emergency contract again outlined in IPB 22028604.  Any delay in the

  execution of this contract extension may lead to a loss of United States Department of Labor grant funds, as

  procurements/expenditures related to this procurement are for the $10,800,000 for grants and other interagency

  agreements as outlined in PBC 13-000000072621 that was approved by OMB on July 23, 2012.  PBC13-

  000000072621 was processed for the entire funding received in the amount of $12,000,000.

  Signed By:  Adam Pollet, Acting Director

     Vendor:  Social Policy Research Associates                                    Notary Date: 5/23/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $892,559.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                            Page 7 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                              April 1, 2013 through June 30, 2013

  14     NATURAL RESOURCES, DEPARTMENT OF                           

                                                                                                             Filed:                                                                                                             5/21/2013

  The Department of Natural Resources (DNR) requires an emergency procurement to the aqueduct and

  towpath/trail structures spanning Nettle Creek were severely damaged during the heavy rains, and subsequent flood

   event, which began on or around April 18, 2013 causing water from the canal to drain into Nettle Creek.  The

  emergency efforts are needed to restore water to the upstream section of the I & M Canal, east of Nettle Creek,

  (approximately 17 miles to the town of Channahon) to avoid the long term damage associated with having dry

  conditions, such as unwanted vegetative growth; cracking of the clay seal causing water, when re-introduced, to

  seep into the sub-surface levels of surrounding homes and agricultural fields; and the continued erosion to flood

  damaged areas during normal rain events.  (These conditions were experienced when the DuPage River dam failed

  in the 1996 flood and water was reintroduced two years later.  The canal took almost one year to seal itself while,

  in the meantime, adjacent farm fields and homeowner basements were flooded.)  The temporary emergency

  structure, west of Nettle Creek, shall be used to restore and impound water in three ponds at Gebhard Woods

  State Park and retain water in the canal from another three miles to the Stagecoach Road Access Area.

 

  Retaining water in the canal also allows for the continuation of local municipal events to take place during the

  summer months.  The temporary structures shall impound water in approximately twenty (20) miles of the Illinois &

  Michigan Canal in order to maintain the aquatic plant and animal diversity, as well as the historic value, associated

  with this resource.  Keeping the channel prism saturated ensures the impervious clay channel liner remains sealed,

  which when dried, becomes cracked and pervious.  Once this layer becomes pervious, any water introduced to the

   system drains through the underlying sandy soil strata and seeps into neighboring homeowner's basements or

  adjacent agricultural fields between the municipalities of Channahon and Morris.

 

  DNR shall procure the services of "D" Construction for the emergency construction of two temporary water

  retaining (berm/dam) structures, as well as an embankment stabilization/reconstruction effort, on the Illinois &

  Michigan Canal  at/near the Nettle Creek Aqueduct in Morris, IL.  "D" Construction was selected to undertake this

   work because they were mobilized to the immediate area installing a storm sewer overflow for the City of Morris. 

   "D" Construction has held previous contracts with the Department to the Department's satisfaction.

  Signed By:  Melissa Orrill, State Purchasing Office, DNR

     Vendor:  D Construction, Inc.                                                     Notary Date: 5/16/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $48,750.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                            Page 8 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  15     NATURAL RESOURCES, DEPARTMENT OF                           

                                                                                                             Filed:                                                                                                             5/21/2013

  DNR requires services for the replacement of two blower/motor combination units at the Sanitary Plant at Starved

  Rock State Park near Utica, Illinois.  The wastewater treatment plant was flooded during the heavy rains and

  subsequent flood event, which began on or around April 17, 2013 causing water from the Illinois River to breach

  its banks in the area where the wastewater plant is located.  The Sanitary Plant at Starved Rock State Park

  processes waste from the entire park system including the lodge, restaurant, visitor's center, offices, and

  campground.  This procurement will allow for the repairs necessary to properly treat and discharge the waste per

  state and federal regulations.  Berryman Equipment Company was selected to undertake this work because they

  are familiar with this equipment and are located in Addison, which is close proximity to Starved Rock State Park. 

  Berryman Equipment Company has held previous contracts with the Department to the Department's satisfaction.

  Signed By:  Melissa Orrill, State Purchasing Office, DNR

     Vendor:  Berryman Equipment Company                                       Notary Date: 5/17/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $40,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  16     NATURAL RESOURCES, DEPARTMENT OF                           

                                                                                                             Filed:                                                                                                             6/11/2013

  DNR requires services for the replacement of two blower/motor combination units at the Sanitary Plant at Starved

  Rock Park near Utica, IL. The wastewater treatment plant was flooded during the heavy rains around April 17,

  2013 causing water from the IL River to breach its banks in the area where the wastewater plant is located.

  This procurement will allow for the repairs necessary to properly treat and discharge the waste per state and

  federal regulations.

  Signed By:  Melissa Orrill, St. Purchasing Officer

     Vendor:  Berryman Equipment Co.                                               Notary Date:  6/6/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $40,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                            Page 9 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  17     NATURAL RESOURCES, DEPARTMENT OF                           

                                                                                                             Filed:                                                                                                             6/17/2013

  The aqueduct and towpath/trail structures spanning Nettle Creek were severely damaged during the heavy rains

  and subsequent flood event, which began on or around April 18, 2013 causing water from the canal to drain into

  Nettle Creek. Efforts are need to restore water to the upstream section of the I & M Canal to avoid the long term

  damage associated with having dry conditions. The temporary emergency structure west of Nettle Creek shall be

  used to restore and impound water in three ponds at Gebhard Woods State Park and retain water in the canal for

  another three miles to the Stagecoach Road Access Area. The expected end date is now 7-31-2013

  Signed By:  Robert Partridge, Senior State Purchasing Officer

     Vendor:  D Construction, Inc.                                                     Notary Date: 6/13/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $48,750.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  18     DEPARTMENT OF JUVENILE JUSTICE

                                                                                                             Filed:                                                                                                             5/9/2013

  Per Joe Urbanski, Stationery Engineer at IYC-St. Charles, the old resin from the water units should be removed

  and rebedded with new softener resin.  This process is needed to remove radon from the drinking water.  Right

  now the old softeners are not working and we need this to be compliant with EPA drinking water regulations.  The

  facility is currently running on Straight Well water which is causing damage to units throughout the facility. 

  (Memorandum dated April 24, 2013 from Joe Urbanski, Stationary Engineer to Byron Johnson, Assistant

  Superintendent- Operations)

  Signed By:  Joe Thekel, Business Administrator

     Vendor:  Siemens                                                                    Notary Date:  5/1/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $22,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 10 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  19     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             4/9/2013

  Emergency Purchase of industrial size conveyor type dishwasher with exhaust system for the Dietary Department

  At Graham Corr Ctr is required to replace old dishwasher beyond repair.

  Signed By:  Darryl Edwards, Asst Warden

     Vendor:  Boelter Companies, Inc.                                                Notary Date:  4/3/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $120,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  20     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             4/16/2013

  One water heater is completely down and the second is not able to provide hot water to all of the hosing units.

  Lime deposits over the years have caused these water heaters to be damaged. Vendor will remove old tubes and

  tube sheets and install new stainless steel tubes.

  Signed By:  Pamela Schlueter, Business Administrator

     Vendor:  Jarvis Welding Co.                                                       Notary Date:

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $25,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  21     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             4/16/2013

  Water Main Break by the inmate kitchen

  Signed By:  Randy Plister, Warden

     Vendor:  Opperman/Mid-IL and Kelly Elec                                     Notary Date:  4/4/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $20,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 11 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  22     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             4/22/2013

  The conditions and circumstances requiring this emergency purchase, including reason for selection of the particular

  contractor are: The Clever-Brooks 100HP Boiler which services the Administration Building has leaking boiler

  tubes and an inoperable gas valve due to exposure to water. The boiler provides heat to the entire Admin Building.

  Immediate repairs to plug the leaking tubes and replace the gas valve are necessary to operate the boiler. A

  complete re-tubing of the boiler was planned in the off heating season however, due to additional leaking tube

  discovered on 1/11/13, the re-tubing project need to be completed as soon as possible to avert the risk of

  complete failure of the boiler unit which is the only source of heat for the Admin Building.

  Signed By:  Marc Hodge, Warden

     Vendor:  CiCi Engineering Sales & Service, Inc.                              Notary Date:  4/5/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:                    $0.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  23     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             5/2/2013

  The High Mast Light directly south of the X-House sustained damage due to winds. A light ring cable snapped

  which caused the light ring to fall 120 feet completely destroying the light ring. Lighting is critical in this area due to

  maximum level of the X-House. Lighting is considered a life safety issue that needs to be addressed immediately.

  Signed By:  Dirk Dusing, Asst Warden

     Vendor:  McGinn and McGinn Electrical                                        Notary Date: 4/23/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $30,000.00                                                                  13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 12 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  24     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             5/2/2013

  Chief Engineer's Office and Masonry shop @ IYC - St Charles have serious roofing shingle failures on two

  buildings. The existing sloped roof asphalt shingles have degraded to the point where by they should be removed

  and replaced. The leaking and associated problems causing damage to the buildings, equipment and staff welfare

  will require and emergency response to mitigate further damage and thereby protect state assets. Also, the milder

  weather approaching now would be a good time to get this work started. For reference, the two buildings are Chief

   Engineer's Office and Masonry Shop. The contractor will provide both parts and labor to remove and replace roof.

  Signed By:  Joy Thekel, Bus Admin @ IYC

     Vendor:  Elens & Maichin Roofing                                               Notary Date: 4/25/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $140,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  25     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             5/9/2013

  A direct short has occurred on circuit LP-B that affects high mast light HM1 which is located behind Building 118

  and HM2 which is located behind Build 25.  The short has taken out half of the lights on these two masts. 

  Currently HM1 has 3 out of 8 lamps working and HM2 has 2 out of 8 lamps working.  There is approximately 900

   feet of underground cable between the two high mast lights where the short may have occurred or the short may

  have occurred in the 900 feet of underground cable and underneath concrete between HM2 and Building 138.  On

   3/1/13 the circuit (Circuit A) is randomly tripping making the high mast lights totally inoperable.  Lighting is

  desperately needed in the areas of these two High Mast Lights.  Lack of lighting makes it a security concern for the

  safety of the institution and public.  An outside contractor will be needed to locate and correct the problem.

  Signed By:  Nedra Chandler, Warden

     Vendor:  McGinn & McGinn Inc.                                                Notary Date:  5/9/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:                    $0.00             $2,192.57                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 13 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  26     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             5/9/2013

  The 50 Kw emergency generator and 150 amp transfer switch needed for Housing Unit 29 are damaged and un-

  repairable.  The generator has a major water pump leak and the oil is fouled.  Prior electrical repairs to the transfer

  switch were not done correctly.  The existing electrical work is not sound.  The control panel is an aftermarket unit.

   It runs but does not perform properly.  A new generator and transfer switch is needed in case of an electrical

  failure by the primary power provider.  The generator provides power to the Control Rooms door control panel,

  intercom system and emergency lighting.

  Signed By:  Nedra Chandler, Warden

     Vendor:  Ficek Electric & Communication Systems                           Notary Date: 4/30/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $40,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  27     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             5/21/2013

  The 120 ton water chiller that provides air conditioning to the Vocational Building has failed and is not cost effective

   to repair.  A new unit can be purchased and installed for less cost than repairing failed unit.  We will be unable to

  provide cooling to all classrooms in the inmate education area, education office area, clinical services area, staff

  dining room, chapel areas.  There are many computers in the building that could be affected because of excessive

  heat.  All inmate classes would be disrupted because of excessive heat.  The staff dining area contains equipment

  that may be compromised because of high heat and humidity in the building.

  Signed By:  Keith Anglin, Warden

     Vendor:  Rogers Supply Company                                                Notary Date:  5/6/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $62,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 14 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  28     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             5/30/2013

  Previous master contract expired. CMS in process of awarding new master contract for white broadcloth.

  Originally it was thought 70,000 yards would be sufficient to allow ICI to provide boxer shorts to inmates. Due to

  another delay in securing a contract an additional 100,000 yards of broadcloth to ensure uninterrupted delivery of

  boxers before a contract is finalized. This emergency purchase will cover the lapse period until master contract is in

  place. On March 27, 2013 100,00 yards of broadcloth was ordered. 99,524 yards were delivered for a total of

  169,5234 yards @ $1,07each.

  Signed By:  James Clinton, IL Corr Industries Superintendent

     Vendor:  Tabb Textiles Co.                                                        Notary Date: 5/24/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:                    $0.00          $181,390.68                                         13          4

    Federal Cost                  $0.00                  $0.00

  29     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             6/5/2013

  Literacy Volunteers of Illinois has been providing tutoring and mentoring services to the IDJJ school dist 428

  schools for 18 years. This is a vital service that helps our students to achieve academic success while incarcerated

  and in transition to their community schools.

  Signed By:  Bryan Gleckler, CFO

     Vendor:  Literacy Volunteers of Illinois, Inc.                                   Notary Date: 5/23/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:                    $0.00           $30,155.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 15 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  30     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             6/13/2013

  One water heater is completely down and the second is not able to provide hot water in all of the housing units.

  Lime deposits over the years have caused these water heaters to be damaged. Vendor will remove old tubes and

  tube sheets, fabricate and weld in new tube sheets and install new stainless steel tubes.

  Signed By:  Tarry Will, Warden

     Vendor:  Jarvis Welding Co.                                                       Notary Date: 5/29/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:                    $0.00           $25,000.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  31     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             6/24/2013

  ICI Menard Farm is needing to purchase a Trash Truck. The trash truck services Menard Correctional Facility and

   surrounding state facilities. The Truck is an integral part of the Menard Farm recycling program. The current truck

  being replaced is a 1995 model that has the transmission out and is no longer able to pass inspection as road

  worthy.

  Signed By:  Jen Aholt, CEO ICI

     Vendor:  The Larson Group                                                        Notary Date: 6/17/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:                    $0.00          $157,500.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 16 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  32     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             6/24/2013

  The 50 Kw emergency generator and 150 amp transfer switch need for Housing Unit 29 are damaged and un-

  repairable. The generator has a major water pump leak, and the oil is fouled. Prior electrical repairs to the transfer

  switch were not done correctly. The existing electrical work is not sound. The control panel is an aftermarket unit.

  It runs but does not perform properly. A new generator and transfer switch is needed in case of an electrical failure

  by the primary power provider. The generator provides power tot eh Control Rooms door control panel, intercom

  system and emergency lighting.

  Signed By:  Nedra Chandler, Warden

     Vendor:  Ficek Elec and Communication System                              Notary Date:  6/7/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:                    $0.00           $37,177.39                                         13          4

    Federal Cost                  $0.00                  $0.00

  33     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             6/24/2013

  On June 7, 2013 flooding occurred due to high river levels infiltrating sewer system causing higher than normal

  water levels in the facility bar screen. The high water levels have damaged the motor, bearing assembly, and guide

  rollers of the bar screen. These items require replacement for the facility bar screen to function properly and meet

  EPA guidelines established for sewer entering the City of Chester sewer system.

  Signed By:  Richard Harrington, Warden of Menard

     Vendor:  Industrial Supply Consultants Inc.                                     Notary Date: 6/13/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $24,636.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 17 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  34     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             6/25/2013

  Vandalia C I needs to purchase soy products: TVP 124, TVP224 and Acorn S to Fulfill FY13 orders that have

  been placed with Vandalia Correctional Industries meat plant.

  Signed By:  Steve Gruner, Industries Sup/ Vandalia CI

     Vendor:  Good Source                                                              Notary Date: 6/17/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $35,227.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  35     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             6/25/2013

  Vandalia Corr Industries  needs repair to the roof of the pasteurizer building, meat processing building and farm

  office.

  Vandalia Industries farm provides foods to IDOC, IDJJ and DHS, also various facilities and school districts. The

  roofs of these buildings are in disrepair. In addition to possible interior damage, if the roofs are not

  repaired/replaced, production will stop and ICI will be unable to fulfill their obligations.

  Signed By:  Jen Aholt, CEO ICI

     Vendor:  Litteken Construction Co.                                              Notary Date: 6/20/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $123,400.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 18 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  36     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             6/26/2013

  The existing air conditioning systems (three) that serve the second floor are worn out and do not function properly.

  These units are twenty plus years old and have out lived the useful life expectancy. They will not cool the areas they

   are serving, leak condensate due to their cabinets being rusted through and replacement compressors are no longer

   available from the manufacturer. This expenditure is to purchase three new air handling units, cooling coils,

  condensing units and all necessary accessories for a complete system.

  Signed By:  Richard Harrington, Warden @ Menard

     Vendor:  TAT Inc                                                                   Notary Date: 6/17/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $12,955.88                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  37     HEALTHCARE AND FAMILY SERVICES, DEPT OF

                                                                                                             Filed:                                                                                                             4/15/2013

  The State received a federal grant from the Center for Medicare & Medicaid Innovation (CMMI) to engage a

  wide variety of stakeholders to design and develop a State Health Innovation Plan. The Plan will be submitted to

  CMMI for additional funding to implement the Plan. The Plan must be completed and initial grant expenses incurred

   by Oct 31, 2013. Given the level of effort involved and the short timeframe, immediate action is necessary to avoid

   loss of federal funds. HMA is currently working closely with Cook County Health and Hospitals Systems and

  engaging Care Coordination Entitles and Managed Care Community Networks on related projects. Selection of

  HMA allows the State to leverage HMA's current work and relationships with key healthcare stakeholders, and

  meet the short deadlines. Estimated amount assumes subsequent extension to October 31, 2013.

  Signed By:  Brett Cox, St. Purchasing Officer

     Vendor:  Health Management Assoc., Inc.                                      Notary Date: 4/11/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:         $1,420,200.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 19 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  38     PUBLIC HEALTH, DEPARTMENT OF                               

                                                                                                             Filed:                                                                                                             3/15/2013

  This contractor produces specialized, unique medical treatment formulas that are not available elsewhere. The

  procurement of these specific products is critical to the life of individuals diagnosed with a metabolic disorder.

  Provision of specialized metabolic treatment products to individuals diagnosed with certain disorders is mandated

  by the 77 Ill., Adm Code Part 661 Newborn Metabolic Screening and Treatment Code. Without on going

  provision of these products, individuals with these disorders would be unable to maintain their physical health and in

   some circumstances could experience irreversible, sometimes life threatening damage to the brain and other

  organs, or even death.

 

  A letter was received on June 3, 2013 extending the EP FY 13 Qtr 4 Item# 4, for 6-9-13 to 10-6-13 for an

  estimated amount of $88,000.

  Signed By:  Thomas Schafer, Deputy Director

     Vendor:  Vita Flow USA, LLC                                                    Notary Date:  3/5/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $92,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 20 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  39     STATE POLICE, DEPARTMENT OF                                

                                                                                                             Filed:                                                                                                             5/10/2013

  This procurement will obtain up to 14 contractual resources to automate the identification and entry of prohibited

  persons into the National Instant Criminal Background Check System (NICS).  The phases of the project will

  continue the development of a comprehensive, flexible, and modular NICS reporting system to improve the

  accuracy and timeliness of records of prohibiting mental health adjudications and commitments.   Automation of this

   system will eliminate manual processes and significantly increase the volume, timeliness and accuracy of

  submissions.  State and federal legislative mandates, such as compliance with NICS Improvement Act, dictate the

  need for this procurement.  The current Illinois State Police (ISP), Firearm Owner's Identification (FOID) systems

  are antiquated and difficult to modify and to keep pace with changing legislation.  These systems also undermine the

   goals of completeness, automation, and transmittal of NICS records.

 

  On or about December 11, 2012, the 7th Circuit Court of Appeals, declared Illinois's prohibition on the bearing of

  arms outside of one's home unconstitutional and gave the State of Illinois 180 days to enact a constitutional statute.

   Pursuant to this decision, the ISP will soon be required to implement a concealed carry permitting process.  The

  concealed carry legislation that must be in place no later than June 8, 2013, will have an interface requirement with

  the existing FOID system.  The concealed carry permitting  process will utilize many of the current FOID processes

   including the qualification review and eligibility review processes but will have significantly stricter permitting

  guidelines and may include the submission of fingerprints.  If this procurement is not approved, the ISP will not have

   the resources needed to automate the identification and entry of prohibited persons into the NICS system.  This

  will translate into an inability to implement a concealed carry permit component that interfaces with the current

  FOID system.

  Signed By:  Hiram Grau, Director

     Vendor:  Levi, Ray & Shoup                                                      Notary Date:  5/7/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $175,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 21 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  40     STATE POLICE, DEPARTMENT OF                                

                                                                                                             Filed:                                                                                                             5/14/2013

  The Illinois State Police (ISP) requires a 90 day contract with Boland Enterprises for the keying and scanning of

  Firearm Owners Identification (FOID) card applications.  The current contract with vendor Rely Services Inc.

  which was established to include this time period, is being terminated early.  This emergency procurement is

  expected to start upon the effective date of termination of the current contract.  Until a new contract or alternative

  method is identified, there is a continued need for these services in order for ISP to meet its statutory mandate.  The

   Firearm Owners Identification Card Act, 430 ILCS 65/5, states that the Department of State Police shall either

  approve or deny all FOID card applications within 30 days of receipt, and every applicant found qualified by the

  Department shall be entitled to the issuance of a FOID card.  Boland Enterprises has performed these services in

  the past and is a qualified vendor.

  Signed By:  Hiram Grau, Director

     Vendor:  Boland Enterprises                                                       Notary Date: 5/10/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $90,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  41     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                             Filed:                                                                                                             4/30/2013

  Extensive flooding of the Illinois River eroded the pavement and west shoulder of Rt 351 from north of the

  Shippingsport Bridge toward the City of LaSalle for approx. 1/2 mile. The rains that began on April 17, 2013

  caused the closure of IL 351 at approximately 4 AM on Friday, April 19th. Roadway damage was noted on

  Sunday with the extent being more fully realized as the water receded. The damage requires IL Rt 351 to be closed

   until repairs can be made. The Scope of work will be to rebuild the bituminous shoulder and to remove and

  replace delaminated asphalt surface. The Department has selected Advanced Asphalt to perform the work.

  Signed By:  Paul Loete, Dep Dir of Highways Region2

     Vendor:  Advanced Asphalt Co.                                                  Notary Date: 4/25/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $350,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 22 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  42     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                             Filed:                                                                                                             4/30/2013

  Extensive flooding along routes IL 17, IL 23, IL 71, IL 89 IL 251 and Longpoint Rd. Caused erosion of the

  shoulders creating a hazard along the roadways. As there are no contract aggregate producers in the immediate

  area of the flooding, To expedite repairs and opening the roadways to traffic, The District has chosen Riverstone

  Group to supply aggregate material. They are a certified aggregate producer that is in the immediate area.

  Signed By:  Paul Loete, Deputy Dir of Highways Region 2

     Vendor:  Riverstone Group/ Vermillion Quarry                                Notary Date: 4/25/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $75,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  43     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                             Filed:                                                                                                             5/9/2013

  Due to severe rains and flooding, the earthen slope wall between the southern abutment of the structures carrying I-

  39 over I-88 failed in several locations.  The result of these failures deposited sediment on the WB shoulder of I-88

   and exposed the top of the concrete slope wall allowing for continued erosion and undermining.  The District does

  not own the necessary equipment to perform this type of repair.  As a result, a pre-bid meeting was conducted on-

  site with three of the four invited area contractors in attendance.  Bids were received from each.  The District has

  selected Martin & Company Excavating to perform these repairs.  Their selection was based on the estimate to

  repair the area, proximity to the work site and ability to begin work immediately.

  Signed By:  Paul A. Loete, Deputy Director, Region 2

     Vendor:  Martin & Co. Excavating                                               Notary Date:  5/8/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $50,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 23 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  44     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                             Filed:                                                                                                             6/13/2013

  Pavement deterioration has rapidly developed on I-55 near Lawndale in Logan City. This is resulting in vehicle

  damage.

  Workers are preparing to mill of 3 1/4  of the roadway surface in deteriorated areas and replace the removed

  material with hot mix asphalt. The scope of work for this emergency is to supply the needed surface and binder hot

  mix asphalt material. Truman Flatt was the lower bidder.

  Signed By:  Aaron Weatherholt, Deputy Dir, Div of Highways

     Vendor:  Truman L. Flatt & Sons Co. Inc.                                      Notary Date:

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $27,075.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  45     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                             Filed:                                                                                                             6/21/2013

  Due to emergency call out, vehicle damage due to roadway rapid deterioration and the inability to temporary patch

  "pot Holes" in the roadway surface, we are asking for approval to purchase hot mix asphalt to allow us to mill off

  the top 3 1/4" of the roadway surface and replace that with new asphalt. This will extend the life of the roadway

  and allow the motoring public to have trouble free travel along this area of I-55 in Logan county. There has been

  sever damage to some vehicles recently to the extent of knocking the axel out from under a traveler's vehicle.

  Truman Flatt is the low bidder and can supply us with the estimated 150 tons of hot mix asphalt and the 180 tons of

   Binder in the time frame needed.

  Signed By:  Aaron Weatherholt, Dep Dir/ Div of Highways

     Vendor:  P.H. Broughton, Inc.                                                    Notary Date: 6/19/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $15,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 24 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  46     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                             Filed:                                                                                                             6/25/2013

  When flood water receded on June 3, 2013, it was discovered that there was extensive erosion damage to Illinois

  Route 9 at the Spoon River in Fulton County, IL. The erosion left intermittent drop-offs of up to ten feet deep

  immediately adjacent to the south edge of pavement. This section of IL 9 initially closed on May 29, 2013, as a

  result of the rising water. As a result of the erosion, it remained closed to all traffic until June 6, 2013 when it

  opened to one lane of traffic utilizing temporary traffic signals. Re-opening the roadway to two-lane traffic will

  greatly reduce the time delay for emergency services.

  Signed By:  Joseph Crowe, Deputy Dir/ IDOT

     Vendor:  Halverson Construction Co.                                            Notary Date: 6/21/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $850,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  47     TRANSPORTATION, DEPARTMENT OF                               

                                                                                                             Filed:                                                                                                             7/5/2013

  Upon inspection it has been determined that the electrical lines and transformer on the 60/62 bridge are in need of

  repair. The navigational lights must be brought into compliance with the Coast Guards regulations immediately of a

  $25,000 per day could result. This e/p occurred within the same FY 13-4 Fiscal Qtr.

  Signed By:  Keith Miley, Dist 9 Operations Engineer

     Vendor:  Keith Martin Electric                                                    Notary Date:  7/3/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $16,200.00           $16,200.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 25 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  48     CAPITAL DEVELOPMENT BOARD                                  

                                                                                                             Filed:                                                                                                             4/29/2013

  On 4/11/13 the DOJJ reported that the IYC at Harrisburg has water leaks from the roof in the dietary that have

  become so severe that they splash youths and staff when walking down the serving line, possibly compromising the

  safety of the food being served and a safety hazard due to the wet surfaces. The warehouse portion of the building

  is also leaking excessively causing the loss of inventory. The leaks above the boiler area risk damaging the boiler

  equipment and present a life/safety issue for those required to work in the area.

  The vendor, Harlan Bohnsack is providing abbreviated design services for the roof replacement. Based on the

  design and how it affects the subsequent construction approach and schedule, observation may ultimately be

  included. Bohnsack was chosen due to their availability to design the project within 30 days, proximity to the site

  and experience.

  Signed By:  Gus Behnke, CFO

     Vendor:  Harlan M. Bohnsack                                                     Notary Date: 4/26/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $45,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 26 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  49     CAPITAL DEVELOPMENT BOARD                                  

                                                                                                             Filed:                                                                                                             5/8/2013

  In September of 2012, the already-leaking roof on the Cold Storage Building at the Menard Correctional Center

  experienced more severe water infiltration from the failed roofing system.  Baysinger Design Group evaluated the

  building and determined that it is no longer structurally safe and recommended that it be vacated.  The inmate ice

  production and storage is located in the building and therefore has to be relocated.  Baysinger continues to proceed

   with design of an overall replacement of the building, however, completion of design and competitive bidding will

  not take place for several months which necessitates the immediate relocation of the ice machines.  The cell houses

  at Menard CC are not air-conditioned and ice is needed for inmate health and well-being during the summer

  months.  The emergency project is required to complete the relocation of the existing ice machines before the

  summer temperatures require ice to be issued to the inmates.

 

  The current condition of the cold storage building and the upcoming summer weather suggests that the relocation

  take place more quickly than could be done through a competitive bidding process which, utilizing CDB's existing

  process, would last much longer than it will take for the summer weather to begin.  For this reason, an emergency

  procurement is necessary to allow for an expedited relocation of the ice machines to protect the health and safety of

   the inmates and staff during the summer heat and to minimize the disruption of this critical state service.

 

  Vendor #1:  Haury's Plumbing and Heating, Inc. is relocating the ice machines and making them operational in the

  new location.  To ensure as much competition as was practicable under the circumstances, CDB solicited bids from

   selected vendors.  Haury Plumbing and Heating, Inc. submitted the low bid.

  Signed By:  Gus Behnke, Chief Fiscal Officer

     Vendor:  Haury's Plumbing and Heating, Inc.                                  Notary Date:  5/6/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:                    $0.00           $69,880.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 27 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  50     CAPITAL DEVELOPMENT BOARD                                  

                                                                                                             Filed:                                                                                                             6/28/2013

  Lawrence CC experienced a complete power failure on Sunday May 19, 2013 and is powering the facility on the

  emergency generator. It is believed that a raccoon entered the high voltage substation and caused the failure.

  The vendor is providing temporary repair to allow the facility to stop using the generator and use utility power,

  testing and or replacement of cables, installation of a temporary 15KV disconnect switch and wiring as well as an

  analysis to determine the cause of the event to prevent future failures and potentially incorporate any needed

  changes into an additional repair.

  Signed By:  Gus Behnke, CFO

     Vendor:  PCI Skanska Design, Inc.                                               Notary Date: 5/24/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $50,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  51     CAPITAL DEVELOPMENT BOARD                                  

                                                                                                             Filed:                                                                                                             6/28/2013

  The 5th District Appellate Court in Mt Vernon, IL serves a large population of 37 southern counties.

  The chiller in the courthouse has ruptured and is leaking. Records and physical structures such as plaster, have

  begun to deteriorate as a result of high humidity levels. The current condition of the chiller and summer weather

  suggests that the chiller be replaced more quickly than could be done through a competitive bidding process.

  Proposals from 3 vendors, Culbertson Heating and Cooling was the low bidder and willing to provide this

  immediate response.

  Signed By:  Gus Behnke, CFO

     Vendor:  Culbertson Heating and Cooling                                       Notary Date: 6/11/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $55,077.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 28 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  52     GAMING BOARD, ILLINOIS

                                                                                                             Filed:                                                                                                             5/10/2013

  This is for an independent testing laboratory to assist in setting standards, test and certify electronic gaming devices

  test as needed. Connections between EGD and a local system and other related technological components utilized

  in the casino industry. Without these testing services, testing of EGD would cease and could have a negative impact

   on collection of revenues in the State of Illinois.

  There is "NO COST" to the State contract as all costs are paid by the licensees.

  Signed By:  Maye Kelsey, Lakewood, NJ

     Vendor:  Gaming Laboratories International, LLC                             Notary Date:  5/3/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:                    $0.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  53     TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                             Filed:                                                                                                             4/12/2013

  This request is an emergency purchase of engine oil, transmission fluid and chassis grease. These lubricants are vital

  to keeping our fleet of trucks, equipment, State Police vehicles maintained and operational. Without access to these

   commodities, equipment and vehicle breakdowns will occur. Normally these items are purchased through A CMS

  master contract: However, there is no current master contract available.

  The FY13 Qtr 3 Item# 74 has been paid,

  This EP FY 13 Qtr 4 Item# 70 is new, not an extension of FY13 qtr3 item#74.

  Signed By:  John Donato, Chief of Procurement for Tollway

     Vendor:  Quimex, Inc.                                                              Notary Date: 3/21/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $112,500.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 29 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  54     TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                             Filed:                                                                                                             4/26/2013

  This affidavit is for labor and parts needed to replace two vehicle hoists at maintenance garage number 3 located in

  Park Ridge, IL. Both hoists are in need of replacement as soon as possible as they are both inoperable. One small

  lift and on larger lift are necessary due to the high volume of repairs at this location. Both lifts are critical to the fleet

  maintenance operation for servicing vehicles. At this time, we are without a contract that would cover complete

  hoist replacement. Both lifts must be replace simultaneously to keep up with the high volume of vehicle repairs to

  maintain a safe roadway.

  Signed By:  John Donato, Chief Procurement Officer

     Vendor:  Stand Indus. & Automotive Equip                                    Notary Date: 4/23/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $145,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  55     TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                             Filed:                                                                                                             6/11/2013

  The fascia beam on the Balmoral Ave. bridge over the Tri-State Tollway (I-294) was hit by a semi-dump truck

  with  its bed in the raised position. This resulted in a closure and then a partial closure of the northbound Tri State

  Tollway while the bridge was evaluated and debris was removed. The bridge was determined to be stabilized and

  all lanes of the Tri-State Tollway were reopened later that evening. The outside eastbound lane on Balmoral Ave.

  remains closed. The structure is being monitored and surveyed and any worsening of the damage will result in a

  closure of the northbound Tri State Tollway. Our General Engineering Consultant has determined that , if the bridge

   is struck again in its present condition, it can potentially collapse. The Tollway has contracted Lorig to immediately

  assist in the removal and repair of the damaged beam. Lorig recently worked on widening the Balmoral Ave bridge

  and has worked on the replacement of this same beam on the Balmoral Ave, bridge when the structure was hit in

  1997

  Signed By:  John Donato, Chief of Procurement for IL Tollway

     Vendor:  Lorig Construction Co                                                   Notary Date:  6/6/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $750,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 30 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  56     GOVERNORS STATE UNIVERSITY                                 

                                                                                                             Filed:                                                                                                             6/12/2013

  The additional scope of services were needed for Phase 2 of an ongoing, current construction project on the

  campus, due to an unknown construction condition. Services are needed immediately as these specifications were

  not known and therefore not included in the initial contract award and project scope.

  Signed By:  Tracy Sullivan, Asst VP for Procurement

     Vendor:  Hygieneering Inc.                                                        Notary Date: 6/11/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $80,092.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  57     ILLINOIS STATE UNIVERSITY                                  

                                                                                                             Filed:                                                                                                             5/10/2013

  Illinois State University determined it was necessary to immediately employ the services of a construction

  management team to ensure completion of the east side of Hancock Stadium for its use for the start and during the

  fall 2013 football season.  Work on the project has been significantly delayed due to adverse weather conditions

  and, despite repeated requests from the University, neither the general contractor nor the architect/engineer have

  proposed a project completion plan capable of ensuring timely project completion.  Additional project delays will

  compromise the University's ability to fully use the stadium in fall 2013, resulting in a loss of approximately

  $125,000 per game ($625,000 for the season) in the form of suite leases, ticket sales (suite, club, season and single

   game), concessions and merchandise sales.  Nearly $2.0 million in capital gifts have been pledged for the stadium;

  these gifts were made with the understanding the stadium would be available for the complete fall 2013 season. 

  Failure to complete the project on time may also risk significant loss of good will from University donors at a time

  when these resources are increasingly important for University operations.  For these reasons, the University

  determined that the services of a construction management team with expertise in coordinating the work of the

  architect/engineer, the general contractor, and each of the prime contractors is required to provide daily oversight

  and project management to ensure a timely project completion.  Additional supporting information is attached.

  Signed By:  Debra Smitley, Senior Assoc. V.P.

     Vendor:  Pepper/Mangieri, LLC                                                  Notary Date:  5/7/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $202,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 31 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  58     NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                             Filed:                                                                                                             5/20/2013

  An inspection revealed that numerous temporary repairs to a concrete deck had failed, and that structural repairs

  were needed immediately to address life safety concerns.  Partial collapse of a ceiling structure is possible and may

  occur at any time.  Permanent repairs will also ensure protection of mechanical equipment located in room.  The

  particular contractor was chosen based on prior experience with the University and their quotation.

  Signed By:  Al Mueller, Director of Procurement Services

     Vendor:  Pepper Construction Company                                         Notary Date: 5/15/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $249,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  59     NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                             Filed:                                                                                                             6/3/2013

  The University was able to secure a substantial one-time discount on purchase of software, hardware and systems

  maintenance due to a change by the vendor in the strategic direction of our particular product line as well as

  favorable pricing based on the company's end of fiscal year 5/30/2013. This singular opportunity became available

  due to market conditions experienced by the vendor and was only available until 5/24/2013. Similarly as part of this

   purchase all software licensed from the company, not just the items included in the purchase are covered by

  maintenance caps for five years. The vendor was chosen based on many years of prior experience with the

  University.

  Signed By:  Al Mueller, Dir of Procurement Serv @ NIU

     Vendor:  Oracle America, Inc.                                                    Notary Date: 5/29/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:                    $0.00        $2,525,630.73                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 32 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  60     SOUTHERN ILLINOIS UNIVERSITY                               

                                                                                                             Filed:                                                                                                             5/31/2013

  In early May, Oracle communicated that they are willing to lower the amount of our annual support. They also

  stated that our only option was to proceed with an annual renewal ($949,140.90) and not a shorter term.

  We rely on Oracle support for security patches, bug fixes, application support and version upgrades. We do

  believe that these impacts can be successfully mitigated by the use of third party support and ad hoc consulting

  services at a much lower cost. Oracle has relented and offered a 90 day extension of our support agreement for an

  amount of $247,036.67.

  Signed By:  Debbie Abell, Director of Purchases @ SIU

     Vendor:  Oracle America, Inc.                                                    Notary Date: 5/28/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:                    $0.00          $247,036.67                                         13          4

    Federal Cost                  $0.00                  $0.00

  61     SOUTHERN ILLINOIS UNIVERSITY - PHYSICIANS &

                                                                                                             Filed:                                                                                                             5/20/2013

  The discovery of mold behind vinyl covering during routine repair of the wall covering and the subsequent

  remediation required to abate this hazard from the Simmons Cancer Institute.  The remediation requires air quality

  testing, removal of all vinyl wall covering and repair to damaged walls in a protected environment, painting of all

  affected surfaces, and a final professional disinfection and cleaning of the space affected.  The facility is used for

  cancer treatment of highly immune systems, compromised patients, and requires a clinical treatment environment

  that is clean and safe for patients and building occupants.

  Signed By:  Pamela J. Speer, Associate Provost for Finance & Admin.

     Vendor:  DAS Consultants/Davis Painting/Peerless                            Notary Date: 5/16/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $302,250.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 33 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  62     UNIVERSITY OF ILLINOIS                                     

                                                                                                             Filed:                                                                                                             4/22/2013

  On February 28, 2013, the Hospital Department of Transplant Surgery ordered through the donor registry process

   a cadaver pancreas, intestine and liver for a critical transplant patient. The Transplant Surgery Department was

  unaware of the vendor status and the necessity for an emergency purchase. The normal provider, Gift of Hope Inc.

  could not supply the organs. No alternative was available.

  Signed By:  Kevin Fair, Interim Director

     Vendor:  Gift of Life Michigan                                                    Notary Date: 4/18/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:                    $0.00          $107,700.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  63     UNIVERSITY OF ILLINOIS                                     

                                                                                                             Filed:                                                                                                             5/6/2013

  On April 27, 2013, the Physical Plant Office was notified of a water break around Lecture Center D located at

  804 S. Halsted St. Chicago, IL. An emergency service call was placed. A three person crew was sent as well as a

  combination backhoe machine with hydraulic breaker and equipment trucks to investigate the problem. They had to

   cut and break out sections of sidewalk and excavate down to the 4 inch water servicing piping encountering

  various utilities which had to be bypassed by hand. The 4 inch water service was severely decayed and leaking in

  two separate areas. Two 12"  long stainless steel repair clamps were installed to provide a temporary fix until they

  return to replace section of piping. The vendor is scheduled to return on Saturday May 4, 2013 at which time the

  amount of pipe needing to be replaced will be determined. The cost to date is approx. $6,000.00.

 

  Letter was received on June 4th, 2013 for Final Cost of $31,745.31. This occurred within the same Fiscal FY13-4

   Qtr

  Signed By:  Kevin Fair, Interim Dir of Purchasing

     Vendor:  J.S.R. Enterprises, Inc.                                                  Notary Date:  5/1/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $75,000.00           $31,745.31                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 34 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  64     UNIVERSITY OF ILLINOIS                                     

                                                                                                             Filed:                                                                                                             5/22/2013

  The Information Trust Institute (ITI) was awarded a grant from the IDCEO to develop and operate a facility at U

  of I campus that will provide services for the validation of information Technology and control aspects of Smart

  Grid systems. In late April an evaluation was done of hardware options to meet design specification. While working

   on the Sole Source justification it was realized that the first available Sole Source Hearing would not take place

  until June 5, 2013. Therefore, Immediate action is necessary.

  Signed By:  Janet Milbrandt, Dir Purchasing

     Vendor:  Finetech                                                                    Notary Date: 5/22/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:                    $0.00           $65,808.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  65     UNIVERSITY OF ILLINOIS                                     

                                                                                                             Filed:                                                                                                             5/28/2013

  On May 17, 2013 the Physical Plant Office was notified that the main chiller failed in the Administration Office

  Building located at 1737 W. Polk, Chicago, IL An emergency service call was placed to Kroeschell Services and

  the chiller compressor/motors were disassembled. After the motors were inspected and tested it was determined

  that replacement of one motor and repair to the other was necessary. The project is ongoing but a not exceed cost

  estimate of $100,000 has been determined.

  Signed By:  Kevin Fair, Director of Purchasing

     Vendor:  Kroeschell Service, Inc.                                                 Notary Date: 5/21/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $100,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 35 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  66     UNIVERSITY OF ILLINOIS                                     

                                                                                                             Filed:                                                                                                             5/28/2013

  Krannert is an annual performance, they are now at a critical point in being able to get booklets printed for FY13 at

   the est. cost of $105,000 which was expected and posted as part of the $522,000 potential renewal cost. The

  booklets are key to notifying donors of the upcoming Krannert events and performance. The booklets are paid for

  by gift funds and ticket sales revenue, although, the overall operation for Krannert does consist of some University

  funds.

  Signed By:  N/A , N/A

     Vendor:  The Premier Print Group                                                Notary Date: 5/21/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $105,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  67     UNIVERSITY OF ILLINOIS                                     

                                                                                                             Filed:                                                                                                             6/3/2013

  Solar is onsite this week performing annual maintenance on the gas turbines at the Abbott Power Plant. During the

  course of inspection, Solar discovered problems with the generator on Gas Turbine 2 that must be corrected

  before GT2 can be returned to service. This will require the generator to be removed from the Gas Turbine skid

  and shipped to the repair facility. The solar contract covers all charges associated with this repair, except for the

  rigging required to remove and reinstall the generator and the shipping to the repair facility.

  Mid-America systems has successfully performed rigging work for Abbott Power Plant in the past and provided a

  quote that will likely cost $90,000 - $100,000 to complete the rigging and shipping to Solar.

  Signed By:  Janet Milbrandt, Dir of Purchasing

     Vendor:  Mid-America Systems                                                   Notary Date: 5/24/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $90,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 36 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  68     UNIVERSITY OF ILLINOIS                                     

                                                                                                             Filed:                                                                                                             6/5/2013

  During the course of inspection of Steam turbine generator 2 it was determined that a considerable amount of repair

   work is needed on both the steam turbine and generator before it can be returned to services. Without this assist it

  will put Abbott Power plant at risk to reliably and efficiently provide the steam required to support the campus. The

   scope of work covered in this emergency purchase request is going to require a minimum of 12 weeks of offsite

  repair, fabrication, re-assembly and testing. By delaying the purchase of service would extend the repair to Steam

  turbine generator 2 well into peak heating season on campus and having the steam turbine generator available to

  serve the peak campus heat demand is essential.

  Signed By:  Justin Johnson, Assoc Dir of Purchasing

     Vendor:  Wood Group Field Services, Inc.                                      Notary Date: 5/31/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:         $2,209,339.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  69     UNIVERSITY OF ILLINOIS                                     

                                                                                                             Filed:                                                                                                             6/6/2013

  On April 19, 2013 the University of IL, the College of Agriculture, Consumer and Environmental Sciences, Office

  of International Programs was awarded as U.S. Host institution for the Fulbright Visiting Scholar Program for Libya

   to host a five week program to refine the Fulbright visiting faculty's English language skills while including materials

  relevant to their academic disciplines to the extent possible. The cost to house 40 participants from the five week

  program from June 2-July 6, 2013 is $61,400.

  Signed By:  Janet Milbrandt, Director of Purchasing

     Vendor:  Illini Towers                                                              Notary Date: 5/20/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:                    $0.00           $61,400.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 37 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  70     STUDENT ASSISTANCE COMMISSION, ILLINOIS                    

                                                                                                             Filed:                                                                                                             5/15/2013

  The IL Designated Account Purchase Program (IADAPP), a division of ISAC seeks to enter into an emergency

  contract with (ECSI)  for student loan servicing and billing services. ECSI is the current servicer for the loans. The

  final renewal term of the contract with ECSI ended 2-10-13 with no renewal options. A new servicer has been

  selected but because of delays in selecting the new servicer, we need to retain ECSI to continue to service the

  loans until they are converted to the new servicer.

  Signed By:  Linda McHugh, Agency Procurement Officer

     Vendor:  Educational Computer Systems, Inc.                                  Notary Date: 5/13/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:                    $0.00           $99,637.98                                         13          4

    Federal Cost                  $0.00                  $0.00

  71     STUDENT ASSISTANCE COMMISSION, ILLINOIS                    

                                                                                                             Filed:                                                                                                             5/15/2013

  The IL Designated Account Purchase Program (IADAPP), a division of ISAC seeks to enter into an emergency

  contract with (ECSI)  for student loan servicing and billing services. ECSI is the current servicer for the loans. The

  final renewal term of the contract with ECSI ended 2-10-13 with no renewal options. A new servicer has been

  selected but because of delays in selecting the new servicer, we need to retain ECSI to continue to service the

  loans until they are converted to the new servicer.  Original EP was an actual cost, this is a new EP with Estimated

  Cost of $75,000

  Expected Start - May12, 2013 - Feb 27, 2014

  Signed By:  Linda McHugh, Agency Procurement Officer

     Vendor:  Educational Computer Systems, Inc.                                  Notary Date: 5/13/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $75,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 38 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  72     AGING, DEPARTMENT ON                                       

                                                                                                             Filed:                                                                                                             11/30/2012

  A letter was received on June 12, 2013 that FY13 Qtr 2 Item02 had an actual cost of $304,756.25

  Signed By:  Dennis Miner, CFO

     Vendor:  Capitol Strategies                                                        Notary Date:     11/28/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $397,500.00          $304,756.25                                         13          4

    Federal Cost                  $0.00                  $0.00

  73     CENTRAL MANAGEMENT SERVICES                                

                                                                                                             Filed:                                                                                                             8/15/2012

  A letter was received on May 21, 2013 for Initial EP 8-14-2012 - 11/11/2012 and the extension from 11-12-

  2012 -

  2-11-2013. The final cost of these is $168,277.69

  Signed By:  Dante Watson, Strategic Manager

     Vendor:  CENVO                                                                    Notary Date:  8/9/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $104,343.75          $168,277.69                                         13          4

    Federal Cost                  $0.00                  $0.00

  74     CENTRAL MANAGEMENT SERVICES                                

                                                                                                             Filed:                                                                                                             3/15/2013

  A letter was received on April 8, 2013 for the Final Cost of FY 13-3 Item# 09 for $72,519.38

  Signed By:  Dante Watson, Strategic Sourcing Manager

     Vendor:  Uniformity, Inc                                                           Notary Date:     12/21/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $80,000.00           $72,519.38                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 39 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  75     DEPARTMENT OF JUVENILE JUSTICE

                                                                                                             Filed:                                                                                                             10/12/2012

  A letter was received on May 17, 2013 reporting that FY 13 Qtr 2 Item# 14 had an actual cost of $52,983.00.

  Signed By:  Debra Miller, PSA

     Vendor:  TASC, Inc.                                                                Notary Date: 10/3/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $98,000.00           $52,983.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  76     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             9/18/2012

  A letter was received on April 1, 2013 reporting that fy13 Qtr 1 Item #36 had an actual cost of $19,933.25.

  Signed By:  Glen Austin, Warden @ JCC

     Vendor:  Doyle Plumbing & Heating                                             Notary Date: 9/11/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $50,000.00           $19,933.25                                         13          4

    Federal Cost                  $0.00                  $0.00

  77     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             10/12/2012

  A letter was received on May 17, 2013 reporting the final cost of Fy13 Qtr 2 Item # 21 had an actual cost of

  $40,004.00

  Signed By:  Debra Miller, PSA

     Vendor:  TASC, Inc.                                                                Notary Date: 10/3/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $51,216.00           $40,004.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 40 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  78     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             10/12/2012

  A letter was received on May 9, 2013 reporting that FY13 Qtr 2 Item# 20 had an actual cost of $37,974.11

  Signed By:  Debra Miller, PSA

     Vendor:  TASC, Inc.                                                                Notary Date: 10/3/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $35,000.00           $37,974.11                                         13          4

    Federal Cost                  $0.00                  $0.00

  79     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             11/1/2012

  A letter was received on April 4, 2013 for the Final Cost of FY 13-2 Item# 28 for $43,063.45

  Signed By:  Randy Davis, Warden

     Vendor:  Siemens Building Technologies                                       Notary Date:     10/15/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $42,000.00           $43,063.45                                         13          4

    Federal Cost                  $0.00                  $0.00

  80     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             11/12/2012

  A letter was received on May 9, 2013 reporting that FY13 Qtr 2  Item 30 had an actual cost of $40,569.65.

  Signed By:  Debra Miller, PSA

     Vendor:  Wells Center                                                              Notary Date: 11/4/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $50,092.00           $40,569.65                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 41 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  81     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             11/26/2012

  A letter was received on may 30, 2013 reporting that FY13 Qtr 2 Item# 36 had an actual cost of $61,479.09

  Signed By:  Marcus Hardy, Warden, Stateville

     Vendor:  Conserve FS                                                              Notary Date:     11/15/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $65,000.00           $61,479.09                                         13          4

    Federal Cost                  $0.00                  $0.00

  82     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             12/10/2012

  A letter was received on May 9, 2013 extending EP Fy13 Qtr 2 Item# 38 from May 17, 2013 to Nov 12, 2013

  for an estimated amount of $200,000.00.

  Signed By:  Rich Mautino, SPSA

     Vendor:  United Parcel Service                                                    Notary Date: 12/5/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $200,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  83     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             12/10/2012

  A letter was received on April 1, 2013 reporting the actual cost for FY 13 Qtr 2 #39 as $56,301

  Signed By:  Zachary Roeckeman, Warden, Big Muddy

     Vendor:  Green Boiler Technologies                                             Notary Date:     11/21/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $60,000.00           $56,301.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 42 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  84     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             12/14/2012

  A letter was received extending FY 13 Qtr 2 Item# 40 for an additional 6 months at an estimated cost of $390,000

  Signed By:  Michael Atchison, Warden, Menard

     Vendor:  PLM Trailer & Cooling Concepts                                     Notary Date: 12/7/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $390,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  85     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             12/19/2012

  A letter was received on May 9, 2013 reporting that FY13 Qtr2 Item43 had an actual cost of $41,471.30

  Signed By:  Debra Miller, PSA

     Vendor:  Wells Center                                                              Notary Date:     12/18/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $50,092.00           $41,471.30                                         13          4

    Federal Cost                  $0.00                  $0.00

  86     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             1/16/2013

  A letter was received on April 9, 2013 extending the EP of FY13 Qtr 3 Item# 12 from 4-112013 to 10-7-2013

  for an estimated amount of $30,000.00."

  Signed By:  Rich Mautino, Asst. CEO of IL Corr. Industries

     Vendor:  Chicago Meat Group                                                    Notary Date: 1/14/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $30,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 43 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  87     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             1/17/2013

  A letter was received on June 24, 2013 reporting the actual cost of FY 13 Qtr 3 Item # 19 as $40,701.64.

  Signed By:  Jen Aholt, CEO of IL Correctional Industries

     Vendor:  Volunteer Knit                                                            Notary Date: 1/14/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $42,000.00           $40,701.64                                         13          4

    Federal Cost                  $0.00                  $0.00

  88     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             1/17/2013

  A letter was received on June 21, 2013 reporting the actual cost of FY 13 Qtr 3 Item# 17.

  Signed By:  Michael Lemke, Warden, Stateville

     Vendor:  Industrial Soap - Stateville                                              Notary Date: 1/14/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $32,000.00           $29,412.80                                         13          4

    Federal Cost                  $0.00                  $0.00

  89     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             1/17/2013

  A letter was received on June 24, 2013 reporting the actual cost of FY 13 Qtr 3 Item# 16 as $41,700

  Signed By:  Jen Aholt, CEO of IL Correctional Industries

     Vendor:  Tabb Textile Company Inc.                                            Notary Date: 1/14/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $40,000.00           $41,700.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 44 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  90     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             1/17/2013

  A letter was received on April 16, 2013 reporting the actual cost of FY 13 Qtr 3 Item #14..

  Signed By:  Jen Aholt, CEO of IL Correctional Industries

     Vendor:  Volunteer Knit                                                            Notary Date: 1/14/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $85,000.00           $60,329.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  91     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             1/17/2013

  A letter was received on June 25, 2013 reporting the actual cost of FY 13 Qtr 3 Item # 15 as $16,135.12

  Signed By:  Jen Aholt, CEO of IL Correctional Industries

     Vendor:  Volunteer Knit                                                            Notary Date: 1/14/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $14,100.00           $16,135.12                                         13          4

    Federal Cost                  $0.00                  $0.00

  92     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             1/22/2013

  A letter was received on April 15, 2013 reporting the actual cost of Fy13 Qtr 3 Item # 23 $52,800.

  Signed By:  Nancy Stanfa, Business Administrator

     Vendor:  A & H Mechanical Contracting, Inc.                                 Notary Date:     11/16/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $62,000.00           $52,800.00                                         13          4

    Federal Cost                  $0.00                  $3.00

7/10/2013                                                rptQuarterlyWeb                           Page 45 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  93     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             1/30/2013

  A letter was received on May 2, 2013 extending EP FY13 Qtr 3 Item# 26 from April 28, 2013 to August 25,

  2013 for an estimated amount of $20,352.00.

  Signed By:  Jen Aholt, Senior Public Service Administrator

     Vendor:  Human Services Center                                                 Notary Date: 1/30/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $20,352.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  94     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             1/31/2013

  A letter was received on April 25, 2013 extending EP FY13 Qtr 3 Item# 28 from April 28, 2013 to August 25,

  2013, estimated amount is $10,200.00.

  Signed By:  Jen Aholt, Senior Public Service Administrator

     Vendor:  Dawn Food Products                                                    Notary Date: 1/28/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $10,200.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  95     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             1/31/2013

  A letter was received on April 25, 2013 extending FY13 Qtr 3 Item# 30 from April 28, 2013 to August 25, 2013

  estimated cost is $143,925.00,

  Signed By:  Jen Aholt, Senior Public Service Administrator

     Vendor:  Bianchi Milling Inc.                                                     Notary Date: 1/28/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $143,925.00                                                                  13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 46 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  96     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             1/31/2013

  A letter was received on April 9, 2013 extending EP FY13 Qtr3 Item # 29 from 4-16-2013 to 8-15-2013 with an

   estimated amount of $37,500.00

  Signed By:  Jen Aholt, CEO of IL Correctional Industries

     Vendor:  Human Service Center                                                  Notary Date: 1/18/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $37,500.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  97     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             2/14/2013

  A letter was received on May 17, 2013 reporting that FY13 Qtr 3 Item# 33 had an actual cost of $107,835.00

  Signed By:  Michael Lemke, Warden, Stateville

     Vendor:  Retrieval Business Systems, Inc.                                      Notary Date:  2/8/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $107,835.00          $107,835.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  98     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             3/5/2013

  A letter was received on May 17, 2013 reporting that FY 13 Qtr 3 Item # 39 had an actual cost of $29,412.80

  Signed By:  Kimberly S Butler, Asst. Warden of Menard Corr. Center

     Vendor:  Industrial Soap Company                                               Notary Date:  5/1/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $29,412.80           $29,412.80                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 47 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  99     CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             3/13/2013

  A letter was received on May 28, 2013 extending EP FY13 Qtr 3 Item # 40 from 6-30-13 to 9-29-13 for an

  estimated amount of $1,200,000.00.

  Signed By:  Alyssa William-Schafer, Public Services Admin/Cood. For Sex Off.

     Vendor:  BI Incorporated                                                           Notary Date:  3/7/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:         $1,200,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  100   CORRECTIONS - GENERAL OFFICE                               

                                                                                                             Filed:                                                                                                             3/13/2013

  A letter was received on May 17 extending FY 13 Qtr 3 Item# 41 for addition time from  5-20-13 to 7-18-13.

  Does not appear to have any additional cost involved.

  Signed By:  Glen Austin, Warden, Jacksonville

     Vendor:  Henson Robinson Company                                            Notary Date: 2/21/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:                    $0.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  101   HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                             Filed:                                                                                                             3/2/2011

  A letter was received on June 11, 2013 for the actual cost of FY 11 Qtr 3 Item# 26 for $9,160

  Signed By:  Ronald Wilson, SPO

     Vendor:  Kelson Burnett Co.                                                      Notary Date: 2/15/2011

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $15,000.00             $9,160.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 48 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  102   HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                             Filed:                                                                                                             3/21/2011

  A letter was received on June 11, 2013 for the actual cost of FY 11 Qtr 3 Item# 27 as $10,000.

  Signed By:  Kenneth Crutcher, SPO

     Vendor:  Rockford Steam Boiler Works                                         Notary Date: 3/21/2011

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $10,000.00           $10,000.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  103   HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                             Filed:                                                                                                             6/7/2011

  A letter was received on June 7, 2013 for the actual cost of FY 11 Qtr 3 Item # 36 as $44,669.10

  Signed By:  Kenneth Crutcher,

     Vendor:  Pathway Health Services                                                Notary Date:  6/2/2011

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $49,300.00           $44,669.10                                         13          4

    Federal Cost                  $0.00                  $0.00

  104   HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                             Filed:                                                                                                             8/4/2011

  A letter was received on May 28, 2013 for the actual cost of FY 12 Qtr 1 Item # 38 as $134,398.

  Signed By:  Kenneth Crutcher, SPO

     Vendor:  Crowe Horwath LLP                                                    Notary Date: 7/29/2011

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $105,000.00          $134,398.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 49 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  105   HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                             Filed:                                                                                                             2/2/2012

  A letter was received on April 19, 2013 revising the actual cost for FY 12 Qtr 3 Item # 30 as $1,010,275.66

  Signed By:  Kenneth Crutcher, Chief Procurement Off for DHS

     Vendor:  Harborside Rehab/ Ready Nurse                                       Notary Date:

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $484,600.00        $1,010,275.66                                         13          4

    Federal Cost                  $0.00                  $0.00

  106   HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                             Filed:                                                                                                             6/15/2012

  A letter was received on May 28, 2013 reporting actual cost of FY 12 Qtr 4 Item# 26 as $0.00

 

  Madden did not utilize the vendor as requested.

  Signed By:  Edith Newman, Hosp Administrator

     Vendor:  Annashae Corp                                                           Notary Date: 5/29/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $150,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  107   HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                             Filed:                                                                                                             8/2/2012

  A letter was received on April 10, 2013 for the Final Cost of FY 13-1 Item# 46 for $99,701.58

  Signed By:  Melissa Wright, Director

     Vendor:  UPS                                                                        Notary Date: 7/24/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $100,000.00           $99,701.58                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 50 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  108   HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                             Filed:                                                                                                             10/29/2012

  A letter was received on April 3, 2013 for the actual cost of FY 13 Qtr 2 Item# 49 as $27,300.

  Signed By:  Glenda Corbett, Acting Center Director

     Vendor:  3 Vendors                                                                 Notary Date:

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $54,600.00           $27,300.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  109   HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                             Filed:                                                                                                             1/11/2013

  A letter was received on June 5, 2013 for the actual cost of FY 13 Qtr 3 Item# 47 as $98,407.61.

  Signed By:  James Veach, Facility Director

     Vendor:  Walts Floor Tile and Maintenance                                    Notary Date:  1/3/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $120,000.00           $98,407.61                                         13          4

    Federal Cost                  $0.00                  $0.00

  110   HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                             Filed:                                                                                                             3/8/2013

  A letter was received on May 7, 2013 extending FY 13 Qtr 3 Item# 48 from 4-28-2013 to 7-26-2013 for an

  estimated amount of $561,816.00.

  Signed By:  L. Collins, Shapiro Center Director

     Vendor:  All Group North America Corp.                                       Notary Date:  3/5/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $561,816.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 51 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  111   HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                             Filed:                                                                                                             4/10/2013

  A letter was received on April 10, 2013 for the Final cost of FY 13-3 Item# 49, $16,434.25

  Signed By:  Edith Newman, Hospital Admin

     Vendor:  Lionheart Critical Power Specialist                                   Notary Date:  4/3/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:                    $0.00           $16,434.25                                         13          4

    Federal Cost                  $0.00                  $0.00

  112   HEALTHCARE AND FAMILY SERVICES, DEPT OF

                                                                                                             Filed:                                                                                                             2/27/2013

  A letter was received on May 1, 2013 extending the EP of FY 13 Qtr 3 Item # 52 from May 30, 2013 to

  December 31, 2013. The estimated amount is $7,500,000.00

  Signed By:  Brett M. Cox, State Purchasing Officer

     Vendor:  DentaQuest of Illinois                                                   Notary Date: 2/22/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:         $75,000,000.0                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  113   PUBLIC HEALTH, DEPARTMENT OF                               

                                                                                                             Filed:                                                                                                             1/18/2013

  A letter was received extending the Org EP FY 13 Qtr 3 Item# 56 with an estimated amount of $184,000

  Signed By:  Thomas J. Schafer, Deputy Director, Health Promotion

     Vendor:  Abbott Laboratories                                                      Notary Date: 1/10/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $184,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 52 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  114   PUBLIC HEALTH, DEPARTMENT OF                               

                                                                                                             Filed:                                                                                                             1/18/2013

  A letter was received on April 9, 2013 extending EP FY 13 Qtr 3 Item # 54 form 4-11-2013 to 10-7-2013, the

  estimated amount is $135,000.

  Signed By:  Thomas J. Schafer, Deputy Director, Health Promotion

     Vendor:  Applied Nutrition Corp.                                                 Notary Date:  1/9/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $135,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  115   PUBLIC HEALTH, DEPARTMENT OF                               

                                                                                                             Filed:                                                                                                             1/18/2013

  This EP FY 13 Qtr3 Item# 55 is being extended from 4-11-2013 to 10-07-2013 the new estimated amount is

  $113,400"

  Signed By:  Thomas J. Schafer, Deputy Director, Health Promotion

     Vendor:  Cambrooke Foods, LLC                                                Notary Date:  1/9/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $113,400.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  116   PUBLIC HEALTH, DEPARTMENT OF                               

                                                                                                             Filed:                                                                                                             2/22/2013

  A letter was received on May 9 2013 for the actual amount of $193,250, this covers FY 13 Qtr 2 Item# 57 and

  FY 13- Qtr 3 Item# 57 and FY 13 -Qtr 3 Item # 58, from November 1, 2012 to March 31, 2013.

  Signed By:  Toinette Colon, Deputy Director

     Vendor:  Capitol Strategies Consulting                                          Notary Date: 2/26/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $42,000.00          $193,250.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 53 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  117   PUBLIC HEALTH, DEPARTMENT OF                               

                                                                                                             Filed:                                                                                                             3/15/2013

   A letter was received on June 3, 2013 extending EP FY 13 Qtr 3 Item# 59 from 6-9-2013 to 10-6-2013 for an

  estimated amount of $152,000.

  Signed By:  Thomas J. Schafer, Deputy Director, Health Promotion

     Vendor:  Nutricia North America                                                 Notary Date:  3/5/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $152,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  118   PUBLIC HEALTH, DEPARTMENT OF                               

                                                                                                             Filed:                                                                                                             3/15/2013

  A letter was received on June 3, 2013 to extend EP FY 13 Qtr 4 Item# 04 from 6-9-2013 to 10-6-2013 for an

  estimated amount of $88,000.

  Signed By:  Thomas Schafer, Deputy Director

     Vendor:  Vita Flow USA, LLC                                                    Notary Date:  3/5/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $88,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  119   STATE POLICE, DEPARTMENT OF                                

                                                                                                             Filed:                                                                                                             11/8/2012

  A letter was received on April 25, 2013 reporting the actual cost of FY 13 Qtr 2 Item# 60 as $186,379.91

  Signed By:  Hiram Grau, Dir of St Police

     Vendor:  Fisher Scientific Co.                                                     Notary Date: 11/2/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $240,200.00          $186,379.91                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 54 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  120   TRANSPORTATION, DEPARTMENT OF                              

                                                                                                             Filed:                                                                                                             10/12/2012

  A letter was received on April 30, 2013 reporting the actual cost of FY 13 Qtr 2 Item # 61 as $406,993.04

  Signed By:  Roger Driskell, Region 4 Engr

     Vendor:  2 Vendors                                                                 Notary Date:     10/10/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $406,993.12          $406,993.04                                         13          4

    Federal Cost                  $0.00                  $0.00

  121   TRANSPORTATION, DEPARTMENT OF                              

                                                                                                             Filed:                                                                                                             12/6/2012

  A letter was received on April 9, 2013 for the Final Cost of FY 13-2 Item# 64 for $34,650

  Signed By:  Matt Hughes, Dir of Fin and Admin

     Vendor:  Capitol Strategies                                                        Notary Date: 12/6/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $200,000.00           $34,650.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  122   TRANSPORTATION, DEPARTMENT OF                              

                                                                                                             Filed:                                                                                                             1/24/2013

  A letter was faxed on May 21, 2013 for the Extension amount for FY 13 Qtr 3 Item# 61 as $22,714.86

  Signed By:  Aaron Weatherholt, Dep Director

     Vendor:  G A Rich & Sons, Inc/ Funks Grove Rest                           Notary Date:     12/21/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $25,000.00           $22,714.86                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 55 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  123   CAPITAL DEVELOPMENT BOARD                                  

                                                                                                             Filed:                                                                                                             3/26/2012

  A letter was received on June 26, 2013 for actual cost of Baysinger Design Group and Geissler Roofing Co.

  For FY 12 Qtr 3 Item# 50 for $245,400.

  Signed By:  Gus Behnke, Chief Fiscal Officer

     Vendor:  Baysinger Design Group                                                Notary Date: 3/19/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $350,000.00          $245,400.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  124   CAPITAL DEVELOPMENT BOARD                                  

                                                                                                             Filed:                                                                                                             5/18/2012

  A letter was received on April 1, 2013 for the Final Cost of FY 12-4 Item # 42 for $124,435.60

  Signed By:  Gus Behnke, Chief Fiscal Officer

     Vendor:  JH2B Tinley Park MH Closure                                        Notary Date: 5/15/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $350,000.00          $124,435.60                                         13          4

    Federal Cost                  $0.00                  $0.00

  125   ENVIRONMENTAL PROTECTION AGENCY                            

                                                                                                             Filed:                                                                                                             8/31/2012

  A letter was received on February 14. 2013 for the Final Cost of FY 13-1 Item # 73 for $5,523.71

  Signed By:  John Kim, Interim Director

     Vendor:  Absolute Standard, Inc.                                                 Notary Date: 8/31/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $15,000.00             $5,523.71                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 56 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  126   TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                             Filed:                                                                                                             8/1/2012

  A letter was received on May 1, 2013 reporting the actual cost of FY 13 Qtr 1 Item# 79 as $1,575,165.47.

  Signed By:  John Donato, Chief of Procurement

     Vendor:  IGOR the WatchDog                                                    Notary Date: 7/10/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:         $1,990,450.00        $1,575,165.47                                         13          4

    Federal Cost                  $0.00                  $0.00

  127   TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                             Filed:                                                                                                             1/17/2013

  A letter was received on May 1, 2013 reporting the actual cost of FY 13 Qtr 3 Item# 74 as $55,657.70

  Signed By:  John Donato, Chief of Procurement

     Vendor:  Quimex, Inc.                                                              Notary Date: 1/10/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $70,000.00           $55,657.70                                         13          4

    Federal Cost                  $0.00                  $0.00

  128   TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                             Filed:                                                                                                             2/28/2013

  A letter was received on April 26, 2013 stating that  Emergency Purchase FY 13 Qtr 3 Item# 75 had been

  cancelled.

  No Cost was incurred.

  Signed By:  John Donato, Chief of Procurement

     Vendor:  Standard Industrial & Automotive Equip.                            Notary Date: 2/21/2013

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $145,000.00                  $0.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 57 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  129   UNIVERSITY OF ILLINOIS                                     

                                                                                                             Filed:                                                                                                             9/6/2011

  A letter was received on April 29, 2013 for the actual cost of FY 12 Qtr 1 Item# 80 for $167,895.00.

  Signed By:  Janet Milbrandt, Interim Director

     Vendor:  Various Entertainment Acts                                            Notary Date: 8/30/2011

                                 Estimate                Actual                                          FY     QTR

    State Cost:                    $0.00          $167,895.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  130   UNIVERSITY OF ILLINOIS                                     

                                                                                                             Filed:                                                                                                             2/1/2012

  A letter was received on May 23, 2013 reporting the actual cost of FY 12 Qtr 3 Item# 105 as $23,421.00

  Signed By:  Janet Milbrandt, Int Purch Dir

     Vendor:  Illinois Rocstar LLC                                                     Notary Date: 1/26/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:             $75,000.00           $23,421.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  131   UNIVERSITY OF ILLINOIS                                     

                                                                                                             Filed:                                                                                                             7/10/2012

  A letter was received on May 20, 2013 reporting the actual cost of FY 13 Qtr 1 Item # 87 for an Actual Cost of

  $75,000.

  Signed By:  Kevin Fair, Dir of Purchasing

     Vendor:  Kroeschell Services, Inc.                                                Notary Date: 6/28/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $100,000.00           $75,000.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 58 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  132   UNIVERSITY OF ILLINOIS                                     

                                                                                                             Filed:                                                                                                             7/16/2012

  A letter was received on April 9, 2013 for the Final Cost of FY 13-1 Item# 88 for $1,953,571.00

  Signed By:  Kevin Fair, Interim Dir of Purchasing

     Vendor:  University of Chicago                                                   Notary Date: 7/12/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $639,350.75        $1,953,571.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  133   UNIVERSITY OF ILLINOIS                                     

                                                                                                             Filed:                                                                                                             9/17/2012

  A letter was received on April 18, 2013 reporting the final cost of FY 13 Qtr 1 Item# 89 as $123,936.00

  Signed By:  Kevin Fair, Dir of Purchasing U of I Chicago

     Vendor:  Center for Children's Digestiv                                          Notary Date: 9/13/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $100,000.00          $123,936.00                                         13          4

    Federal Cost                  $0.00                  $0.00

  134   UNIVERSITY OF ILLINOIS                                      

                                                                                                             Filed:                                                                                                             11/8/2012

  A letter was received on June 7, 2013 reporting the actual cost of FY 13 Qtr 2 Item# 80 as $29,4822.01.

  Signed By:  Janet Milbrandt, Dir of Purchasing

     Vendor:  Ioditech, Inc.                                                              Notary Date: 11/2/2012

                                 Estimate                Actual                                          FY     QTR

    State Cost:                    $0.00          $294,822.01                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 59 of  60


                                   LIST OF EMERGENCY PURCHASE AFFIDAVITS

                              FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                               April 1,2013 through June 30, 2013

  135   UNIVERSITY OF ILLINOIS                                     

                                                                                                             Filed:                                                                                                             2/7/2013

  A letter was received on May 28, 2013 reporting the actual cost for veterinary pharmaceutical and medical

  products.

  Signed By:  Janet Milbrandt, Interim Director

     Vendor:  Butler Animal Health                                                    Notary Date:     10/21/2011

                                 Estimate                Actual                                          FY     QTR

    State Cost:            $120,000.00          $179,950.00                                         13          4

    Federal Cost                  $0.00                  $0.00

7/10/2013                                                rptQuarterlyWeb                           Page 60 of  60