LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  1       Human Services, Department of                                                                 File Date:  9/29/2022

  Original Filing – 9/29/2022: FY23, Qtr 2, Item# 1

 

  This vendor was going to take over services once the renewal process was completed and they have the required

  knowledge to provide the services.

 

  This vendor will provide business services for the Early Intervention (EI) program. Specifically, the vendor of these

  business services will adjudicate provider service claims, submit Medicaid claims to the Illinois Department of

  Healthcare & Family Services (HFS), allow for EI provider enrollment, and conduct family participation fee invoices

   and receivables. The vendor must administer the insurance requirements of the EI system, including the granting of

  waivers and exemptions from insurance use. Linkage to EI service authorization data in the front end data system,

  currently Cornerstone, is a required interface as are other interfaces with other DHS and EI data systems, i.e. current

   fiscal system, Consolidated Accounting Reporting System (CARS).

The vendor will use software they developed

  and own and hardware they own and use at their location to provide these services. IDHS is not purchasing a

  software system or hardware.

 

  Vendor was notified via email of the 34% BEP goal and asked if they would consider using a BEP vendor for part of

   the services.  At this time, the Vendor has stated they are only able to meet 5% of the goal but will continue to try

  for more.

 

  This Emergency Purchase has an expected start date of 10/1/2022 through 12/29/2022 with an Original Estimated

  Cost of $1,020,000.00.

   Signed By:  Jean Sandstrom, APO

       Vendor:  IPHCA IL Primary Health Care Assoc                                          Notary Date:   9/29/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:     $1,020,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  2       Central Management Services, Department of                                          File Date:  9/30/2022

  Original Filing – 9/30/2022: FY23, Qtr 2, Item# 2

 

  The previous contract P-11585 was for 5 Day Janitorial services at J0200 MABB located at 160 N LaSalle St,

  Chicago, IL.  This contract expired 08/31/22 and the next State Use Meeting was set to convene on 09/07/22.  The

  new contract was approved at that meeting; however, it will not be effective until 11/01/22 so the building will be

  without janitorial service for the additional month of October 2022.   As this is the Vendor who is currently

  servicing the building and will be the Vendor on the new contract, it makes sense to continue services with this

  Vendor for the one month period.

 

  The Vendor will provide 5 day janitorial services for the building which includes cleaning all restrooms, stocking

  paper supplies as needed, vacuuming carpets, mopping floors, removing waste, cleaning entryways, picking up

  litter and debris from entryways and sidewalks in front of the building, cleaning elevators, washing windows on first

   floor and dusting blinds.

 

  As this will be a State Use Vendor, no BEP goals were assessed.

 

  This Emergency Purchase has an expected start date of 10/01/2022 through 10/31/2022 with an Original Estimated

  Cost of $39,915.00.

   Signed By:  Martha Blackwell, Manager

       Vendor:  Sertoma Centre, Inc.                                                                     Notary Date:   9/30/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:          $39,915.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  3       Innovation & Technology, Department of                                                 File Date:  9/30/2022

  Original Filing – 9/30/2022: FY23, Qtr 2, Item# 3

 

  Motorola Solutions, Inc. owns and operates the Starcom21 communications network. It is the only statewide

  trunked, digital public safety communications network available in Illinois. It is the only statewide, trunked, digital

  voice radio network in Illinois that meets the design, function, and performance requirements of the State of Illinois.

 

 

There is no other statewide trunked, digital public safety communications network available in Illinois.

  STARCOM21 was built, tested, and is being operated according to specifications provided by the State of Illinois

  as a result of the original competitive bid. The network took 7 years to completely build out and pass acceptance

  testing. Motorola is the only vendor that has a network in place that meets the State's needs, and it has met the

  State's needs since implementation. Illinois’ Starcom21 system is utilized by over 69,000 users, including16,000

  state agency users, and any disruption in service would be devastating to all users and therefore devastating to

  public safety in Illinois.  The system includes

  :

● Users – 69,000+ (16,000 State Agency Users)

● Talk Groups - 5834

● Zones - 4

● RF Sites – 327

● Dispatch Sites

   - 97

● Dispatch Operator Positions - 673

● 359 T1 Circuits

● 25 DS3 Circuits

● 53 Microwave Circuits

● 30+

  Satellites

● 40 4G (cellular backup)

 

  The State's need is to lease a statewide, trunked, digital voice radio network and purchase associated infrastructure

  equipment. Supplies and services to be supplied or delivered under the contract include the following components:

 

  Access to the System

• Network Infrastructure Services and Equipment

• Warranty and Maintenance

 

 

 

This includes Zone Controllers, RF equipment, towers, standby power, consoles, control stations and dispatch

  equipment, backhaul/transport, network access, software, system maintenance, training, and professional services.

 

 

 

 

The STARCOM21 network provides the day-to-day and emergency 2-way radio communication needs of over

  69,000 subscribers, including state agency subscribers, public safety subscribers and public service subscribers from

   various governmental and non-governmental entities. The network allows the State to effectively address homeland

  security and interoperability concerns.  It also figures prominently in the Statewide Communications

  Interoperability Plan (SCIP) which identifies a statewide strategy in Illinois that focuses on establishing a single

  platform so all public safety agencies can share emergency information.  It is imperative for public safety that the

  State continue the use of this public safety network.

 

  Do to the nature of the Starcom21 Network there can be no BEP subcontractors for this procurement.

 

  This Emergency Purchase has an expected start date of 10/1/2022 through 12/29/2022 with an Original Estimated

  Cost of $4,125,000.00.

   Signed By:  Van P Austin, APO

       Vendor:  Motorola Solutions, Inc.                                                               Notary Date:   9/30/2022


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:     $4,125,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  4       Capital Development Board                                                                        File Date:  10/3/2022

  Original Filing – 07/28/2022: FY23, Qtr 2, Item# 4

 

  On July 27, 2022, the Department of Human Services requested CDB undertake an Emergency Procurement.

  The Illinois School for the Visually Impaired (ISVI) serves as a statewide educational resource, offering students

  with visual impairments quality services which will enable them to become personally productive, self-sufficient

  citizens. ISVI is a residential/day school where student both live and attend classes on an 18-acre campus. The

  utilities are provided from a central power plant through a utility tunnel system that runs to each building on

  campus. The tops of these tunnels are also used as sidewalks for the students and staff to walk around campus. On

  a recent inspection visit by the Capital Development Board they noticed severe deterioration of a portion of the

  sidewalk/tunnel top. The sidewalk above the utility tunnel running parallel to the Auditorium (Building 7) on the

  west side has a 35 ft to 40 ft portion that has been settled below the level of the rest of the sidewalk. This sidewalk

  is believed by site staff to serve as the top ceiling slab of an approximate 40 ft by 8 ft utility tunnel, which is vital

  to the continued operation of the school facility. Currently there is noticeable settlement of the slab with respect to

  the wall inside the tunnel, and the underside of the slab has severe spalling with rusting of the reinforcement to the

  extent that it cannot be considered effective in contributing to structural strength of the slab based on the CDB

  inspection report and their recommendation DHS is requesting this emergency that this portion of sidewalk be

  replaced for

  the safety of the student and staff that use this sidewalk daily.

 

  This project began through the emergency selection of an Architect/Engineer (“A/E”); this exempts the selection

  from a 14-day solicitation required through Qualifications-Based Selection (“QBS”). Considering the time frames

  needed for the selection, negotiation and execution of an A/E contract followed by bidding and award procedures, an

  assessment of the damages followed by recommendations, design and repairs under the existing processes would

  likely not begin for several months. For this reason, emergency purchases are necessary to assess and repair the

  damage as quickly as possible in order to protect against the threat to public health and safety, to protect against

  further loss or damage and to prevent or minimize serious disruption in critical State services. Hurst-Roche, Inc. of

  Hillsboro, IL, was selected because they have the expertise and experience to assess and design the needed work,

  and they can respond immediately to this request for emergency services.

 

  The project scope provides for an assessment of the existing conditions, by a firm experienced in utility tunnel

  repair projects. This assessment should include an evaluation of different construction methods for safe removal of

  the deficient portion of the top slab, selecting the best available option considering time, cost and safety, and

  reconstructing the top slab to be safely supported by the existing tunnel and resulting in a smooth line and grade for

  the sidewalk to be used by visually impaired students.

 

  The construction will consist of removal and replacement of the deteriorated sections of the top slab as

  recommended by the AE, and epair to surface damages directly related to this effort. Replacement of the top slab

  will be performed with either cast-in-place or precast concrete, with a positive connection made between the slab

  and vertical walls of the tunnel. The slab will be of sufficient structural strength to resist current and anticipated

  loads from both vehicular and pedestrian use. Adjustments will be made as necessary to ensure the top of slab is

  continuous with the vertical alignment of the remainder of the sidewalk. Work must be completed prior to August

  14,2022 in which students will be returning to campus. If it is determined the ceiling slab and sidewalk are unable to

  be repaired before August 14,2022, due to design or construction constraints, a separate walkway will be

  constructed in a separate or adjacent location in order to provide a safe walkway for ISVI students.


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

 

  Incorporated documents include the March 2009 Standard Documents for Construction & Supplement and the

  March 2009 Design and Construction Manual & Supplement. Basic Architectural Services provided under this

  procurement should not exceed $50,000.00, which is a place-holder prior to the negotiation of a Professional

  Services Agreement, without prior authorization from the Capital Development Board in consultation with the

  Chief Procurement Office. Final Actual Costs will be reported upon project completion and project close-out.

 

  In accordance with 30 ILCS 500/50-35, all contractors, and each subcontractor to be used whose

  contract/subcontract exceeds an annual value of $50,000, shall submit financial disclosures and certifications as a

  material term of the contract. In accordance with section 00 21 50 of the Standard Documents for Construction, the

  General Contractor shall perform no less than 20% of work with its

  own staff. Each other trade shall perform no less than 40% of work with its own staff. Work with own staff

  includes direct labor and supervision, as well as material purchases where the material is installed by the contractor.

 

 

  This Emergency Purchase has an expected start date of 07/28/2022 through 10/26/2022 with an Original Estimated

  Cost of $50,000.00.

   Signed By:  Chris Miles, Exec II

       Vendor:  Hurst Roche Eng                                                                          Notary Date:   7/28/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:          $50,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  5       Public Health, Department of                                                                     File Date:  10/3/2022

  Original Filing –10/3/2022: FY23, Qtr 2, Item# 5

 

  BioFire Defense FilmArray system is the only system and vendor, approved by the Center for Disease Control and

   Prevention and the Department of Defense for the detection of all species of Ebolavirus and are limited to LRN

  laboratories.

 

  6 instruments to test Ebolaviruses and reagent test kits.

 

  Unfortunately, this instrument is only made by one vendor that holds the patents and applied for patents.

 

  This Emergency Purchase has an expected start date of 10/3/2022 through 12/30/2022 with an Original Estimated

  Cost of $325,020.00.

   Signed By:  Nicole Hildebrand, CFO

       Vendor:  BioFire Defense                                                                           Notary Date:   10/3/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $325,020.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  6       Transportation, Department of                                                                  File Date:  10/4/2022

  Original Filing – 10/4/2022: FY23, Qtr 2, Item# 6

 

  They are a pre-qualified IDOT Contractor working on an IDOT project within 1 mile of the emergency location.

  Additionally they have the necessary equipment and are prepared to start as soon as plans are available

 

  On 9/28 a fire caused extensive damage on SB l-90/l-94/Dan Ryan exit ramp (Exit 53C) to SB l-55/Stevenson.

  The ramp was closed shortly after and will remain closed until repairs can be made. Contractor will provide

  barrier wall and traffic control equipment and signage to close the damaged location on the bridge for interim repairs

  as well as facilitating permanent repairs.

 

  This Emergency Purchase has an expected start date of 10/03/2022 through 12/31/2022 with an Original Estimated

  Cost of $400,000.00.

   Signed By:  Jose Rios, Deputy Director

       Vendor:  Lorig Construction Co.                                                                 Notary Date:   10/4/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $400,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  7       University of Illinois Chicago                                                                     File Date:  10/2/2022

  Original Filing – 10/2/2022: FY23, Qtr 2, Item# 7

 

  UI Health Hospital and Clinics, Self-Funded

 

  The vendor, One Sixty over Ninety, LLC (Vendor), developed a cohesive, umbrella brand for the University of

  Illinois System that united the three universities — Urbana-Champaign, Chicago, and Springfield — for a

  comprehensive fundraising campaign. The “Altogether Extraordinary” campaign resulted in increased enrollment

  across the entire system, record fundraising (a 75% increase in FY18 over FY17), and the approved budget’s largest

  appropriation increase (FY21) in two decades.

 

 

The Specialty Care Building (SCB) was announced in November 2019, and groundbreaking took place in August

   2020. In early 2021, because of its experience and success working with and promoting the University System, the

  vendor was recommended to UI Hospital and Clinics to help support a campaign for the launch of the Specialty

  Care Building.

 

 

In FY22, UI Hospital and Clinics and the vendor partnered on an initial commercial (Phase 1) that would serve

  as the basis for the FY23 media campaign to support the opening of the SCB. After completing the initial phase of

  campaign in late FY22, the vendor presented two subsequent phases of the campaign, in FY23, to support the

  launch of the SCB. University of Illinois Hospital & Clinics Leadership approved the concept for these phases and

  green lit the vendor to move into conception. The Phase 1 video launched in June 2022; the Phase 2 video is planned

   to launch mid-to-late October 2022; the Phase 3 video is planned to launch in Q2 2023.

  It was not until Aug. 9, 2022 — fewer than seven weeks before the opening of the SCB — that UI Hospital and

  Clinics received a cost breakdown for the remainder of the campaign — with an estimated $150,000 for Phase 2 and

  $90,000 for Phase 3, exceeding the small-bid threshold.

 

 

  The SCB is a new, 200,000-square-foot, $194 million building. It is an extremely important project for UI Hospital

  and Clinics, and the state. It is the first new clinical facility on the UI Hospital and Clinics campus in two decades.

  Not only does the state-of-the-art building expand UI Hospital and Clinics' clinical footprint, it has the potential to

  grow the UI Hospital and Clinics brand, improve the lives of our patients and communities, and, as the academic

  health enterprise for the University of Illinois, bolster the reputation of the System.

 

 

There were three aspects to funding the build

 

• Donor support. A gift commitment of $10 million from Bruno & Sallie Pasquinelli provided the substantial support

  to make the surgical aspects of this building happen. More importantly, it was their commitment to this endeavor

  that set the stage for UI Hospital and Clinics to have the confidence to move the project forward.

• Planned

  Investment. The second aspect of funding comes from the reserves the UI Hospital and Clinics have set aside

  through its financial diligence. These reserves allowed UI Hospital and Clinics to advance technology in support of

  the many clinical needs of our patients.

• Public-private partnership. In concert with UI Hospital and Clinics

  resources, the UI Hospital and Clinics leveraged a public-private partnership (P3) for 80% of this project.

 

 

The true success of the strategic financial approaches to building and operationalizing this facility lie in

  utilization — clinic and surgical volumes (patients). The building has 182 clinic rooms, eight operating rooms, and

  24 pre- and post-surgery bays. UI Health Hospital and Clinics anticipates: 

 

• 200,000 annual patient visits

• 8,200 annual surgeries300 annual GI procedures

 

 

If clinics and operating rooms are not being fully utilized, revenue is not being fully realized. The sooner the

  building becomes profitable, the sooner the state is collecting revenue from this facility. If operations and finances

  under perform, it could weaken donor trust and jeopardize future support. Likewise for the willingness to capitalize


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

   on public-private partnership opportunities. It would be an enormous financial blow.

 

 

The vendor has concepted and is ready to produce the next phase of the campaign within the next few weeks. If

  UI Hospital and Clinics cannot move forward with the vendor, then the nearly $200 million facility will not be

  promoted to its potential, which would set it on a course to be to be underutilized and financially underperform.

 

 

This is the only vendor that can execute a campaign, right now, to support the Specialty Care Building in the

  immediate and critical weeks that following its opening. And with its knowledge and previous success with the

  University System, we are confident they would create work that achieves our goals for the facility and is congruent

   with the brand and mission of the University System overall.  A Sole Economically Feasible Source procurement

  will be initiated to complete the project.

 

 

  Television commercial filming and production services in English and Spanish language designed to reach the needs

  of Chicago residents to introduce and promote the new Specialty Care Building. Vendor to work with UI Hospital

  and Clinics to produce the Phase 2 video of a 3-video series. The focus of this video is the opening of the new

  Specialty Care Building. Estimate includes agency hours and hard costs associated with the production/execution of

  this video. Estimate includes one (1) 1-day location scout, one (1) tech scout and up to three (3) shoot days in

  Chicago. Costs include crew, crew travel, equipment rental, casting, locations, and craft services per the approved

  directors treatment. The hours include time for Video Production and Account & Creative oversight, etc.

 

  This Emergency Purchase has an expected start date of 09/30/2022 through 12/28/2022 with an Original Estimated

  Cost of $240,000.00, using Self-Funded : UI Health Hospital and Clinics

   Signed By:  Debra Matlock, Exec Dir

       Vendor:  One sixty over ninty, LLC                                                            Notary Date:   10/2/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $240,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  8       Transportation, Department of                                                                  File Date:  10/4/2022

  Original Filing – 10/4/2022: FY23, Qtr 2, Item# 80

 

  Lion Lumber is in the vicinity and has the needed timbers available for immediate delivery. Two other local

  vendors were solicited but could not supply timbers in time for repair project. Horigan urban lumber was a no quote

   and Calumet Lumber did not have inventory to meet deadline.

 

  On 9/28 a fire caused extensive damage on SB l-90/l-94/Dan Ryan exit ramp (Exit 53C) to SB l-55/Stevenson.

  The ramp was closed shortly after and will remain closed until repairs can be made. These timbers are needed for the

   initial repair to open one lane of the ramp.

 

  This Emergency Purchase has an expected start date of 10/03/2022 through 12/30/2022 with an Original Estimated

  Cost of $4,000.00.

   Signed By:  Michael Walton, Engineer of Day Labor

       Vendor:  Lion Lumber/ Sterling                                                                   Notary Date:   10/4/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:            $4,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  9       University of Illinois Chicago                                                                     File Date:  10/10/2022

  Original Filing – 10/10/2022: FY23, Qtr 2, Item# 9

 

  Upon the selection process for the university's outdoor student concert, this entertainer was selected by the

  students.  An offer was made to Partynextdoor (PND) on September 13, 2022.  PND’s team accepted and provided

   a contract on September 21, 2022.  PND's contract needed to be revised for the event location.  CSI  (Center for

  Student Involvement) submitted the contract on September 22, 2022 and the University requested the vendor

  information form to be completed by the artist, which is contracted through vendor Partyomo Touring LLC. We

  received the vendor form on September 23, 2022.  There was an issue with the vendor number, which delayed

  having the entertainer added in iBuy until October 3,2022.  A requisition was created on October 7,2022 at 5:53p.m.

   and the purchase order was approved October 8,2022 at 7:03a.m.  PND required payment/PO by Saturday,

  October 8, 2022. 

 

  Entertainer will perform for 60 minutes outdoors, meet and greet with 30 students.

 

  This Emergency Purchase has an expected start date of 10/08/2022 through 10/08/2022 with an Original Estimated

  Cost of $150,000.00.

   Signed By:  Debra Matlock, Exec Dir

       Vendor:  Partyomo Touring, LLC                                                                Notary Date: 10/10/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $150,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  10     Corrections, Department of                                                                        File Date:  8/5/2022

  Original Filing – 8/5/2022: FY23, Qtr 2, Item# 10

 

  The Vendor is able to provide needed commissary items to the Illinois Department of Corrections for its Individual

  in Custody and Correctional Facility Employees.

 

  The Vendor will provide approved commissary items that will allow for the continued sales of food, clothing,

  health/beauty, sundries and electronics to individuals in custody and Correctional Facility Employees.

 

  The Illinois Department of Corrections is setting the BEP goal for this procurement at 20%.

 

  This is a zero dollar contract, the State does not fund the expenses.

 

 

  This Emergency Purchase has an expected start date of 08/04/2022 through 11/2/2022 with an Original Estimated

  Cost of $6,000,000.00, using none State Funds.

 

 

  No State or Federal Funding.

   Signed By:  Jacenta Wilson, APO

       Vendor:  Keefe Group                                                                                Notary Date:     8/5/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:     $6,000,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  11     Corrections, Department of                                                                        File Date:  8/5/2022

  Original Filing – 8/5/2022: FY23, Qtr 2, Item# 11

 

  The Vendor is able to provide needed commissary items to the Illinois Department of Corrections for its Individual

  in Custody and Correctional Facility Employees.

 

  The Vendor will provide approved commissary items that will allow for the continued sales of food, clothing,

  health/beauty, sundries and electronics to individuals in custody and Correctional Facility Employees.

 

  The Illinois Department of Corrections is setting the BEP goal for this procurement at 20%.

 

  This Emergency Purchase has an expected start date of 08/05/2022 through 11/02/2022 with an Original Estimated

  Cost of $6,000,000.00, using none State or Federal Funds.

 

  This is a zero dollar contract, the State does not fund the expenses.

   Signed By:  Jacenta Wilson, APO

       Vendor:  Performance Group dba Vistar                                                     Notary Date:     8/5/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:     $6,000,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  12     Corrections, Department of                                                                        File Date:  8/5/2022

  Original Filing – 08/05/2022: FY23, Qtr 2, Item# 12

 

  The Vendor is able to provide needed commissary items to the Illinois Department of Corrections for its Individual

  in Custody and Correctional Facility Employees.

 

  The Vendor will provide approved commissary items that will allow for the continued sales of food, clothing,

  health/beauty, sundries and electronics to individuals in custody and Correctional Facility Employees.

 

  The Illinois Department of Corrections is setting the BEP goal for this procurement at 20%.

 

  This Emergency Purchase has an expected start date of 08/05/2022 through 11/02/2022 with an Original Estimated

  Cost of $6,000,000.00, using none State or Federal Funds.

 

  This is a zero dollar contract, the State does not fund the expenses.

   Signed By:  Jacenta Wilson, APO

       Vendor:  Union Supply Group                                                                    Notary Date:     8/5/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:     $6,000,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  13     Corrections, Department of                                                                        File Date:  8/5/2022

  Original Filing – 8/5/2022: FY23, Qtr 2, Item# 13

 

  The Vendor is able to provide needed commissary items to the Illinois Department of Corrections for its Individual

  in Custody and Correctional Facility Employees.

 

  The Vendor will provide approved commissary items that will allow for the continued sales of food, clothing,

  health/beauty, sundries and electronics to individuals in custody and Correctional Facility Employees.

 

  The Illinois Department of Corrections is setting the BEP goal for this procurement at 20%.

 

  This Emergency Purchase has an expected start date of 08/05/2022 through 11/02/2022 with an Original Estimated

  Cost of $6,000,000.00, using none State or Federal Funds.

 

  This is a zero dollar contract, the State does not fund the expenses.

   Signed By:  Jacenta Wilson, APO

       Vendor:  Walkenhorst's                                                                               Notary Date:     8/5/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:     $6,000,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  14     Corrections, Department of                                                                        File Date:  8/5/2022

  Original Filing – 8/5/2022: FY23, Qtr 2, Item# 14

 

  The Vendor is able to provide needed commissary items to the Illinois Department of Corrections for its Individual

  in Custody and Correctional Facility Employees.

 

  The Vendor will provide approved commissary items that will allow for the continued sales of food, clothing,

  health/beauty, sundries and electronics to individuals in custody and Correctional Facility Employees.

 

  The Illinois Department of Corrections is setting the BEP goal for this procurement at 20%.

 

  This Emergency Purchase has an expected start date of 08/05/2022 through 11/02/2022 with an Original Estimated

  Cost of $6,000,000.00, using none State or Federal Funds.

 

  This is a zero dollar contract, the State does not fund the expenses.

   Signed By:  Jacenta Wilson, APO

       Vendor:  E Ford Commisaary Inc.                                                               Notary Date:     8/5/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:     $6,000,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  15     Corrections, Department of                                                                        File Date:  10/13/2022

  Original Filing – 10/13/2022: FY23, Qtr 2, Item# 15

 

  Vendor was on-site doing work for another project. Vendor has experience in this type of work.

 

  Vendor shall rebuild 2 pumps and install 1 of them.  Vendor shall build a 6' diameter vault with a 30" hatch and

  building an emergency bypass. Vendor shall replace the Check Valves and Gate Valves with Plug Valves.  Vendor

  shall replace the piping from the existing Base Elbow through the Valve Vault .  Vendor shall run the bypass pump

  for a month.  Vendor shall include 1440 gallons of fuel at $5.00 per gallon in the cost of the bypass pumping.

 

  Vendor is a registered BEP vendor.

 

  This Emergency Purchase has an expected start date of10/10/2022 through 01/06/2023 with an Original Estimated

  Cost of $114,739.97.

   Signed By:  Sandy Robinson II, PM

       Vendor:  Schomburg & Schomburg Const Co. Inc.                                     Notary Date: 10/13/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $114,739.97                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  16     University of Illinois Chicago                                                                     File Date:  10/14/2022

  Original Filing – 10/14/2022: FY23, Qtr 2, Item# 16

 

  The University is experiencing a staffing shortage of building service workers, who provide custodial and

  environmental cleaning services on campus. Our current vendor Southwest Service Corporation (SSC (E&I / IPHEC

  vendor), does not have the staff to meet the University needs for temporary cleaning, housekeeping, and

  disinfection services. This situation means that campus buildings do not have personnel available to provide cleaning

   and disinfection services - a threat to public health. The vendor Vargas Group is able to provide personnel to clean

  these buildings while the University works towards issuing an award for custodial services via RFP #IDM631. The

  response period for RFP #IDM631 has ended and the University is reviewing responsive submissions. Upon award

   of this competitive solicitation and execution of a resulting contract the University will no longer experience

  conditions that necessitate an emergency purchase.  This emergency purchase serves as a gap stop to ensure

  custodial and environmental cleaning services on campus continue.

 

  The Vendor will provide temporary cleaning, housekeeping, and disinfection services in campus buildings; Science

  and Engineering Labs East (607), Science and Engineering Labs West (608), Behavioral Sciences Building (618),

  Science & Engineering South (619), Engineering Research Facility (648), and 2242 West Harrison Street (980). The

  Vendor will provide all labor and required equipment to complete the work.

 

  This Emergency Purchase has an expected start date of 11/01/2022 through 01/29/2023 with an Original Estimated

  Cost of $428,118.00, using Self Supporting Funds.

   Signed By:  Debra Matlock, Exec Director

       Vendor:  Vargas Group                                                                               Notary Date: 10/14/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $428,118.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  17     Employment Security, Department of                                                        File Date:  10/17/2022

  Original Filing – 10/17/2022: FY23, Qtr 2, Item# 17

 

  The Illinois Department of Employment Security (IDES) needs postage services to mail mission critical information

   to citizens of Illinois that have applied for Unemployment Insurance (UI) benefits. These mailings inform citizens

  of the status of their UI applications and the level of their benefits. The postage must be delivered remotely, using

  IDES' leased Pitney Bowes postage equipment. Much of the mail that will be processed contain client benefits and

  related information, which is mandated by both State and Federal statute/policy.

 

 

 

Currently USPS metered postage rates for a one (1) ounce first class letter is $0.60 and since IDES does not pre-

  pay for postage which would be required if IDES purchased postage from the United States Postal Service (USPS),

  IDES requires a mechanism that allows the agency to pay for postage after services have been rendered. Pitney

  Bowes has extended the usage of Purchase Power to IDES to pay for postage and is the only company that will

  provide this mechanism. Further, due to proprietary issues, Pitney Bowes will only load postage onto a Pitney

  Bowes meter and IDES utilizes Pitney Bowes postage meters for the application of postage because IDES has a

  combination of owned and leased Pitney Bowes postage meters and other mailing equipment. Therefore, it is

  important that IDES continue the postage services with Pitney Bowes to avoid an interruption in services which

  would be disastrous for the agency as well as the claimants.

 

  Bulk Metered Postage delivered on-demand remotely to IDES leased and owned Pitney Bowes postage equipment.

 

 

  This Emergency Purchase has an expected start date of 10/17/2022 through 01/13/2023 with an Original Estimated

  Cost of $550,000.00, using Federal Funds.

   Signed By:  Dorthea Lovelace, SSPM

       Vendor:  Pitney Bowes, Inc.                                                                        Notary Date: 10/17/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:                   $0.00                                                   $0.00                      $0.00       23      2

    Federal Cost:       $550,000.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  18     University of Illinois Chicago                                                                     File Date:  10/18/2022

  Original Filing – 10/18/2022: FY23, Qtr 2, Item# 18

 

  The University is experiencing a staffing shortage of building service workers, who provide custodial and

  environmental cleaning services on campus. Our current vendor Southwest Service Corporation (SSC) (E&I / IPHEC

   vendor), does not have the staff to meet the University needs for temporary cleaning, housekeeping, and COVID-

  19 disinfection services. This situation means that the UI Hospital does not have personnel available to provide

  cleaning and disinfection services - a threat to public health. The vendor is BEP certified and is able to provide

  personnel to clean this building while the University  works towards issuing an award for custodial services via RFP

   #IDM631. The response period for RFP #IDM631 has ended and the University is reviewing responsive

  submissions.  Upon the award of this competitive solicitation and execution of a resulting contract, the University

  will no longer experience conditions that necessitate an emergency purchase.  This emergency purchase serves as a

  stopgap to ensure custodial and environmental cleaning services on campus continue.

 

  Apache Service and Supply Company will provide temporary EVS/hospital-grade cleaning, housekeeping, and

  COVID-19 disinfection

services at the UI Hospital (Building 949). Vendor will provide all labor and required

  equipment to complete the work.

 

  This Emergency Purchase has an expected start date of 11/01/2022 through 01/29/2023 with an Original Estimated

  Cost of $437,736.00, using Self-Supporting Funds.

   Signed By:  Debra Matlock, Exec Dir

       Vendor:  Apache Service & Supply Co.                                                      Notary Date: 10/18/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $437,736.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  19     University of Illinois Chicago                                                                     File Date:  10/26/2022

 

  Latest Filing - 12/08/2022: FY23, Qtr 2, Item # 19

  An Actual Total Cost of $599,678.55 was reported in the same filing quarter.

 

  Original Filing – 10/26/2022: FY23, Qtr 2, Item# 19

 

  We need to upgrade an existing scientific instrument manufactured by Keysight that contains technology that is

  proprietary to Keysight. Therefore, Keysight  is the only vendor that can perform the upgrade.  Keysight provided

  a discounted quote will expire on Monday, October 31st.  Tuesday, November 1st the price will go up by $36K

  and the grant only covers the original amount of $599,680.

 

  The existing vector network analyzer model PNA-X N5242B by Keysight operates from 10 MHz to 26.5 GHz.

  We are purchasing an upgrade so that the vector network analyzer can extend its upper frequency of operation from

   26.5 GHz to 110 GHz to give our laboratory new measurements research capabilities and to make us more

  competitive. UIC members and their respective research groups will benefit from this upgrade.

 

  This Emergency Purchase has an expected start date of 10/26/2022 through 10/28/2022 with an Original Estimated

  Cost of $599,678.55, using Federal Funds.

   Signed By:  Debra Matlock, Exec Director

       Vendor:  Keysight Technologies, Inc.                                                         Notary Date: 10/26/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:                   $0.00                                                   $0.00                                      23      2

    Federal Cost:       $599,678.55                                                                       $599,678.55


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  20     University of Illinois Chicago                                                                     File Date:  10/28/2022

  Original Filing – 10/28/2022: FY23, Qtr 2, Item# 20

 

  AT&T is the existing switched Ethernet service vendor for data/internet access for UIC- Division of Specialized

  Care for Children (DSCC). AT&T provides services for data/internet communication services given DSCC is not

  physically connected to UIC campus by university infrastructure. AT&T is the only vendor who can provide these

   services for all of our statewide offices and ensure no loss of service at the current pricing.

 

  The switched Ethernet services will cover statewide offices at DSCC with various Internet speeds based on the

  requirements of each office.  These services are critical for the daily business functions at DSCC and the university.

  The services will give DSCC the ability to send vital electronic communications, access software and meet

  university IT security requirements. 

 

  The current State of Illinois Master Contract expires on December 9, 2022 without any renewals. AT&T is the only

   vendor who can provide these services to all of DSCC's statewide offices.  Without an agreement in place, DSCC

  would see a large increase in monthly service fees due to AT&T's tariff pricing.  The financial impact to the

  university for the increase tariff pricing would go from $6,102 per month ($73,224 annually) to $ $11,340 per

  month ($136,080 annually).   This would increase costs by $62,856 per year.   The university and/or State of

  Illinois procurement teams will work to ensure a RFP, or other state approved procurement process, is conducted

  prior to the end of this quick purchase term.  The lack of these service would disrupt DSCC's ability to partner with

   Illinois families and communities to help children and youth connect to the services and resources.

 

 

  This Emergency Purchase has an expected start date of 10/26/2022 through 10/27/2022 with an Original Estimated

  Cost of $146,448.00 using combination of fund types such as EAA, Federal Block Grant, and Aux/Self-Supporting

  Funds.

   Signed By:  Debra Matlock, Exec Dir

       Vendor:  AT&T                                                                                           Notary Date: 10/28/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:                                                                               $0.00                      $0.00       23      2

    Federal Cost:       $146,448.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  21     Capital Development Board                                                                        File Date:  10/21/2019

 

  Latest Filing – 12/08/2022: FY 23, Qtr 2, Item 21

  A final Cost Statement was received on 12/08/2022, stating that the Actual Total Cost is $257,602.78 with a final

  term of contract 12/08/2022.

 

 

  Fifth Filing - 10/20/2020:

  An Emergency Purchase Extension was received on October 20, 2020, requesting an extension until 12/31/2020. he

  extension expenditure is not assessed and will be charged for time only.

 

  Fourth Filing - 05/29/2020:

  An Emergency Purchase Extension was received on May 29, 2020 requesting an extension for dates starting

  06/18/2020 to 10/01/2020 revising the current contract amount for Farnsworth Group, Inc. to $141,100.00 and

  Limbaugh Construction Co. to $2,825,099.35, for a total amount of $2,966,199.35. The extension expenditure is not

   assessed and will be charged for time only.

 

  Third Filing - 03/13/2020:

  The scope of this Emergency Purchase for Farnsworth Group, Inc. has been expanded, adding a new Statewide

  Processing Center ("SPC") at Alton Mental Health Center which will require additional temporary workspace in

  Willow Hall as well as permanent workspace in Maple as suggested by the A/E of record and approved by CDB.

  The scope of work also includes design services for the renovation of Willow Hall into a temporary workspace for a

   Statewide Processing Center ("SPC") as well as design services for the renovation of Maple Hall for permanent

  workspace. The revision is for dates starting 10/21/2019 to 07/01/2020 at an additional estimated cost of

  $285,000.00, revising the total estimated cost to $1,410,000.00.

 

  Second Filing - 12/13/2019:

  An Emergency Purchase Extension was received on December 13, 2019, for Farnsworth Group Inc. & Limbaugh

  Construction Company Inc., requesting an extension for dates starting 01/02/2020 to 07/01/2020 at an additional

  estimated cost of $0.00, keeping the estimated cost at $1,125,000.00.

 

  Original Filing - 10/21/2019:

  On August 30, 2019, the Centers for Medicare and Medicaid Services (Federal CMS) approved a Corrective Action

  Plan (CAP) submitted by the Illinois Department of Healthcare and Family Services (HFS) in response to

  deficiencies outlined in a December 2018 and February 2019 Federal inspections. The CAP is to correct areas where

   the State of Illinois is out of compliance with Federal Medicaid laws for, among other reasons, failure to allow

  beneficiaries to respond and provide renewal forms or necessary information through any of the modes of

  submission which includes telephone, (specifically, HFS as the State Medicaid Agency and the Illinois Department

  of Human Services (DHS), the agency that makes determinations on public benefits). This CAP includes a plan to

  create a new call center at Alton to address these findings and it is to be fully functional on April 1, 2020. Therefore,

   DHS has asked that CDB procure vendor(s) under an emergency declaration to renovate the first floor of Holly

  Hall into a call center. The call center is necessary to alleviate wait times as high as 50 minutes and abandonment

  rates well exceeding 50%. This potentially endangers hundreds of thousands of Illinoisans and puts them at risk for

  not having food or getting needed medical attention if they cannot reach DHS to apply for public benefits. Not only

  is the State of Illinois under a CAP from federal CMS, but we are also under a CAP from the United States


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  Department of Agriculture (USDA) Food and Nutrition Service (FNS) on SNAP benefits (for timeliness issues).

  The scope of work provides for design services to renovate the existing interior space for approximately 80

  workers. The work includes removal of existing walls and finishes, the creation of new toilet rooms, office space,

  and breakroom. The existing electrical must be replaced and HVAC system must be modified to accommodate the

  increased occupant load. The existing entrances will have to be modified for accessibility. The existing elevator must

  be repaired. A new parking lot will be constructed to accommodate the increased occupancy of the building. This

  project includes the removal of asbestos-containing materials. Lead removal may also be required. This Emergency

  Purchase has an expected start date of 10/21/2019 through 01/18/2020 with an Original Estimated Cost of

  $125,000.00 for Farnsworth Group and $1,000,000.00 for Limbaugh Construction Company, Inc..

   Signed By:  Chris Miles, Executive II

       Vendor:  Farnsworth Group, Inc. & Limbaugh Construction Co., Inc.        Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:     $1,125,000.00        $2,966,199.35         $257,602.78           $257,602.78       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  22     Natural Resources, Department of                                                             File Date:  11/7/2022

  Original Filing – 11/7/2022: FY23, Qtr 2, Item# 22

 

  The Office of Mines and Minerals' Abandoned Mined Land Reclamation Division (AMLRD) responded to a call on

   Thursday, November 3rd, regarding a possible mine subsidence event on Roanoke Drive in Springfield. When

  OMM staff arrived on the scene, they learned that an excavator was performing work in the backyard of a residence

   and partially fell into a mine airshaft. Fortunately, no one was injured and the City of Springfield was able to pull

  the excavator out of the hole. This event was not subsidence but was a result of the excavator breaking through the

  concrete cap of the airshaft. Once the excavator had been removed, staffwere able to measure the opening which was

   approximately 11ft x 8 feet and had a depth of 40 feet. There was no sign of mine off-gassing and approximately 30

   feet of water in the pit. The City of Springfield covered the airshaft with steel plating and cordoned off the area.

  OMM employees have

  been visiting the site regularly on Friday and Monday (Nov 7th) to ensure safety of the situation. OMM

  employees met with a potenial contractor this morning to determine a reclamation plan and cost estimate. This

  emergency contract is necessary to alleviate the potential life-threating hazards of on open pit within a residential

  neighborhood. This vendor is able to complete the work immediately. The are also located within the City of

  Springfield.

 

  This vendor will alleviate the hazards of the open pit by first pumping/removing the water located within the pit.

  Once the water has been removed, the vendor will begin filling the void with concrete. The concrete will be formed

  into a cap for safety. Due to the location of the pit, concrete will need to be pumped to the backyard from the

  street. Once the concrete cap has cured, the area will be covered with dirt and seeded. This vendor has the

  equipment and knowledge to complete these construction requirements.

  Construction Services

 

  There are no nearby contractors in Springfield that can complete the required work that are certified under the BEP.

  The only registered vendor will have to subcontract the construction services.

 

  This Emergency Purchase has an expected start date of 11/7/2022 through 11/9/2022 with an Original Estimated

  Cost of $50,000.00.

   Signed By:  Eric Michael, APO

       Vendor:  United Contractors Midwest                                                         Notary Date:   11/7/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:          $50,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  23     Innovation & Technology, Department of                                                 File Date:  11/15/2022

  Original Filing – 11/15/2022: FY23, Qtr 2, Item# 23

 

  Motorola has been the current vendor for the MC Starcom21 compatible subscriber radio equipment contract. 

  Motorola was originally selected through competitive bid process. Motorola previously supported DoIT during

  initial 5 years contract term, there were no renewals. DoIT has previously been able to successfully negotiate

  contracts with this vendor and the existing contract terms will be used for the Emergency period. Contract

  negotiations with a new vendor could take several weeks creating significant risk and exposure during negotiations.

  The administrative review process has previously been completed with this vendor, including financial disclosures

  and BEP utilization plan. Bringing in a new vendor for such a large and complicated implementation would take

  months as the configuration. 

 

  The Department of Innovation and Technology is currently working on an IFB for replacement of the Emergency

  Starcom21 Equipment Contract.  Due to additional needs and time constraints in procurements, DoIT will need a 90

   day emergency contract to allow adequate time to review any new pricing, equipment and needs for this contract,

  to publish the IFB, and allow time for bids to be received, bids reviewed, award published, and contract execution. 

  There was an emergency contract in place that expired.  A new extension was requested, but that contract extension

  was not able to get executed prior to the emergency contract expiring.   Therefore this new emergency is being

  processed to allow time for the new IFB to be completed and awarded.

 

Motorola supplies equipment to the state of Illinois entities utilizing Starcom21 radio network communication via

   radio mobile and portable radios, emergency agencies and dispatch consoles.  The equipment purchased from this

  contract is invaluable to the support of Illinois Law enforcement agencies State, Local and County.  This equipment

  also supports emergency communication with the equipment purchased on this contract.  The loss of the ability to

  purchase equipment on this contract would be detrimental to all Emergency agencies throughout the state and would

   degrade emergency communications in critical incidents throughout the state with law enforcement and emergency

  agencies such as fire departments, emergency medical technicians, prison guards.   This Emergency JPMC contract

  will be available for use by all governmental units and qualified not-for-profits.

 

  This Emergency Purchase has an expected start date of 11/15/2022 through 02/13/2023 with an Original Estimated

  Cost of $2,000,000.00.

   Signed By:  Van P Austin, APO

       Vendor:  Motorola Solutions Inc                                                                 Notary Date: 11/15/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:     $2,000,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  24     Capital Development Board                                                                        File Date:  11/15/2022

  Original Filing – 11/15/2022: FY23, Qtr 2, Item# 24

 

  The scope of work provides for the replacement of critical 2400V Automatic Transfer Switch parts, and operational

   testing as directed by the AE of record. Scope also includes the acquisition of additional required ATS parts for

  back-up bench stock.

 

  Incorporated documents include the March 2009 Standard Documents for Construction & Supplement, design

  documents provided by the Architect/Engineer of record and quote received by Block Electric Company,Inc.

  Construction Services provided under this procurement should not exceed $180,400.00,which is a place-holder prior

   to entering into a Construction Contract,without prior

  authorization from the Capital Development Board in consultation with the Chief Procurement Office. Final Actual

  Costs will be reported upon project completion and project close-out.

 

  In accordance with 30 ILCS 500/50-35,all contractors, and each subcontractor to be used whose

  contract/subcontract exceeds an annual value of $50,000, shall submit financial disclosures and certifications as a

  material term of the contract. In accordance with section 00 21 50 of the Standard Documents for Construction,the

  General Contractor shall perform no less than 20% of work with its

  own staff. Each other trade shall perform no less than 40% of work with its own staff. Work with own staff

  includes direct labor and supervision, as well as material purchases where the material is installed by the contractor.

 

 

  Additionally,Governor Pritzker has issued Executive Order 2022-21 containing additional mitigations to address the

  COVID-19 pandemic. This includes an indoor mask requirement and vaccinations for those working at Illinois

  Department of Human Services (IDHS) facilities. These requirements apply to this project.

 

  This Emergency Purchase has an expected start date of 11/15/2022 through 02/12/2023 with an Original Estimated

  Cost of $180,400.00.

   Signed By:  Chris Miles, Exec II

       Vendor:  Block Electric Co                                                                         Notary Date: 11/15/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $180,400.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  25     University of Illinois Chicago                                                                     File Date:  11/17/2022

  Original Filing – 11/17/2022: FY23, Qtr 2, Item# 25

 

  The existing Epic implementation consulting partner contracts that emanated from KRS125 are expiring in January

  2023. These existing partners are currently engaged in several important Epic optimization initiatives. We expect

  new Epic module implementations to start in January. A new RFP has been drafted and issued (EWM168) and

  vendor responses are currently being evaluated. We had hoped that the RFP award would be on the January 2023

  University of Illinois Board of Trustees (BOT) meeting agenda. However, we have been given guidance that the

  proposed timeline would not allow a January Board meeting and therefore are now targeting the March 2023 BOT. 

  As a result, we are requesting an emergency to continue to utilize this consulting partner in order not to create a gap

  in services and to avoid causing delays in critical project start dates.

 

  Impact Advisors will continue to provide consulting services on several important Epic optimization initiatives.

 

  This Emergency Purchase has an expected start date of 11/17/2022 through 4/08/2023 with an Original Estimated

  Cost of $180,000.00.

   Signed By:  Debra Matlock, Exec Dir

       Vendor:  Impact Advisors                                                                           Notary Date: 11/17/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $180,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  26     University of Illinois Chicago                                                                     File Date:  11/17/2022

  Original Filing –11/17/2022: FY23, Qtr 2, Item# 26

 

  The existing Epic implementation consulting partner contracts that emanated from KRS125 are expiring in January

  2023. These existing partners are currently engaged in several important Epic optimization initiatives. We expect

  new Epic module implementations to start in January. A new RFP has been drafted and issued (EWM168) and

  vendor responses are currently being evaluated. We had hoped that the RFP award would be on the January 2023

  University of Illinois Board of Trustees (BOT)meeting agenda. However, we have been given guidance that the

  proposed timeline would not allow a January Board meeting and therefore are now targeting the March 2023 BOT.

  As a result, we are requesting an emergency to continue to utilize this consulting partner in order not to create a gap

  in services and to avoid causing delays in critical project start dates.

 

  Huron will continue to provide consulting services on several important Epic optimization initiatives.

 

  This Emergency Purchase has an expected start date of 02/01/2023 through 05/01/2023 with an Original Estimated

  Cost of $180,000.00.

   Signed By:  Debra Matlock, Exec Dir.

       Vendor:  Huron Consulting Group                                                              Notary Date: 11/17/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $180,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  27     University of Illinois Chicago                                                                     File Date:  11/17/2022

  Original Filing –11/17/2022: FY23, Qtr 2, Item# 27

 

  The existing Epic implementation consulting partner contracts that emanated from KRS125 are expiring in January

  2023. These existing partners are currently engaged in several important Epic optimization initiatives. We expect

  new Epic module implementations to start in January. A new RFP has been drafted and issued (EWM168) and

  vendor responses are currently being evaluated. We had hoped that the RFP award would be on the January 2023

  University of Illinois Board of Trustees (BOT) meeting agenda. However, we have been given guidance that the

  proposed timeline would not allow a January Board meeting and therefore are now targeting the March 2023 BOT.

  As a result, we are requesting an emergency to continue to utilize this consulting partner in order not to create a gap

  in services and to avoid causing delays in critical project start dates.

 

  CSI will continue to provide consulting services on several important Epic optimization initiatives.

 

  This Emergency Purchase has an expected start date of 01/09/2023 through 04/08/2023 with an Original Estimated

  Cost of $180,000.00.

   Signed By:  Debra Matlock, Exec Dir

       Vendor:  CSI                                                                                               Notary Date: 11/17/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $180,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  28     University of Illinois Chicago                                                                     File Date:  11/17/2022

  Original Filing – 11/17/2022: FY23, Qtr 2, Item# 28

 

  The existing Epic implementation consulting partner contracts that emanated from KRS125 are expiring in January

  2023. These existing partners are currently engaged in several important Epic optimization initiatives. We expect

  new Epic module implementations to start in January. A new RFP has been drafted and issued (EWM168) and

  vendor responses are currently being evaluated. We had hoped that the RFP award would be on the January 2023

  University of Illinois Board of Trustees (BOT) meeting agenda. However, we have been given guidance that the

  proposed timeline would not allow a January Board meeting and therefore are now targeting the March 2023 BOT.

  As a result, we are requesting an emergency to continue to utilize this consulting partner in order not to create a gap

  in services and to avoid causing delays in critical project start dates.

 

  Ettain Group will continue to provide consulting services on several important Epic optimization initiatives.

 

  This Emergency Purchase has an expected start date of 01/11/2023 through 04/10/2023 with an Original Estimated

  Cost of $180,000.00.

   Signed By:  Debra Matlock, Exec Dir

       Vendor:  Leidos Health dba Ettain Group                                                   Notary Date: 11/17/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $180,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  29     University of Illinois Chicago                                                                     File Date:  11/17/2022

  Original Filing – 11/17/2022: FY23, Qtr 2, Item# 29

 

  The existing Epic implementation consulting partner contracts that emanated from KRS125 are expiring in January

  2023. These existing partners are currently engaged in several important Epic optimization initiatives. We expect

  new Epic module implementations to start in January. A new RFP has been drafted and issued (EWM168) and

  vendor responses are currently being evaluated. We had hoped that the RFP award would be on the January 2023

  University of Illinois Board of Trustees (BOT) meeting agenda. However, we have been given guidance that the

  proposed timeline would not allow a January Board meeting and therefore are now targeting the March 2023 BOT.

  As a result, we are requesting an emergency to continue to utilize this consulting partner in order not to create a gap

  in services and to avoid causing delays in critical project start dates.

 

  Nordic will continue to provide consulting services on several important Epic optimization initiatives.

 

  This Emergency Purchase has an expected start date of 01/09/2023 through 04/08/2023 with an Original Estimated

  Cost of $180,000.00.

   Signed By:  Debra Matlock, Exec Dir

       Vendor:  Nordic Consulting Partners                                                           Notary Date: 11/17/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $180,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  30     Capital Development Board                                                                        File Date:  11/21/2022

  Original Filing – 11/21/2022: FY23, Qtr 2, Item# 30

 

  The scope of work provides for construction services to support the removal and replacement of approximately

  1,450 square feet of low-slope roofing membrane and insulation on the perimeter roof below the building's main

  standing seam roof. Included in the work will be replacing all metal cap and counter flashing and replacing all

  necessary roof accessories. Four additional drain heads will need to

  be added.

  Incorporated documents include the March 2009 Standard Documents for Construction & Supplement, design

  documents provided by the Architect/Engineer of record and quote received by Sterling Commercial Roofing, Inc..

  Services provided under this procurement should not exceed $69,650.00 prior to entering into a Construction

  Contract, without prior authorization from the Capital DevelopmentBoard in consultation with the Chief

  Procurement Office. Final Actual Costs will be reported upon project completion and project closeout.

  In accordance with 30 ILCS 500/50-35, all contractors, and each subcontractor to be used whose

  contract/subcontract exceeds an annual value of $50,000, shall submit financial disclosures and certifications as a

  material term of the contract. In accordance with section 00 21 50 of the Standard Documents for Construction, the

  General Contractor shall perform no less than 20% of work with its

  own staff. Each other trade shall perform no less than 40% of work with its own staff. Work with own staff

  includes direct labor and supervision, as well as material purchases where the material is installed by the contractor.

 

 

  This Emergency Purchase has an expected start date of 11/21/2022 through 02/18/2023 with an Original Estimated

  Cost of $69,650.00.

   Signed By:  Chris Miles, Exec II

       Vendor:  Sterling Commercial Roofing, Inc.                                               Notary Date: 11/21/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:          $69,650.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  31     Central Management Services, Department of                                          File Date:  11/17/2022

  Original Filing – 11/17/2022: FY23, Qtr 2, Item# 31

 

  The Illinois Office of Communication and Information (IOCI) is statutorily mandated by 20 ILCS 405/405-270 to

  provide for and coordinate broadcast communications services for State agencies and, when requested and when in

  the best interests of the State, for units of federal or local governments and public and not-for-profit institutions of

  primary, secondary, and higher education.

 

 

 

IOCI originally sought to procure the services of a vendor to replace the satellite controller which instructs the

  satellite antenna motor to move the dish that is located on the roof of the 120 W. Jefferson St., Springfield, IL

  62702.  The current controller is 30 years old and had stopped working, although the dish was still able to send and

  receive transmissions.  IOCI and CMS Bureau of Strategic Sourcing (BOSS) attempted to procure the controller

  equipment via multiple requests for quotes (small purchases) with no success.  On or about September 22, 2021,

  the dish was struck by lightning and is now unable to receive on the horizontal downlink.  Because it is not possible

  to move the dish, it is now not possible to receive any signals.

 

 

 

In order to meet statutory requirements, it has been determined that replacement of the entire system is in the

  best interest of the State.  Based on the lack of success in replacing the satellite controller, IOCI contacted the

  vendor who installed the current satellite transmission equipment in the early 1990s to request a quote.  The vendor

  was able to access their records and has a good understanding of the location of the equipment and what is needed to

   meet the State's needs and the vendor was willing to provide a quote for the new equipment.

 

 

The BEP goals calculated at 0% as there are no BEP vendors certified under NIGP Codes:

          726-54

  Ground Stations, Satellite: Transmit/Receive and Receive Only (Including Antennas)

 

  840-20 Broadcast Equipment, Television

  840-45 Satellite Receiver Dish (Video)

 

 

 

Due to the recently recognized requirement of a crane being needed to remove the original satellite as well as

  installing the new satellite once the construction has been completed and the previous Emergency contract extension

   was not executed, we are doing a new Emergency which includes the estimated cost of the crane.  It is estimated as

  we are unsure how many days it will actually be needed. The cost of the satellite itself will be paid under the old

  Emergency P-41130 and cost of the removal, installation and crane will be covered under this new Emergency.

 

  This Emergency Purchase has an expected start date of 11/16/2022 through 02/14/2023 with an Original Estimated

  Cost of $144,766.00.

   Signed By:  Martha Blackwell, Manager

       Vendor:  Comm & Power Industries LLC Satcom & antenna Tech Div      Notary Date: 11/17/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $144,766.00                                                   $0.00                      $0.00       23      2


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  32     Innovation & Technology, Department of                                                 File Date:  11/23/2022

  Original Filing – 11/23/2022: FY23, Qtr 2, Item# 32

 

  The state sold the JRTC to Google, which means DoIT has to remove/relocate the state owned fiber network from

  the basement of the JRTC.  Complicating matters and compressing the timeline for this move, the city of Chicago

  issued an unexpected temporary moratorium on cutting LaSalle and Lake Streets beginning 12/1/22.  DoIT must

  have the conduit along these streets relocated/replaced by the end of November, which is Phase 1 of the JRTC fiber

  relocate project.  Once the conduit has been moved/relocated, Phase 2 will begin to finish the installation. Phase 2

  includes: remainder of LaSalle Street fiber, hand-hole, conduit placement, the inside plant work at City hall - splice

  work, conduit, fiber install, fiber termination (repeat for MABB).  DoIT and Meade are at the mercy of several local

   permitting entities before work can be done in downtown Chicago, this further delayed the ability of DoIT and

  Meade to get the emergency relocation started earlier.

 

 

 

The existing contract CIC3648240 with Meade expires 11/27/22 with no renewals.  DoIT submitted an

  amendment on 11/4/2022 to add $850,000 of funds to finish phase 1 of the fiber move on BidBuy B-33097.  Due to

   receiving amendment approval with only one business day remaining before contract expiration, some funds from

  the amendment have also been included in this emergency to ensure contract coverage and a funding source to finish

  phase 1 of the fiber move before the moratorium begins 12/1 and allow the state to vacate the JRTC per the sales

  agreement.  Failure to finish phase 1 may result in significant delays and pose a risk to the fiber network which is a

  critical state asset.  The JRTC fiber provides one of two physical paths to the Chicago POP which serves all

  Chicago and collar county government and education sites, Equinix which processes ~50% of all traffic leaving the

  network, and network services for the City of Chicago and Cook County.  Loss of the JRTC fiber creates a

  vulnerability that will almost certainly result in a widespread outage that would likely take days to restore. 

 

  In addition to the emergency fiber move detailed above, Meade also covers our owned fiber network statewide.  If

  we do not have a fiber maintenance vendor on contract we risk prolonged network outages every time our fiber is

  damaged by having to negotiate a new emergency contract for the fiber repair each time it is damaged.

 

 

 

DoIT is in process of completing a request for a 12-month sole source contract to cover Meade's services until a

  new RFP can be issued and awarded.  DoIT anticipates sending the sole source for review and approval within one

  to two weeks.  The new RFP is currently being drafted and is being done on R-125058.

 

 

  This Emergency Purchase has an expected start date of 11/22/2022 through 02/19/2023 with an Original Estimated

  Cost of $1,050,000.00.

   Signed By:  Van P Austin, APO

       Vendor:  Meade, Inc.                                                                                  Notary Date: 11/23/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:     $1,050,000.00                                                   $0.00                      $0.00       23      2


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

    Federal Cost:                  $0.00                                                                                  $0.00

  33     Human Services, Department of                                                                 File Date:  11/23/2022

  Original Filing – 11/23/2022: FY23, Qtr 2, Item# 33

 

  Only 2 vendors were identified as offering guard services for mental health facility residents outside of the facility

  and the master contract for Guard Service will not provide one on one physical monitoring in a hospital setting.

 

  The second vendor who had been hired previously will no longer provide services outside of Chicago - The patient

  is being moved to DesPlaines - a Northwestern suburb of Chicago approximately 30 miles from Elgin MHC.

 

  TriStone was the only vendor available to provide security for mental health patients at offsite locations.

 

  Emergency Procurement of "Sitter Services" for One on One (or Two on One) physical 24/7 monitoring of Elgin

  Mental Health Center psychiatric patients in a hospital setting in Chicagoland and Northwest Suburban Hospitals.

  Cost and Terms are estimated.

 

  A inquiry as to TriStone's participation was sent via email on 11/23/2022. To date, vendor has not responded.

  Vendor needed to begin services immediately due to the resident's poor physical condition and need for medical

  assistance.

An analysis of available BEP vendors was performed; no vendors were identified as offering offsite

  security to residents of mental health facilities.

IDHS will continue to encourage the vendor to seek out and utilize

  BEP vendors where they can.

 

  This Emergency Purchase has an expected start date of 11/23/2022 through 02/20/2023 with an Original Estimated

  Cost of $135,000.00.

   Signed By:  Jean Sandstrom, APO

       Vendor:  TriStone Security                                                                          Notary Date: 11/23/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $135,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  34     Chicago State University                                                                           File Date:  11/29/2022

  Original Filing – 11/29/2022: FY23, Qtr 2, Item# 34

 

  Chicago State University (CSU) made necessary personnel adjustments within the Information Technology

  Department  (ITD) on campus at the end of August 2022 that required immediate engagement with an outside

  vendor for interim leadership and project management under Emergency Purchase CSU090122.  EC-United has

  provided CSU with personnel and managed projects for CSU during the emergency purchase term utilizing both

  CSU ITD personnel, EC-United personnel, and has contracted with outside vendors as subcontractors as necessary

  to provide necessary services to campus. 

 

  The emergency need has not abated.  Much of the initial emergency term has been utilized addressing immediate,

  emergency needs while reviewing exactly what technology is in place on campus, what is operational, and what

  requires attention.  A competitive solicitation alone cannot address the ongoing need for personnel, and search

  processes are just beginning to identify qualified candidates to lead CSU's ITD team in a more permanent fashion. 

  The University will engage with this vendor for a new three month emergency term so the vendor can continue

  managing projects and CSU personnel until the internal team stabilizes. 

 

  This Emergency Purchase has an expected start date of 11/30/2022 through 02/28/2023 with an Original Estimated

  Cost of $1,184,848.00.

   Signed By:  Kent M. Clapsaddle, Dir Procurement Services

       Vendor:  Exec Consultants United LLC dba EC-United                              Notary Date: 11/29/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:     $1,184,848.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  35     Innovation & Technology, Department of                                                 File Date:  11/30/2022

  Original Filing – 11/30/2022: FY23, Qtr 2, Item# 35

 

  The Department currently has a Sole Source contract with AT&T Corp until 12/09/22.  AT&T has developed a

  significant infrastructure of services provided to the state and other agencies.  The Department currently has these

  services with AT&T at a reduced cost.  At this time, AT&T is the only known vendor that can provide this wide

  array of services statewide without significant down time.    Due to significant delays processing a new SEFS

  procurement to replace the expiring contract, the Department is forced to pivot and request an emergency to ensure

  uninterrupted services continue for thousands of state employees, offices, and schools around the state.  This

  contract provides roughly 90% of the state network connectivity and is vital to daily operations for hundreds of

  agencies and schools.  The Department currently has a RFP on the street for a new 10 year contract for these

  services which closes 12/15.  We will not be able to award this contract in time, nor is there sufficient time for any

  potential transition to a new provider.  This emergency contract will be a JPMC available for use by all state

  agencies, other governmental entities, and not-for-profits.

 

  The Department requires services which fulfill the State’s private telecommunications network voice and data

  services required to perform our critical mission.  The scope of services covered is wide-ranging services (Transport

  services, Private Fiber, Internet  Egress, Local Voice, Long Distance, Conferencing and Other Services) which will

  enable governmental units and qualified not-for-profit agencies to purchase telecommunications services, some

  directly from the resulting contract and some through the DoIT, as to be specified in the resulting contract.

 

  This Emergency Purchase has an expected start date of 12/10/2022 through 03/09/2023 with an Original Estimated

  Cost of $3,000,000.00.

   Signed By:  Van P Austin, APO

       Vendor:  AT&T Corp                                                                                  Notary Date: 11/30/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:     $3,000,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  36     Innovation & Technology, Department of                                                 File Date:  12/2/2022

  Original Filing – 12/02/2022: FY23, Qtr 2, Item# 36

 

  The existing contract expires 12/2/22 and there are no renewals. The vendor is currently reviewing the DoIT

  provided draft contract that is being done on bid buy # B-30910. The vendor has indicated their review will not be

  completed before expiration of the current contract.

 

 

 

The Illinois Department of Innovation and Technology currently has a contract with Fujitsu CIT0144170 for :

  Equipment, Maintenance, services, training and materials/services needed for implementation, installation, or

  support of the Fujitsu Network. The existing contract ends December 2, 2022. Over the life of existing (expiring)

  and past contracts with Fujitsu,  the state has purchased approximately $20 million in equipment, maintenance,  and

   services. To switch to another vendor at this point would mean the state would have to spend an estimated $10-12

  million on new equipment. That figure does not include the cost of engineering and other labor costs involved in

  implementing a new network from the ground up. Engineering, other staff labor, and training costs for state staff

  implementing a new network could add another $2M to the cost of switching vendors. The ICN must maintain a

  fiber lab and staff has been through extensive training and has spent thousands of labor hours implementing the

  existing network that runs on Fujitsu DWDM equipment. Staying with Fujitsu will allow for maintenance on the

  existing equipment as well as end of life and damaged equipment replacement. The existing Fujitsu equipment

  owned by the state and not yet depreciated will be unusable and would have to be shelved. Migrating the network

  to a new vendor would take at least 18-24 months and during that time the sole priority would be the network

  migration to the new vendor. The state has used Fujitsu gear to implement a large portion of the Connect Illinois/K-

  12 initiative since the start of the 2019/2020 school year.  This is the primary contractual mechanism used to

  provide K-12 schools with equipment, support and maintenance in conjunction with the Connect Illinois initiative

  as well as supporting the needs of the DoIT ICN fiber backbone. 

 

  This contract will allow for the continued purchasing of:  Fujitsu DWDM equipment such as optical shelves,

  LAMDA access modules, Dispersion Compensation Modules (DCM),  light amplification modules, transponders,

  optical cards, services, training/mentoring, and maintenance. The state has used Fujitsu gear to implement a large

  portion of the Connect Illinois/K-12 initiative since the start of the 2019/2020 school year.  This is the primary

  contractual mechanism used to provide K-12 schools with equipment, support and maintenance in conjunction with

   the Connect Illinois initiative as well as supporting the needs of the DoIT ICN fiber backbone.

 

  This Emergency Purchase has an expected start date of 12/03/2022 through 03/02/2023 with an Original Estimated

  Cost of $100,000.00.

   Signed By:  Van P Austin, APO

       Vendor:  Fujitsu Network Comm, Inc.                                                        Notary Date:   12/2/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:     $1,000,000.00                                                   $0.00                      $0.00       23      2


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  37     University of Illinois Chicago                                                                     File Date:  12/7/2022

  Original Filing – 12/07/2022: FY23, Qtr 2, Item# 37

 

  Due to increased violence and attacks in public areas, including hospitals and schools, it has become necessary to

  have additional safeguards to protect patients, visitors, and staff. The Evolv weapons detection system will be

  installed at 12 access points within the five UI Health buildings.   The Evolv system, purchased from Apex3,  is a

  next-generation intelligent security system that combines sensor technology with artificial intelligence to produce

  more accurate threat detection. The Evolv system has high output scanning ability, up to 3,600 people per hour.

  This speed will allow seamless entry into our facility without causing delays. The system scans for weapons and

  will not set off an alarm with non-threatening items such as keys, wallet, and belts. The system distinguishes

  between non-threatening items and weapons, such as guns/gun components, and possible explosive items with real-

  time tracking software and tablets showing the weapon's location on the person. It will notify security of the

  weapon placement on the person, in bags and backpacks. The sensors immediately alert security supervisors if a

  weapon is found or an alert is triggered. The COVID-19 pandemic has made the touchless feature of scanning

  visitors an added benefit in spaces where social distancing is required. If a purchase order is approved by December

  31, 2022, the University will save $521,744 by avoiding price increases that go into effect on January 1, 2023.

 

  he vendor will provide services via a four-year lease for a total cost of $1,274,322. This includes the installation of

  Dual Lane Evolv Express systems and Single Lane Evolv Express systems, programming and configuration of Evolv

  Express systems with appropriate software and services, wireless tablets with floor stands for use with Dual Lane

  and Single Lane Evolv systems, performance measuring and test analytics with Operational Test Kit (OTK), and

  training for client on how to use the system and assist with process/procedure adjustments. This quick purchase

  includes:

 

  Qty: 3 Evolv Express Dual Lane | Indoor | Wireless | Hardware-Lease

Qty: 3 Evolv Express Dual Lane | Indoor |

  Software & Services

Qty: 6 Indoor/Outdoor 10" Tablet w/ Floor Stand

Qty: 6 Indoor/Outdoor 10" Tablet w/

  Desk Stand

Qty: 9 Evolv Express Single Lane #1 | Indoor | Wireless | Hardware-Lease

Qty: 9 Evolv Express

  Single Lane #1 | Indoor | Software & Services

Qty: 9 Indoor/Outdoor 10" Tablet w/ Floor Stand

Qty: 9

  Indoor/Outdoor 10" Tablet w/ Desk StandQty: 2 Evolv Express Single Lane #2 | Indoor | Wireless | Hardware-Lease

 

Qty: 2 Evolv Express Single Lane #2 | Indoor | Software & Services

Qty: 2 Indoor/Outdoor 10" Tablet w/ Floor

  Stand

Qty: 2 Indoor/Outdoor 10" Tablet w/ Desk Stand (INCLUDED) Express Wireless Indoor/Outdoor 10"

  Tablet on Desk Stand (DTR)

Qty: 5 Outdoor Battery Charger, Ganged (6)

Qty: 4 Express Operational Test Kit

  (OTK)

Qty: 1 Shipping: $6,000.00

Qty: 1 Install & Training of equipment

 

  ****Funding is received thru Hospital Self-Supporting (Institutional) Funds

 

  This Emergency Purchase has an expected start date of 12/07/2023 through 03/06/2023 with an Original Estimated

  Cost of $1,274,322.00.

   Signed By:  Debra Matlock, Exec Dir

       Vendor:  Apex3 Systems                                                                             Notary Date:   12/7/2022


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:     $1,274,322.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00

  38     Commerce and Economic Opportunity, Department of                            File Date:  12/9/2022

  Original Filing – 12/09/2022: FY23, Qtr 2, Item# 38

 

  The Vendor was awarded a contract (22-420DCEO-STRTC-P-32126) after a competitive solicitation.  However,

  the Vendor failed to meet the BEP goal during the initial term of the contract in order to be eligible for renewal. The

  Vendor is being retained on an emergency basis until another competitive solicitation can be processed.

 

  A statewide call center to supplement in-person client intake and to provide an alternative mode for low-income

  clients to request services for the Low-Income Home Energy Assistance Program (LIHEAP) and Community

  Services Block Grant (CSBG) program through its Help Illinois Families call center announced by the Governor in

  June 2020 during the height of the global pandemic. There will continue to be a critical and increased need to safely

  provide utility bill assistance and other essential services in the future. Affording clients the option to start the pre-

  application process for LIHEAP and CSBG remotely and with the assistance of a live call center agent will increase

  accessibility, outreach and capacity to broadly serve many more eligible households efficiently and effectively in the

   long-term.  Implementing a statewide call center to support Help Illinois Families will extend much-needed support

   to OCA grantees and local intake sites in handling the peak demand periods for LIHEAP and CSBG services. This

  should prospectively minimize the delay of application review as best practices are developed and assimilated to

  the ongoing circumstances in the best interest of prioritizing and serving the vulnerable populations in Illinois.

 

  ****Funding is received thru Federal & State Funds

 

  This Emergency Purchase has an expected start date of 12/08/2022 through 03/07/2023 with an Original Estimated

  Cost of $400,000.00.

   Signed By:  Candyce Thompson, APO

       Vendor:  FH Cann & Assoc.                                                                       Notary Date:   12/9/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $400,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  39     Central Management Services, Department of                                          File Date:  12/9/2022

  Original Filing – 12/09/2022: FY23, Qtr 2, Item# 39

 

  The power failed at the Suburban North Building located at 9511 Harrison St. in Des Plaines, Illinois.  JPMC

  Vendor Fairfield was called in to diagnose the problem and they can do part of the repair work but they cannot

  perform the majority of the complex repair work and will work with Prime Electric to restore the power as Prime

  Electric has the experience required to do the more complex work required.

 

  1. Provide (350'x3) 1050' 4/0 al JCN neutral conductor. 2. Provide/install (3) 4/0 15KV Conventional Terminations

  with lugs and bolts torqued into place and cable shielding connected to system ground. 3. Provide/install (3) 4/0

  15KV Loadbreak Elbow 4. High Potentially Test Cables with Quantitative Analysis Report. 5. Labor based on

  normal double time 6. Freight for shipping cables red eye due to time limitations.

 

  This Emergency Purchase has an expected start date of 12/09/2022 through 03/09/2023 with an Original Estimated

  Cost of $175,000.00.

   Signed By:  Martha Blackwell, FPM

       Vendor:  Prime Elec Co.                                                                              Notary Date:   12/9/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $175,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  40     Innovation & Technology, Department of                                                 File Date:  12/13/2022

  Original Filing – 12/13/2022: FY23, Qtr 2, Item# 40

 

  Alert IT Solutions, Inc. (AlertIT) is  a  CMS registered BEP registered reseller for Rocket Software. The Rocket

  products in use by DoIT provide application access to the agency' mainframe. The system is a Web based GUI

  front end to the IMS Mainframe based KIDS system. GUI is Graphical User Interface and IMS is a mainframe

  database and transaction system in which applications for mainframe are written.

 

 

 

Lack of maintenance would eventually cause the interfaces to the KIDS application to become unstable and

  unreliable, resulting in reduced efficiency and increased costs of using KIDS and possibly system failure. This could

  result in the Agency's failure to meet program objectives, federal and state mandates.

 

 

 

KIDS or Key Information Delivery System is used by Child Support Enforcement. The information it is

  providing directly impacts child welfare in the state of Illinois.

 

 

 

The Key Information Delivery System (KIDS) notifies the Division of Child Support Enforcement (DCSE) of

  all:

Approvals; Suspensions; Resumptions; Cancellations; Sanctions; Reinstatements; Additions and deletions of a

  dependent child to the cash or medical assistance unit; Inter-Office transfers of cases; Changes in program eligibility;

   Changes in the basis of a child's eligibility; Account information; and all known information relating to the

  noncustodial parent.

 

 

The Rocket products in use by DoIT provide application access to the agency' mainframe reporting software,

  which processes thousands of reports from the mainframe on a monthly basis and is critical to the State of Illinois

  for daily processing and business needs.

 

  These products are currently licensed and used by agencies hosted and supported on the State of Illinois IT

  infrastructure. It is a standard business practice at DoIT to maintain software support/maintenance on all mainframe

   products.

 

 

This Emergency is for maintenance on:

VNZ - Mobius®-Windows,VNB - Mobius®-Windows - Packet

  Production,VNN - Mobius®-Windows - Network Server Access,VNL -

Mobius®-Windows - Advanced Laser

  Printing,DRZ - ASG-DocumentDirect®,DRN - ASG-DocumentDirect® - Network Server

Access,DRA - ASG-

  DocumentDirect® - AFP,DRD - ASG-DocumentDirect® - DJDE/Metacode,DXZ - ASG-DocumentDirect®

  Application

Suite,DXN - ASG-DocumentDirect® Application Suite - Network Server Access,DXA - ASG-

  DocumentDirect® Application Suite -

AFP,DNA - ASG-DocumentDirect® for the Internet-NT - AFP,DRM - ASG-

  DocumentDirect® - z/OS Server Access,DRA -

ASGDocumentDirect -®AFP,DRD - ASG-DocumentDirect® -

  DJDE/Metacode - TCE - ASG-TMON® for CICS TS for z/OS - DNZ - ASG-DocumentDirect® for the Internet-

  NT,DNM - ASG-DocumentDirect® for the Internet-NT - z/OS Server Access,DND - ASG-DocumentDirect® for

  the Internet-NT - DJDE/Metacode,VZZ - Mobius®-z/OS,VZB - Mobius®-z/OS - Packet Production,VZC -

  Mobius®-z/OS - CICS Server,VZU - Mobius®-z/OS -VTAM Server,VZL - Mobius®-z/OS - Advanced Laser

  Printing,VZR - Mobius®-z/OS - Remote Job - Output,VZM - Mobius®-z/OS - Microfiche,VZT - Mobius®-z/OS

  - Tape ViewDirect,VZN - Mobius®-z/OS -IBM-OAM,VZO - Mobius®-z/OS - FileTek Optical ViewDirect,VZK

  - Mobius®-z/OS - Kodak Optical ASG-DocumentDirect® for the Internet-NT - ViewDirect API for JAVA (DNJ)

  - LS 3270 GUI Developer WinJa Maintenance - LS 3270 GUI Server WinJa Maintenance - LS Client Access

  License 3270/VT WinJa Maintenance - Rocket MX (Desktop Edition) Engine For 3270 Maintenance - Rocket MX

  (Desktop Edition) Builder For 3270 Maintenance - Rocket Modern Experience Reinstatement Fee.

 

 

Rocket Software is the manufacturer for DoIT's Mainframe reporting software - Mobius/Document Direct. 


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  Rocket also provides CICS TS for Z/OS and ViewDirect API which works in conjunction with the reporting tool.

  Mobius processes thousands of reports from the mainframe on a monthly basis and is critical to the SOI for daily

  processing and business needs.

 

 

The Contract ended on 6/30/2022. The vendor is not giving a prorated cost to the agency, so a pricing for the full

   year has been negotiated from $979,892.40 to $903,756.66 for a total cost savings to the SOI of $76,135.74.  DoIT

  has an IFB in process to replace this Emergency. Once the IFB has been executed the emergency contract will no

  longer be needed.

 

  This Emergency Purchase has an expected start date of 12/12/2022 through 03/11/2023 with an Original Estimated

  Cost of $903,756.66.

   Signed By:  Van P Austin, APO

       Vendor:  Alert IT Solutions Inc.                                                                  Notary Date: 12/13/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $903,756.66                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  41     Central Management Services, Department of                                          File Date:  12/8/2022

  Original Filing – 12/08/2022: FY23, Qtr 2, Item# 41

 

  This Vendor's role of construction was outlined in the original Emergency Purchase Statement on B-28680, declared

  when ordering the Satellite and Engineering services; however, was not actually named in the Emergency Statement. 

 

1) The specifications for the new satellite had to be built out which took several months.  We did not receive these

   specs until 3/28/22.

2) Then we had to have the Engineering firm use those specifications to do the engineering

  work of what was needed to reinforce the roof of the building to hold the new satellite.  The solicitation was done

  but the contract was not executed until 6/9/22 due to terms and conditions. The engineering work was not completed

   until 08/2022.

3) The estimate received for the construction services dated 9/23/22 was in the amount of $193,000

  and could not be done as a Small Purchase as originally intended.

4) Personnel resource changes prevented the

  forward movement of the original emergency project.

5) Due to the time constraints of the crane being scheduled

  with the original satellite Vendor, for removal of the old satellite and the timing of opening the roof for the upgrades,

   we need to do this as an emergency. 

 

 

  1) Remove and reinstall drop ceilings in work area on upper floor

 

2) Remove fireproofing on existing beams where new steel members will be instald

   

3) Install new fireproofing at locations disturbed by our scope of wor

   

4) Remove portions of existing ballast roof to install new steel meber

   

5) Patch ballast roof at complete of steel wor

  .

6) Remove existing roof frame in preparation for new satellite structe

  .

7) Install new galvanized steel frame for new satellite structure.

 

  This Emergency Purchase has an expected start date of 12/08/2022 through 03/08/2023 with an Original Estimated

  Cost of $193,000.00.

   Signed By:  Martha Blackwell, FPM

       Vendor:  R.D. Lawrence                                                                             Notary Date:   12/8/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $193,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  42     Auditor General, Office of the                                                                    File Date:  9/2/2022

  Original Filing – 9/2/2022: FY23, Qtr 2, Item# 42

 

  The conditions and circumstances requiring this emergency purchase, including reasons for selection of the particular

   contractor and a description of what the contractor will do or provide, are:

  A fair and reasonable price was negotiated with KEB, who has experience with the Auditor General's program and

  and has sufficient staff and experience to perform the engagement and begin work within the necessary timeframe to

  avoid serious disruption in OAG audit/examination services.

 

  This Emergency Purchase has an expected start date of 09/15/2022 through 02/10/2023 with an Original Estimated

  Cost of $132,000.00.

   Signed By:  Jane Clark, Director

       Vendor:  Kerber, Eck & Braeckel, LLP                                                       Notary Date:   9/15/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $132,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  43     Auditor General, Office of the                                                                    File Date:  12/21/2022

  Original Filing – 12/21/2022: FY23, Qtr 2, Item# 43

 

  The conditions and circumstances requiring this emergency purchase, including reasons for selection of the particular

   contractor and a description of what the contractor will do or provide, arc:

  A fair and reasonable prices was negotiated with Adelfia LLP, who has experience with the Auditor General's

  program and has sufficient staff and experience to perform the engagement and begin work with the necessary

  timeframe to avoid serious disruption in OAG examination services.

 

  This Emergency Purchase has an expected start date of 03/01/23 through 06/30/24 with an Original Estimated Cost

  of $108,000.00.

   Signed By:  Jane Clark, Director

       Vendor:  Adelfia, LLC                                                                                Notary Date: 12/21/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $108,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


 

 

 

 

 

 

Updates

To

Previously Filed

Emergency Purchases

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  44     Transportation, Department of                                                                  File Date:

 

  Latest Filing - 10/17/2022:  FY23. Qtr 2, Item# 44

  An Actual Total Cost of $39,308.00 was reported in the same filing quarter.

 

  Original Filing – 9/28/2022: FY23, Qtr 2, Item# 44

 

  Brown Electric was the original installer of the lights on this bridge thus most familiar with the current

  configuration. They were also available to immediately respond.

 

  On Sept 19th the Coast Guard notified IDOT that all lights were out on the bridge that carries I-57 over the

  Mississippi River. After reviewing all of the normal issues we could not identify the problem. Brown Electric was

  able to assess the issue and will be providing the parts and labor to repair the navigational lights. This will include

  reinstalling conduit that has come loose due to vibration that wore mounting hole of the strap causing failure.

 

  This Emergency Purchase has an expected start date of 09/27/2022 through 12/25/2022 with an Original Estimated

  Cost of $40,000.00.

   Signed By:  Rob Graeff, OE

       Vendor:  Brown Electric, Inc.                                                                      Notary Date:   9/28/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:          $40,000.00                                          $39,308.00             $39,308.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  45     University of Illinois Chicago                                                                     File Date:

 

  Latest Filing - 10/27/2022:  FY23, Qtr 2, Item #45

  An Actual Total Cost of $230,682.40 was reported in the same filing quarter.

 

 

  Original Filing – 10/4/2022: FY23, Qtr 2, Item# 8

 

  UI Health opened the outpatient Specialty Care Building (SCB) on 9/26/2022 and has started surgeries.  We need

  the Xenex LightStrikes onsite to ensure that adequate enhanced disinfection protocols can be met for patient and

  staff safety. The services are needed to maintain the same level of care and disinfection that is taking place in the

  hospital.

 

 

With manual liquid cleaning alone, harmful pathogens remain on surfaces even with the best liquid chemical

  disinfection.   Over 40% of high-touch surfaces in patient rooms are not disinfected by manual cleaning. UI health

  started outpatient surgeries at SCB on 9/27/22, and we are increasing the risk of germs being transmitted from

  surfaces to hospital staff to patients by not having the enhanced disinfection protocols on site.  By utilizing Xenex

  LightStrike Robots as a standard of care, there is an enhanced level of safety for hospital staff and patients.

 

Xenex LightStrike Robots are patented Pulsed Xenon Ultraviolet (UV) devices and are the only UV product with

  over 40 peer reviewed published studies showing efficacy.  Other UV devices utilize a mercury bulb that has been

  proven to cause materials damage, such as damage to Operating Room (OR) lights where these will be primarily

  used. as well as not proving to have a statistically significant effect on disinfection.

 

 

The hospital currently has 8 Xenex systems that were purchased in 2020.  Additional Xenex units are preferable

   for compatibility and ease of use of Environmental Services (EVS) people who operate these machines.

  Xenex robots are ultraviolet light disinfection systems that will be used to kill all kinds of pathogens in the SCB

  operating rooms.

 

  This Emergency Purchase has an expected start date of 09/28/2022 through 12/27/2022 with an Original Estimated

  Cost of $230,000.00

   Signed By:  Debra Matlock, Exec Director

       Vendor:  Xenex Disinfection Services inc.                                                  Notary Date:   10/4/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $230,000.00                                        $230,682.40           $230,682.40       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  46     University of Illinois Chicago                                                                     File Date:

 

  Latest Filing - 12/06/2022: FY23, Qtr 2, Item #46

  An Actual Total Cost of $196,756.63 was reported in the same filing quarter.

 

 

  Original Filing – 10/8/2022: FY23, Qtr 2, Item# 11

 

  Using Institutional Funds.

 

  Duce Construction Company was chosen from a pool of prequalified, currently well performing Division 01

  contractors which provided the lowest responsible price in their proposal for the corrective work.  Duce

  Construction Company is familiar with the required work, site constraints, and time constraints for the work.

 

  The eastern section of the Student Services Arcade Building (Arcade) is on a crawlspace with shallow foundations

  that have been undermined.   There is a risk of foundation failure if the underlying soils are compromised, especially

  during the planned demolition of the adjacent Illini Hall.   The Contractor shall perform traditional underpinning by

  progressive excavation of small sections then filled in by cast-in-place concrete for the southern exterior strip

  footings.  The northern strip footing shall be repaired by installing/restoring the interior concrete berm along the

  strip footing using shotcrete or cast-in-place concrete.  Six interior spread footings will add supplemental supports

  extended to adjacent competent grade. 

 

  This Emergency Purchase has an expected start date of 10/7/2022 through 12/30/2022 with an Original Estimated

  Cost of $173,500.00, using Institutional Funds, Auxiliary Facility System Repair and Replacement Reserve Funds.

   Signed By:  Paul Ellinger, VP

       Vendor:  Duce Construction Co.                                                                 Notary Date:   10/8/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $173,500.00                                        $196,756.63           $196,756.63       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  47     University of Illinois Chicago                                                                     File Date:

 

  Latest Filing - 11/29/2022:  FY23, Qtr 2, Item# 47

  An Actual Total Cost of $122,893.40 was reported in the same filing quarter.

 

  Original Filing – 10/7/2022: FY23, Qtr 2, Item# 18

 

  GE is the manufacturer and the only service provider of the MRI Equipment, that became non-functional because of

   magnetic nitrous tank was brought to the MRI room and damaged the equipment.

 

  Service is needed from GE, to make the MRI equipment operable. The magnetic nitrous oxide tank was accidentally

  brought into the magnet room on anesthesia equipment. During patient set up, the tank dislodged from the

  anesthesia cart, created a missile effect and ricocheted into the magnet bore. Extensive damage to the MRI

  equipment. MRI needs to be ramped down to remove the tank safely. Current estimated downtime is three to four

  days for repair. 

 

  The service contract with GE doesn't cover damage to the equipment because this was an accident by the hospital

  and is not covered under the contract.

 

  This Emergency Purchase has an expected start date of 10/7/2022 through 01/05/2023 with an Original Estimated

  Cost of $121,248.40

   Signed By:  Debra Matlock, Exec Director

       Vendor:  GE Precision Healthcare                                                               Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $121,248.40                                        $122,893.40           $122,893.40       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  48     Veterans Affairs, Department of                                                                File Date:  9/28/2022

  Final Filing - 9/28/2022

  Latest Filing – 07/15/2022: FY23, Qtr 2, Item #48

  The Actual Total Cost of FY23, Qtr 2, Item# 48  is $3,072,158.57, with a final contract term ending 9/28/2022.

 

  Second Filing - 12/03/2021:

  An Emergency Purchase Extension was received on December 3, 2021 requesting an extension for dates starting

  1/1/2022 to 12/31/2022 at an additional estimated cost of $2,863,060.00, revising the total estimated cost to

  $3,338,060.00.

 

  Original Filing - 12/15/2020:

  Provide three balanced meals daily to the veteran residents of the Manteno Veterans Home. This Emergency

  Purchase has an expected start date of 11/17/2020 through 02/14/2021 with an Original Estimated Cost of

  $475,000.00.

   Signed By:  Elbert Henderson, Executive II

       Vendor:  Arena Food Services                                                                    Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $475,000.00        $3,338,060.00      $3,072,158.57        $3,072,158.57       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  49     Capital Development Board                                                                        File Date:  11/10/2022

 

  Extension & Final Cost – 11/10/2022  FY23, Qtr 2  Item #49

  On November 10, 2022, both an Extension Emergency Purchase Statement and a Final Actual Cost Statement were

  received on 11/10/2022 in same filing quarter. Requesting an extension for dates starting 07/08/2022 through

  12/31/2022, and reporting the Estimated Total Cost to be $205,555.00

 

 

  Original Filing – 5/2/2022: FY22, Qtr 4, Item# 23

 

   The Capital Development Board ("CDB") has been made aware by the Department of Human Services ("DHS")

  that the chiller that provides air conditioning for the Forensic Treatment Center at Elgin Mental Health Center is no

  longer in operation. This building is the hospital for approximately 210 patients who are there by court order

  because they were found to be criminally insane or unfit to stand trial. DHS has no other secure buildings in the

  State to move these individuals.

   A CDB project to provide a temporary chiller and replace the failed chiller began through the selection of an

  Architect/Engineer under the Qualifications Based Selection process. After the design was complete, regular bidding

  processes occurred in November and December of 2021. However, due to various bidding deficiencies, the project

  was never awarded and is to be re-bid. The project has yet to re-bid and CDB and DHS feel that temporary cooling

  measures need to be implemented prior to summer conditions.

   Considering the time frames needed for standard re-bidding and award procedures, the implementation of at least

  temporary cooling measures under the existing processes would likely not begin for several months. For this reason,

  an emergency purchase is necessary to provide a temporary chiller as quickly as possible in order to provide air

  conditioning to the Forensic Treatment Center until such

  time the overall project can take place.

   Ideal Heating Company, located in Chicago, IL, was selected to provide a temporary chiller because they are

  relatively in close proximity to the site, they have the necessary expertise to complete the work, and they can

  respond immediately to the request for emergency services. Several firms that provided bids for the overall project

  to replace the chiller were asked to provide quotes for this emergency temporary chiller work. Ideal Heating

  Company provided the lowest quote that met the recommendations provided by the Architect/ Engineer of records

  based on site conditions and facility needs.

 

  The scope of work provides for the installation of a 500-ton air-cooled temporary chiller, and all necessary ancillary

   equipment and maintenance, at Elgin Mental Health Center's Forensic Building through November 1, 2022.

  Incorporated documents include the March 2009 Standard Documents for Construction & Supplement. Services

  provided under this procurement should not exceed $205,555.00, which is a place-holder prior to entering into a

  Construction Contract, without prior authorization from the Capital Development Board in consultation with the

  Chief Procurement Office. Final Actual Costs will be reported upon project completion and project close-out.

  In accordance with 30 ILCS 500/50-35, all contractors, and each subcontractor to be used whose

  contract/subcontract exceeds an annual value of $50,000, shall submit financial disclosures and certifications as a

  material term of the contract. In accordance with section 00 21 50 of the Standard Documents for Construction, the

  General Contractor shall perform no less than 20% of work with its

  own staff. Each other trade shall perform no less than 40% of work with its own staff. Work with own staff

  includes direct labor and supervision, as well as material purchases where the material is installed by the contractor.

 


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  Additionally, Governor Pritzker has issued Executive Order 2022-11 (and subsequent Executive Orders) containing

  additional mitigations to address the COVID-19 pandemic. This includes an indoor mask requirement and

  vaccinations for those working at Illinois Department of Human Services facilities. These requirements apply to this

   project. Valid religious and medical exemptions to the vaccine can apply.

 

  This Emergency Purchase has an expected start date of 05/02/2022 through 07/30/2022 with an Original Estimated

  Cost of $205,555.00.

   Signed By:  Chris Miles, Exec II

       Vendor:  Ideal Heating Co                                                                           Notary Date:     5/2/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $205,555.00                                        $205,555.00           $205,555.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  50     Capital Development Board                                                                        File Date:  11/1/2022

 

  Latest Filing - 11-1-2022:  FY23, Qtr 2, Item # 50

  An Actual Total Cost of $26,780.00 was reported in the same filing quarter.

 

  Second Filing - 02/23/2022:  FY23, QTR 2, Item #50

  An Emergency Purchase Extension was received on 11/1/22 requesting an extension for dates starting 02/22/2022 to

  04/30/2022. The extension expenditure is not assessed and will be charged for time only.

 

  Original Filing – 11/29/2021: FY22, Qtr 2, Item# 41

 

   The Department of Human Services ("DHS") notified the Capital Development Board ("CDB") that on August 2,

  2021 the Alton Mental Health Hospital had a power outage. The outage affects the Locust Cottage (BD013), which

   is a patient living unit, and does not have power because the emergency generator failed. A temporary rental

  emergency generator was located and brought to Locust and installed.

   While the design continues for the replacement of the emergency generator, it was discovered the initial power

  failure began and was a result of feeder line failures at the Aspen Building. The Aspen Building was being used by

  doctors for overnight stays and has water lines that will be prone to freezing as winter weather quickly approaches.

  Therefore, an emergency purchase is necessary in order to replace

  the feeder lines to the Aspen Building as quickly as possible in order to provide heat, protect against damage to the

  building, and so designs to replace the emergency generator at the Locust Cottage can be completed.

   Pyramid Electrical Contractors, Inc., located in Fairview Heights, IL was selected to provide feeder line replacement

   work, because they are relatively in close proximity to the site, have the expertise to provide the services being

  requested, and they can respond immediately to this request for emergency services.

 

   The scope of work provides for construction services to remove the existing damaged non-shield cables from

  conduit between man hole B8 and B9. Cut cables at the man hole B9 and remove cable reducer in the other man hole

  B8. Provide new submersible load break connector per phase to connect into the existing MV cable. Provide (2) 4/0

  5kv, (MV-105-133%) shield cable from man hole B9 to cable in

  man hole B8. Cable is reduced to #2 on Aspen side ( man hole B8 ). Any additional efforts or materials necessary to

   restore power is subject to CDB's approval in consultation with the Chief Procurement Office.

   Incorporated documents include the March 2009 Standard Documents for Construction & Supplement. Services

  provided under this procurement should not exceed $40,000.00, prior to entering into a Construction Contract,

  without prior authorization from the Capital Development Board in consultation with the Chief Procurement

  Office. Final Actual Costs will be reported upon project completion and project close-out.

   In accordance with 30 ILCS 500/50-35, all contractors, and each subcontractor to be used whose

  contract/subcontract exceeds an annual value of $50,000, shall submit financial disclosures and certifications as a

  material term of the contract. In accordance with section 00 21 50 of the Standard Documents for Construction, the

  General Contractor shall perform no less than 20% of work with itsown staff. Each other trade shall perform no less

   than 40% of work with its own staff. Work with own staff includes direct labor and supervision, as well as material

   purchases where the material is installed by the contractor.

 

  This Emergency Purchase has an expected start date of 11/29/2021 through 2/26/2022 with an Original Estimated

  Cost of $40,000.00.


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

   Signed By:  Chris Miles, Exec II

       Vendor:  Pyramid Electrical Contractors, Inc.                                             Notary Date: 11/29/2021

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:          $40,000.00                                          $26,780.00             $26,780.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  51     University of Illinois Chicago                                                                     File Date:  6/2/2022

 

  Fourth Filing - 12/07/2022: FY23, Qtr 2, Item# 51:

  An Emergency Purchase Extension was received on December 7, 2022, requesting an extension for dates starting

  1/14/2023 to 7/31/2023 at an additional estimated cost of $0.00, keeping the estimated cost at $4,674,200.00.

  reporting in the same filing quarter.

 

 

  Third Filing - 10/13/2022: FY23, Qtr 2. Item #51

  An Emergency Purchase Extension was received on 10/13/2022 requesting an extension for dates starting 10/29/2022

   to 01/13/2023. The extension expenditure is not assessed and will be charged for time only.

 

  Second Filing - 06/02/2022: FY22, Qtr 4, Item #69

  An Emergency Purchase Extension was received on June 02, 2022 requesting an extension for dates starting

  07/01/2022 to 10/28/2022 at an additional estimated cost of $2,337,100.00, revising the total estimated cost to

  $4,674,200.00.

 

  The scope of the emergency purchase has not changed since the original request.  However, the schedule has been

  extended due to finalization of custom design for each room and unprecedented supply chain and manpower issues.

    Long lead times for some items (light fixtures for example) have resulted in the need to re-specify products and

  identify alternate sources.  Using a competitive bidding process at this point would cause a significant delay in the

  schedule, derail the good faith effort and further delay the provision of accessible rooms for patients.  JOC

  Contractor has proceeded with shop drawings, susbcontractor agreements and procurement of materials.  The JOC

  Contractor would need to be reimbursed for all materials and efforts expended to date.  This would result in a

  significant cost increase to the project.

 

  Original Filing – 11/23/2021: FY22, Qtr 2, Item# 39

 

  The scope consists of the interior renovation/reconfiguration of (6) patient rooms and adjacent private toilet rooms

  into ADA compliant spaces. The contractor will provide materials, labor,equipment, submittals,testing and

  supervision to complete the rooms. Work includes,but is not limited to, selective demolition, drywall partitions,

  doors/frames/hardware, new finishes, ceilings,millwork, wall protection plumbing fixtures,lighting. Additional scope

  includes temperature controls,piping,medical gases,fire protection,electrical power, data,fire alarm, other special

  systems and coordination of owner provide headwalls.

  As part of a settlement agreement to a lawsuit,the Hospital is required to renovate a total of (25) rooms by June 30,

  2023. This emergency purchase is required to show good faith effort by completing renovation of (6) rooms this

  fiscal year (June 30, 2022) and to start construction during the current calendar year. This phasing will also reduce

  the impact on clinical operations by limiting quantity of patient rooms that are taken off-line at any one time. The

  renovation of the remaining (19) rooms will be procured via the standard

  university competitive bid process.

 

  This Emergency Purchase has an expected start date of 11/15/2021 through 06/30/2022 with an Original Estimated

  Cost of $2,337,100.00, using Activity, Storeroom and Service Funds.


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

   Signed By:  Paul Ellinger, CFO

       Vendor:  F.H. Paschen                                                                                Notary Date: 11/23/2021

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:     $2,337,100.00        $4,674,200.00                    $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  52     Capital Development Board                                                                        File Date:  7/13/2022

  Latest Filing - 11/01/2022:    FY23, Qtr 2, Item #52

  A Final Cost Statement was received on November 1, 2022, reporting in the same filing quarter as extension, that

  the Actual Total Cost is $47,068.62.

 

 

  Second Filing - 07/13/2022:  FY23, Qtr 2, Item #52

  An Emergency Purchase Extension was received on July 13, 2022 requesting an extension for dates starting

  7/29/2022 to 10/31/2022. The extension expenditure is not assessed and will be charged for time only.

 

 

  Original Filing – 5/20/2022: FY22, Qtr 4, Item# 40

 

  The Capital Development Board (“CDB”) was made aware by the Department of Corrections (“DOC”) that there

  are serious structural concerns at the Menard Correctional Center Vegetable House, to include corrosion and failure

  of several steel columns causing buckling and/or compression of the columns, sagging and building separation on the

  second floor of the building, and differential settlement of

  the floor slab.

   The Vegetable House stores the daily supply of milk, produce, and juice. The second floor of that building houses

  the pharmacy and central supply. The pharmacy has special parameters due to DEA regulations and access to

  pharmaceuticals and narcotics. The central supply also stores everyday medical supplies that are needed on a daily

  basis.

   In response, CDB Professional Services conducted a site visit to investigate. This site visit included field

  observations of all the accessible structural systems in this building. Based on the findings, it is evident that there is

  differential settlement of the floor slab, and a failure of a steel column at the bottom of the first floor. The latter

  finding is a serious safety concern, and there should be no further occupancy of this building until remedial measures

   have been implemented, which have been designed by a qualified structural engineer.

   Due to the above, DOC has requested that CDB procure the services of an Architect/Engineer under an emergency

  declaration to provide an assessment, recommendations, and potentially immediate design services to prevent

  further deterioration and/or a catastrophic collapse of the building.

   This project began through the emergency selection of an Architect/Engineer (“A/E”); this exempts the selection

  from a 14-day solicitation required through Qualifications-Based Selection (“QBS”). Considering the time frames

  needed for the selection, negotiation and execution of an A/E contract, an assessment, recommendations and

  potential design services related to the structural integrity of the building under the existing processes would likely

  not begin for several months.

   For this reason, emergency purchases are necessary to assess the Vegetable House as quickly as possible to protect

   against the threat to public health and safety, and to prevent or minimize serious disruption in critical State

  services, and to prevent further loss or deterioration to the building.

   The Architect/Engineer of record visited the site on May 17, 2022 to inspected the interior and exterior of the

  building on both floors. The facility was aware of the areas of concern and had been monitoring changes in the

  structure. The building is moving significantly in a short period of time. The 2nd floor is designed for a 125 pounds

  per square foot ("PSF") live load, but the loading is most likely closer to 150 psf due to large bookcases filled with

  papers/files. Although the building is unoccupied, staff still enters to move items stored on the 2nd floor to clear the

   space out. Existing drawings of the building show the 2nd floor and roof framing is not positively connected to the

  exterior walls. Due to the severity of the structural steel and masonry deterioration and the lack of lateral support of


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

   the walls, the Architect/Engineer recommends immediate temporary shoring of the 2nd floor of the building prior to

   removal of storage items. A full

  assessment of the structural integrity of the building is forthcoming.

   H & N Construction, Inc., located in Steeleville, IL, was selected to provide shoring for the 2nd floor as they have

  the capabilities and resources needed to complete the work, they are located in close proximity to the site, and they

  can respond immediately to the request for emergency services.

   The scope of work provides for shoring of the 2nd floor of the Vegetable House as directed by the

  Architect/Engineer of record. Additional shoring work may be required, subject to CDB and CPO approval.

   Incorporated documents include the March 2009 Standard Documents for Construction & Supplement and any

  design documents provided by the Architect/Engineer of record. Services provided under this procurement should

  not exceed $100,000.00, prior to entering into a Construction Contract, without prior authorization from the Capital

   Development Board in consultation with the Chief Procurement Office. Final Actual Costs will be reported upon

  project completion and project close-out.

   In accordance with 30 ILCS 500/50-35, all contractors, and each subcontractor to be used whose

  contract/subcontract exceeds an annual value of $50,000, shall submit financial disclosures and certifications as a

  material term of the contract. In accordance with section 00 21 50 of the Standard Documents for Construction, the

  General Contractor shall perform no less than 20% of work with its

  own staff. Each other trade shall perform no less than 40% of work with its own staff. Work with own staff

  includes direct labor and supervision, as well as material purchases where the material is installed by the contractor.

 

   Additionally, Governor Pritzker has issued Executive Order 2022-12 containing additional mitigations to address

  the COVID-19 pandemic. This includes an indoor mask requirement and vaccinations for those working at Illinois

  Department of Corrections (IDOC) facilities. These requirements apply to this project.

 

  This Emergency Purchase has an expected start date of 05/20/2022 through 08/17/2022 with an Original Estimated

  Cost of $100,000.00.

   Signed By:  chris Miles, Exec II

       Vendor:  H & N Construction, Inc.                                                             Notary Date:   5/20/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $100,000.00                                          $47,068.62             $47,068.62       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  53     Capital Development Board                                                                        File Date:  11/1/2022

 

  Lastest Filing - 11-1-2022  FY23, Qtr 2, Item #53

  A Final Cost Statement was received on November 1, 2022, reporting in the same filing quarter as extension, that

  the Actual Total Cost is $8,337.17

 

 

  Second Filing - 08/29/2022: FY23, Qtr 2, Item 53

  An Emergency Purchase Extension was received on August 29, 2022 requesting an extension for dates starting

  08/29/2022 to 11/01/2022. The extension expenditure is not assessed and will be charged for time only.

 

  Original Filing – 06/07/2022: FY22, Qtr 4, Item# 48

 

  The Capital Development Board ("CDB") was made aware by the Department of Corrections ("DOC") that there

  are serious sewer piping failure concerns at Logan Correctional Center. The sewer pipes were originally installed in

  1929 and have never been replaced.The facility is experiencing frequent sewer back up in the Housing Units.

   In February 2022, facility staff procured the services of Henson Robinson Company to use their sewer camera on

  the main sewer line from Housing Unit 6 to Housing Unit 7, 8, and 9. The video shows that tree roots have entered

  the clay pipe throughout the sewer.The tree roots have caused bells and parts of the pipes to crumble and break. It

  also shows that in some places, the piping is 75%-90% blocked with "root curtains" that is slowing or catching solid

   waste,contributing to the sewer blockage/backup. It also shows the line between Housing Unit 6 and Housing Unit

  9 to have 2 complete sink holes that have started where the pipe is no longer together and either has holes or the top

   of the pipe is completely missing.This also includes a spot where the old dietary basement sewer line was directly

  tied in or stubbed into the clay pipe that now has completely failed. This shows a complete void (possible sinkhole)

   where the two pipes meet and has been carved out.The video from Housing Unit 6 to Housing Unit 7 also shows

  where this has caused sections of pipe to be undermined, causing the pipe to be pitched backwards.

   Due to on-going CDB renovations at the facility,limited spacing is available to move female individuals in custody

  to other Housing Units within the facility when the sewer backs up inside the buildings. DOC has requested that

  CDB provide immediate sewer line repair work under an emergency declaration.

   This project began through the emergency selection of an Architect/Engineer ("A/E");this exempts the selection

  from a 14-day solicitation required through Qualifications-Based Selection ("QBS"). Considering the time frames

  needed for the selection,negotiation and execution of an A/E contract,followed by regular bidding processes, repairs

  to the sewer piping system under the existing processes would likely not begin for several months.

   For this reason, emergency purchases are necessary to provide immediate sewer line repair work at Logan

  Correctional Center as quickly as possible to protect against the threat to public health and safety, to prevent or

  minimize serious disruption in critical State services, and to prevent further loss and sewer back up within the

  Housing Units.

   Henson Robinson Company,located in Springfield,IL, was selected to provide construction services for limited

  sewer line repair work because they have the capabilities and resources needed to complete the work,they have

  prior experience working at the facility,to include a previous assessment of the sewer lines, they are located in close

  proximity to the site, and they can respond immediately to the request for emergency services.

   The scope of work provides for assessment assistance to the Architect/Engineer and limited construction services

  for any immediate sewer line repair work serving Housing Units 6, 7, 8 & 9 at Logan Correction Center as directed

  by the Architect/Engineer and subject to CDB/CPO approval.

   Incorporated documents include the March 2009 Standard Documents for Construction & Supplement. Services


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  provided under this procurement should not exceed $100,000.00,which is a place-holder prior to entering into a

  Construction Contract,without prior authorization from the Capital Development Board in consultation with the

  Chief Procurement Office.

   The bidder shall reconcile work completed on a continual basis (daily and weekly) with the CDB Project Manager

  prior to commencement of such expenditure. Final Actual Costs will be reported upon project completion and

  project close-out.

   In accordance with 30 ILCS 500/50-35,all contractors, and each subcontractor to be used whose

  contract/subcontract exceeds an annual value of $50,000, shall submit financial disclosures and certifications as a

  material term of the contract. In accordance with section 00 21 50 of the Standard Documents for Construction,the

  General Contractor shall perform no less than 20% of work with its

  own staff. Each other trade shall perform no less than 40% of work with its own staff. Work with own staff

  includes direct labor and supervision, as well as material purchases where the material is installed by the contractor.

 

   Additionally,Governor Pritzker has issued Executive Order 2022-13 containing additional mitigations to address the

   COVID-19 pandemic. This includes an indoor mask requirement and vaccinations for those working at Illinois

  Department of Corrections (IDOC) facilities. These requirements apply to this project.

 

  This Emergency Purchase has an expected start date of 06/07/2022 through 09/04/2022 with an Original Estimated

  Cost of $100,000.00.

   Signed By:  Chris Miles, Exec II

       Vendor:  Henson Robinson Co.                                                                  Notary Date:     6/7/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $100,000.00                                            $8,337.17               $8,337.17       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  54     Capital Development Board                                                                        File Date:  12/10/2021

  Final Filing - 10/26/2022 :  FY23, Qtr 2. Item #54

  A Final Cost Statement was received on October 26, 2022, reporting in the same filing quarter as extension, that the

  Actual Total Cost is $1,045,973.18.

 

  Fourth Filing - 12/10/2021:  FY23, Qtr 2, Item #54

  An Emergency Purchase Extension was received on January 13, 2021 requesting an extension for dates starting

  01/18/2022 to 02/28/2022. The extension expenditure is not assessed and will be charged for time only.

 

 

  Third Filing - 10/04/2021:

  An Emergency Purchase Extension was received on October 4, 2021 requesting an extension for dates starting

  10/19/21 to 1/31/2022. The extension expenditure is not assessed and will be charged for time only.

 

  Second Filing - 05/21/2021: FY21, Qtr 4, Item# 68:

  An Emergency Purchase Extension was received on May 21, 2021, requesting an extension for dates starting

  05/20/2021 to 10/31/2021 at an additional estimated cost of $0.00, keeping the estimated cost at $955,000.00.

 

  Original Filing – 5-21-2021 FY21, Qtr 4, Item #73:

 

  The scope of services provides for the decommissioning and demolition of the existing failed boilers and the

  purchase and installation of five (5) 150 HP modular steam low pressure boilers as designed by the

  Architect/Engineer of record. Incorporated documents include the March 2009 Standard Documents for

  Construction & Supplement, the design and specifications provided by the Architect/Engineer

  of record and quote provided by The Stone Group, Inc. on April 12, 2021. Construction Services provided under

  this procurement should not exceed $955,000.00, without prior authorization from the Capital Development Board

  in consultation with the Chief Procurement Office. Final Actual Costs will be reported upon project completion and

   project close-out.

  This Emergency Purchase has an expected start date of 04/14/2021 through 07/12/2021 with an Original Estimated

  Cost of $955,000.00.

   Signed By:  Chris Miles, Executive II

       Vendor:  The Stone Group, Inc.                                                                  Notary Date:   4/14/2021

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $955,000.00                                     $1,045,973.18        $1,045,973.18       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  55     Capital Development Board                                                                        File Date:  1/21/2022

  Final Filing - 10/31/2022:  FY23, Qtr 2, Item #55

  A Final Cost Statement was received on October 31, 2022, reporting in the same filing quarter as extension, that the

  Actual Total Cost is $56,669.25.

 

  Second Filing - 01/21/2022: FY23, Qtr 2, Item #55

  An Emergency Purchase Extension was received on January 21, 2022 requesting an extension for dates starting

  01/20/2022 to 09/30/2022. The extension expenditure is not assessed and will be charged for time only.

 

  Original Filing – 11/15/2021: FY22, Qtr 2, Item# 30

 

  The Department of Corrections has notified the Capital Development Board that the Sheridan Correctional Center

  is experiencing multiple leaks in their Dietary Building as a result of the failing roofing system. The EPDM roof has

  become brittle over the years and is beyond temporary repairs. Facility staff have installed plastic sheeting in

  several areas to prevent debris and water from falling into the food preparation areas and serving line. As a result of

  these leaks, mildew is developing in the ceiling tiles which is creating additional health and safety concerns. The

  leaks also creates pools of water on the dietary floor and becoming a severe safety hazard.

 

  The scope of work provides for emergency design services for the replacement of the Dietary Building's (C0862)

  lower slope membrane roof.

   Incorporated documents include the March 2009 Standard Documents for Construction & Supplement and the

  March 2009 Design and Construction Manual & Supplement.  Basic Architectural Services provided under this

  procurement should not exceed $100,000.00, which is a place-holder prior to the negotiation of a Professional

  Services Agreement, without prior authorization from the Capital Development Board in consultation with the

  Chief Procurement Office.  Final Actual Costs will be reported upon project completion and project close-out.

   In accordance with 30 ILCS 500/50-35, all contractors, and each subcontractor to be used whose

  contract/subcontract exceeds an annual value of $50,000, shall submit financial disclosures and certifications as a

  material term of the contract.  In accordance with section 00 21 50 of the Standard Documents for Construction, the

  General Contractor shall perform no less than 20% of work with its own staff. Each other trade shall perform no

  less than 40% of work with its own staff.  Work with own staff includes direct labor and supervision, as well as

  material purchases where the material is installed by the contractor.

   Additionally, Governor Pritzker has issued Executive Orders 2021-20, 2021-22, 2021-23, and 2021-27 containing

  additional mitigations to address the COVID-19 pandemic.  This includes an indoor mask requirement and

  vaccinations for those

  working at Illinois Department of Corrections (IDOC) facilities.  These requirements apply to this project.

 

  This Emergency Purchase has an expected start date of 11/15/2021 through 2/12/2022 with an Original Estimated

  Cost of $100,000.00.

   Signed By:  Chris Miles, Exec II

       Vendor:  Farnsworth Group, Inc.                                                                Notary Date: 11/15/2021


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $100,000.00                                          $56,669.25             $56,669.25       23      2

    Federal Cost:                  $0.00                                                                                  $0.00

  56     Capital Development Board                                                                        File Date:  10/13/2022

  Final Filing - 10-13-2022:  FY23, Qtr 2. Item #56

  Latest Filing – 10/13/2022:

  The Actual Total Cost of FY23, Qtr 2, Item #56  is $1,689,672.83, with a final contract term ending.10/13/2022.

 

  Original Filing - 05-03-2021; FY21, Qtr 4, Item #27:

  The scope of work provides for the modernization of each of the three hydraulic elevators by providing new power

  units, cylinders and energy efficient components. The scope also includes providing fully functional units that are

  code compliant with all existing and impending elevator code requirements.

  This Emergency Purchase has an expected start date of 05/03/2021 through 07/31/2021 with an Original Estimated

  Cost of $2,036,000.00.

   Signed By:  Chris Miles, Executive II

       Vendor:  Parkway Elevators, Inc                                                                 Notary Date:     5/3/2021

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:     $2,036,000.00                                     $1,689,672.83        $1,689,672.83       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  57     Capital Development Board                                                                        File Date:  10/5/2022

  Final Filing - 10/5/2022

  Latest Filing – 10/5/2022: FY23, Qtr 2, Item #57

  The Actual Total Cost of FY23, Qtr 2, Item# 57  is $536,966.81, with a final contract term ending.10/5/2022.

 

  Second Filing - 11/24/2021:

  A Revised Emergency Purchase dated/received, November 24,2021, reported in the same filing quarter.  Requesting

  NO ADDITIONAL TIME OR COST at this time.  Reporting only more strom damage to be repaired on the

  project.

 

  REVISED (11/24/2021): During the assessment of the facility for storm damage, it was discovered that there is

  structural damage throughout the Garage. The Garage consists of the Wash Bay, Garage/Shop Area, and Tack

  House. In their assessment report, the Architect/Engineer expresses concern with several brick wall cracks and wall

  displacement issues throughout the Garage and recommends immediate repair work (specifically under

  recommendations R1, R2, R3 & R4 in the report), due to life/safety concerns and/or to prevent moisture infiltration

  and further deterioration. Although most of these structural issues were pre-existing, they are said to have worsened

   as a result of the storm/wind, creating a safety hazard. Therefore, in order to prevent the threat to public safety and

   to protect against the threat of further damage to the buildings, structural repair work is hereby being added to the

  scope for this emergency declaration. This additional work will be added via a Proceed Oder/Change Order to the

  existing contract.

 

  Original Filing – 10/27/2021: FY22, Qtr 2, Item# 32

 

  The scope of work provides for construction services for temporary and permanent repairs from this storm damage,

   including but not limited to roof failures, and other associated damage from the storm, at Menard Correctional

  Center as directed by the Architect/ Engineer of record and approved by CDB. Incorporated documents include the

  March 2009 Standard Documents for Construction & Supplement and any design documents provided by the

  Architect/Engineer. Services provided under this procurement should not

  exceed $400,000.00, which is a place-holder prior to entering into a Construction Contract, without prior

  authorization from the Capital Development Board in consultation with the Chief Procurement Office. Final Actual

  Costs will be reported upon project completion and project close-out.

 

  In accordance with 30 ILCS 500/50-35, all contractors, and each subcontractor to be used whose

  contract/subcontract exceeds an annual value of $50,000, shall submit financial disclosures and certifications as a

  material term of the contract. In accordance with section 00 21 50 of the Standard Documents for Construction, the

  General Contractor shall perform no less than 20% of work with its

  own staff. Each other trade shall perform no less than 40% of work with its own staff. Work with own staff

  includes direct labor and supervision, as well as material purchases where the material is installed by the contractor.

 

  This Emergency Purchase has an expected start date of 10/25/2021 through 01/22/2022 with an Original Estimated

  Cost of $400,000.00.

   Signed By:  Chris Miles, Exec II


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

       Vendor:  Joiner Sheet Metal & Roofing                                                      Notary Date: 10/27/2021

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $400,000.00                                        $536,966.81           $536,966.81       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  58     University of Illinois Chicago                                                                     File Date:  10/4/2022

  Final Filing - 10/4/2022

  Latest Filing – 10/4/2022: FY23, Qtr 2, Item 58

  The Actual Total Cost of FY23, Qtr 2, Item# 58 is $253,011.00, with a final contract term ending 10/04/2022.

 

  Original Filing – 1/20/2022: FY22, Qtr 3, Item# 13

 

  The current system (3D mapping system of the Heart) that we have will not be supported by Biosense Webster as

  of 1/31/2022. The new Carto 3D Mapping system replaces the old outdated system that will no longer be

  supported. The Proprietary software, hardware, supplies and services that work together are only manufactured by

  Biosense Webster. The Software and Hardware upgrades are included for the term of the subscription agreement and

   only available from Biosense Webster. The current price for 3 years includes equipment, software and updates

  during the contractual period. We have the option to lease to own for $253,011, which is only valid till 01/31/2022.

  After the date of 1/31/22 the price will increase by $133,489. The quick purchase will save the organization $133K.

 

 

  This system replaces and upgrades old outdated system so we can continue to provide excellent patient care.

  Proprietary Carto 3D Mapping system of the heart, for dynamic 3D mapping of the electrical conduction of the

  heart. The Smartablate system for controlled focal RF (Radio Frequency) energy to the heart tissue and a cooling

  system so surrounding tissue is not harmed. Pressure sensor catheters are used so the correct amount of pressure is

  applied to ablate the correct amount of tissue.

 

  This Emergency Purchase has an expected start date of 1/31/2022 through 01/30/2025 with an Original Estimated

  Cost of $253,011.00.

   Signed By:  Debra Matlock, Exec Director

       Vendor:  Biosense Webster, Inc.                                                                 Notary Date:   1/20/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $253,011.00                                        $253,011.00           $253,011.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  59     Capital Development Board                                                                        File Date:  10/27/2022

  Final Filing - 10/27/2022 : 

  Latest Filing – 10/27/2022: FY23, Qtr 2, Item #59

  The Actual Total Cost of FY23, Qtr 2, Item# 59  is $10,538.23, with a final contract term ending 10/27/22.

 

  Original Filing – 03/07/2022: FY22, Qtr 3, Item# 40

  Central Management Services ("CMS") has notified the Capital Development Board that the State Museum

  Research & Collection Center, a 184,000 square foot, two-story building established in 1940, is experiencing several

  leaks throughout the building as a result of a failed roofing system. This building houses the States Artifacts and rare

   artwork (approx. 15M items), most of which are considered priceless.

  Numerous attempts have been made in the past to attempt to stop the water penetration, yet facility staff continue

  to find additional leaks, many located directly above the artifacts. Staff continually have to use buckets and plastic

  shielding to prevent damage. This space is climate controlled with specific humidity requirements to maintain the

  integrity of its contents. Due to the amount of items stored here, it is often difficult to locate points of penetration.

  This delays finding the leaks and causes the humidity levels to fluctuate.

   If this roof is not replaced, damage to the contents will be imminent and could be significant, resulting in a total loss

   of irreplaceable priceless artifacts and artwork.

   Considering the time frames needed for the selection, negotiation and execution of an A/E contract followed by

  bidding and award procedures, the implementation of at least temporary repairs, followed by the design and

  construction of the replacement roof, under the existing processes would likely not begin for several months. For

  this reason, an emergency purchase is necessary to provide temporary roofing repairs as quickly as possible in order

   to protect against the threat to further loss or damage to the building and artifacts until such time the replacement

  roofing system can be designed and replaced.

   Designed Roofing Systems, Inc., located in Springfield, IL, was selected to provide construction services for

  temporary roofing repair work because are in close proximity to the site, they have the necessary expertise to

  complete the work, and they could respond immediately to the request for emergency services.

   The scope of work provides for expedited temporary roofing repair work at the State Museum Research &

  Collection Center.

   Incorporated documents include the March 2009 Standard Documents for Construction & Supplement. Services

  provided under this procurement should not exceed $150,000.00, which is a place-holder prior to entering into a

  Construction Contract, without prior authorization from the Capital Development Board in consultation with the

  Chief Procurement Office. Final Actual Costs will be reported upon project completion and project close-out.

   In accordance with 30 ILCS 500/50-35, all contractors, and each subcontractor to be used whose

  contract/subcontract exceeds an annual value of $50,000, shall submit financial disclosures and certifications as a

  material term of the contract. In accordance with section 00 21 50 of the Standard Documents for Construction, the

  General Contractor shall perform no less than 20% of work with its

  own staff. Each other trade shall perform no less than 40% of work with its own staff. Work with own staff

  includes direct labor and supervision, as well as material purchases where the material is installed by the contractor.

 

 

  This Emergency Purchase has an expected start date of 03/07/2022 through 06/04/2022 with an Original Estimated

  Cost of $150,000.00.


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

   Signed By:  Chris Miles, Exec II

       Vendor:  Designed Roofing Systems, Inc                                                    Notary Date:     3/7/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $150,000.00                                          $10,538.23             $10,538.23       23      2

    Federal Cost:                  $0.00                                                                                  $0.00

  60     Corrections, Department of                                                                        File Date:  10/18/2022

  Final Filing - 10/18/2022

  Latest Filing – 10/18/2022: FY23, Qtr 2, Item #60

  The Actual Total Cost of FY23, Qtr 2, Item#  60 is $31,382.17, with a final contract term ending October 18, 2022.

 

 

 

  Original Filing – 7/1/2022: FY23, Qtr 1, Item# 9

 

  Gibson Oil will provide the required diesel full to keep the temporary generator system running for the duration of

  the electrical system repair process.

 

  This Emergency Purchase has an expected start date of 07/01/2022 through 09/29/2022 with an Original Estimated

  Cost of $52,085.00.

   Signed By:  Jacenta Wilson, APO

       Vendor:  Gibson Oil                                                                                    Notary Date:     7/1/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:          $52,085.00                                          $31,382.17             $31,382.17       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  61     Corrections, Department of                                                                        File Date:  9/23/2022

 

  Latest Filing – 9/23/2022:

  The Actual Total Cost of FY23, Qtr 2, Item# 61  is $59,808.50, with a final contract term ending7/30/2022

 

 

  Original Filing –7/5/2022: FY23, Qtr 1, Item# 10

 

  Engel Electric was chosen as the contractor due to their knowledge of Dixon Correctional Center electrical layout,

  electrical switch gear and experience in 4160 high-voltage wiring.

 

  Vendor will repair the damages caused by the fire at the facilities Powerhouse.

 

  This Emergency Purchase has an expected start date of 07/01/2022 through 09/29/2022 with an Original Estimated

  Cost of $68,294.00.

   Signed By:  Jacenta Wilson, APO

       Vendor:  McGinn & McGinn dba Engel Electric                                         Notary Date:     7/5/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:          $68,294.00                                          $59,808.50             $59,808.50       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  62     Capital Development Board                                                                        File Date:  10/3/2022

  Latest Filing – 10/03/2022:

  The Actual Total Cost of FY23, Qtr 2, Item# 62  is $19,410.00, with a final contract term ending 10/03/2022.

 

 

  Original Filing – 7/28/2022: FY23, Qtr 1, Item# 20

 

  The project scope provides for an assessment of the existing conditions, by a firm experienced in utility tunnel

  repair projects. This assessment should include an evaluation of different construction methods for safe removal of

  the deficient portion of the top slab, selecting the best available option considering time, cost and safety, and

  reconstructing the top slab to be safely supported by the existing tunnel and resulting in a smooth line and grade for

  the sidewalk to be used by visually impaired students.

  The construction will consist of removal and replacement of the deteriorated sections of the top slab as

  recommended by the AE, and repair to surface damages directly related to this effort. Replacement of the top slab

  will be performed with either cast-in-place or precast concrete, with a positive connection made between the slab

  and vertical walls of the tunnel. The slab will be of sufficient structural strength to resist current and anticipated

  loads from both vehicular and pedestrian use. Adjustments will be made as necessary to ensure the top of slab is

  continuous with the vertical alignment of the remainder of the sidewalk.

  Work must be completed prior to August 14,2022 in which students will be returning to campus. If it is determined

  the ceiling slab and sidewalk are unable to be repaired before August 14,2022, due to design or construction

  constraints, a separate walkway will be constructed in a separate or adjacent location in order to provide a safe

  walkway for ISVI students.

  Incorporated documents include the March 2009 Standard Documents for Construction & Supplement and the

  March 2009 Design and Construction Manual & Supplement. Basic Architectural Services provided under this

  procurement should not exceed $50,000.00, which is a place-holder prior to the negotiation of a Professional

  Services Agreement, without prior authorization from the Capital Development Board in consultation with the

  Chief Procurement Office. Final Actual Costs will be reported upon project completion and project close-out.

  In accordance with 30 ILCS 500/50-35, all contractors, and each subcontractor to be used whose

  contract/subcontract exceeds an annual value of $50,000, shall submit financial disclosures and certifications as a

  material term of the contract. In accordance with section 00 21 50 of the Standard Documents for Construction, the

  General Contractor shall perform no less than 20% of work with its

  own staff. Each other trade shall perform no less than 40% of work with its own staff. Work with own staff

  includes direct labor and supervision, as well as material purchases where the material is installed by the contractor.

 

 

  This Emergency Purchase has an expected start date of 07/28/2022 through10/26/2022 with an Original Estimated

  Cost of $50,000.00.

   Signed By:  Amber Evans, Capital Program Analyst

       Vendor:  Hurst Roche Engineers, Inc.                                                         Notary Date:   7/28/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

        State Cost:          $50,000.00                                          $19,410.00             $19,410.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00

  63     Central Management Services, Department of                                          File Date:  10/17/2022

 

  Latest Filing – 10/17/2022:

  The Actual Total Cost of FY23, Qtr 1, Item# 63  is $41,277.00, with a final contract term ending 10/17/2022.

 

 

  Original Filing – 8/24/2022: FY23, Qtr 1, Item# 29

 

  The vendor was chosen due to familiarity and proximity to the location.  The SNROB building (J0951) has 2 sump

  pumps in the crawl space of the building. One had gone out earlier this year and an RFE 051622 ScarpA was

  submitted but never approved before the end of fiscal year as a result it was canceled.  The second sump pump

  failed over the weekend.  The water level in the pit is at floor level and will overflow if there is any more rain.  This

  will pose a potential moisture, humidity and mold problem at SNROB if the crawl space becomes flooded. 

 

  Replace 4 Inch Sump Pump In Crawl Space - Replace existing 5 HP pump with 1-Weil Pump Co. Model 2547

  Submersible 4 inch NPT Discharge Ejector with 5 HP, 1750 RPM, 3 phase, 460v motor.  Pump will have the same

  hydraulic performance as the existing & includes 25 ft power cable.  Also, replace 4 inch flanged check valve, all

  necessary gaskets, 4 in x 10 ft discharge pipe.

 

  This Emergency Purchase has an expected start date of 08/22/2022 through 11/01/2022 with an Original Estimated

  Cost of $14,740.00.

   Signed By:  Martha Blackwell, Manager

       Vendor:  Traynor Plumbing                                                                         Notary Date:   8/24/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:          $14,740.00                                          $41,277.00             $41,277.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  64     University of Illinois Chicago                                                                     File Date:  10/18/2022

  Latest Filing – 10/18/2022:

  The Actual Total Cost of FY23, Qtr 2, Item# 64 is $434,000.00, with a final contract term ending10/19/2022.

 

  Original Filing – 7/19/2022: FY23, Qtr 1, Item# 16

 

  AFMFA FUNDING

 

  On 3/15/22, the existing 4,200 gallon hot water expansion tank in the Physical Education Building (PEB)

  experienced a major leak causing water to come in close contact with an MCC located directly beneath, further

  damaging an already deteriorated MCC. Building engineers protected electrical equipment with plastic sheeting and

  were able to contain the leak and direct water to a nearby floor drain. The Office of Planning, Sustainability, and

  Project Management (PSPM) immediately engaged a retainer design engineer to produce emergency bid-level pricing.

   On 4/16/22, the tank experienced a catastrophic failure and flooded the adjacent pool equipment room. The entire

  facility, including physical education facilities, classrooms, offices, and teaching labs were without means for heat

  and domestic hot water. On 4/19/22 UIC procured a temporary replacement tank which was installed later that

  week to restore heat to the facility.

 

  Mechanical: Capping and disconnects of hot water expansion tank and installation of new bladder expansion tanks;

  installation of valves for future equipment install; mechanical system accessories and insulation. Contractors have

  completed the installation of future valves for the new bladder tanks and made the existing expansion tank safe for

  demolition.

 

 

Electrical: Installation of new distribution panel (DP), main 480 feeder interception, and transference of electrical

   loads off of failed motor control center (MCC) and onto new DP; installation of new combination motor

  starter/disconnects for all loads connected to MCC; installation of new lighting and fire alarm system devices in

  newly converted electrical closet. The electrical contractor has procured all equipment and ship dates indicate

  equipment will begin arriving in late July, 2022.

 

 

Controls: Relocation of controls cabinets in floor space needed for new bladder tanks; relocation of controls

  relays from MCC to new motor starter locations and integration with controllers.

 

 

General: All demo scope (mechanical and electrical, in addition to general items); project logistics for ingress and

  egress of materials through area wells, exterior fencing and protection/restoration of landscaping; masonry wall

  restoration proceeding tank demolition; architectural modification to storage space to convert to an electrical closet

  including partition wall construction, door and hardware replacements - the architectural modification is required

  now to reconstruct the MCC in compliance with current building codes. Major Demolition is mobilizing 7/20 and

  will take 2 weeks. General conditions to create a pathway for demo and new material is completed; temporary

  enclosures are erected on the north side of the facility and temporary power has been installed for hoisting

  equipment and cutting equipment.

 

This new Part 1 Form revision was initiated to continue this emergency work due to the Part 2 date extension for

  the original Part 1 Form was unable to get an extension hearing scheduled / conducted in time to meet the

  Procurement Code requirements.  Work commenced via verbal communication from the University with the formal

  contract being routed for signatures at this time. 

 

  FUNDING WILL BE USED THRU THE ACADEMIC FACILITIES MAINTENANCE FUN ASSESSMENT

  (AFMFA)

 


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  This Emergency Purchase has an expected start date of 07/25/2022 through 10/23/2022 with an Original Estimated

  Cost of $434,000.00.

   Signed By:  Paul Ellinger, CFO

       Vendor:  International Quality Contracting, Inc.                                          Notary Date:   7/19/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $434,000.00                                        $434,000.00           $434,000.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  65     Labor, Department of                                                                                 File Date:  11/4/2022

  Latest Filing – 11/4/2022:

  The Actual Total Cost of FY23, Qtr 2, Item# 65  is $121,428.60, with a final contract term ending 11/4/2022.

 

  Original Filing – 08/26/2022: FY23, Qtr 1, Item# 37

 

  IBA encourages its 217 participating statewide radio members to participate in airing the campaigns and providing

  those participating IBA-member stations with traffic instructions for run-dates and requested frequency minimums

  for volunteer airplay, IBA licensed software then tracks airplay and provides quarterly reports to its sponsors

  reflecting the total airplay and perceived value of that airplay when combined with IBA’s services extended to

  sponsor in association with the campaign.  IBA will secure estimated Nielsen audience measurement reports for

  IDOL.

 

   ILDOL seeks help distributing and promoting the On-Site Safety and Health non-commercial sustained

  announcement (NCSA) radio commercial. The goal is to have the NCSA commercials: Polish, Spanish and English

  played for 5-weeks statewide. The Illinois Broadcasters Association has agreed to handle the promotion and

  distribution for this allotted time. 

 

  IBA is a conglomerate that partners with 100s of radio stations throughout the entire State of IL, which will allow

  us to reach the largest audience possible under the time constraints. Per market research, there are two

  conglomerates capable of reaching an audience that covers the entire state.  IBA was able to give a discounted price

  and is able to deliver the message within the scheduled time frame without a lapse of federal funds.

 

  This Emergency Purchase has an expected start date of 08/29/2022 through 09/30/2022 with an Original Estimated

  Cost of $121,428.60, using State and Federal Funds.

   Signed By:  Molly Kershaw, CFO

       Vendor:  IL Broadcasters Assoc                                                                  Notary Date:   8/26/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $121,428.60                                        $121,428.60           $121,428.60       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  66     Capital Development Board                                                                        File Date:  11/10/2020

 

  Latest Filing –11/10/2022:

  The Actual Total Cost of FY23, Qtr 2, Item# 66 is $442,559.55, with a final contract term ending 11/10/2022.

 

  Sixth Filing - 11/30/2020:

  An Emergency Purchase Extension was received on November 30, 2020 requesting an extension until 03/31/2021.

  The extension expenditure is not assessed and will be charged for time only.

 

  Fifth Filing - 10/20/2020:

  An Emergency Purchase Extension was received on October 20, 2020 requesting an extension until 12/31/2020. he

  extension expenditure is not assessed and will be charged for time only.

 

  Fourth Filing - 05/29/2020:

  An Emergency Purchase Extension was received on May 29, 2020 requesting an extension for dates starting

  06/18/2020 to 09/30/2020 revising the current contract amount for Brown Electric, Inc. $255,286.59 and WRF

  Engineers to $51,500.00, for a total amount of $306,786.59. The extension expenditure is not assessed and will be

  charged for time only.

 

  Third Filing - 03/02/2020: FY20, Qtr 2, Item# 29:

  An Emergency Purchase Extension was received on March 2, 2020, requesting an extension for dates starting

  04/08/2020 to 06/30/2020 at an additional estimated cost of $0.00, keeping the estimated cost at $470,000.00.

 

  Second Filing - 01/09/2020: FY20, Qtr 2, Item# 29:

  On January 9, 2020 and Emergency Purchase Statement was received to include Brown Electric, Inc.. Brown

  Electric will provide construction services for the replacement of the employee duress system at Chester Mental

  Health Center as directed by the architect/engineer of record. Some abatement is possible. Incorporated documents

  include the March 2009 Standard Documents for Construction & Supplement and design documents provided by

  the Architect/Engineer of record and approved by CDB. This Emergency Purchase has an expected start date of

  01/09/2020 through 04/07/2020 with an Original Estimated Cost of $370,000.00, revising the estimated cost to

  $470,000.00

 

  Original Filing - 12/23/2019: FY20, Qtr 2, Item# 29:

  On August 20, 2019, a survey of the employee duress system at the Chester Mental Health Center was conducted

  to determine if necessary actions were needed to prevent or minimize a serious disruption of the system. The

  Chester Mental Health Center is a 28 building maximum security facility established in 1975. The survey indicates

  the current system is over 24 years old, the original manufacturer is no longer in business, and repair parts are

  extremely difficult to locate or do not exist. The duress system is used to alert security and medical personnel that

  additional staff are required at an area immediately to protect both staff and patients and allows for rapid response

  to any critical situation throughout the facility. An emergency could consist of anything from a staff assault, patient

   assault, or even a medical emergency. The scope of work provides for the investigation and assessment of the

  employee duress system in this 28 building facility and to provide design services for its entire replacement. Some

  abatement is possible. Incorporated documents include the March 2009 Standard Documents for Construction &

  Supplement and the March 2009 Design and Construction Manual & Supplement. WRF Engineers is authorized to

  proceed with the scope of work outlined in this Emergency Purchase Statement. The cost for Professional Services


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  provided under this procurement is estimated not to exceed $100K. The contract amount is not to be exceeded

  without prior authorization from the Capital Development Board in consultation with the Chief Procurement

  Office. This Emergency Purchase has an expected start date of 12/23/2019 through 03/21/2020 with an Original

  Estimated Cost of $100,000.00.

   Signed By:  Chris Miles, Executive II

       Vendor:  WRF Engineers & Brown Electric, Inc.                                        Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $100,000.00           $306,786.59         $442,559.55           $442,559.55       23      2

    Federal Cost:                  $0.00                                                                                  $0.00

  67     Human Services, Department of                                                                 File Date:  11/15/2022

  Latest Filing – 11/15/2022:

  The Actual Total Cost of FY23, Qtr 2, Item# 67  is $40,270.50, with a final contract term ending 10/14/2022.

 

 

  Original Filing – 08/03/2022: FY23, Qtr 1, Item# 25

 

  This vendor originally won the bid for the sidewalk repairs on campus. This is now an emergency, when the vendor

  came to perform the services they removed some concrete over a tunnel which caused a hole exposing asbestos.  The

   asbestos has now been contained but the hole is still exposed causing safety issues to students and staff on campus.

   

 

  They will replace the cap and sidewalk above the tunnel.

 

  This Emergency Purchase has an expected start date of 08/08/2022 through 10/14/2022 with an Original Estimated

  Cost of $40,000.00.

   Signed By:  Jean Sandstrom, APO

       Vendor:  CSD Environmental Services                                                        Notary Date:     8/3/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:          $40,000.00                                          $40,270.50             $40,270.50       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  68     Central Management Services, Department of                                          File Date:  11/17/2022

 

  Latest Filing – 11/17/2022:

  The Actual Total Cost of FY23, Qtr 2, Item# 68 is $197,909.00, with a final contract term ending 11/17/2022.

 

  Original Filing – 8/17/2022: FY23, Qtr 1, Item# 26

 

  Satellite Equipment:

 

 

1. 5.0-meter KU band uplink antenna w/motorized azimuth , elevation, and polarization.  Minimum 3 ports (2

  RX, 1 TX).

 

2. Mount for above antenna for roof load frae

 

3. Antenna control unit (RCI4500 or equivalent), controller to be mounted in interior equipment rack with

  contactor and local control assembly at the antenna. ACU must be capable of integrating with Crystal M&C

  software.  Serial or IP interface (IP preferred).

 

4. Ku-band low noise block downconverter, quantit2.

 

5. Forced air (or equivalent) dish deicing system with local and remotcontrols

 

6. System design, checkout, performance analysis, waanty

 

7. Removal of current non-functional antenna.

 

8. Assembly of antenna on customer supplied roof interface. Install feed, waveguide, and remote-control cable,

  maximum of 100 ft, includes IFL cable connectors and crane.

 

9. Lightning groundingit

 

 

 

Civil Engineering - will be conducted as a small purchase with emergency conditions and will be awarded to an

  Illinois BEP Certified Vendor:

 

1. Vendor shall provide all necessary drawings to provide for modification of roof

  load frame to support the new CPI Satcom 4.8 meter antenna.

2. The load frame shall support the weight of the

  antenna assembly and all motors and control equipment for motorized azimuth, elevation, and polarization.

3. The

   load frame shall be of sufficient strength to allow the antenna to be capable of surviving 125 mph winds minimum.

 

4. If possible, the load frame shall be modified in a way that does not require removal of the current antenna.

5.

  The load frame shall be designed to place the antenna center position at the necessary azimuth to allow the greatest

  view of North American satellites.

 

Construction- will be conducted as a small purchase with emergency

  conditions and will be awarded to an Illinois BEP Certified Vendor:

 

1. The vendor shall be responsible for the

  modification of the roof load frame in accordance with the drawings provided by the structural engineer.

2. The

  vendor shall be responsible for the addition, subtraction, or substitution of steel members in accordance with the

  design of the structural engineer.

3. The vendor shall perform any necessary modifications to the roof structure, if

  necessary, in accordance with the design of the structural engineer.

4. The vendor shall perform any required

  fireproofing to interior steel members, ifnecessary, in accordance with the design of the structural engineer.

5. The

  vendor shall paint all external steel members in accordance with the design of the structural engineer.

6. The vendor

   shall be responsible for obtaining all necessary construction permits.

 

  This Emergency Purchase has an expected start date of 08/17/2022 through 11/15/2022 with an Original Estimated

  Cost of $324,475.00.

   Signed By:  Will Stephens, APO


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

       Vendor:  CPI Satcom & Antenna Technologies, Inc.                                   Notary Date:   8/17/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $324,475.00                                        $197,909.00           $197,909.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00

  69     Human Services, Department of                                                                 File Date:  11/22/2022

 

  Latest Filing – 11/22/2022:

  The Actual Total Cost of FY23, Qtr 2, Item# 69  is $32,883.00, with a final contract term ending 10/11/2022.

 

  Original Filing –7/15/2022: FY23, Qtr 1, Item# 13

 

  This vendor has been awarded multiple contracts in the past and has been reliable to meet our needs quickly.  They

  are the closest HVAC vendor to our facility and are very familiar with our setting and needs.  They have provided

  these services satisfactorily in the past and are very responsive to our needs.  We needed a quick turnaround on this

  due to the extreme high temperatures we have been experiencing lately.

 

  We need the replacement of two non functioning AC systems in the Clinical Services Building of Choate Center.

 

  This Emergency Purchase has an expected start date of 07/14/2022 through 10/11/2022 with an Original Estimated

  Cost of $32,883.00.

   Signed By:  Pamela Enno, APO

       Vendor:  Gurley & Sons Heating & Air Conditioning                                 Notary Date:   7/15/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:          $32,883.00                                          $32,883.00             $32,883.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  70     Capital Development Board                                                                        File Date:  11/29/2022

 

  Latest Filing – 11/29/2022:

  The Actual Total Cost of FY23, Qtr 2, Item# 70  is $21,524.46 with a final contract term ending 11/29/2022.

 

  Original Filing – 06/07/2022: FY22, Qtr 4, Item#45

 

  The Capital Development Board ("CDB") was made aware by the Department of Corrections ("DOC") that there

  are serious sewer piping failure concerns at Logan Correctional Center. The sewer pipes were originally installed in

  1929 and have never been replaced.The facility is experiencing frequent sewer back up in the Housing Units.

   In February 2022, facility staff procured the services of Henson Robinson Company to use their sewer camera on

  the main sewer line from Housing Unit 6 to Housing Unit 7, 8, and 9. The video shows that tree roots have entered

  the clay pipe throughout the sewer.The tree roots have caused bells and parts of the pipes to crumble and break. It

  also shows that in some places, the piping is 75%-90% blocked with "root curtains" that is slowing or catching solid

   waste,contributing to the sewer blockage/backup. It also shows the line between Housing Unit 6 and Housing Unit

  9 to have 2 complete sink holes that have started where the pipe is no longer together and either has holes or the top

   of the pipe is completely missing.This also includes a spot where the old dietary basement sewer line was directly

  tied in or stubbed into the clay pipe that now has completely failed. This shows a complete void (possible sinkhole)

   where the two pipes meet and has been carved out.The video from Housing Unit 6 to Housing Unit 7 also shows

  where this has caused sections of pipe to be undermined, causing the pipe to be pitched backwards.

   Due to on-going CDB renovations at the facility,limited spacing is available to move female individuals in custody

  to other Housing Units within the facility when the sewer backs up inside the buildings. DOC has requested that

  CDB provide immediate sewer line repair work under an emergency declaration.

   This project began through the emergency selection of an Architect/Engineer ("A/E");this exempts the selection

  from a 14-day solicitation required through Qualifications-Based Selection ("QBS"). Considering the time frames

  needed for the selection,negotiation and execution of an A/E contract,followed by regular bidding processes, repairs

  to the sewer piping system under the existing processes would likely not begin for several months.

   For this reason, emergency purchases are necessary to provide immediate sewer line repair work at Logan

  Correctional Center as quickly as possible to protect against the threat to public health and safety, to prevent or

  minimize serious disruption in critical State services, and to prevent further loss and sewer back up within the

  Housing Units.

   Dewberry Engineers Inc.,located in Peoria,IL, was selected to provide limited design services if needed,

  recommendations and any other professional services required to support sewer line repair work because they have

  the capabilities and resources needed to complete the work,they are currently working on-site and has vast

  knowledge of the facility, they are located in close proximity to thesite, and they can respond immediately to the

  request for emergency services.

   The scope of work provides for an assessment and limited design services if needed, recommendations, and any

  other professional services required to support limited sewer line repair work serving housing units 6, 7, 8 & 9 at

  Logan Correction Center.

   Incorporated documents include the March 2009 Standard Documents for Construction & Supplement and the

  March 2009 Design and Construction Manual & Supplement. Basic Architectural Services provided under this

  procurement should not exceed $100,000.00, which is a place-holder prior to the negotiation of a Professional

  Services Agreement, without prior authorization from the Capital Development Board in consultation with the

  Chief Procurement Office. Final Actual Costs will be reported upon project completion and project close-out.

   In accordance with 30 ILCS 500/50-35,all contractors, and each subcontractor to be used whose


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  contract/subcontract exceeds an annual value of $50,000, shall submit financial disclosures and certifications as a

  material term of the contract. In accordance with section 00 21 50 of the Standard Documents for Construction,the

  General Contractor shall perform no less than 20% of work with its own staff. Each other trade shall perform no

  less than 40% of work with its own staff. Work with own staff includes direct labor and supervision, as well as

  material purchases where the material is installed by the contractor.

   Additionally,Governor Pritzker has issued Executive Order 2022-13 containing additional mitigations to address the

   COVID-19 pandemic. This includes an indoor mask requirement and vaccinations for those working at Illinois

  Department of Corrections (IDOC) facilities. These requirements apply to this project.

 

  This Emergency Purchase has an expected start date of 06/07/2022 through 09/04/2022 with an Original Estimated

  Cost of $100,000.00.

   Signed By:  Chris Miles, Exec II

       Vendor:  Dewberry Engineering, Inc.                                                          Notary Date:     6/7/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $100,000.00                                          $21,524.46             $21,524.46       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  71     University of Illinois Chicago                                                                     File Date:  11/30/2022

 

  Latest Filing – 11/20/2022:

  The Actual Total Cost of FY23, Qtr 2, Item# 71  is $465,437.16, with a final contract term ending 11/20/2022.

 

 

  Original Filing – 08/24/2022: FY23, Qtr 1, Item# 36

 

  The Biomedical Health and Information Sciences Department (BHIS) has found Embanet/Compass (EC) to be the

  preeminent full-service provider of on line learning services for not-for-profit universities and colleges.  EC’s ability

  to attract and retain students has been critical to the success of BHIS and UIC in growing, sustaining, and delivering

  high quality on line degree programs.  EC currently supports over 120 degree programs across 36 university

  partners including 7 AAU institutions (Association of American Universities) and over 20 of the top 200 U.S.

  News and World Report Nationally Ranked Universities in 2013.  EC has been a provider of these services for more

   than 20 years and serves more than twice as many degree programs as its nearest competitor in the industry, which

  has approximately five years less experience and supports only 5 top 20 institutions.

 

We are requesting an

  emergency because our contract with Pearson expired on 2/22/22.

  We need to continue services with Pearson until the students they recruited into our programs have graduated per

  terms in the agreement. After graduation we are no longer continuing with Pearson and will be working with

  Extended Campus. Pearson provides invoices based on enrollment reports that are ran 10 days after the start of each

   semester and 4 weeks at the end of each semester. The first set of invoices will be sent mid-September and we need

  to have a procurement method in place. We are currently pursuing a sole economically feasible source. Eliminating

  EC from this equation risks diminishing program quality, the maintenance of which is exceedingly important to very

   vocal and visible professional student and alumni groups.

  The EC approach is flexible and specific to each program they support.  They have a core set of packaged services,

  and importantly, work with each university to develop a customized partnership solution that meets the specific

  needs and goals for each online program being supported.  This has been accomplished over a 5 year period and has

  resulted in unparalleled programmatic success within the entire University of Illinois system.  BHIS has built a

  reputation in the health informatics and information technology industry for educational opportunities as a result of

  the EC partnership. Service fees will include marketing and website management, student recruiting, student

  registration and re-enrollment support, student advisement and course selection recommendations, student retention

   support, and faculty administrative support.

 

  This Emergency Purchase has an expected start date of 08/22/2022 through 11/20/2022 with an Original Estimated

  Cost of $400,000.00.

   Signed By:  Debra Matlock, Exec Dir

       Vendor:  NCS Pearson Inc.                                                                         Notary Date:   8/24/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $400,000.00                                        $465,437.16           $465,437.16       23      2


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  72     University of Illinois Chicago                                                                     File Date:  11/30/2022

 

  Latest Filing – 11/30/2022:

  The Actual Total Cost of FY23, Qtr 2, Item#  72 is $534,000.00, with a final contract term ending 11/30/2022.

 

 

  Original Filing – 2/18/2022: FY22, Qtr 3, Item# 29

 

  AT&T is our existing analog circuit vendor. AT&T provides analog circuits for campus communication services for

  Technology Solutions to connect to buildings which are not physically connected to campus by University

  infrastructure. AT&T is the only vendor who can provide the analog circuits for the outdated technology.

 

  The crucial analog circuits must remain in service as the scope of the services are critical for the daily business

  function of the university. The services include Analog Private Lines serving the emergency response systems,

  hospital and campus call distribution systems, UIC parking lots, and other campus services.

 

  The current State of Illinois Contract which we are utilizing expires on December 9, 2022 without any renewals and

  AT&T does not execute contracts under 12 months. AT&T is the only vendor who can provide this analog circuits

  for the outdated technology. There are different types of analog circuits covered on this current contract under the

  State Contract, including our life safety emergency response system that reports directly to UIC Police dispatch,

  UIC Parking services, and our hospital and campus call distribution systems. The financial impact to the university

  for these circuits will increase from $44,500 MRC per month ($534,000 annually) to $66,750 MRC per month

  ($801,000 annually). In addition, a tariff increase will occur in September 2022. The Technology Solutions team is

  actively working on decommissioning these circuits, but expect the work to be completed between August-October

  2022. It is in the best interest of the University to procure the services as a Quick Purchase before before March 1,

  2022 the new rate will increase by $22,250 per month which equates to $267,000 annually.

 

  This Emergency Purchase has an expected start date of 03/01/2022 through 02/28/2023 with an Original Estimated

  Cost of $534,000.00.

   Signed By:  Debra Matlock, Exec Director

       Vendor:  AT&T                                                                                           Notary Date:   2/18/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $534,000.00                                        $534,000.00           $534,000.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  73     Capital Development Board                                                                        File Date:  12/10/2021

 

  Final Filing - 10/26/2022:  FY23, Qtr 2, Item #73

  A Final Cost Statement was received on October 26, 2022, reporting in the same filing quarter as extension, that the

  Actual Total Cost is $159,576.00.

 

  Fourth Filing -12/10/2021: FY23, Qtr2, Item #73

  An Emergency Purchase Extension was received on December 10, 2021 requesting an extension for dates starting

  01/18/2022 to 02/28/2022. The extension expenditure is not assessed and will be charged for time only.

 

  Third Filing - 10/19/2021:

  An Emergency Purchase Extension was received on October 19, 2021 requesting an extension for dates starting

  10/19//2021 to 01/31/2022. The extension expenditure is not assessed and will be charged for time only.

 

  Second Filing - 12/10/2020:

  An Emergency Purchase Extension was received on December 20, 2020, in the same filing quarter, requesting an

  extension to 10/31/2021. The extension expenditure is not assessed and will be charged for time only.

 

  Original Filing - 10/15/2020:

  Central Management Services ("CMS") owns and operates the facility at 2121 W. Taylor, in the heart of the

  Chicago Medical Center Complex. The building is 5 stories and approximately 180,000 sf. The primary tenants are

  the University of Illinois Chicago (UIC) and the Illinois Department of Public Health (IDPH). Both tenants operate

  labs in the facility and perform critical testing. The scope of services provides for an evaluation of the boiler system,

   recommendations for temporary and permanent solutions, including cost estimates and lead times, and an expedited

   design of the replacement boiler(s) and all ancillary components. In addition, the scope also includes providing a

  temporary boiler, as a reimbursable item under the Architect/Engineer Professional Services Agreement, until the

  permanent boiler(s) can be installed. Asbestos abatement may be required. This Emergency Purchase has an

  expected start date of 10/15/2020 through 01/12/2021 with an Original Estimated Cost of $100,000.00.

   Signed By:  Chris Miles, Executive II

       Vendor:  Nest Builders, Inc.                                                                        Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $100,000.00                                        $159,576.00           $159,576.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  74     University of Illinois Chicago                                                                     File Date:  12/5/2022

 

  Latest Filing – 12/5/2022:

  The Actual Total Cost of FY23, Qtr 2, Item# 74  is $1,116,079.85 with a final contract term ending 10/31/2022.

 

 

  Second Filing - 12/9/2021: FY22, Qtr 2, Item #20

  An Emergency Purchase Extension was received on December 9,2021, within the same filing quarter requesting an

  extension for dates starting 1/30/2022 to 10/31/2022 at an additional estimated cost of $569,413.00, revising the

  total estimated cost to $759,216.00.   Funding is received thru Self-Supporting Funds.

 

  Original Filing – 10/29/2021: FY22, Qtr 2, Item# 38

 

  Our current vendor Southwest Service Corporation (SSC (E&I / IPHEC vendor), does not have the staff to meet the

  University Campus needs for temporary cleaning, housekeeping, and COVID-19 disinfection services. The

  University Campus has an emergency award #JMG913 - Vargas Group. This situation means that the UI Hospital

  does not have personnel available to provide cleaning and disinfection services - a threat to public health. The

  vendor is BEP certified and is able to provide compliant personnel to clean these buildings while the University

  rectifies the situation.

 

  Apache Service and Supply Company will provide temporary EVS/hospital-grade cleaning, housekeeping, and

  COVID-19 disinfection services at the UI Hospital (Building 949).  Vendor will provide all labor and required

  equipment to complete the work. .

 

  This Emergency Purchase has an expected start date of 11/01//2021 through 01/29/2022 with an Original Estimated

  Cost of $189,803.13   Funding is received thru Self Supporting Funds.

   Signed By:  Debra Matlock, Exec Director

       Vendor:  Apache Service and Supply Co.                                                   Notary Date: 10/29/2021

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $189,803.13           $759,216.00      $1,116,079.85        $1,116,079.85       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  75     Innovation & Technology, Department of                                                 File Date:  12/6/2022

 

  Second Filing - 12/06/2022: FY23, Qtr 2, Item # 75

  An Emergency Purchase Extension was received on December 6, 2022 requesting an extension for dates starting

  12/7/2022 to 06/06/2023. The extension expenditure is not assessed and will be charged for time only.

 

 

  Original Filing – 09/07/2022: FY23, Qtr 1, Item# 47

 

  As a result of DocuWare service issues, processing agency wide job postings is in a backlog. CMS is unable to

  process state-wide postings and the backlog is building up due to DocuWare becoming unavailable for use. As a

  result of job posting backlog building up, agencies positions may not be filled on time, impacting agencies' ability to

  provide services (a mission critical task), including services that affect health, safety, or collections of State

  revenues. Com-Microfilm is the software publisher and most recent vendor providing services to multiple agencies

  for several years. They have staff trained to handle specific agency needs and knowledge of the existing systems to

  keep them operational.

 

This Emergency is intended to be a Joint Purchase Master Contract (JPMC) available to all governmental units

  and qualified not-for-profit entities. “Governmental unit” means State of Illinois, any State agency as defined in

  Section1-15.100 of the Illinois Procurement Code, officers of the State of Illinois, any public authority which has

  the power to tax or any other public entity created by statute.  “Qualified not-for-profit agency” means any not-

  for-profit agency that qualifies under Section 45-35 of the Illinois Procurement Code and that either (1) acts

  pursuant to a board established by or controlled by a unit of local government or (2) receives grant funds from the

  State or from a unit of local government. The following governmental units use DocuWare under this contract: All

  agencies under the Governor and all other constitutional officers.

  *Contract to include all Docuware products and services provided under the recently expired JPMC Master

  Contract. 

More specifically, the products and services previously provided, include but are not limited to:

 

  *Document and drawing/scanning/imaging that comply with the State's Enterprise document archival requirements

  and controls.

*Transferring the scanned images to microfilm.

*Provide user agency document transportation,

  storage, and destruction.

*Storing images into the appropriate DocuWare file cabinets.

*Assessment of the users'

   imaging requirements and provide specific details of configuration specifications for their organization which

  include DocuWare file cabinet specifications, user role defining, etc.

*Provide training and technical support for

  the user agencies regarding document handling, batching documents, and local scanning.

*Assist the DoIT technical

   staff with maintaining the Enterprise DocuWare platform.

*DoIT is seeking to acquire DocuWare brand imaging,

  storage and retrieval software licenses, add-on modules, and maintenance and support for DocuWare Version 7 and

  all later versions.

 

 

1: Create a test bed for DocuWare 7.x to work preliminarily and for future use by staff and those wishing to

  develop for the platform.

 

2: Build a new architecture to support DocuWare 7.x which includes support for workflow, intelligent indexing

  and other features not currently installed at shared services.

   

3: Audit and adjust all existing systems to reduce the documents no longer needed to move to DocuWare 7.x,

  adjust for newer functions of DocuWare 7.x.

   

4: Develop a plan for points of billing client agencies for the use of the DocuWare system as shared services

  moves forward.

 

5: Bring up to date all of the systems maintenance and licensing to the same level and consolidate billing and

  ownership of DocuWare to DoIT. Stabilizing maintenance of the DocuWare Systems licensing under DoIT.


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

   

6: Build out the DocuWare 7.x system on the new architecture and install new systems as listed below.

7: Train

   and move the users, systems staff and agencies to the new platform in a systematic and precise way as to not

  interrupt their productivity.

   

8: Prepare, train and assist DoIT personnel regarding the newly installed capabilities and possibilities for the uses

   of DocuWare to optimize the use of the product and maximize the cost savings it can provide.

 

  Previous master contract expired on July 16th, 2021. IPB #17-448DOIT-APP44-P-300, Contract Number:

  DIT8032540. This contract was a JPMC.  We are seeking an emergency JPMC with this vendor to cover the license

   and services listed above.   This contract will be available to DoIT supported governmental units or qualified not-

  for-profit.

 

  This Emergency Purchase has an expected start date of 09/08/2022 through 12/06/2022 with an Original Estimated

  Cost of $2,000,000.00.

   Signed By:  Van P Austin, APO

       Vendor:  Com-Microfilm Co.                                                                      Notary Date:     9/7/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:     $2,000,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  76     Innovation & Technology, Department of                                                 File Date:  12/7/2022

 

  Second Filing - 12/07/2022:  FY23, Qtr 2,  Item #76

  An Emergency Purchase Extension was received on December 7, 2022 requesting an extension for dates starting

  12/09/2022 to 06/06/2022. The extension expenditure is not assessed and will be charged for time only.

 

  Original Filing – 09/08/2022: FY23, Qtr 1, Item# 48

 

  The Illinois Department of Innovation and Technology currently has an emergency contract with SEPS, Inc,

  CIT2030189 for critical power, generator, UPS, and maintenance needs. The existing contract ends September 9,

  2022. This vendor is familiar with all of the DoIT/ICN sites across the state of Illinois and has installed the majority

   of the equipment in use at these locations. This vendor also has security clearance to enter and perform work at

  these and other locations. This vendor has staff that are certified and licensed to do highly skilled work including but

   not limited to: install power, remove corrosive batteries, and perform maintenance.  This equipment support and

  backs up numerous critical state infrastructure.  Failure to properly maintain this equipment could result in

  catastrofic loss of functionality and data in the event of a power disruption. 

 

  This emergency contract will provide maintenance and support of existing infrastructure and allow DoIT to

  engineer, furnish and install replacement uninterrupted power supply (“UPS”) systems, generators, and related

  equipment as needed. The resulting contract will also provide the following services: power installation,

  maintenance, emergency maintenance, and preventative maintenance at locations statewide. Maintenance and

  emergency maintenance are crucial to keep critical state services working in case of power outages. An IFB is

  currently drafted and is working it's way through reviews before posting which will replace the goods and services

  provided by this emergency contract. 

 

  he goal setting worksheet and GSR recommended a 4% BEP goal for this emergency.  The vendor agreed to the 4%

  BEP goal.

 

  This Emergency Purchase has an expected start date of 09/10/2022 through 12/08/2022 with an Original Estimated

  Cost of $3,500,000.00.

   Signed By:  Van P Austin, APO

       Vendor:  SEPS, Inc.                                                                                     Notary Date:     9/8/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:     $3,500,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  77     Military Affairs, Department of                                                                 File Date:  12/7/2022

 

  Latest Filing – 12/07/2022:

  The Actual Total Cost of FY23, Qtr 2, Item#  77 is $114,989.00, with a final contract term ending 12/07/2022.

 

  Original Filing – 09/19/2022: FY23, Qtr 1, Item# 52

 

  Vendor is located in the close proximity of the area the State Active duty soldiers will be working.  Vendor is also

  $60k cheaper than other vendors quoted.

 

  Lodging and meals for State Active duty soldiers activated in response to Gubernatorial Proclamation 09142022. 

  Asylum seekers arriving from Texas .

 

  BEP vendors were researched and there are only two in the state for the commodity codes.  One is in Peoria which

  is 3 hours from the work site in Elk Grove and the other is in Chicago over an hour from the work site with minimal

  traffic.  Soldiers/Airmen have to be to the work site on time, any delays would hinder the mission.  Multiple

  contractors in the vicinity of the work site were contacted and the selected vendor was the cheapest and most

  accessible for the services required.

 

  This Emergency Purchase has an expected start date of 09/17/2022 through 12/13/2022 with an Original Estimated

  Cost of $106,000.00.

   Signed By:  Scott Eldridge, Exec I

       Vendor:  Centric Hospitality dba Holiday Inn Elk Grove Village                Notary Date:   9/19/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $106,000.00                                        $114,989.00           $114,989.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  78     Capital Development Board                                                                        File Date:  12/8/2022

 

  Latest Filing – 12/08/2022:

  The Actual Total Cost of FY23, Qtr 2, Item# 78  is $644,142.48, with a final contract term ending12/08/2022.

 

 

  Sixth Filing - 4/29/2021: FY21, Qtr 4 Item #63:

  An Emergency Purchase Extension was received on April 29, 2021 requesting an extension for dates starting April

  29, 2021 to July 31, 2021. The extension expenditure is not assessed and will be charged for time only.

 

  Fifth Filing - 01/14/2021: FY20, Qtr 3, Item# 25:

  An Emergency Purchase Extension was received on January 14, 2021 requesting an extension for dates starting

  01/31/2021 to 06/30/2021. The extension expenditure is not assessed and will be charged for time only.

 

  Fourth Filing - 11/02/2020: FY20, Qtr 3, Item# 25:

  An Emergency Purchase Extension was received on November 2, 2020 requesting an extension for dates starting

  11/19/2020 to 01/31/2021. The extension expenditure is not assessed and will be charged for time only.

 

  Third Filing - 09/03/2020: FY20, Qtr 3, Item# 25:

  An Emergency Purchase Extension was received on August 6, 2020 requesting an extension for dates starting

  09/17/2020 to 11/30/2020. The extension expenditure is not assessed and will be charged for time only.

 

  Second Filing - 05/29/2020: FY20, Qtr 3, Item# 25:

  An Emergency Purchase Extension was received on May 29, 2020 requesting an extension for dates starting

  06/17/2020 to 09/30/2020 revising the current contract amount to $627,728.00. The extension expenditure is not

  assessed and will be charged for time only.

 

  Original Filing - 03/24/2019: FY20, Qtr 3, Item# 25:

  In preparation for patients that are receiving mental health treatment at Ludeman Developmental Center and Shapiro

   Developmental Center, who might potentially be diagnosed with Covid-19 or show similar symptoms, the

  Department of Human Services is requesting emergency purchases from CDB to assess and potentially renovate

  space in 4 homes at Ludeman Developmental Center and Building 603 at Shapiro Developmental Center for

  isolation rooms. This project began through an Emergency Selection of an Architect/Engineer (“A/E”); this exempts

  the selection from a 14-day solicitation required through Qualifications-Based Selection (“QBS”). Considering the

  time frames needed for the selection, negotiation and execution of an A/E contract, followed by bidding and award

  procedures if construction services are necessary, an assessment and/or renovation work at Ludeman Developmental

   Center and Shapiro Developmental Center under the existing processes would likely not begin for several months.

  For this reason, emergency purchases are necessary for Architect/Engineer services to assess, provide guidance and

  potentially design isolation rooms as quickly as possible in order to protect against the threat to public health and

  safety and to minimize a serious disruption in critical State services. Knight E/A, Inc., located in Chicago, IL was

  selected to provide architect/engineering services as they have the necessary experience for this work, are relatively

  in close proximity to the site and they can respond immediately to this request for emergency services. This

  Emergency Purchase has an expected start date of 03/24/2020 through 06/21/2020 with an Original Estimated Cost

  of $50,000.00.


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

   Signed By:  Chris Miles, Executive II

       Vendor:  Knight E/A, Inc.                                                                           Notary Date:

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:          $50,000.00           $627,728.00         $644,142.48           $644,142.48       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  79     University of Illinois Chicago                                                                     File Date:  12/9/2022

 

  Latest Filing – 12/09/2022:  FY23, Qtr2, Item #79

  A final Cost Statement was received on 12/09/2022, stating that the Actual Total Cost is $79,472.00 with a final

  term of contract 8/31/2022..

 

 

  Second Filing - 03/10/2022: FY22, Qtr 3, Item#  17:

  An Emergency Purchase Extension was received on March 10, 2022, reporting in the same filing quarter. Requesting

   an extension for dates starting 05/09/2022 to 08/31/2022 at an additional estimated cost of $0.00, keeping the

  estimated cost at $350,000.00.

 

  Original Filing – 1/28/2022: FY22, Qtr 3, Item# 17

 

  KR Miller was the chosen because they were general contractors on the JOC list, have the experience working at

  UIC and would be able to provide the needed emergency services. In addition, KR Miller is familiar with the wall

  and ceiling that requires the reinforcement to prevent the possible cave in.

 

  KR Miller will install reinforcements to the wall and ceiling from within the valve chamber to stabilize the structure

  and prevent a possible cave in. The valve chamber is located underneath the drop off at the West Harrison Street

  entrance and exit lanes. The street is very active with pedestrian and vehicular traffic . The vault stabilization will be

   implemented to reduce the potential impact to public safety, including the risks of personal injury and property

  damage. This was discovered when K&K, an electrical contractor, was hired to

  redo the lighting within the tunnel. They could not remove the existing conduit because of the unstable structure.

  This was because when they would, pieces of concrete would come off, this lead into a deeper investigation which

  showed that the valve chamber was in poor structural condition.

 

  This Emergency Purchase has an expected start date of 02/07/2022 through 05/08/2022 with an Original Estimated

  Cost of $350,000.00.

   Signed By:  Debra Matlock, Exec. Director

       Vendor:  KR Miller Const                                                                           Notary Date:   1/28/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $350,000.00                                          $79,472.00             $79,472.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  80     Innovation & Technology, Department of                                                 File Date:  8/18/2022

 

  Second Filing - 08/18/2022:  FY23, Qtr 2, Item # 80

  An Emergency Purchase Extension was received on August 18, 2022 requesting an extension for dates starting

  08/30/2022 to 11/27/2022. The extension expenditure is not assessed and will be charged for time only.

 

 

  Original Filing – 5/18//2022: FY22, Qtr 4, Item# 39

 

  Motorola is the current vendor for the MC Starcom21 compatible subscriber radio equipment contract .  Motorola

  was originally selected through competitive bid process. Motorola previously supported DoIT during initial 5 years

   contract term, there are no renewals. DoIT has previously been able to successfully negotiate contracts with this

  vendor and the existing contract terms will be used for the Emergency period. Contract negotiations with a new

  vendor could take several weeks creating significant risk and exposure during negotiations. The administrative review

   process has previously been completed with this vendor, including financial discloser and BEP utilization plan.

  Bringing in a new vendor for such a large and complicated implementation would take months as the configuration. 

 

 

  Motorola supplies equipment to the state of Illinois entities utilizing Starcom21 radio network communication via

  radio mobile and portable radios, emergency dispatch consoles.  The equipment purchased from this contract is

  invaluable to the support of Illinois Law enforcement agencies State, Local and County.  This equipment also

  supports emergency communication with the equipment purchased on this contract.  There is an IFB request to

  replace this contract in legal final review and with the timeline of IFB review and posting we are uncertain it will be

  completed in time so we are requesting an emergency 90 day to cover while the IFB is posting and awarded.    This

  Emergency JPMC contract will be available for use by all governmental units or qualified not-for-profits.

 

  This Emergency Purchase has an expected start date of 06/01/2022 through 08/29/2022 with an Original Estimated 

  cost of $2,000,000.00.

   Signed By:  Matthew Lehman, IT Strategic Sourcing Manager

       Vendor:  Motorola Solutions Incorp.                                                           Notary Date:   5/18/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:     $2,000,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  81     Public Health, Department of                                                                     File Date:  10/13/2022

 

  Second Filing - 10/13/2022: FY23, Qtr2, Item # 81

  An Emergency Purchase Extension was received on October 13, 2022 requesting an extension for dates starting

  10/17/2022 to 10/16/2023 The extension expenditure is not assessed and will be charged for time only.

 

  Original Filing – 7/19/2022: FY23, Qtr 1, Item# 17

 

  The laboratory currently uses the IConnect Lab Web Portal for COVID-19 sample submissions.   Due to the

  increasing demand for monkey pox molecular testing, the lab has an emergent need to expand this on line web portal

  to allow providers to order the testing electronically.   This eliminates data entry errors, staff over time for hand

  entry, and reduces turn around time delays from  manual data entry.

 

  This request is for a 90-day emergency contract to expand the existing Lab Web Portal (LWP) to include the ability

  to order monkeypox testing through an Electronic Testing, Ordering and Reporting Portal (ETOR).

 

  This Emergency Purchase has an expected start date of 07/18/2022 through 10/16/2022 with an Original Estimated

  Cost of $119,500.00.

   Signed By:  Nicole Hildebrand, Chief Financial Officer

       Vendor:  Iconnect Consulting                                                                      Notary Date:   7/19/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $119,500.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022

  82     University of Illinois Chicago                                                                     File Date:  10/6/2022

  Second Filing - 10/6/2022: FY23, Qtr 2, Item 82

  An Emergency Purchase Extension was received on October 6, 2022 requesting an extension for dates starting

  11/1/2022 to 3/10/2023. The extension expenditure is not assessed and will be charged for time only.

 

  Original Filing – 08/17/2022: FY23, Qtr 1, Item# 27

 

  The HVAC Fan stopped producing Air-flow to the space. We called in the only vendor that we are aware of in our

  area that works on this specialized type of fan (Variable Axis Fan).  MVB Mechanical Vibration & Balancing has

  been instrumental in performing repairs to this fan in the past to supply Air-Flow to Building 948. The fan blew

  out a viber-stop, pushing and collapsing the Variable Blades which catastrophically damaged itself by blowing apart

  and sending aluminum blades slamming into each other.  This is an emergency repair because we have no unit to

  supply Air-Flow to Building 948. By the university not having the proper equipment repaired and ready to go is

  failure on UIC Heat, Light & Power division.

 

  Vendor will rebuild and or replace hub and all parts. Vendor will order new complete wheel & components, remove

  the old parts & hub

from motor shaft; remove motor from housing so housing can be repaired; replace motor in fan

  housing and make sure motor is secure. Repair all cracks reinforce structure as needed. When new parts (new wheel

  and components) arrive, vendor will install in the unit.

Calibrations will be reset once repairs are completed.

  Vendor will test and balance the unit. a complete report will be sent after repairs are complete. All old parts will be

  removed from building.  The vendor has indicated the lead time for the parts will be 18 to 20 weeks.

 

  This Emergency Purchase has an expected start date of 08/12/2022 through11/10/2022 with an Original Estimated

  Cost of $115,000.00.

   Signed By:  Debra Matlock, Exec Dir

       Vendor:  MVB Mechanical Vibration & Balancing                                     Notary Date:   8/17/2022

                                      Original                   Revised                Paid To                    Actual

                                     Estimate                 Estimate                     Date              Final Cost        FY   QTR

        State Cost:        $115,000.00                                                   $0.00                      $0.00       23      2

    Federal Cost:                  $0.00                                                                                  $0.00


                                       LIST OF EMERGENCY PURCHASE STATEMENTS

                                 FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                 October 1, 2022 through December 31, 2022