  1       SECRETARY OF STATE                                          File Date:  4/27/2018

  Original Filing - 04/27/2018:

  Illinois Secretary of State ordered vehicles thru a CMS master contract with Wright Automotive. The

  vehicles were never  delivered to the vendor. Chrysler has made arrangements with Bob Ridings to take

  possession of these vehicles so the SOS can purchase them. There are no dealerships that would provide

  these vehicles at the cost established in the master contract as they would lose money. Bob Ridings has

  agreed to provide these vehicles to the SOS for an additional cost of $1,610.00. The Secretary of State is

  seeking an emergency contract to obtain the vehicles before they are sold to another entity. This

  emergency contract will be a one-time purchase for the Dodge Caravans. This Emergency Purchase has an

  expected start date of 04/27/2018 through 06/30/2018 with an Actual Estimated Cost of $101,500.00.

   Signed       Matt Brown, SOS-Purchasing

       Vendor   Bob Ridings                                                                                  Notary Date:   4/20/2018

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                            $0.00                                        $101,500.00           $101,500.00       18      4

    Federal                           $0.00                                                                                  $0.00

  2       SECRETARY OF STATE                                          File Date:  4/27/2018

  Original Filing - 04/27/2018:

  Illinois Secretary of State ordered vehicles thru a CMS master contract with Wright Automotive. The

  vehicles were built and delivered to the vendor. The vehicles were repossessed by Ford upon the

  cancellation of the master contract. Ford coordinated the transfer of the 3 Ford Explorers to Morrow

  Brothers Ford, Inc. The pricing will remain the same as the original contract pricing. Illinois Secretary of

  State is seeking an emergency contract to obtain the vehicles before they are sold to another entity. This

  emergency contract will be a one-time purchase of the Ford Explorers. This Emergency Purchase has an

  expected start date of 04/27/2018 through 06/30/2018 with an Actual Estimated Cost of $77,520.00.

   Signed       Matt Brown, SOS-Purchasing

       Vendor   Morrow Brothers Ford Inc.                                                           Notary Date:   4/20/2018

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                   $77,520.00                                          $77,520.00             $77,520.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  3       CENTRAL MANAGEMENT SERVICES                                 File Date:  5/3/2018

  Original Filing - 05/03/2018:

  DHFS has occupied this lease facility since 2007. The initial lease was written for a term of ten years

  which expired on November 4, 2017, and has been in holdover. The six-month limit on holdover will

  expire in early May, 2018, and a new five-year lease was recently rejected by the Procurement Policy

  Board. This emergency lease is necessary to provide continued occupancy and payment of rent until a new

   lease is approved by the Policy Board. This Emergency Purchase has an expected start date of

  05/05/2018 through 08/02/2018 with an Actual Cost of $156,557.05.

   Signed       Jeff Miller, CMS Leasing Representative

       Vendor   Illinois Building LLC                                                                    Notary Date:   4/30/2018

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $156,557.05                                        $156,557.05           $156,557.05       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  4       NATURAL RESOURCES, DEPARTMENT OF                            File Date:  4/11/2018

  An Emergency Purchase Statement was received on June 12, 2018 requesting an extension for dates

  starting 07/10/2018 to 06/30/2019 at an additional estimated cost of $0.00, keeping the revised estimated

  cost at $195,000.00.

 

  Original Filing - 04/11/2018:

  Emergency construction services are required in order to stabilize a home in imminent danger of

  catastrophic collapse. Contractor shall detach the structure from its foundation, re-level the structure and

  support the house on steel beams. The residence is located in Benld, IL, Macoupin County. The

  Abandoned Mined Lands Reclamation Division (AMLRD) receives federal grant funding for the sole

  purpose of eliminating mine related public health and safety hazards. The U.S. Department of the Interior,

   Office of Surface Mining has declared this site an AML emergency. If the State does not make this

  emergency procurement, the public safety hazard will remain and unexpended AMLRD funds will be

  returned to the federal government. This Emergency Purchase has an expected start date of 04/12/2018

  through 07/09/2018 with an Original Estimated Cost of $195,000.00.

   Signed       Andrew Henning, State Purchasing Officer

       Vendor   EHM Consulting LLC                                                                   Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                                                                                        $0.00                      $0.00       18      4

    Federal                $195,000.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  5       NATURAL RESOURCES, DEPARTMENT OF                            File Date:  4/11/2018

  Latest Filing - 06/22/2018:

  A Emergency Purchase Final Cost Statement was received in the same filing quarter reporting a Total

  Actual Cost at $99,700.00.

   

  Original Filing - 04/11/2018:

  Flooding of the Illinois River has washed up large amounts of debris, requiring massive clean-up work at

  Starved Rock. There is significant hazardous flood debris in the park, creating a very hazardous condition

  for anyone in the area. Illinois will lose significant visitation and revenue if these areas are not cleaned

  immediately. This Emergency Purchase has an expected start date of 04/05/2018 through 06/29/2018

  with an Original Estimated Cost of $109,670.00.

   Signed       Andrew Hennig, State Purchasing Officer

       Vendor   Homer Tree Care, Inc.                                                                  Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $109,670.00                                          $99,700.00             $99,700.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  6       NATURAL RESOURCES, DEPARTMENT OF                            File Date:  5/29/2018

  Original Filing - 05/29/2018:

  Emergency Construction Services are required for the demolition of the Windjammer Boatel located

  within the Wayne Fitzgerrell State Recreational Area Resort.  The Boatel in question has been undergoing

  mold remediation, during this process it was discovered that much of the underlying structure was rotten.  

  The Agency hired a structural engineer to perform an analysis of the structure, their findings were that

  there was a severe amount of dry rot and deteriorated structural members.  The Agency has determined

  that even though the Resort is closed to the Public, there remains a threat to public safety due to the

  instability of the Boatel Structure.   The Boatel is located on land/water, it is uncertain as to whether the

  structure could withstand high winds/strong storms.  It is possible that pieces of the structure could be

  thrown into the  water into the paths of unsuspecting boaters or on to pedestrians seeking shelter on land.

   The boat docks are located 100 ft. from the structure in question and remain open to lake access only,

  however, the boat ramp is 300 ft. from the structure and remains open to the public. This Emergency

  Purchase has an expected start date of 05/24/2018 through 08/22/2018 with an Original Estimated Cost of

   $120,000.00.

   Signed       Robert Appleman, Director Office of Realty & Capital Plan

       Vendor   Lake Contracting                                                                          Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $120,000.00                                                   $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  7       NATURAL RESOURCES, DEPARTMENT OF                            File Date:  6/12/2018

  Original Filing 06/12/2018:

  Two 25-horsepower pumps provide irrigation for the Grand Marias Golf Course at Frank Holten State

  Recreation Area, which is owned by the State. Watering must be frequent and regular to sustain the grass

  on the course. Approximately May 1, 2018, both pumps failed in rapid succession. Immediate replacement

   is necessary to protect damage to State Property. IDNR is under contractual obligation to provide

  maintenance services to the concessionaire operating the golf course under a lease agreement. This

  Emergency Purchase has an expected start date of 06/08/2018 through 09/05/2018 with an Original

   Signed       David Berry,

       Vendor   Bel-O Sales & Service, Inc.                                                          Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $101,000.00                                                   $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00

  8       DEPARTMENT OF JUVENILE JUSTICE                                               File Date:  6/27/2018

  Original Filing - 06/27/2018:

  This emergency procurement is for a hot water pipe that carries hot water from the heat plant to the

  facility. This procurement includes removing concrete, digging the earth to expose the leaking pipe,

  replacing the damaged section of pipe, testing the repair to ensure that the repair is sound, backfilling the

  site with sand and gravel, and replacing the concrete which was originally. The contractor was on site

  repairing the Heater Line when additional repair work was discovered. This Emergency Purchase has an

  expected start date of 06/20/2018 through 09/19/2018 with an Original Estimated Cost of $140,597.00.

   Signed       Jeff Schukai, State Purchasing Officer

       Vendor   Mechanical, Inc.                                                                           Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $140,597.00                                                   $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  9       HUMAN SERVICES, DEPARTMENT OF                               File Date:  6/6/2018

  Original Filing - 06/06/2018:

  Logicoy will connect hospitals and clinics to the Prescription Monitoring Program automated web service.

   This Emergency Purchase has an expected start date of 06/04/2018 through 08/30/2018 with an Original

  Estimated Cost of $600,000.00.

   Signed       William Strahle, Agency Procurement Officer

       Vendor   Logicoy Inc.                                                                                 Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                            $0.00                                                   $0.00                      $0.00       18      4

    Federal                $600,000.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  10     HUMAN SERVICES, DEPARTMENT OF                               File Date:  4/25/2018

  Second Filing - 07/23/2018:

  On April 17, 2018 Electrical Power Loop #14 at Elgin Mental Health Center failed.  This loop provides

  electrical power to 3 forensic patient units and the Read Building which houses offices for Family and

  Community Services.  The master contract vendor for electrical services was contacted to diagnose the

  problem.  The repair would require to replace the main cable for the Loop which had shorted out in a few

  different places.  An emergency was declared and the master contract vendor provided 4 power generators

  for the 3 patient units and the Read Building.  CDB took responsibility of overseeing and paying for the

  repair.  The repair was estimated to take two to three months however there was an initial delay in

  starting the repair work because of approval processes and another delay because of an issue with the

  replacement cable.  Because of these delays the repair is taking longer than expected and the generators

  will need to be rented past the original term date of the emergency contract of July 16, 2018. An

  Emergency Purchase Statement was received on July 23, 2018 requesting an extension for dates starting

  07/17/2018 to 10/14/2018 at an additional estimated cost of $300,000.00, making the revised estimated

  cost at $700,00.00.

 

  Original Filing - 04/25/2018: FY18, Qtr 4, Item# 10:

  A failure in the feed #14 electrical loop has caused a power outage in 2 residential buildings and one

  program building at the Elgin Mental Health Center. The rental of generators are required to provide the

  electricity to the 3 buildings to maintain occupancy. This Emergency Purchase has an expected start date

  of 04/18/2018 through 07/16/2018 with an Original Estimated Cost of $400,000.00.

   Signed       William Strahle, Procurement Officer

       Vendor   The Stone Group                                                                          Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $400,000.00           $700,000.00                    $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  11     HUMAN SERVICES, DEPARTMENT OF                               File Date:  6/6/2018

  Original Filing - 06/06/2018:

  ACESS will continue to provide fiscal, payroll and bill payment services for individuals receiving services

  through the Illinois' Home and Community-based (HCBS) Waiver for individuals with Intellectual and

  Developmental Disabilities and their representatives, when appropriate, throughout the State who hire

  their own direct support persons directly. This Emergency Purchase has an expected start date of

  06/04/2018 through 06/30/2018 with an Original Estimated Cost of $500,000.00.

   Signed       William Strahle, Agency Procurement Officer

       Vendor   Northeast Pennsylvania dba ACESS                                             Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $500,000.00                                                   $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00

  12     TRANSPORTATION, DEPARTMENT OF                               File Date:  4/2/2018

  Latest Filing - 07/09/2018:

  The Actual Total Cost of FY18, Qtr 4, Item# 12 is $1,091,832.18.

 

  Original Filing - 04/02/2018: FY18, Qtr 4, Item# 12:

  The work includes inlaying the pavement and associated repairs on US51B/Center Street from Division St.

  to Locust St. in Bloomington and US150/Clinton Street from Empire St to just north of Oakland Ave in

  McClean County. Immediate expenditure is necessary for repairs to State property to protect against

  further loss or damage. As a result of a winter with extreme freeze/thaw cycles and excessive moisture we

  have experienced an excessive amount of potholes and pavement deterioration. These conditions are

  creating a traffic hazard causing vehicles to have tire blowouts or swerve into adjacent lanes potentially

  causing accidents. This Emergency Purchase has an expected start date of 03/30/2018 through 06/28/2018

   with an Original Estimated Cost of $1,200,000.00.

   Signed       Kensil Garnett, Region 3 Engineer

       Vendor   Rowe Construction, a Division of U.C.M., Inc.                            Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State              $1,200,000.00                                     $1,091,832.18        $1,091,832.18       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  13     TRANSPORTATION, DEPARTMENT OF                               File Date:  4/4/2018

  Latest Filing - 07/09/2018:

  The Actual Total Cost of FY18, Qtr 4, Item# 13 is $1,064,922.14.

 

  Original Filing - 04/04/2018: FY18, Qtr 4, Item# 13:

  Full depth and partial depth pavement patching on FAI Route 255 from Illinois route 157 to Illinois Route

   15, in St. Clair County. Immediate expenditure is necessary for repairs to State property to protect

  against further loss or damage. As a result of a winter with extreme freeze/thaw cycles and excessive

  moisture, we have experienced an excessive amount of potholes and pavement deterioration. These

  conditions are creating a traffic hazard causing vehicles to have tire blowouts or swerve into adjacent lanes

  potentially causing accidents. This Emergency Purchase has an expected start date of 04/02/2018 through

  07/01/2018 with an Original Estimated Cost of $1,000,000.00.

   Signed       Jeffrey Keirn, Region 5 Engineer

       Vendor   Kinney Contractors, Inc.                                                              Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State              $1,000,000.00                                     $1,064,922.14        $1,064,922.14       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  14     TRANSPORTATION, DEPARTMENT OF                               File Date:  4/4/2018

  Latest Filing - 07/09/2018:

  The Actual Total Cost of FY18, Qtr 4, Item# 14 is $1,982,399.08.

 

  Original Filing - 04/04/2018: FY18, Qtr 4, Item# 14:

  Interstate 57 north bound and south bound in Franklin County from Williamson County to Jefferson

  County. Immediate expenditure is necessary for repairs to State property to protect against further loss or

  damage. As a result of a winter with extreme freeze/thaw cycles and excessive moisture, we have

  experienced an excessive amount of potholes and pavement deterioration. These conditions are creating a

  traffic hazard causing vehicles to have tire blowouts or swerve into adjacent lanes potentially causing

  accidents. This Emergency Purchase has an expected start date of 04/04/2018 through 07/03/2018 with an

   Original Estimated Cost of $2,200,000.00.

   Signed       Jeffrey Keirn, Region 5 Engineer

       Vendor   Southern Illinois Asphalt Co., Inc.                                                Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State              $2,200,000.00                                     $1,982,399.08        $1,982,399.08       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  15     TRANSPORTATION, DEPARTMENT OF                               File Date:  4/4/2018

  Latest Filing - 06/07/2018:

  The Actual Total Cost is $436,887.10.

 

  Original Filing - 04/04/2018:

  Interstate 64 in Jefferson County north bound and south bound from mile post 62 to mile post 73.

  Immediate expenditure is necessary for repairs to State property to protect against further loss or damage.

  As a result of a winter with extreme freeze/thaw cycles and excessive moisture, we have experienced an

  excessive amount of potholes and pavement deterioration. These conditions are creating a traffic hazard

  causing vehicles to have tire blowouts or swerve into adjacent lanes potentially causing accidents. This

  Emergency Purchase has an expected start date of 04/04/2018 through 07/03/2018 with an Original

  Estimated Cost of $402,705.83.

   Signed       Jeffrey Keirn, District 5 Engineer

       Vendor   Southern Illinois Asphalt Co., Inc.                                                Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $402,705.83                                        $436,887.10           $436,887.10       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  16     TRANSPORTATION, DEPARTMENT OF                               File Date:  4/4/2018

  Latest Filing - 07/09/2018:

  The Actual Total Cost of FY18, Qtr 4, Item# 16 is $2,554,532.15.

 

  Original Filing - 04/04/2018: FY18, Qtr 4, Item# 16:

  District #7 is requesting an emergency skip patching and resurfacing project in Macon County for US 51

  and IL 121. Immediate expenditure is necessary for repairs to State property to protect against further

  loss or damage. As a result of a winter with extreme freeze/thaw cycles and excessive moisture, we have

  experienced an excessive amount of potholes and pavement deterioration. These conditions are creating a

  traffic hazard causing vehicles to have tire blowouts or swerve into adjacent lanes potentially causing

  accidents. This Emergency Purchase has an expected start date of 04/04/2018 through 07/03/2018 with an

   Original Estimated Cost of $2,564,836.80.

   Signed       Jeffrey South, Region 4 Engineer

       Vendor   Illinois Valley Paving, a Division of U.C.M., Inc.                        Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State              $2,564,836.80                                     $2,554,532.15        $2,554,532.15       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  17     TRANSPORTATION, DEPARTMENT OF                               File Date:  4/12/2018

  Latest Filing - 07/09/2018:

  The Actual Total Cost of FY18, Qtr 3, Item# 17 is $1,025,559.85.

 

  Original Filing - 04/12/2018:

  Full depth PCC pavement patching on FAI Route 55/64 Westbound from east of the MLK Bridge Exit

  Ramp to East of Structure -08-0010 over Riverpark Drive, in St. Clair County. Immediate expenditure is

  necessary for repairs to State property to protect against further loss or damage. As a result of a winter

  with extreme freeze/thaw cycles and excessive moisture, we have experienced an excessive amount of

  potholes and pavement deterioration. These conditions are creating a traffic hazard causing vehicles to

  have tire blowouts or swerve into adjacent lanes potentially causing accidents. This Emergency Purchase

  has an expected start date of 04/13/2018 through 07/12/2018 with an Original Estimated Cost of

  $1,120,658.25.

   Signed       Jeffrey Keirn, Region Five Engineer

       Vendor   Keeley & Sons                                                                             Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State              $1,120,658.25                                     $1,025,559.85        $1,025,559.85       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  18     TRANSPORTATION, DEPARTMENT OF                               File Date:  4/16/2018

  Latest Filing - 08/22/2018:

  The Actual Total Cost of FY18, Qtr 4, Item# 18 is $997,435.27.

 

  Original Filing - 04/16/2018:

  Immediate expenditure is necessary for repairs to State property to protect against further loss or damage.

  A recent inspection of highway lighting poles along FAI Route 255 has indicated serious concerns due to

  loose bolts and/or base fractures. The Core Ten lighting poles at FAI 270 at IL 157 and FAI 55/70 at IL

  203 have shown fracture issues and thinning of the steel which can lead to sudden failure, potential causing

  harm to the motoring public and additional damage to State facilities. This Emergency Purchase has an

  expected start date of 04/16/2018 through 07/15/2018 with an Original Estimated Cost of $750,000.00.

   Signed       Joseph Monroe, District 8 Operations Engineer

       Vendor   Wissehr Electric Inc.                                                                     Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $750,000.00                                        $997,435.27           $997,435.27       18      4

    Federal                           $0.00                                                                                  $0.00

  19     TRANSPORTATION, DEPARTMENT OF                               File Date:  4/16/2018

  Original Filing - 04/16/2016:

  This is for a one-time purchase of Dodge Grand Caravans, Ford F150s and SUVs for the Department fleet.

  These vehicles were originally ordered through the master contract with Wright Automotive. The vendor

  was no longer able to provide the vehicles and the master contract was canceled. These requests are critical

   to the district in support of safe roadways for motorists. These vehicles will either be used to oversee

  winter road maintenance or to oversee summer road construction. There are not a sufficient number of

  reliable operating vehicles to perform necessary work tasks. This Emergency Purchase has an expected

  start date of 05/29/2018 through 06/28/2018 with an Actual Cost of $344,905.00 to Bob Ridings Inc. and

  $572,612.00 to Morrow Brothers Ford Inc.

   Signed       Aundra Williams, Agency Purchasing Officer

       Vendor   Bob Ridings Inc. and Morrow Brothers Ford Inc.                         Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $917,517.00                                        $917,517.00           $917,517.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  20     TRANSPORTATION, DEPARTMENT OF                               File Date:  4/26/2018

  Latest Filing - 06/07/2018:

  The Actual Total Cost is $81,623.04.

 

  Original Filing - 04/26/2018:

  Recently Coles County, particularly the Charleston area, received several inches of rain in just a few hours.

   The flash flooding caused significant scouring and erosion around the piers of a bridge we maintain south

  of Charleston. District 7 assessed the structure and is requesting to proceed with an emergency contract to

  install riprap and other fill material to stabilize the piers and overall structure. This Emergency Purchase

  has an expected start date of 04/25/2018 through 07/23/2018 with an Original Estimated Cost of

   Signed       Jeffrey South, Region 4 Engineer

       Vendor   Howell Paving, Inc.                                                                      Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $150,000.00                                          $81,623.04             $81,623.04       18      4

    Federal                           $0.00                                                                                  $0.00

  21     TRANSPORTATION, DEPARTMENT OF                               File Date:  6/4/2018

  Latest Filing - 08/20/2018:

  The Actual Total Cost of FY18, Qtr 4, Item# 21 is $304,558.10.

 

  Original Filing - 06/05/2018: FY18, Qtr 4, Item# 21:

  The District has received a report of a "rough road" which prompted an inspection of the existing

  structure 014-0010 over the Shoal Creek Overflow. The inspection found the bridge to be defecting 4

  inches due to a failure on four of the beams. Out of an abundance of caution, the adjacent structures were

  also inspected. One structure was revealed to have similar deterioration. It was also deemed to need beam

  repairs. Both structures require emergency repairs to prevent potential harm to the motoring public. This

  Emergency Purchase has an expected start date of 06/01/2018 through 08/29/2018 with an Original

  Estimated Cost of $500,000.00.

   Signed       Joseph Monroe, District 8 Engineer

       Vendor   Keeley & Sons, Inc.                                                                     Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $500,000.00                                        $304,558.10           $304,558.10       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  22     TRANSPORTATION, DEPARTMENT OF                               File Date:  6/30/2018

  Latest Filing - 08/20/2018:

  The Actual Total Cost of FY18, Qtr 4, Item# 22 is $81,583.88.

 

  Original Filing - 06/30/2018: FY18, Qtr 4, Item# 22:

  Immediate expenditure is necessary for repairs to State property to protect against further loss or damage.

  As a result of a box culvert wing wall failure and recent rains, we have experienced roadway slope failures.

  These conditions are creating a possible traffic hazard if the slope continues to erode closer to the

  pavement. The district has an emergency box culvert wing wall and slope repair project located on US 67,

  0.23 miles southeast of White Oak Road, southeast of Rushville in Schuyler County. This Emergency

  Purchase has an expected start date of 06/30/2018 through 09/25/2018 with an Original Estimated Cost of

   $100,000.00.

   Signed       Jeffrey South, IDOT, Region Four Engineer

       Vendor   County Contractors, Inc.                                                              Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $100,000.00                                          $81,583.88             $81,583.88       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  23     CAPITAL DEVELOPMENT BOARD                                   File Date:  4/6/2018

  Second Filing - 05/17/2018:

  In the same filing quarter, an Emergency Purchase Extension was received on May 17, 2018 requesting an

  extension for dates starting 07/03/2018 to 05/22/2019 at an additional estimated cost of $0.00, keeping

  the revised estimated cost at $150,000.00.

 

  Original Filing - 04/06/2018:

  This vendor will install in-line building filtration at various buildings at the Quincy Veterans’ Home campus

   to reduce particulates in the portable water systems. Associated work may include installation of

  circulation loops within the buildings, asbestos abatement, testing and balancing, and A/E assist for

  permitting of installations and design parameters. The filtration will improve the effectiveness in

  removing bio material in the systems, increase the life of the point-of-use filters, and improve the

  reliability of the water monitoring system (currently in design). Work to be performed in compliance with

  direction by BRiC Partnership LLC. This Emergency Purchase has an expected start date of 04/05/2018

  through 07/03/2018 with an Original Estimated Cost of $150,000.00.

   Signed       Jerry Burlingham, State Purchasing Officer

       Vendor   Sparrow Plumbing and Heating, Inc.                                            Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $150,000.00                                                   $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  24     CAPITAL DEVELOPMENT BOARD                                   File Date:  5/17/2018

  Third Filing - 08/08/2018:

  An Emergency Purchase Extension was received extending Carlile Architects LLC's contract not to exceed

   717 days. There was no additional cost reported.

 

  Second Filing - 06/27/2018: FY18, Qtr 4, Item# 24:

  An Emergency Purchase Statement was received adding vendor Bulley & Andrews Masonry Restoration,

  LLC. Bulley & Andrews Masonry Restoration will provide stabilization of window sill by utilizing stainless

  steel straps mechanically fastened above and below the failed stone to prevent complete dislodging and the

   falling of stone. Additionally, under the direction of the A/E, the scope provides for the stabilization, or

  removal of any large scaling and hollow sounding stone to prevent dislodging from the building

  representing a fall hazard in order for the A/E to develop a complete assessment of the facades.  The

  stabilization work also includes the removal and replacement of the stone arch/lintel above the east side

  entranceway, providing masonry repairs above the door arch to water proof the building and protect the

  masonry, repairing or replacing the leaking roof above the entranceway, including the repair or

  replacement of the roofs wrought iron railing posts as specified by the A/E and approved by CDB. IHPA

  will be kept informed at every phase of this project.  Incorporated documents include the March 2009

  Standard Documents for Construction & Supplement. Services provided under this procurement should not

  exceed $50,000.00, which is a place-holder prior to entering into a contract, without prior authorization

  from the Capital Development Board in consultation with the Chief Procurement Office. This Emergency

   Purchase has an expected start date of 05/30/2018 through 08/27/2018 with an Original Estimated Cost

  of $50,000.00; making the revised state estimate of $100,000.00.

 

  Original Filing - 05/17/2018: FY18, Qtr 4, Item# 24:

  The Administration Building at the Shapiro Developmental Center is a 140-year-old structure that is used

  daily for all administrative functions to operate the facility. The main entrance/exit to the building

  includes a 3 piece masonry arch over the doorway. The bottom of the stone on the north side of the arch

  spalled of approximately 1/3 of its thickness. Since breaking off, the entrance door and pedestrians have

  been protected with a lumber shelter. Directly above the arch is a flat roof that has an un-ballasted EPDM

  roofing system which is in poor condition and is allowing storm water to enter the masonry. In addition, a

  piece of concrete used to patch stone masonry on or around the clock tower has dislodged from the ledge

  and fell below narrowly missing a parked car. This Emergency Purchase has an expected start date of

  05/17/2018 through 08/14/2018 with an Original Estimated Cost of $50,000.00.

   Signed       Chris Miles, Executive II

       Vendor   Carlile Architects & Bulley & Andrews Masonry Rest.                Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                   $50,000.00           $100,000.00                    $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  25     CAPITAL DEVELOPMENT BOARD                                   File Date:  5/17/2018

  Second Filing - 09/12/2018:

  An Emergency Purchase Extension was received extending this contract to 01/31/2019. There was no

  additional cost reported.

 

  Original Filing - 05/17/2018: FY18, Qtr 4, Item# 25:

  The 2nd District Appellate Court Building has a ballasted membrane roof that is leaking in several areas

  after each rain and snow. Repairs have been attempted, but leaks are still occurring and are damaging

  interior surfaces and furnishings. The roof needs to be replaced as soon as possible in order to protect the

  interior surfaces and furnishings of the building as well as certain structural elements as there are visible

  cracks in various windows as a result of rusting structural components. This Emergency Purchase has an

  expected start date of 05/17/2018 through 08/11/2018 with an Original Estimated Cost of $30,000.00.

   Signed       Chris Miles, Executive II

       Vendor   Batir Architecture Ltd.                                                                  Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                   $30,000.00                                                   $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  26     CAPITAL DEVELOPMENT BOARD                                   File Date:  5/31/2018

  Latest Filing - 08/02/2018:

  An Emergency Purchase Extension was received extending Farnsworth Group, Inc.'s contract not to

  exceed 521 days. There was no additional cost reported.

 

  Third Filing - 07/24/2018:

  An Emergency Purchase Statement was received reporting the Final Actual Cost for Henson Robinson at

  $6,184.00. The estimated cost for Farnsworth Group, Inc. remains at $150,000.00

 

  Second Filing - 06/27/2018: FY18, Qtr. 4, Item# 26:

  An Emergency Purchase Extension was received on June 27, 2018 requesting an extension for dates

  starting 08/29/2018 to 12/31/2018 at an additional estimated cost of $0.00, keeping the total estimated

  cost at $160,000.00.

 

  Original Filing - 05/31/2018: FY18, Qtr. 4, Item# 26:

  The Logan Correction Center's Program Center has two 40 ton chillers that have failed and are no longer

  repairable. The building is used daily to conduct education classes, various programs and has several staff

  offices. The facility currently has no air-conditioning as a result and there is not additional space to

  conduct the classes. In addition, the building's roofing system has failed, causing several leaks throughout

  the building and is beyond repair. The roofing system needs to be replaced as soon as possible in order to

  protect the interior surfaces and furnishings, which have already experienced significant damage. The

  failed roofing system and lack of air conditions is creating excessive heat and creating mold issues.

  Farnsworth Group, Inc. will remove the existing roof in its entirety, and include the installation of new

  high R-value insulation and all necessary accessories and flashings. The work also provides for replacing

  two chillers, pumps, a portion of controls and some incidentals. Some abatement may also be necessary.

  Henson Robinson  will provide immediate temporary roof patch as directed by CDB until permanent roof

  replacement commences. This Emergency Purchase has an expected start date of 05/31/2018 through

  08/28/2018 with an estimated cost of $150,000.00 to Farnsworth Group, Inc. and a estimated cost of

  $10,000.00 to Henson Robinson, making the Original Estimated Total Cost at $160,000.00.

   Signed       Chris Miles, Executive II

       Vendor   Farnsworth Group, Inc. and Henson Robinson Company            Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $160,000.00                                            $6,184.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  27     CAPITAL DEVELOPMENT BOARD                                   File Date:  6/7/2018

  Second Filing - 08/29/2018:

  An Emergency Purchase Statement was received on August 29, 2018 requesting an extension for this

  contract not to exceed 269 days. There was no additional cost reported.

 

  Original Filing - 06/07/2018: FY18, Qtr 4, Item# 27:

  The scope of work provides for correcting identified code violations and making basic improvements to

  allow the Illinois Department of Veterans' Affairs to occupy the building as quickly as possible. Asbestos

  abatement may be required. This project has a six month expedited design and construction schedule and

  will require substantial on-site observation in order to monitor construction progress and cost.

  Incorporated documents include the March 2009 Standard Documents for Construction & Supplement and

  the March 2009 Design and Construction Manual & Supplement. This Emergency Purchase has an

  expected start date of 06/07018 through 09/04/2018 with an Original Estimated Cost of $900,000.00.

   Signed       Chris Miles, Executive II

       Vendor   DLR Group, Inc.                                                                          Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $900,000.00                                                   $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  28     CAPITAL DEVELOPMENT BOARD                                   File Date:  6/7/2018

  Second Filing - 08/29/2018:

  An Emergency Purchase Statement was received on August 29, 2018 requesting an extension for this

  contract not to exceed 118 days. There was no additional cost reported.

 

  Original Filing - 06/07/2018:

  The scope of work includes testing for asbestos containing materials, lead paint, and the presence of PCB's

   in lighting ballasts. The scope also includes the creation of an asbestos management plan. This project has

   a six month expedited design and construction schedule. Incorporated documents include the March 2009

  Standard Documents for Construction & Supplement and the March 2009 Design and Construction Manual

   & Supplemental. Services provided under this procurement should not exceed $50,000,00, which is a

  place-holder prior to the negotiation of a Professional Services Agreement, without prior authorization

  from the Capital Development Board in consultation with the Chief Procurement Office. This Emergency

   Purchase has an expected start date of 06/07/2018 through 09/04/2018 with an Original Estimated Cost

  of $50,000.00.

   Signed       Chris Miles, Executive II

       Vendor   Reliable Environmental Solutions, Inc.                                         Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                   $50,000.00                                                   $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  29     CAPITAL DEVELOPMENT BOARD                                   File Date:  6/11/2018

  Second Filing - 08/29/2018:

  An Emergency Purchase Statement was received on August 29, 2018 requesting an extension for this

  contract not to exceed 238 days. There was no additional cost reported.

 

  Original Filing - 06/11/2018: FY18, Qtr 4, Item# 29:

  The scope of work provides for correcting identified code violations and making basic improvements to

  allow the Illinois Department of Veterans' Affairs to occupy the building at 720 Sycamore Street in

  Quincy, Illinois as directed by the Architect/Engineer of record. Asbestos abatement may be required. This

  project has a six month expedited design and construction schedule. Incorporated documents include the

  March 2009 Standard Documents for Construction & Supplement and the March 2009 Design and

  Construction Manual & Supplement. This Emergency Purchase has an expected start date of 06/11/2018

  through 09/04/2018 with an Original Estimated Cost of $6,000,000.00.

   Signed       Chris Miles, Executive II

       Vendor   River City Construction LLC                                                        Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State              $6,000,000.00                                                   $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  30     FIRE MARSHAL, STATE                                         File Date:    5/2/2018

  Original Filing - 05/02/2018:

  The OSFM needs to do a one time purchase of SUVs that were previously ordered under master contract

  but had to be canceled since the vendor (Wright Automotive) could no longer provide the vehicles. The

  OSFM had an executed contract with Wright. Morrow Brothers has the SUV vehicles we originally ordered

  on their lot and ready for us to take possession. NOTE: The OSFM is purchasing less SUVs than originally

  intended (down to 23 from the original 39) because we utilized the other existing vehicle master to

  purchase trucks for our Storage Tank Safety Inspectors. Trucks are not a necessity for the remainder of

  our inspection staff. This Emergency Purchase has an expected start date of 05/01/2018 through

  06/30/2018 with an Original Estimated Cost of $594,320.00.

   Signed       Jodi Schrage, APO

       Vendor   Morrow Brothers Ford, Inc.                                                          Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $594,320.00                                                   $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00

  31     CHICAGO STATE UNIVERSITY                                    File Date: 4/5/2018

  Original Filing - 04/05/2018:

  Sungard AS is to provide disaster recovery IT services to Chicago State University. These services back-up

  all important IT servers throughout the Chicago State University campus. These services have been out

  for RFP. This emergency will allow time for Chicago State University to award these services through the

  competitive bidding process. This Emergency Purchase has an expected start date of 03/31/2018 through

  06/30/2018 with an Original Estimated Cost of $45,306.00.

   Signed       Eric Cotton, Director of Purchasing

       Vendor   Sungard Availability Services                                                       Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                   $45,306.00                                                   $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  32     CHICAGO STATE UNIVERSITY                                    File Date: 6/7/2018

  Original Filing - 06/07/2018:

  The IPHEC contract with Schindler was not utilized because Chicago State University awarded American

  Hoist and Manlift the service contract prior to the award of the IPHEC contract. American Hoist and

  Manlift is familiar with the elevators and Chicago State University. This Emergency Purchase has an

  expected start date of 06/05/2018 through 08/05/2018 with an Original Estimated Cost of $18,075.00.

   Signed       Eric Cotton, Director of Purchasing

       Vendor   American Hoist & Manlift                                                            Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                   $18,075.00                                                   $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  33     CHICAGO STATE UNIVERSITY                                    File Date: 6/21/2018

  Original Filing - 06/21/2018:

  The current student housing furniture is 20 years old and is past its useful life. In January 2018, CSU began

  the process of getting quotes and sample furniture from two IPHEC vendors and Foliot, a National

  Cooperative Purchasing Alliance vendor. The furniture from the IPHEC vendors was deemed inferior and

  was not a good value to Chicago State University. On May 3rd 2018, an attempt for a joint purchasing

  agreement was attempted for Foliot Furniture Pacific. Three weeks passed and there was no movement on

  having the joint purchasing agreement request reviewed. Therefore, on May 23rd, 2018 CSU posted an

  IFB for the furniture. Two bidders responded. Both bidders were within approximately 0.4% of each other

  in price. The second bidder could not meet the timeline requested. Therefore, Foliot Furniture Pacific was

  to be awarded the contract through the IFB process. However, both bidders were deemed non-responsive

  for not having formal BEP utilization plans. Foliot provided good faith effort information stating that 8%

   of the total of the value of the contract would be subcontracted to a BEP firm to cover the installation of

   the furniture. At this point, there is no time to put out another IFB to replace the furniture for the

  students of the University. This Emergency Purchase has an expected start date of 06/20/2018 through

  07/30/2018 with an Original Estimated Cost of $345,611.84.

   Signed       Eric Cotton, Director of Purchasing

       Vendor   Foliot Furniture Pacific                                                                 Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $345,611.84                                                   $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  34     CHICAGO STATE UNIVERSITY                                    File Date: 6/30/2018

  Original Filing - 06/23/2018:

  The University awarded a contract for Boiler Rental. This emergency/quick purchase was required due to a

  situation in which public health or safety was threatened. The University's boiler system has failed

  requiring immediate action in securing temporary rental of boilers to prevent disruption of services. The

  temporary boiler is installed at the Main Heating Plant to support the generator that supplies heat and hot

   water for the campus. This Emergency Purchase has an expected start date of 06/30/2018 through

  09/28/2018 with an Original Estimated Cost of $386,046.00.

   Signed       Eric Cotton, Director of Purchasing

       Vendor   Anchor Mechanical Inc.                                                               Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $386,046.00                                                   $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00

  35     UNIVERSITY OF ILLINOIS                                      File Date:     4/25/2018

  Original Filing - 04/25/2018:

  Thomas Monfort, DVM, will sell the assets of his practice to the University of Illinois. The sale will

  include client information, route schedules, operating systems, medical equipment, veterinary trucks,

  medical supplies and pharmaceuticals, instrumentation, and permission to open discussion with Monfort

  practice personnel regarding the prospect of employment through the University of Illinois. Dr. Monfort's

   practice was selected by the College of Veterinary Medicine because it's the only regional equine practice,

  the only one for sale in the region, and it will fulfill the goal of increasing the equine customer base for the

   College of Veterinary Medicine. This Emergency Purchase has an expected start date of 04/19/2018 with

  an Original Estimated Cost of $825,000.00.

   Signed       Bradley Henson, Director

       Vendor   Thomas Monfort & Assocs. And Illinois Equine Center               Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $825,000.00                                                   $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  36     UNIVERSITY OF ILLINOIS                                      File Date:     5/17/2018

  Original Filing - 05/17/2018:

  The Chicago Field site housed at IMHR will be responsible to recruit and examine a total of 15,000

  participants in the next 5 years. A mobile medical unit is needed for use in participant recruitment in

  Chicago community areas for hard to reach population in underserved communities. The mobile medical

  clinic unit is custom designed to have a fully functional research clinic and includes a private examination

  for physical measurements, waiting and lab processing area. This Emergency Purchase has an expected

  start date of 05/17/2018 through 08/15/2018 with an Original Estimated Cost of $233,529.00.

   Signed       Debra Matlock, Director of Purchasing

       Vendor   Farber Specialty Vehicles                                                             Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $233,529.00                                                   $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00

  37     UNIVERSITY OF ILLINOIS                                      File Date:     5/25/2018

  Original Filing - 05/25/2018:

  UIC purchased a 3T MRI scanner from General Electric (GE) Healthcare in 2011. Thus, upgrade on this

  scanner can ONLY be provided by GE Healthcare. The Center for MR Research, College of Medicine of

  UIC, supports ~20 funded research investigators. Six of federally-funded projects are presently put on hold

  waiting for this upgrade. An immediate deadline is June 30, 2018 to demonstrate the research feasibility

  that can only be performed with this upgrade. This means that the installation of the upgrade has to be

  completed immediately to allow the researchers to conduct the studies and demonstrate the feasibilities by

  June 30, 2018. If this upgrade were not done in time, we run the risk of losing $2.5 million in federal funds

   . This Emergency Purchase has an expected start date of 05/24/2018 through 08/21/2018 with an

  Original Estimated Cost of $285,400.00.

   Signed       Kevin Fair, Associate Director of Purchasing

       Vendor   General Electric Healthcare                                                          Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $285,400.00                                                   $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  38     UNIVERSITY OF ILLINOIS                                      File Date:     6/4/2018

  Original Filing - 06/04/2018:

  The University awarded a contract for construction services. This emergency/quick purchase was required

  due to a situation in which public health or safety was threatened. The south tower of the Neuropsychiatric

   Institute (NPI) building located at 912 S. Wood Street, Chicago, IL comprises 11 stories, 8 of which

  services patients. The tower is serviced by only two elevators that are nearing the end of their useful life

  and UIC was developing plans to modernize them. One elevator had a complete failure that cannot be

  repaired and the second elevator is rapidly deteriorating. It requires constant maintenance to remain

  operational but suffers periodic outages. The lack of dependable, operable elevators creates a safety issue

  for patients. After The Joint Commission received a complaint from a disabled patient, UIC was given 60

  days to demonstrate a plan for reinstating reliable elevator service. This Emergency Purchase has an

  expected start date of 06/04/2018 through 08/31/2018 with an Original Estimated Cost of $500,000.00.

   Signed       John Knittle, State Purchasing Officer

       Vendor   Parkway                                                                                       Notary Date:   5/30/2018

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $500,000.00                                                   $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  39     UNIVERSITY OF ILLINOIS                                      File Date:     6/21/2018

  Original Filing - 06/21/2018:

  The University awarded a contract for temporary staffing . This emergency/quick purchase was required

  due to a situation in which immediate action was needed to prevent any disruption in University services.

  The University of Illinois Hospital & Health Sciences System (UI Health) is responsible for providing

  comprehensive care, education, and research to the people of Illinois and beyond. A part of the University

   of Illinois at Chicago (UIC), UI Health, comprises a clinical enterprise that includes a 465-bed tertiary

  care hospital, 21 outpatient clinics, and 11 Mile Square Health Center facilities, which are Federally

  Qualified Health Centers. It also includes the seven UIC health science colleges: the College of Applied

  Health Sciences; the College of Dentistry; the School of Public Health; the Jane Addams College of Social

  Work; and the Colleges of Medicine, Pharmacy, and Nursing, including regional campuses in Peoria, Quad

  Cities, Rockford, Springfield, and Urbana. UI Health is dedicated to the pursuit of health equity. If UI

  Health has a lapse in providing the critical services, this could jeopardize patients' health and the loss of

  revenue. The University is in the midst of issuing a new request for proposal (RFP) #KRS128, but the

  entire process will not be completed by June 30, 2018. This emergency is being requested in order to avoid

  a lapse in critical services and loss of revenue for UI Health. This Emergency Purchase has an expected

  start date of 07/01/2018 through 09/29/2018 with an Original Estimated Cost of $400,000.00.

 

   The current Special Project Staffing by Salem Incorporated/Salem Group (Salem) contract is for

  temporary personnel services that will end on June 30, 2018. Salem provides Customer Service Assistants.

  Salem currently has 24 agency staff working at both UIC and UI Health to provide clinical and non-

  clinical support.

   Signed       Debra Matlock, Director, UIC Purchasing

       Vendor   Special Project Staffing by Salem, Inc.                                         Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $400,000.00                                                   $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  40     UNIVERSITY OF ILLINOIS                                      File Date:     6/21/2018

  Original Filing - 06/21/2018:

  The University awarded a contract for temporary personnel services. The University of Illinois Hospital

  & Health Sciences System (UI Health) is responsible for providing comprehensive care, education, and

  research to the people of Illinois and beyond. A part of the University of Illinois at Chicago (UIC), UI

  Health, comprises a clinical enterprise that includes a 465-bed tertiary care hospital, 21 outpatient clinics,

  and 11 Mile Square Health Center facilities, which are Federally Qualified Health Centers. It also includes

  the seven UIC health science colleges: the College of Applied Health Sciences; the College of Dentistry;

  the School of Public Health; the Jane Addams College of Social Work; and the Colleges of Medicine,

  Pharmacy, and Nursing, including regional campuses in Peoria, Quad Cities, Rockford, Springfield, and

  Urbana. UI Health is dedicated to the pursuit of health equity. If UI Health has a lapse in providing the

  critical services, this could jeopardize patients health and the loss of revenue.  The University is in the

  midst of issuing a new request for proposal - RFP #KRS128, but the entire process will not be completed by

   June 30, 2018. This emergency is being requested in order to avoid a lapse in critical services and loss of

  revenue for UI Health.  The current Premier Staffing Source, Inc. (Premier Staffing) contract is for

  temporary personnel services that will end on June 30, 2018. Premier Staffing provides Food Sanitation

  Laborers and Medical Insurance Representatives. Premier Staffing currently has four (4) agency staff

  working at both UIC and UI Health to provide clinical and non-clinical support. This Emergency Purchase

   has an expected start date of 07/01/2018 through 09/16/2018 with an Original Estimated Cost of

  $400,000.00.

   Signed       Debra Matlock, Director, UIC Purchasing

       Vendor   Premier Staffing Source, Inc.                                                        Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $400,000.00                                                   $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  41     UNIVERSITY OF ILLINOIS                                      File Date:     6/21/2018

  Original Filing - 06/21/2018:

  The University awarded a contract for temporary staffing services. This emergency/quick purchase was

  required due to a situation in which immediate action was needed to prevent any disruption in University

  services. The University of Illinois Hospital & Health Sciences System (UI Health) is responsible for

  providing comprehensive care, education, and research to the people of Illinois and beyond. A part of the

  University of Illinois at Chicago (UIC), UI Health, comprises a clinical enterprise that includes a 465-bed

  tertiary care hospital, 21 outpatient clinics, and 11 Mile Square Health Center facilities, which are

  Federally Qualified Health Centers. It also includes the seven UIC health science colleges: the College of

  Applied Health Sciences; the College of Dentistry; the School of Public Health; the Jane Addams College

  of Social Work; and the Colleges of Medicine, Pharmacy, and Nursing, including regional campuses in

  Peoria, Quad Cities, Rockford, Springfield, and Urbana. UI Health is dedicated to the pursuit of health

  equity. If UI Health has a lapse in providing the critical services, this could jeopardize patients health and

  the loss of revenue.  The University is in the midst of issuing a new request for proposal - RFP #KRS128,

  but the entire process will not be completed by June 30, 2018. This emergency is being requested in order

  to avoid a lapse in critical services and loss of revenue for UI Health.  The current Cross Country Staffing,

  Inc./Medical Staffing Network (Cross Country) contract is for temporary personnel services that will end

  on June 30, 2018. Cross Country provides Medical Laboratory Technicians and Histotechnicians. Cross

  Country currently has 22 agency staff working at both UIC and UI Health to provide clinical and non-

  clinical support. This Emergency Purchase has an expected start date of 07/01/2018 through 09/29/2018

  with an Original Estimated Cost of $400,000.00.

   Signed       Debra Matlock, Director, UIC Purchasing

       Vendor   Cross Country Staffing, Inc.                                                         Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $400,000.00                                                   $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  42     UNIVERSITY OF ILLINOIS                                      File Date:     6/21/2018

  Original Filing - 06/21/2016:

  The University awarded a contract for temporary personnel services . This emergency/quick purchase was

  required due to a situation in which immediate action was needed to prevent any disruption in University

  services. The University of Illinois Hospital & Health Sciences System (UI Health) is responsible for

  providing comprehensive care, education, and research to the people of Illinois and beyond. A part of the

  University of Illinois at Chicago (UIC), UI Health, comprises a clinical enterprise that includes a 465-bed

  tertiary care hospital, 21 outpatient clinics, and 11 Mile Square Health Center facilities, which are

  Federally Qualified Health Centers. It also includes the seven UIC health science colleges: the College of

  Applied Health Sciences; the College of Dentistry; the School of Public Health; the Jane Addams College

  of Social Work; and the Colleges of Medicine, Pharmacy, and Nursing, including regional campuses in

  Peoria, Quad Cities, Rockford, Springfield, and Urbana. UI Health is dedicated to the pursuit of health

  equity. If UI Health has a lapse in providing the critical services, this could jeopardize patients health and

  the loss of revenue.  The University is in the midst of issuing a new request for proposal - RFP #KRS128,

  but the entire process will not be completed by June 30, 2018. This emergency is being requested in order

  to avoid a lapse in critical services and loss of revenue for UI Health. This Emergency Purchase has an

  expected start date of 07/01/2018 through 09/30/2018 with an Original Estimated Cost of $400,000.00.

   Signed       Debra Matlock, Director, UIC Purchasing

       Vendor   Maxim Staffing Solutions                                                             Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $400,000.00                                                   $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  43     UNIVERSITY OF ILLINOIS                                      File Date:     6/21/2018

  Original Filing - 06/21/2018:

  The University awarded a contract for temporary staffing. This emergency/quick purchase was required due

   to a situation in which immediate action was needed to prevent any disruption in University services. The

   University of Illinois Hospital & Health Sciences System (UI Health) is responsible for providing

  comprehensive care, education, and research to the people of Illinois and beyond. A part of the University

   of Illinois at Chicago (UIC), UI Health, comprises a clinical enterprise that includes a 465-bed tertiary

  care hospital, 21 outpatient clinics, and 11 Mile Square Health Center facilities, which are Federally

  Qualified Health Centers. It also includes the seven UIC health science colleges: the College of Applied

  Health Sciences; the College of Dentistry; the School of Public Health; the Jane Addams College of Social

  Work; and the Colleges of Medicine, Pharmacy, and Nursing, including regional campuses in Peoria, Quad

  Cities, Rockford, Springfield, and Urbana. UI Health is dedicated to the pursuit of health equity. If UI

  Health has a lapse in providing the critical services, this could jeopardize patients health and the loss of

  revenue.  The University is in the midst of issuing a new request for proposal - RFP #KRS128, but the

  entire process will not be completed by June 30, 2018. This emergency is being requested in order to avoid

  a lapse in critical services and loss of revenue for UI Health. The current Staffing Team, Inc. (Staffing

  Team) contract is for temporary personnel services that will end on June 30, 2018. Staffing Team

  provides Dental Clinic Clerks, Dental Assistants, and a significant number of Accountants. Staffing Team

  currently has 60 agency staff working at both UIC and UI Health to provide clinical and non-clinical

  support. This Emergency Purchase has an expected start date of 07/01/2018 through 09/29/2018 with an

  Original Estimated Cost of $400,000.00.

   Signed       Debra Matlock, Director, UIC Purchasing

       Vendor   Staffing Team, Inc.                                                                       Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $400,000.00                                                   $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  44     UNIVERSITY OF ILLINOIS                                      File Date:     6/22/2018

  Original Filing - 06/22/2018:

  The University awarded a contract for repair of the underground utility system. This emergency/quick

  purchase was required due to a situation in which public health or safety was threatened. The current

  emergency between Marshfield and Polk street requires removal of the sidewalk, excavation, removal and

  replacement of the steam piping that has failed underground. At the current time the ruptured underground

   steam system is heating the sidewalk and surrounding area to a temperature of 170 degrees. The rupture is

  also eroding away the surround soil, allowing live steam to come in contact with pedestrians walking down

  the sidewalk. This Emergency Purchase has an expected start date of 06/20/2018 through 09/17/2018 with

   an Original Estimated Cost of $500,000.00.

   Signed       Debra Matlock, Director, UIC Procurement

       Vendor   Anchor Mechanical                                                                      Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $500,000.00                                                   $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


 

 

 

 

 

 

 

Updates

To

Previously Filed

Emergency Purchases

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  45     NATURAL RESOURCES, DEPARTMENT OF                            File Date:  5/9/2018

  Latest Filing - 05/08/2018:

  The Actual Total Cost of FY18, Qtr 3, Item# 6 is $42,271.00.

 

  Original Filing - 01/11/2018: FY18, Qtr 3, Item# 6

  DNR required an emergency procurement to replace/repair a burst water pipe in the Rend Lake Resort

  Restaurant Building. The vendor shall provide for the removal, replacement and repair of water damaged

  drywall and insulation as necessary. The Rend Lake Conference Center Building requires insulation to be

  replaced due to both deterioration and non-existing insulation. The vendor shall also provide for

  replacement of deteriorated and/or missing batt insulation and support via wood strips or poly banding.

  Due to lack of insulation, the temperatures in the Conference Center have been between 40 - 50 degrees

  which is causing the HVAC to run constantly, drastically increasing the Agency's propane costs at the site.

  This Emergency Purchase has an expected start date of 01/03/2018 through 02/28/2018 with an Original

  Estimated Cost of $50,181.00.

   Signed       Andrew Hennig, State Purchasing Officer

       Vendor   Lake Contracting                                                                          Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                   $50,181.00                                          $42,271.00             $42,271.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  46     NATURAL RESOURCES, DEPARTMENT OF                            File Date:  6/30/2018

  Second Filing - 06/12/168:

  An Emergency Purchase Statement was received on June 12, 2018 requesting an extension for dates

  starting 06/14/2018 to 03/31/2019 at an additional estimated cost of $1,765,800.00, making the revised

  estimated cost at $3,503,200.00.

 

  Original Filing - 03/16/2018: FY18, Qtr 3, Item# 7:

  Department of Natural Resources required an emergency procurement to pump cement grout into the

  abandoned mine underneath Wolf Branch School. Mine subsidence has damaged the school building and

  made the building unsafe for students and teachers. The vendor will pump cement grout into the abandoned

   mine to stop the subsidence movements and stabilize the building structure. The Abandoned Mined Lands

  Reclamation Division receives federal dollars for the sole purpose of eliminating mine related public health

   and safety hazards. The U.S. Department of the Interior, Office of Surface Mining has declared the site an

   AML emergency. If the State does not make this emergency procurement, the public safety hazard will

  remain and unexpended AMLRD funds will be returned to the federal government. This Emergency

  Purchase has an expected start date of 03/15/2018 through 06/13/2018 with an Estimated Cost of

  $1,737,400.00

   Signed       Andrew Hennig, State Purchasing Officer

       Vendor   Howard Concrete Pumping Co., Inc.                                            Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                            $0.00        $3,503,200.00                    $0.00                      $0.00       18      4

    Federal             $1,737,400.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  47     NATURAL RESOURCES, DEPARTMENT OF                            File Date:  6/12/2018

  Second Filing - 06/12/2018:

  An Emergency Purchase Statement was received on June 12 2018 requesting an extension for dates

  starting 06/22/2018 to 08/31/2018 at an additional estimated cost of $0.00, keeping the revised estimated

  cost at $108,325.00.

 

  Original Filing - 03/30/2018: FY18, Qtr 3, Item# 9:

  The Department of Natural Resources will procure emergency services to replace the irrigation pump for

  the golf course at Eagle Creek State Park. The original pump is 30 years old and has failed. An inspection

  of the pump has determined that it would not be economically feasible to rebuild the pump due to the cost

  to rebuild it and the uncertainty of how long it would operate and the fact that the work would not be

  warranted. It is in the best interest of the State to replace the pump. This Emergency Purchase has an

  expected start date of 03/27/2018 through 06/22/2018 with an Original Estimated Cost of $108,325.00.

   Signed       Clara Orrill, Assistant APO

       Vendor   ProPump & Controls Inc.                                                             Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $108,325.00                                                   $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  48     HUMAN SERVICES, DEPARTMENT OF                               File Date:  4/27/2018

  Latest Filing - 04/27/2018:

  The Actual Total Cost of FY18, Qtr 3, Item# 10 is $906,590.63.

 

  Original Filing - 01/04/2018: FY18, Qtr 3, Item# 10:

  The selection of the vendor based on evaluation of proposals submitted per RFP criteria will not be

  completed by December 31, 2017, the ending date of the current contract (Sole Source Procurement).

  CQUEST America, Inc. is the current contractor for the Bureau of Early Interventions' Central Billing

  Office. The selection of this vendor will allow the Bureau to continue services to direct service providers

  without disruption in critical State services. This Emergency Purchase has an expected start date of

  01/01/2018 through 03/31/2018 with an Original Estimated Cost of $963,750.00.

   Signed       David Papp, State Purchasing Officer

       Vendor   CQUEST America, Inc.                                                                Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $963,750.00                                        $906,590.63           $906,590.63       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  49     REVENUE, DEPARTMENT OF                                                                File Date:  6/7/2018

  Latest Filing - 05/08/2018:

  The Actual Total Cost of FY18, Qtr 3, Item# 14 is $664,185.81.

 

  Original Filing - 03/14/2018: FY18, Qtr 3, Item#14:

  As a result of a winter with extreme freeze/thaw cycles and excessive moisture, the pavement joints on I-

  39/US 20 between Alpine Road and Harrison Road, EB and WB, in Winnebago County are deteriorating at

  a rate that is beyond the scope of repairing with temporary cold patch material. A more permanent fix is

  required and the work is beyond the capabilities of our maintenance crews. Milling and resurfacing of all of

  the pavement joints at this location is required. This location has received numerous claims (55 since

  February 1) and is dangerous for the motoring public with the large drop-offs and any additional heavy

  rains will cause more deterioration to the pavement. This Emergency Purchase has an expected start date

  of 03/09/2018 through 06/06/2018 with an Original Estimated Cost of $1,000,000.00.

   Signed       Bill Grunloh, Chief Procurement Officer

       Vendor   William Charles Construction Company, LLC                              Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State              $1,000,000.00                                        $664,185.81           $664,185.81       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  50     TRANSPORTATION, DEPARTMENT OF                               File Date:  5/3/2018

  Latest Filing - 05/03/2018:

  The Actual Total Cost of FY18, Qtr 3, Item# 17 is $24,701.25.

 

  Original Filing - 02/14/2018: FY18, Qtr 3, Item# 17:

  Given the current weather emergency, the district has depleted salt in the following team sections:

  Naperville, Eisenhower, Saint Charles, Grayslake, and Biesterfield. In order to respond to the current

  weather emergency, salt has to be moved from the larger salt storage locations to the smaller yards. In

  order to accomplish this efficiently and effectively, the district wants to utilize a private hauler to move

  the salt during a 12 hour period from 6:30 PM Friday to 6:30 AM on Saturday, February 10. This

  procedure makes operational sense because we will have heavy equipment operators at all locations due to

  the current snow operation. This operation will take place after peak traffic travel time so the trucks will

  not be hindered by heavy traffic. Twenty trucks each with a twenty ton load capacity will be used for

  twelve hours. The cost per hour per truck is $105.00 with one hour show-up time for each truck. This

  Emergency Purchase has an expected start date of 02/09/2018 through 02/16/2018 with an Original

  Estimated Cost of $30,000.00.

   Signed       Anthony Quigley, Regional Engineer

       Vendor   Donald Mueller, DBA Sunset Logistics                                        Notary Date:   2/13/2018

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                   $30,000.00                                          $24,701.25             $24,701.25       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  51     TRANSPORTATION, DEPARTMENT OF                               File Date:  4/5/2018

  Latest Filing - 04/05/2018:

  An Emergency Purchase Statement was received adding an additional vendor, Yoder Oil, Inc., for dates

  03/30/2018 through 05/22/2018, at an additional estimated cost of $100,000, making the revised

  estimated total at $300,000.00

 

  Original Filing - 03/02/2018: FY18, Qtr 3, Item# 18:

  This emergency contract will cover the operation yard locations for LaSalle, Yorkville, and Morris, IL and

   for District 4. The vendors will provide diesel bulk fuel oil grade no. 1-D and no. 2-D. Vendors will also

  provide the winter additive to treat diesel fuel. This Emergency Purchase has an expected start date of

  02/23/2018 through 05/22/2018 with an Original Estimated Cost of $200,000.00.

   Signed       Aundra Williams, APO

       Vendor   Grainco FS, Inc., Sunrise FS and Yoder Oil Inc.                           Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $200,000.00           $300,000.00                    $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  52     TRANSPORTATION, DEPARTMENT OF                               File Date:  4/30/2018

  Latest Filing - 04/30/2018:

  The Actual Total Cost of FY18, Qtr 3, Item# 19 is $940,157.21.

 

  Original Filing - 03/02/2018: FY18, Qtr 3, Item# 19:

  Due to recent weather conditions, we have an excessive amount of potholes occurring in asphalt pavement

   surfaces on southbound and northbound 1-55 between the Lake Springfield Bridge and the Montgomery

  County Line. The existing asphalt pavement surface is rapidly deteriorating and becoming unattached

  from the asphalt binder course directly below. The potholes are creating a traffic hazard and have caused

  several vehicles to have tire blow-outs. Traffic is swerving into adjacent lanes trying to miss the potholes

  and potentially causing sideswipe accidents. This Emergency Purchase has an expected start date of

  02/26/18 through 05/25/18 with an Original Estimated Cost of $1,000,000.00.

   Signed       Jeffrey South, Region Four Engineer

       Vendor   Illinois Valley Paving                                                                   Notary Date:   2/28/2018

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State              $1,000,000.00                                        $940,057.21           $940,057.21       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  53     TRANSPORTATION, DEPARTMENT OF                               File Date:  6/7/2018

  Latest Filing - 06/07/2018:

  The Actual Total Cost of FY18, Qtr 3, Item# 20 is $77,769.31.

 

  Original Filing - 03/12/2018: FY18, Qtr 3, Item# 20:

  As a result of an ice jam on the Rock River, IL 78 and Moline Road in Whiteside County were flooded on

  02/21/2018. When the waters receded on 02/26/2018, the District realized the damage to our

  infrastructure. Shoulder stone and supporting soil was washed away in numerous locations along these

  routes. To do the work ourselves would be cost prohibitive and would take time needed to repair potholes

  that also pose a significant threat to the motoring public. We expect to have to place up to 3000 tons of

  aggregate shoulders as well as perform some other shoulder or ditch repair. This Emergency Purchase has

  an expected start date of 03/07/2018 through 06/04/2018 with an Original Estimated Cost of

  $100,000.00.

   Signed       Kevin Marchek, Region Two Engineer

       Vendor   Civil Constructors                                                                         Notary Date:     3/7/2018

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $100,000.00                                          $77,769.31             $77,769.31       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  54     TRANSPORTATION, DEPARTMENT OF                                File Date:  5/1/2018

  Latest Filing - 05/01/2018:

  The Actual Total Cost of FY18, Qtr 3, Item# 22 is $793,220.53.

 

  Original Filing - 03/28/2018: FY18, Qtr 3, Item# 22:

  The district has an emergency mill and resurface project located on SB 1-55 between the Kickapoo Creek

  Bridge to the BL-55/Lincoln Parkway Bridge in Logan County.  Immediate expenditure is necessary for

  repairs to State property to protect against further loss or damage. As a result of a winter with extreme

  freeze/thaw cycles and excessive moisture we have experienced an excessive amount of potholes and

  pavement deterioration. These conditions are creating a traffic hazard causing vehicles to have tire

  blowouts or swerve into adjacent lanes potentially causing accidents. This Emergency Purchase has an

  expected start date of 03/27/2018 through 06/25/2018 with an Original Estimated Cost of $850,000.00.

   Signed       Jeffrey South, Region 4 Engineer

       Vendor   Illinois Valley Paving                                                                   Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $850,000.00                                        $793,220.53           $793,220.53       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  55     TRANSPORTATION, DEPARTMENT OF                               File Date:  6/4/2018

  Latest Filing - 06/04/2018:

  The Actual Total Cost of FY18, Qtr 3, Item# 21 is $507,707.26.

 

  Original Filing - 03/28/2018: FY18, Qtr 3, Item# 21:

  The district has an emergency patch, mill and resurface project located on US 24 between I-172 and 48th

  Street NE of Quincy in Adams County.  Immediate expenditure is necessary for repairs to State property

  to protect against further loss or damage. As a result of a winter with extreme freeze/thaw cycles and

  excessive moisture, we have experienced an excessive amount of potholes and pavement deterioration.

  These conditions are creating a traffic hazard causing vehicles to have tire blowouts or swerve into

  adjacent lanes potentially causing accidents. This Emergency Purchase has an expected start date of

  03/27/2018 through 06/25/2018 with an Original Estimated Cost of $600,000.00.

   Signed       Jeffrey South, Region Four Engineer

       Vendor   Diamond Construction Company                                                 Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $600,000.00                                        $507,707.26           $507,707.26       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  56     TRANSPORTATION, DEPARTMENT OF                               File Date:  6/11/2018

  Latest Filing - 06/1/2018:

  The Actual Total Cost of FY18, Qtr 3, Item# 23 is $1,447,645.30.

 

  Original Filing - 03/28/2018: FY18, Qtr 3, Item# 23:

  I-57 within IDOT D3, between mile post 280 and 285 in the Northbound and Southbound directions in

  Iroquois County has experienced pavement deterioration. Immediate expenditure is necessary for repairs

  to State property to protect against further loss or damage. As a result of a winter with extreme

  freeze/thaw cycles and excessive moisture we have experienced an excessive amount of potholes and

  pavement deterioration. These conditions are creating a traffic hazard causing vehicles to have tire

  blowouts or swerve into adjacent lanes potentially causing accidents. This Emergency Purchase has an

  expected start date of 04/02/2018 through 07/02/2018 with an Original Estimated Cost of $1,579,800.00.

   Signed       Kevin Marchek, Region 2 Engineer

       Vendor   Iroquois Paving Corporation                                                         Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State              $1,579,800.00                                     $1,447,645.30        $1,447,645.30       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  57     TRANSPORTATION, DEPARTMENT OF                               File Date:  6/7/2018

  Latest Filing - 06/07/2018:

  The Actual Total Cost of FY18, Qtr 3, Item# 25 is $154,685.19.

 

  Original Filing - 03/30/2018: FY18, Qtr 3, Item# 25:

  This project is located on IL 78 through the South side of Morrison in Whiteside County. Immediate

  expenditure is necessary for repairs to State property to protect against further loss or damage. As a result

  of a winter with extreme freeze/thaw cycles and excessive moisture, we have experienced an excessive

  amount of potholes and pavement deterioration. These conditions are creating a traffic hazard causing

  vehicles to have tire blowouts or swerve into adjacent lanes potentially causing accidents. This Emergency

  Purchase has an expected start date of 03/29/2018 through 06/26/2018 with an Original Estimated Cost of

   $375,000.00.

   Signed       Kevin Marchek, Region 2 Engineer

       Vendor   Civil Constructors                                                                         Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $375,000.00                                        $154,685.19           $154,685.19       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  58     VETERANS' AFFAIRS - GENERAL OFFICE                          File Date: 5/7/2018

  Second Filing - 05/07/2018:

  An Emergency Purchase Extension was received on May 7, 2018 requesting an extension for dates starting

   05/24/2018 to 08/22/2018 at an additional estimated cost of $200,000.00, revising the total estimated

  cost to $300,000.00.

 

  Original Filing - 02/22/2018: FY18, Qtr 2, Item# 27:

  The Illinois Veterans Home in Quincy, Illinois, seeks an emergency purchase of Pall sink filters. All

  faucets on campus will be replaced as part of our on-going goal to eradicate legionella bacteria in the water

  system. Once faucets are replaced, filters will immediately be put on every faucet. This Emergency

  Purchase has an expected start date of 02/22/2018 through 05/23/2018 with an Original Estimated Cost of

   $100,000.00.

   Signed       Frederick Murphy, Agency Procurement Officer

       Vendor   Unicor                                                                                          Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $100,000.00           $300,000.00                    $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  59     VETERANS' AFFAIRS - GENERAL OFFICE                          File Date: 5/7/2018

  Second Filing - 05/07/2018:

  An Emergency Purchase Extension was received on May 7, 2018 requesting an extension for dates starting

   05/30/2018 to 08/27/2018 at an additional estimated cost of $100,000.00, revising the total estimated

  cost to $200,000.00.

 

  Original Filing - 03/01/2018: FY18, Qtr 2, Item# 29

  The Illinois Veteran's Home in Quincy, Illinois, seeks an emergency purchase of Pall filters for all point of

   contact water on campus. This includes tubs, ice Machines and water drinking fountains. Filters will be

  used and replaced as needed as part of our on-going goal to eradicate legionella bacteria in the water

  system. This Emergency Purchase has an expected start date of 03/01/2018 through 05/29/2018 with an

  Original Estimated Cost of $100,000.00.

   Signed       Frederick Murphy, Agency Procurement Officer

       Vendor   Unicor                                                                                          Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $100,000.00           $200,000.00                    $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  60     CAPITAL DEVELOPMENT BOARD                                   File Date:  6/22/2018

  Latest Filing - 06/22/2018:

  The Actual Total Cost of FY17, Qtr 4, Item# 19 is $70,600.00 to Horner & Shifrin, Inc. and

  $360,716.66 to Red Dot Construction & Equipment Rentals, Inc..

 

  Second Filing - 07/25/2017: FY17, Qtr 4, Item# 19:

  On July 25, 2017 and affidavit was received reporting an increase in the estimated cost for Horner &

  Shifrin, Inc. to $78,100.00 and adding a second vendor; Red Dot Construction and Equipment Rentals,

  Inc., at an estimated cost of $348,000.00, making a revised estimated total of $426,100.00

 

  Original Filing - 05/16/2017: FY17, Qtr 4, Item# 19:

  Menard Correctional Center has experienced a sanitary sewer bar screen failure. The bar screen separates

  foreign debris from sewage before the sewage enters the treatment system. Recent rain and flooding have

  caused  some debris to be scattered across the site and there are concerns that this contaminated debris

  could become a serious EPA issue for both the facility and the City of Chester. Horner & Shifrin, Inc. has

  been selected as the A/E for this project to provide an evaluation of the existing conditions of the sanitary

   sewer bar screen. They are to make recommendations for a replacement sanitary bar screen or grinding

  system capable of supporting the institution's needs, and specify the recommended replacement system.

  The work also includes recommendations for any temporary measures that would assist IDOC in operating

  the system until it can be permanently repaired. This Emergency Purchase has an expected start date of

  05/10/2017 through 08/07/2017 with an Original Estimated Cost of $25,000.00.

   Signed       Gus Behnke, Chief Fiscal Officer

       Vendor   Horner & Shifrin, Inc. and Red Dot Construction &                   Notary Date:   5/15/2017

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                   $25,000.00           $426,100.00         $431,316.66           $431,316.66       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  61     CAPITAL DEVELOPMENT BOARD                                   File Date:  6/6/2018

  Latest Filing - 05/06/2018:

  The Actual Total Cost of FY18, Qtr 1, Item# 20 is $788,725.75.

 

  Original Filing - 08/24/2017: FY18, Qtr 1, Item# 20:

  The Vienna Correctional Center's Power House has a leaking de-aerator tank which feeds warmed water

  into two boilers that provide heat and hot water to the entire institution. Further deterioration and/or

  failure of the de-aerator tank could result in a complete shut-down of the facility. Additionally, the Illinois

   State Fire Marshal notified the Illinois Department of Corrections that the de-aerator tank needs replaced

   immediately in order to obtain a valid inspection certificate and to avoid fines and other potential legal

  ramifications. Hurst-Rosche, Inc. will provide Engineering services and Rend Lake Plumbing & Heating

  Co., Inc. for construction services. This Emergency Purchase has an expected start date of 08/21/2017

  through 11/18/2017 with an Original Estimated Cost of $100,000.00 to Hurst-Rosche, Inc., and an

  Estimated Cost of $1,000,000 to Rend Lake Plumbing & Heating Co., Inc..

   Signed       Gus Behnke, Chief Fiscal Officer

       Vendor   Hurst-Rosche, Inc. & Rend Lake Plumbing & Heating Co.,        Notary Date:   8/22/2017

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State              $1,100,000.00                                        $788,725.75           $788,725.75       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  62     CAPITAL DEVELOPMENT BOARD                                   File Date:  6/27/2018

  Latest Filing - 06/27/2018:

  An Emergency Purchase Extension was received on June 27, 2018 requesting an extension to 10/31/2019

  at an additional estimated cost of $0.00, keeping the total estimated cost at $40,000.00.

 

  Original Filing - 08/28/2017: FY18, Qtr 1, Item# 21:

  The Illinois School for the Visibly Impaired in Jacksonville, IL has an emergency generator that has

  become in-operable. Should a power failure occur, the facility no longer has a back-up power supply which

  could result in a complete shut-down of the facility. Because of the age and condition of the generator,

  attempts at repair are not feasible as parts are no longer being manufactured and there is no guarantee that

  a repair will last for any significant amount of time. Temporary measures in conjunction with a design and

  installation of a new generator and any necessary ancillary components are needed immediately in order to

   minimize serious disruption in critical state service and to protect against the threat to public health and

  safety. This Emergency Purchase has an expected start date of 08/28/2017 through 11/25/2017 with an

  Original Estimated Cost of $40,000.00.

   Signed       Gus Behnke, Chief Fiscal Officer

       Vendor   Benton & Associates                                                                    Notary Date:   8/28/2017

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                   $40,000.00                                                   $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  63     CAPITAL DEVELOPMENT BOARD                                   File Date:  5/17/2018

  Second Filing - 05/17/2018:

  An Emergency Purchase Extension was received on May 17, 2018 requesting an extension for dates

  starting 05/22/2018 to 05/22/2019 at an additional estimated cost of $0.00, keeping the revised estimated

  cost at $150,000.00.

 

  Original Filing - 02/22/2018: FY18, Qtr 3, Item# 31:

  The Illinois Veterans' Home continues to experience Legionnaires Disease outbreaks despite remedial

  efforts that took place in 2015. To date there have been 13 deaths and more than 60 ill residents and

  employees at the home. The scope of work includes but is not limited to design and preparation of

  construction documents needed to construct a water monitoring system in various buildings throughout the

   campus. This project began through the emergency selection of an Architect/Engineer; this exempts the

  selection from a 14-day solicitation required through Qualifications-Based Selection. Considering the time

  frames needed for the selection, negotiation and execution of and Architect/Engineer contract followed by

   bidding and award procedures, repairs at the Illinois Veterans' Home under the existing process would likely

   not begin for several months. For this reason, emergency purchases are necessary to protect against the

  threat to public health and safety and to prevent or minimize serious disruption in critical State Services.

  BRiC was chosen because they are familiar with the site and remedial efforts to date. Scope may also

  include additional related work that is determined to be necessary in addressing the current crises at the

  Veteran's Home. Incorporated documents include the March 2009 Standard Documents for Construction

  and Supplement and the March 2009 Design and Construction Manual and Supplement. Services provided

  under this procurement should not exceed $150,000.00, which is a place-holder prior to the negotiation of

   a Professional Services Agreement, without prior authorization from the Capital Development Board in

  consultation with the Chief Procurement Office. This Emergency Purchase has an expected start date of

  02/22/2018 through 05/22/2018 with an Original Estimated Cost of $150,000.00.

   Signed       Chris Miles, Executive II

       Vendor   BRiC Partnership LLC                                                                  Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $150,000.00                                                   $0.00                      $0.00       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018

  64     TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                      File Date:  4/24/2018

  Latest Filing - 04/24/2018:

  The Actual Total Cost of FY18, Qtr 2, Item# 10 is $203,676.25.

 

  Original Filing - 12/22/2017: FY18, Qtr 2, Item# 10:

  The Illinois State Toll Highway Authority is requesting an emergency procurement to allow for Law

  Enforcement Systems to continue to provide Out-of-State Registration Retrieval Services. The service

  provided within this contract allow for the continuation of violation revenue collection efforts. This

  vendor uses the license plate information provided by the Tollway's back-office system provider to gather

  registered vehicle owner information from the department of motor vehicles from United States

  jurisdictions and Canadian provinces. The Tollway must issue notices within 90 days of the violation or

  they become ineligible for fines. Without these services in place, the Tollway will jeopardize $250,000 to

  $450,000 in revenue per week. This Emergency Purchase has an expected start date of 01/10/2018

  through 04/10/2018 with an Original Estimated Cost of $300,000.00.

   Signed       John Donato, Chief of Procurement

       Vendor   Law Enforcement Systems, LLC                                                  Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State                 $300,000.00                                        $203,676.25           $203,676.25       18      4

    Federal                           $0.00                                                                                  $0.00


                                        LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                        April 1,2018 through June 30, 2018