LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  100   Agriculture, Department of                                                                    File Date:  12/17/2025

  Original Filing – 12/17/2025: FY26, Qtr 3, Item# 100

 

  The Illinois Department of Agriculture- Animal Health and Welfare needs to procure 2 additional vehicles. 

  Bureau staff consists of field veterinarians, 4 currently with a 5th posted, and field investigators, 8 currently

  with a 9th posted, that travel through out the state to conduct both disease and humane care investigations.  As

  the disease investigations are on conducted at livestock facilities, and many of the complaints as well, this leads

  to our investigators traveling long distances in remote areas, often on roads that are not maintained.  Currently, 3

   of our veterinarians utilize a SUV or Truck with the other two being relegated to cars.  In addition, 8 of the 9

  investigator positions also have cars.  This is not conducive to the work we are doing. We need vehicles with

  the capability for our veterinarians to haul disease investigation and response equipment and possibly pull

  equipment including cattle chutes.  A truck bed also helps them to establish a clear clean and dirty line for bio-

  security purposes during disease outbreaks.  Our investigators also need vehicles that can be relied on in less

  than ideal conditions.  Therefore, we are seeking to procure 2 Ford Maverick Hybrid trucks.  These will be

  provided to two of the veterinarians.  The other two will retain use of the SUVS until additional trucks can be

  obtained.  This will also then allow us to rotate out our two highest mileage cars, both of which exceed the

  150,000 miles/8 year replacement restriction, for 2 of the investigator cars.  We will continue procuring vehicles

   that meet our needs as funding allows to ensure all our field people have cars that are able to be utilized during

  disease/disaster response and humane care investigations throughout the state. 

Section 20-30(d) of the Illinois

   Procurement Code and the CPO-GS Administrative Rules [44ILL. Adm. Code 1.2030(c)] provide that the use

  of the Emergency method of source selection may be used to make a "quick purchase" in situations when "items

   are available on the spot market or at discounted prices for a limited time so that good business judgment

  mandates a "quick purchase" immediately to take advantage of the availability and price". The emergency spot

  market method of procurement was chosen over a competitive solicitation because of the amount of time a

  competitive selection could take and given the current market environment, vehicle dealerships are unlikely to

  hold multiple vehicles on their lots without a guarantee of award.

 

  This Emergency Purchase has an expected start date of 12/15/2025 through 03/13/2026 with an Original

  Estimated Cost of $68,330.00.

   Signed By:  Michelle Grimsley, SPSA

      Vendor:  Morrow Brothers                                                                      Notary Date:           12/17/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                        $68,330.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  101   Central Management Services, Department of                                            File Date:  12/15/2025

  Original Filing – 12/15/2025: FY26, Qtr 3, Item# 101

 

  This Vendor had the immediate availability and previous knowledge to come and repair the overhead door at the

  CMS Garage 49 North Overhead Door as it ran off the tracks and was hanging from the few steel rollers that

  were still on the track.  This area had to be roped off until the servicemen arrived and secured the hanging door.

 

 

  The CMS Garage 49 North Overhead Door ran off the tracks and was hanging from the few steel rollers that

  were still on the track.  This area had to be roped off until the servicemen arrived and secured the hanging door.

 

 

  This Emergency Purchase has an expected start date of 12/12/2025 through 03/12/2026 with an Original

  Estimated Cost of $4,921.00.

   Signed By:  Martha Blackwell, Manager

      Vendor:  United Door & Dock                                                                 Notary Date:           12/15/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                         $4,921.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  102   Corrections, Department of                                                                    File Date:  1/5/2026

  Original Filing – 1/05/26: FY26, Qtr 3, Item# 102

 

  The vendor will provide global positioning systems (GPS) and radio (RF) electronic monitoring equipment

  related services for individuals being monitored outside of correctional facilities.

 

  Vendor is current incumbent and was awarded competitively procurement solicitation, B-45231. Contract is

  currently being negotiated between Agency and Vendor.

 

  This Emergency Purchase has an expected start date of 01/01/2026 through 03/31/2026 with an Original

  Estimated Cost of $1,200,000.00.

   Signed By:  Jacenta Wilson, APO

      Vendor:  BI Incorp.                                                                               Notary Date:           1/5/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                    $1,200,000.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  103   Public Health, Department of                                                                  File Date:  12/19/2025

  Original Filing – 12/19/2025: FY26, Qtr 3, Item# 103

 

  The vendor is a licensed pest control provider with demonstrated capacity to respond immediately to an active

  bed bug infestation. The vendor was able to perform an on site inspection and initiate emergency treatment

  without delay, which was required to protect employee health and maintain facility operations.

 

  Emergency pest control and extermination services for an active bed bug infestation at 525 and 535 West

  Jefferson Street Springfield Illinois. Services include immediate treatment of the affected floor on December 18

  2025, followed by treatment of all twelve floors within seventy two hours to prevent further spread. Additional

  follow up treatments of all twelve floors are scheduled on January 24 2026 and February 21 2026 to address the

   bed bug life cycle and ensure complete eradication.

 

  This Emergency Purchase has an expected start date of 12/18/2025 through 03/17/2026 with an Original

  Estimated Cost of $105,080.00.

   Signed By:  Mike Caceres, APO

      Vendor:  Newberry's Termite & Pest Control                                                Notary Date:           12/19/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $105,080.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  104   Public Health, Department of                                                                  File Date:  12/9/2025

  Original Filing – 12/09/2025: FY26, Qtr 3, Item# 104

 

  Groupware Technologies, Inc. (GTI) will provide the Illinois Department of Public Health (IDPH) with the full

  range of proprietary Provide Enterprise® software services and support necessary to maintain uninterrupted

  HIV/AIDS case management, prevention, and surveillance operations. The scope of services includes:

• Annual

  Data Hosting and Business Continuity Services – secure server hosting, disaster recovery, and system uptime

  assurance.

 

• Server Licensing and Support – renewal and maintenance of Provide Enterprise® application server

  licenses.

• User License, Maintenance, and Support Fees (per user) – software access, updates, bug fixes, and

  technical support.

• Imaging Support Services – management and support of the integrated imaging/document

  system.

• 270/271 Eligibility Verification Transactions – real-time Medicaid/insurance eligibility verification.

  Contracted Pharmacy Interface Support – maintenance and troubleshooting of pharmacy data exchanges.

  Medicare TROOP Interface Support – management of Medicare True Out-of-Pocket (TROOP) cost-sharing

  interface.

• Report Writing and Custom Programming (per hour) – development of custom reports, queries, and

  enhancements.

• Implementation Support – technical services required for upgrades, configuration, or system

  changes.

 

These supplies and services are essential to ensure IDPH’s HIV/AIDS Care, Surveillance, and

  Prevention Sections can continue using the Provide Enterprise® platform without disruption, thereby

  safeguarding critical public health functions and service delivery for over 48,000 Illinois residents.

 

  This Emergency Purchase has an expected start date of 12/15/2025 through 03/14/2026 with an Original

  Estimated Cost of $627,009.65, using Federal Funds.

   Signed By:  Mike Caceres, APO

      Vendor:  Groupware Technologies                                                            Notary Date:           12/9/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                               $0.00                                           $0.00                   $0.00      26 3

   Federal               $627,009.65                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  105   Transportation, Department of                                                               File Date:  12/10/2025

  Original Filing – 12/10/2025: FY26, Qtr 3, Item# 105

 

  This contract is to acquire routine maintenance and repair services for RWIS equipment and sensors, which

  supply critical weather data used by forecast vendors. This data enables timely and informed decisions regarding

   the deployment of anti-icing treatments and maintenance personnel, ultimately improving winter response

  efforts, optimizing resource allocation, and promoting the safety of both the traveling public and Illinois

  Department of Transportation (IDOT) maintenance staff.

 

  This Emergency Purchase has an expected start date of 12/10/2025 through 03/09/2026 with an Original

  Estimated Cost of $106,707.00.

   Signed By:  Omolara Erewele, APO

      Vendor:  DBT Transportation Services                                                       Notary Date:           12/10/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $106,707.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  106   Veterans Affairs, Department of                                                              File Date:  12/26/2025

  Original Filing – 12/26/2025: FY26, Qtr 3, Item# 106

 

  The Illinois Veterans Home Chicago - The agency was unable to get the renewal in place before the initial

  contract expired, and to avoid any disruption of services for residents to receive their medications the following

  day, the agency declared an emergency.   As the facility does not have an on-site pharmacy, it is necessary to

  solicit bids to ensure the continuity of pharmaceutical services.  The current vendor, JHC Acquisition Inc. dba

  Omnicare of Northern Illinois, was the sole respondent to the original solicitation (Bid -  B-15691) and has been

  providing reliable service, including six-day-per-week medication deliveries and the use of their medication carts,

    and they have been providing the medication for the residents for 5 years until our contract expired 9/23/2025.

  Omnicare was the only vendor that could provide the necessary services and medication needed without any

  disruption in services. We are requesting to continue with this vendor under an emergency contract to avoid

  jeopardizing the health and safety of the veterans at the Illinois Veterans Home Chicago.   This temporary

  contract will remain in place only until a new competitively awarded contract is finalized, at which point it will

  be canceled.

 

The vendor shall provide pharmacy services, including the dispensing of medications and intravenous (IV)

  solutions, in full compliance with all applicable local, state, and federal laws and regulations.  The vendor must

  supply qualified staff, including a licensed pharmacist available on a 24-hour on-call basis, and conduct monthly

  chart reviews to ensure proper documentation and compliance.  Additionally, the vendor shall provide HIPAA- 

  compliant fax machines for the secure transmission of confidential information, as well as lockable medication

  carts for safe medication storage within the facility.  The vendor is responsible for keeping the Home informed

  of any medical concerns related to medications prescribed to residents.  Convenience boxes must also be

  supplied, including but not limited to: miscellaneous medical supplies, house stock medications, over-the-counter

   (OTC) medications, and IV supply and hydration kits.

 

  Illinois Veterans Home Chicago is in urgent need of pharmaceutical services to ensure all residents receive their

  prescribed medications without delay.  The Agency reached out to the following BEP vendors to see if they

  could provide the service needed for the emergency.

1. 12/22/2025 - Emailed vendor A Safe Haven L.L.C an

  RFQ requesting if they could provide services -  Did not received a response back.

2. 12/22/2025 - Emailed

  vendor Anuco RX  an RFQ requesting if they could provide services - Did not receive a response back.

3.

  12/22/2025 - Emailed vendor PharmaScript Inc. an RFQ requesting if they could provide services - Did not

  receive a response back.

4. 12/22/2025 - Emailed vendor 3 R Health Care Products an RFQ requesting if they

  could provide services - Helen,  the owner called me and stated that she will not be able to meet all requirement

  on the RFQ at this time.

 

  This Emergency Purchase has an expected start date of 12/23/2025 through 03/22/2026 with an Original

  Estimated Cost of $150,000.00.

   Signed By:  Leah Thomas, APO

      Vendor:  JHC Acquisition, LLC dba Omnicare of Northern IL                           Notary Date:           12/26/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

      State Cost:                      $150,000.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00

  107   Capital Development Board                                                                    File Date:  12/30/2025

  Original Filing – 12/30/2025: FY26, Qtr 3, Item# 107

 

  The scope of work provides for removing approximately 45,000 square feet of low-slope gravel ballasted single-

  ply roofing, rigid

insulation, and the original asphalt built-up-roofing down to the sloped concrete deck and

  installing a new single-ply roofing system

with insulation that meets the Stretch Energy Code. The work also

  includes new drain flashings, installing new metal trim, and all related appurtenances.

 

  Incorporated documents include the January 2025 Standard Documents for Construction and the January 2025

  Design and

Construction Manual. Basic Architectural Services provided under this procurement should not

  exceed $200,000.00, which is a placeholder prior to the negotiation of a Professional Services Agreement,

  without prior authorization from the Capital Development Board

in consultation with the Chief Procurement

  Office. Final Actual Costs will be reported upon project completion and project close-out.

 

  This Emergency Purchase has an expected start date of 12/30/2025 through 03/29/2026 with an Original

  Estimated Cost of $200,000.00.

   Signed By:  Chris Miles, Exec II

      Vendor:  Hurst-Rosche, Inc.                                                                    Notary Date:           12/30/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $200,000.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  108   Capital Development Board                                                                    File Date:  1/13/2026

  Original Filing – 1/13/2026: FY26, Qtr 3, Item# 108

 

  The scope of work provides for providing and installing an ADA compliant handicapped access ramp for

  entry/exit at the Old State

Capitol south doors. For access purposes, an ADA ramp is required to allow for

  persons with disabilities access to the building. The

scope of the work will include but not be limited to the

  following : Wood ADA ramp, supports for ramp as well as connections to existing sidewalk, installation of non-

  slit treads, low voltage lighting of pathway, emergency power supply and controls for lighting, cable,

conduit

  and connections to new low voltage lighting, protection of site including barriers and security, complete cleanup

   and

restoration of any affected surfaces damaged during construction.

 

  Incorporated documents include the January 2025 Standard Documents for Construction, design documents

  provided by the Architect/

Engineer of record, and quote provided by Johnco Construction, Inc. Section 01 29

   00 PAYMENT PROCEDURES, will be strictly followed

and adhered to. The sum of all items listed in the

  Contractor Schedule of Values should equal the contract award amount. Payment

amounts will be approved

  based on proof of work actually performed and materials actually used. Construction services provided under

 

  this procurement should not exceed $101,000.00, which is a place-holder prior entering into a Construction

  Contract, without prior

authorization from the Capital Development Board in consultation with the Chief

  Procurement Office. Final Actual Costs will be

reported upon project completion and project close-out.

 

  This Emergency Purchase has an expected start date of 1/13/2026 through 04/12/2026 with an Original

  Estimated Cost of $101,000.00.

   Signed By:  Chris Miles, Exec II

      Vendor:  Johnco Construction, Inc.                                                            Notary Date:           1/13/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $101,000.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  109   Capital Development Board                                                                    File Date:  1/13/2026

  Original Filing – 1/13/2026: FY26, Qtr 3, Item# 109

 

  The scope of work provides for a complete upgrade of the two 12-story traction type elevators serving the

  south tower. This includes

new computer based PLC type controllers, updates to interior cab finishes and

  controls, new dedicated penthouse elevator equipment

room, proper elevator equipment room access and 2-hr

  fire rating, reusing existing cars, rails and shaft systems, provides specific upgrades and replacements, replace

  existing travel cables, repair area of existing shaft for compliance (this includes repairing existing

masonry and

  tile walls as well as enclosing existing utilities interior of the shaft), replace all button stations and travel /

  position

indication at each car lobby, upgrade lighting systems, upgrade fire alarm controls, upgrade power

  systems (208V) serving each unit,

provide new Emergency power feed to CAR A for operation during a power

   outage, and new 208 V power riser from subbasement to

Penthouse. (200A)

 

  Incorporated documents include the January 2025 Standard Documents for Construction, design documents

  provided by the Architect/

Engineer of record, and quote provided by CAD Construction, Inc. Section 01 29

  00 PAYMENT PROCEDURES, will be strictly followed and

adhered to. The sum of all items listed in the

  Contractor Schedule of Values should equal the contract award amount. Payment amounts

will be approved

  based on proof of work actually performed and materials actually used. Construction services provided under

  this

procurement should not exceed $1,430,446.00, which is a place-holder prior entering into a Construction

  Contract, without prior

authorization from the Capital Development Board in consultation with the Chief

  Procurement Office. Final Actual Costs will be

reported upon project completion and project close-out.

 

  This Emergency Purchase has an expected start date of 01/13/2026 through 04/12/2026 with an Original

  Estimated Cost of $1,430,446.00.

   Signed By:  Chris Miles, Exec II

      Vendor:  CAD Construction Inc.                                                               Notary Date:           1/13/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                    $1,430,446.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  110   Gaming Board, Illinois                                                                          File Date:  12/10/2025

  Original Filing – 12/10/2025: FY26, Qtr 3, Item# 110

 

  The Video Gaming Act ("VGA") established a distributed, statewide network of video gaming terminals

  ("VGTs") connected to a

CCS. Illinois video gaming went live in September 2012 and has now evolved into the

   largest video gaming network of its kind

in the world. Illinois is home to approximately 9,000 licensed video

  gaming locations that operate more than 48,000 VGTs. The

CCS tracks and accounts for every dollar inserted

  into the state's VGTs. The CCS collects and allocates the hundreds of millions

of dollars in monthly combined

  video gaming profits (Net Terminal Income or"NTI") and taxes. In October 2025 alone, video

gaming

  generated more than $277.7 million in NTI, resulting in over $97.2 million in tax revenue. The CCS serves as the

 

technological backbone for monitoring all VGTs across the state, ensuring compliance with statutory and

  regulatory

requirements, facilitating tax collection, activating/deactivating individual VGTs, facilitating software

   upgrades, and

safeguarding the integrity of gaming operations.

 

  This Emergency Purchase has an expected start date of 01/01/2026 through 03/31/2026 with an Original

  Estimated Cost of $6,000,000.00, No cost to the State.

   Signed By:  Dan Gerber, General Counsel

      Vendor:  Light and Wonder                                                                     Notary Date:           12/10/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                    $6,000,000.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  111   University of Illinois Urbana-Champaign  (Under SIU)                               File Date:  12/19/2025

  Original Filing – 12/19/2025: FY26, Qtr 3, Item# 111

 

  The heat exchanger in building 963, located at 1140 S. Paulina Street, Chicago, IL 60612, has suffered a critical

  failure. The heating bundle located within the exchanger has developed numerous leaks and broken tubes. This

  is resulting in an excessive amount of water usage. This heat exchanger is the sole system supplying heat to

  building 963. University facilities and engineering staff have examined the exchanger and were only able to make

   partial repairs. This means that building 963 does not have sufficient heat. Without immediate replacement of

  the exchanger the building may suffer additional damage due to the potential for freezing pipes and related water

  damage. Additionally, occupants do not have sufficient heat. Given this, the University obtained a quote from

  Anchor Mechanical, Incorporated to replace the heat exchanger. The vendor was selected due to their prior

  experience providing engineering services to the University, as well as their familiarity with the existing building

  systems.

 

  Anchor Mechanical will provide necessary labor and materials to plug heat exchanger tubes to ensure heat

  exchanger can run until new one is received.  Order (2) Hurst Heat exchanger bundles on a one-day build and

  one-day ship. Receive heat exchanger bundles and deliver to building 963. Demo existing heat exchanger bundle

  and install new heat exchanger bundle. Make any necessary piping modifications needed, and deliver extra heat

  exchanger bundle to building for attic stock.

 

  This Emergency Purchase has an expected start date of 12/19/2025 through 03/18/2026 with an Original

  Estimated Cost of $235,000.00, using Self-Supporting Funds.

   Signed By:  Aaron Rosenthal, Asst Vice Chancellor

      Vendor:  Anchor Mechanical Incorp                                                          Notary Date:           12/19/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $235,000.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  112   University of Illinois Urbana-Champaign  (Under SIU)                               File Date:  1/15/2026

  Original Filing – 1/15/2026: FY26, Qtr 3, Item# 112

 

  The vendor was selected based on their prior experience providing engineering services to the University and

  their familiarity with the existing building systems. Given the urgency of this situation, the University obtained a

  quote from vendor M.V.B. Incorporated to replace and repair the exhaust fans.  Three exhaust fans (EF-11),

  (EF-14), and (EF-28) in the Molecular Biology Research Building (919), have suffered critical failures. The fans,

   located within the penthouse suite, have developed cracked housings and failed motors. University facilities and

  engineering staff have determined that because of these failures the building does not have sufficient exhaust

  pressure to maintain proper ventilation. Without immediate repair of the exhaust fans, the building will

  experience further operational issues as the remaining exhaust fans struggle to compensate for the increased

  load. That strain will cause the remaining fans to prematurely fail.

 

  M.V.B Incorporated will provide the following services:

  Lower the fans to the floor so the emergency repairs can be completed, remove the old, damaged motors, and

  damaged sheaves, bushings and belts, remove the old, damaged shafts and bearings, and the wheels from the

  housing, and clean and balance them, install new SS shafts and bearings and align them, install the new sheaves,

   bushings and belts and align and tension them, install new motors equipped with grounding rings, clean all the

  old components that we will be reusing, raise the unit back in place and install the springs, replace the flex

  connections, and run-test and balance the unit after the work is completed.

 

  This Emergency Purchase has an expected start date of 01/13/2026 through 01/12/2026 with an Original

  Estimated Cost of $110,000.00, using Self-Supporting Funds.

   Signed By:  Aaron Rosenthal, Asst. Vice Chancellor

      Vendor:  Mechanical Vibration & Balancing Incorp.                                       Notary Date:           1/15/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $110,000.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  113   University of Illinois Urbana-Champaign  (Under SIU)                               File Date:  1/14/2026

  Original Filing – 1/14/2026: FY26, Qtr 3, Item# 113

 

  Contractor Power and Light specializes in electrical work. We have successfully used them on similar projects

  and the are available to mobilize right away for this emergency work. Our support and grounding for 12kv

  (12,000 Volt) distribution is under water and is compromised. Everything is rusted and falling apart.  The

  ground protection for the electrical system is almost nonexistent and can create an electrical hazard. The

  support for the 12kv cable are rusted and can collapse damaging electrical distribution cable to the entire

  campus.  We need the emergency to prevent a power outage.

 

  Remove and replace (26) stainless steel back-to-back strut supports and feet in basement. Includes new

  stainless steel anchors for supports.  Remove and replace (13) horizontal stainless steel strut supports for cable,

  (25) porcelain cable clamps on bottom row of supports, copper buss bar around perimeter of basement

  including new insulator stand-offs and hardware, copper buss bar under switchgear in basement including new

  insulator stand-offs and hardware.

 

  This Emergency Purchase has an expected start date of 1/12/2026 through 4/11/2026 with an Original

  Estimated Cost of $124,700.00.

   Signed By:  Aaron Rosenthal, Assist Vice Chancellor

      Vendor:  Contractor Power & Light Co.                                                      Notary Date:           1/14/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $124,700.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  114   Central Management Services, Department of                                            File Date:  1/29/2026

  Original Filing – 1/29/2026: FY26, Qtr 3, Item# 114

 

  The truck used for snow removal in the Southern Portfolio of BoPM has a Western 7'6" plow attached that

  needs immediate repair due to an impending snow storm due this weekend.  The electronic controls including a

  wiring harness and modules need to be repaired immediately and we are using the Vendor from whom the truck

  was purchased as they can do the repair immediately.

 

  Repair the plow and electronic controls, including wiring harness and modules for the Western 7'6" plow

  attached to the CMS vehicle.

 

  This Emergency Purchase has an expected start date of 01/28/2026 through 04/27/2026 with an Original

  Estimated Cost of $4,000.00.

   Signed By:  Martha Blackwell, Manager

      Vendor:  Woody's Municipal Supply Co.                                                    Notary Date:           1/29/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                         $4,000.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  115   Central Management Services, Department of                                            File Date:  1/27/2026

  Original Filing – 1/27/2026: FY26, Qtr 3, Item# 115

 

  The Vendor is registered as a Small Business Vendor in the IL Procurement Gateway and currently has a

  contract with the State for other State owned property in the vicinity.  Since the Vendor was coming out to

  perform snow removal services for the other property, it made sense to have them plow this State facility as

  well.

 

  Snow removal services, including the application of ice melt and salt as appropriate at PL054, 1100 Eastport

  Plaza Drive, Collinsville, IL 62234.

 

  This Emergency Purchase has an expected start date of 01/23/2026 through 04/22/2026 with an Original

  Estimated Cost of $2,500.00.

   Signed By:  Martha Blackwell, Manager

      Vendor:  Snow System Inc.                                                                     Notary Date:           1/27/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                         $2,500.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  116   Capital Development Board                                                                    File Date:  1/29/2026

  Original Filing – 1/29/2026: FY26, Qtr 3, Item# 116

 

  REVISED

 

  The scope of work provides for the installation and connection of an underground natural gas pipeline to an

  existing service by replacing a failing section of pipe. This work includes providing and installing underground

  3- inch and 8-inch gas lines as required, the

associated fittings/connections, and isolation valves at termination

  and take-off locations, in compliance with the International Fuel Gas

Code. The contractor shall hydro-

  excavate the proposed connection location, expose the existing gas main, and verify a viable

connection point

  exists prior to the gas line installation. Compliant backfill and seeding is expected in any related damaged grass

  areas.

In areas of disturbed pavement, replacement of like materials consistent with existing construction is

  expected.

 

  Incorporated documents include the January 2026 Standard Documents for Construction and quote dated

  January 29, 2026 provided

by Dodson Plumbing, Heating & Air Conditioning, Inc. Section 01 29 00

  PAYMENT PROCEDURES, will be strictly followed and adhered

to. The sum of all items listed in the

  Contractor Schedule of Values should equal the contract award amount. Payment amounts will be

approved

  based on proof of work actually performed and materials actually used. Construction services provided under

  this

procurement should not exceed $710,500.00, which is a place-holder prior entering into a Construction

  Contract, without prior

authorization from the Capital Development Board in consultation with the Chief

  Procurement Office. Final Actual Costs will be

reported upon project completion and project close-out.

 

  REVISED

 

  This Emergency Purchase has an expected start date of 01/28/2026 through 04/27/2026 with an Original

  Estimated Cost of $710,500.00.

   Signed By:  Chris Miles, Exec II

      Vendor:  Dodson Plumbing, Heating & Air                                                  Notary Date:           1/29/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $710,500.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  117   Natural Resources, Department of                                                           File Date:  1/16/2026

  Original Filing – 1/16/2026: FY26, Qtr 3, Item# 117

 

  The vault toilet type restroom facility the Wayne Fitzgerrell State Recreation Area has a vault that has

  deteriorated (having lasted long past its anticipated life expectancy) and has failed. Untreated sewage is leak into

  surrounding groundwater and flowing the nearby Rend Lake. Sewage making its way into the lake is an EPA

  violation that necessitates the Agency to closing the facility to the public. Not only is the Sailboat Harbor one of

  the most popular public facilities within Wayne Fitzgerrell SRA, it also the most popular on Rend Lake.  It is

  centrally located, main host boat launch for local fishing tournaments, and a very popular site for dock and bank

   fishing.  Given the popularity of this site, the vault toilet is a very critical to this site. There exists a threat to

  public health (untreated sewage entering both the ground water and nearby lake) -- Illinois Procurement Code -

  30 ILCS 500/20-30 Criteria A. The closure of the vault toilet to the public is a disruption of critical state services

   (as this facility is critical to popular fishing events - including ADA fishing events) -- Illinois Procurement Code

  - 30 ILCS 500/20-30 Criteria C.

 

 

 

Due to the State Emergency Criteria, the Agency has selected DRL Sales, Inc. (V00007083 - DRL). DRL

  has the specialized expertise to install XT Precast Concrete Vault Toilet-style Restrooms (see supplies and

  services below) at other nearby Department of Natural Resources (DNR) locations in DNR Region V. DRL is

  also located in nearby St. Libory, IL (approximately 55 miles from the remote Wayne Fitzgerrell SRA). DRL is a

   Small-Business Set-Aside and is registered in the State Bid Buy system. For these reasons, DRL has been

  selected the the Agency as best suited to most swiftly mobilize and resolve the Emergency Criteria.

 

  The DNR seeks to install a CXT Precast Concrete - Tioga Special double vault toilet system restroom (to match

   existing newly installed vault toilets in Region V). This installation includes the following:

- Two (2)

  polyethylene lined concrete vaults

- Simulated barn wood textured walls

- Simulated cedar shake textured

  roofs

- Delivery of the prefabricated vault toilet to the site

- Installation of the prefabricated vault toilet

-

  Pumping of existing failed vaults in compliance with relevant sanitary waste disposal codes

- Demolition of the

  existing failed vault toilet (including concrete apron)

- Removal and disposal of demolished debris per applicable

   codes

- Excavation to solid ground and installation of 12" compacted CA-6 Aggregate base material

- Rental

  and use of a crane for delivery and installation of the vault toilet vaults and building

- Backfill of dig areas with

  compacted CA-6 Aggregate base material

- Form-and-pour 5'-0" wide concrete apron (at front, sides, and rear

  of the new vault toilet building)

- Form-and-pour 5'-0" wide ADA concrete sidewalk from front apron to ADA

  parking stall

- Installation of applicable HC detachable warning at parking lot

- Fine grading, seed (IDOT seed

  mix), anstraw.

 

 

 

Industry standard lead times for prefabricated vaults and vault toilet-style buildings are 5-6 months (or

  greater). Once the structure is delivered to the site, construction (including concrete aprons and sidewalks) is

  anticipated to take 1-2 additional months (depending on the weather). Due to the lead time for prefabrication and

   installation, delaying 2-3 additional months for a formal Invitation for Bid (IFB) process will result in additional

  delays and loss of vault toilet (a critical service) during upcoming fishing tournements and traditional use at one

  of the DNR's most popular fishing locations / harbors.

 

  This Emergency Purchase has an expected start date of 01/21/2026 through 04/21/2026 with an Original

  Estimated Cost of $110,099.00.


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

   Signed By:  Erick Huck, Div. Manager of Statewide Operations

      Vendor:  DRL Sales, Inc.                                                                        Notary Date:           1/16/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $110,099.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  118   Natural Resources, Department of                                                           File Date:  1/12/2026

  Original Filing – 1/12/2026: FY26, Qtr 3, Item# 118

 

  This project consists of repairing two (2) sanitary lift stations and cleaning two (2) additional lift stations at the

  Wayne Fitzgerrell SRA in Franklin County.  This project will include pumping sludge out of four (4) lift stations

  and power washing all components within each vault, the replacement of two (2) 15 hp centrifugal grinder

  pumps at the main lift station, and the replacement of two (2) 5 hp centrifugal grinder pumps at the beach lift

  station. 

 

 

The Contractor shall provide all labor, equipment, and materials necessary to perform the scope of work as

  outlined below:

 

 

Lift Station 1 – Site Residence:

- The Contractor shall pump out the sludge build-up and thoroughly power wash

  all components within the vault of the lift station.  The material shall be disposed of off-site within all applicable

  rules and regulations.

 

 

 

Lift Station 2 – Beach:

- The Contractor shall pump out the sludge build-up and thoroughly power wash all

  components within the vault of the lift station.  The material shall be disposed of off-site within all applicable

  rules and regulations.

- The beach lift station contains two (2) alternating 5 hp grinder pumps, of which only

  one is currently operational.  Repair work at this location will consist of complete removal and replacement of

  both grinder pumps.  Work to include:

1. Complete labor and material for the above stated project.

2. Remove

   the two (2) existing 5 hp centrifugal grinder pumps, chains, and associated floats.

3. Salvage remaining

  working components for future backup items.

4. New float system is to have four (4) signals (low level/off,

  P1, P1 + P2, and high level alarm).  The two new pumps, thermal overload protection, and outer seal failure

  alarm with visible alarm light mounted on top of the panel.

5. Provide and install two (2) new 5 hp submersible

  sewer ejector pumps, lifting chains, and break away fittings.  The submersible pumps shall be 5 horsepower,

  1750 RPM, single phase, 230 volts, 60 hertz, with a 4” discharge.

6. Provide and install new floats and cable

  weights for each pump.  Once installed, the floats shall be calibrated.

7. Install all electrical connections as

  required for floats and power to the pumps, check that the pump rotation is correct.

8. Allow flow to enter the

   lift station and monitor until the system is fully operational.

9. All installation and calibration shall be done in

  accordance with manufacturer’s recommendations.

10. Clean-up all construction debris and haul osite.

 

 

 

Lift Station 3 – Main:

- The Contractor shall pump out the sludge build-up and thoroughly power wash all

  components within the vault of the lift station.  The material shall be disposed of off-site within applicable rules

  and regulations.

- The main lift station contains two (2) alternating 15 hp grinder pumps, of which only one is

  currently operational.  This lift station collects sewage from the entire facility and pumps it to the Ewing Sewage

   Plant.  If this lift station is not functioning, the entire park would be shut down.  Work at this location will

  consist of complete removal and replacement of the existing grinder pumps and control panel.  Work to include:

 

1. Remove existing control panel, all control wiring, and all associated floats.

2. Remove the two (2) existing

  15 hp centrifugal grinder pumps and associated hoisting chains.

3. Salvage remaining working components for

  future backup items.

4. Provide and install one (1) new control panel and associated floats.  New control panel

  is to have surge protection, hour meter for each of the two pumps, thermal overload protection, and outer seal

  failure alarm with visible alarm light mounted on top of the panel.  The new float system is to have four (4)

  signals (low level/off, P1, P1 + P2, and high level alarm).

5. Provide and install two (2) new 15 hp submersible

   sewer ejector pumps, lifting chains, and break away fittings.  The submersible pumps shall be 15 horsepower,

  1750 RPM, three phase, 230 volts, 60 hertz, with a 4” discharge.

6. The new floats shall include cable weights

  for each pump.  Once installed, the floats shall be calibrated.

7. Once all electrical connections have been made


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

   to the control panel, check that the pump rotation is correct.

8. Allow flow to enter the lift station and monitor

   until the system is fully operational.

9. All installation and calibration shall be done in accordance with

  manufacturer’s recommendations.

10. Provide and install a Davit Crane kit that includes a manual winch with a

  rotating base.  The crane shall be able to lift a maximum load capacity of 400 pounds and the winch shall

  include at minimum a 20 feet steel cable with lifting hook.  The crane shall be located such that it swivels over

  the lift station vault in order to hoist the pumps.

11. Clean-up all construction debris and haul off-site.

 

 

 

Lift Station 4 – Campground:

- The Contractor shall pump out the sludge build-up and thoroughly power wash all

   components within the vault of the lift station.  The material shall be disposed of off-site within all applicable

  rules and regulations.

1. The Contractor shall discard all unused construction material to an off-site location

  and dispose of such material per applicable EPA regulations.

2. The Contractor shall provide two (2) sets of

  Start-Up and O&M Manuals to the Site Superintendent and provide 1 hour of training on the operation and

  maintenance of the new equipment.

 

  This Emergency Purchase has an expected start date of 01/19/2026 through 04/19/2026 with an Original

  Estimated Cost of $164,876.00.

   Signed By:  Erick Huck, Division Manager

      Vendor:  F.W. Electric                                                                           Notary Date:           1/12/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $164,876.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  119   Military Affairs, Department of                                                               File Date:  1/26/2026

  Original Filing – 1/26/2026: FY26, Qtr 3, Item# 119

 

  Mid-illinois mechanical was the only small business vendor in the area that could respond and provide services

  to make repairs to prevent freezing of pipes and restore heat to the facility.  Vendor is also only vendor with the

  boiler and materials in stock.

 

  Labor and materials to install a new boiler as listed in quote attached in Bidbuy.

 

  This Emergency Purchase has an expected start date of 01/22/2026 through 04/21/2026 with an Original

  Estimated Cost of $61,000.00, using Federal Funds.

   Signed By:  Scott Eldridge, Exec I

      Vendor:  Mid-Illinois Mechancial                                                             Notary Date:           1/26/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                               $0.00                                           $0.00                   $0.00      26 3

   Federal                 $61,000.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  120   Healthcare and Family Services                                                               File Date:  1/29/2026

  Original Filing – 1/29/2026: FY26, Qtr 3, Item# 120

 

  The previous contract with eQHealth Solutions, LLC (2021-35-001) (an Acentra Holdings, LLC entity) expired

  on October 29, 2025 and was unable to be renewed. The Agency is contracting with Keystone Peer Review

  Organization, LLC (an Acentra Holdings, LLC entity) and previous parent entity to eQHealth in order to maintain

   continuity of these services.  It is crucial that HFS maintains the State’s federally required surveillance and

  utilization control program under 42 CFR Part 476. Transitioning to a new vendor is not feasible during the

  emergency term, as on-boarding a new contractor would require an estimated minimum of 3-5 month for

  staffing, credentialing, systems integration, data exchange configuration, and statewide provider training and

  readiness. Attempting to transition within the emergency time-frame would threaten the health and safety of

  Medicaid members by interrupting critical prior authorization and utilization review activities. This includes

  determinations for medically necessary inpatient services and psychiatric residential treatment for children,

  creating risk of delayed or denied access to needed care.

 

 

 

The incumbent vendor will maintain the original pricing established under the competitively procured RFP

  and will continue efforts to meet the existing 5% BEP participation goal for the duration of the emergency term,

  ensuring both cost stability and supplier diversity commitments remain intact while the State conducts a

  competitive procurement. The emergency contract will be issued to the legal entity name: Keystone Peer Review

   Organization, LLC dba Acentra Holdings, LLC.

 

  The Quality Improvement Organization (QIO) vendor must provide utilization management and quality

  assurance services for Medicaid members across multiple levels of care. This includes medical necessity

  determinations and continued stay reviews for inpatient hospital care, as well as review and oversight for

  hospital outpatient services, psychiatric residential treatment facilities, long-term acute care hospitals (LTAC),

  integrated health homes (IHHs), and other community-based treatment settings. The vendor will also conduct

  pre-payment and post-payment utilization reviews, appeals and reconsideration reviews, and investigations into

  potential quality of care concerns. The vendor will operate and support the web-based referral and authorization

  platform, provide provider outreach, training, and technical assistance, complete standard and ad hoc reporting,

  and perform special projects as directed by the Department. These activities collectively support the State’s

  surveillance and utilization control program in accordance with 42 CFR Part 476.

 

  This emergency procurement is a bridge to prevent disruption in critical utilization review services while the

  State completes a full competitive procurement. Under the current contract, the vendor is required to maintain a

  5% BEP participation goal. While the vendor did not meet the 5% participation level in the current term, the

  State conducted a Good Faith Effort review during the renewal evaluation period in accordance with 30 ILCS

  500/20-60(f). The vendor provided documentation of outreach and engagement efforts; however, the amount of

   work that could be subcontracted was materially lower than originally projected and required.

 

 

 

A new BEP goal was calculated for the renewal period, resulting in an 8% participation goal. However, the

  emergency term is limited to continuation of existing work to prevent service disruption, and the vendor has not

  met the current 5% goal to date. Therefore, the BEP participation level will remain at 5% during the emergency

  term, with the vendor continuing its existing BEP participation structure. This approach preserves supplier

  diversity to the extent practicable while ensuring continuity of federally required services.

 


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  This Emergency Purchase has an expected start date of 01/28/2026 through 04/27/2026 with an Original

  Estimated Cost of $339,000.00, using Federal & State Funds.

   Signed By:  Monique Wantland, APO

      Vendor:  Keystone Peer Review Org dba Acentra Holdings                              Notary Date:           1/29/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                               $0.00                                           $0.00                   $0.00      26 3

   Federal               $339,000.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  121   Public Health, Department of                                                                  File Date:  2/3/2026

  Original Filing – 2/3/2026: FY26, Qtr 3, Item# 121

 

  The Illinois Department of Public Health (IDPH), Division of Laboratories, requires an emergency procurement

  of proprietary reagents, calibrators, control kits, consumables, and instrument service for the Abbott

  ARCHITECT i1000SR analyzer systems used in HIV and Syphilis testing at the IDPH Carbondale Laboratory.

 

 

 

The Abbott ARCHITECT i1000SR is an automated immunoassay analyzer designed for high-accuracy

  clinical diagnostics. The reagents and consumables used in this system are proprietary to Abbott Laboratories

  and cannot be substituted with generic or third-party equivalents without compromising test validity or

  regulatory compliance.

 

 

 

This emergency procurement include:

  :

• Always-On Service for the ARCHITECT i1000SR instruments

• HIV and Syphilis reagent kits, calibrators, and

  control kits

• Ancillary solutions such as wash buffers, pre-trigger and trigger solutions, reaction vessels, and

  probe conditioning solutions

• Preventive maintenance and service support by Abbott-certified technicians

 

 

 

 

These materials and services are essential to maintain uninterrupted testing operations, uphold CLIA

  certification standards, ensure data integrity for disease surveillance, and support the timely diagnosis and

  treatment of HIV and Syphilis across Illinois. The continuity of these testing services directly supports the health

   and safety of Illinois residents and prevents serious disruption in critical public health operations.

 

 

 

Items included in this contrinclude:

 

Nine (9) Architect i1000 Always on Service #01DL7-01

Seven thousand Five hundred (7,500) HIV Reagent

  Kit #02P36

Seven thousand Five-hundred (7,500) Syphilis Reagent Kit #08D06

Nine (9) Architect IA HIV

  Ag/Ab Calibrator Kit (US)  02P36-01 Included in Reagents

Twenty one (21) Architect IA HIV Ag/Ab Control

  Kit (US) 02P36-10 Included in Reagents

Fifth-teen (15) Architect IA Pre-Trigger Solution 06E23-68 Included

  in Reagents

Five (5) Architect IA Probe Conditioning Solution 01L56-40 Included in Reagents

Eleven (11)

  Architect IA Reaction Vessels 07C15-03 Included in Reagents

Five (5) Architect IA Replacement Caps 04D19-

  01 Included in Reagents

Nine (9) Architect IA Septums 04D18-03 Included in Reagents

Nine  (9) Architect

  IA Syphilis Calibrator Kit 08D06-04 Included in Reagents

Twenty one (21 )Architect IA Syphilis Control Kit

  08D06-13 Included in Reagents

Fifth-teen (15) Architect IA Trigger Solution 06C55-63 Included in Reagent

 

  Seventeen (17) Architect IA Wash Buffer 4x975mL 06C54-58 Included in Reagents

Thirteen (13) Architect

  IA/CC Sample Cups 07C14-01 Included in Reagents

 

  This Emergency Purchase has an expected start date of 02/03/2026 through 05/03/2026 with an Original

  Estimated Cost of $100,020.00, using Federal Funds.

   Signed By:  Mike Caceres, APO

      Vendor:  Abbott Laboratories                                                                  Notary Date:           2/3/2026


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                               $0.00                                           $0.00                   $0.00      26 3

   Federal               $100,020.00                                                                   $0.00

  122   Southern Illinois University                                                                    File Date:  1/27/2026

  Original Filing – 1/27/2026: FY26, Qtr 3, Item# 122

 

  endor has agreed to accept trade in and has the available needed vehicles. 

 

   2026 Ford Police Interceptors 4 door Utility with AWD

 

  The vendor that is awarded the CMS contract would not accept our trade-ins, thus making it less economically

  viable. 

 

  This Emergency Purchase has an expected start date of 1/27/2026 through 04/27/2026 with an Original

  Estimated Cost of $133,540.00, using Service Department Funds.

   Signed By:  Matt Brown, Director of Purchasing

      Vendor:  Bob Ridings Incorporated                                                           Notary Date:           1/27/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                               $0.00                                           $0.00                   $0.00      26 3

   Federal               $133,540.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  123   Commerce and Economic Opportunity, Department of                                 File Date:  1/28/2026

  Original Filing – 1/28/2026: FY26, Qtr 3, Item# 123

 

  NGI Capital Inc. dba Apex IT (Apex) was selected as the vendor because they were the creator of the existing

  Weatherization system and therefore, uniquely qualified to provide the services described below.

 

  Enhance: Enhance the application under the guidance and approval of DCEO stakeholders:

 

  Apex will:

 

 

 

• Perform required data table maintenance

• Make updates and enhancements to IWix Calculations

• Develop

  modifications to reports

• Update required meta data for approved functionality changes and new program

  requirements

• Develop needed Mobile Application functionality changes

• Perform data cleanup and data backup

  as required by DCEO stakeholders

• Build or update Reports as prioritized and within time allowed as required

  Apply required changes needed due to Oracle quarterly updates or patches

• Migrate enhancements/fixes across

  instances

• Perform IWix system knowledge transfer on system capabilities to DCEO resources

 

 

 

Support: Provide Level 3 Application Administration and Support

Tasks (described below) for IWix:

• Release

  Management:

 Monitor and make recommendations and/or implement new code to the application as necessary

   to keep the application compatible with new Oracle releases.

 Work with DCEO resources to test new

  quarterly Oracle releases in all Oracle application environments.

• Support before, during, and post system

  upgrades and patches.

• Provide Service Request (SR) management for issue resolution.

• Provide support, follow-

  up and action for all Oracle Product SRs. Work with Oracle on design considerations and product

  enhancements.

Prioritized Activities - Vendor will work on the following prioritized activities as well as other

  activities defined by DCEO stakeholders within the allotted capacity described below:

 

  Migrate existing IWix pages to the new Oracle Redwood UI. This activity is the highest priority of work for the

  Vendor Team. 

 

  This Emergency Purchase has an expected start date of 1/28/2026 through 04/28/2026 with an Original

  Estimated Cost of $527,531.00, using Federal Funds.

   Signed By:  Rick Rogers, APO

      Vendor:  NGI Capital Inc. dba Apex IT                                                      Notary Date:           1/28/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                               $0.00                                           $0.00                   $0.00      26 3

   Federal               $527,531.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  124   Corrections, Department of                                                                    File Date:  2/25/2026

  Original Filing – 2/25/2026: FY26, Qtr 3, Item# 124

 

  Using Other Funds

 

  The Vendor will provide approved commissary items that will allow for the continued sales of food, clothing,

  health/beauty, sundries and electronics to individuals in custody and Correctional Facility Employees.

 

  The short-term nature of our current purchasing cycle does not allow vendors to secure reliable supply chains

  or establish partnerships with BEP certified businesses. Vendors provide new pricing every 4 to 6 weeks and

  must respond quickly to shifting product availability. Without long-term volume commitments, it is not practical

  for the vendors to formalize subcontractor relationships or guarantee consistent opportunities for BEP

  participation. We will continue to pursue BEP inclusion as market conditions stabilize and we realize our

  competitive solicitation for a long-term contract.

 

  This Emergency Purchase has an expected start date of 02/23/2026 through 05/23/2026 with an Original

  Estimated Cost of $6,000.000.00., Using Other Funds.

   Signed By:  Jacenta Wilson, APO

      Vendor:  E-Ford Commissary                                                                  Notary Date:           2/25/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                    $6,000,000.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  125   Corrections, Department of                                                                    File Date:  2/25/2026

  Original Filing – 2/25/2026: FY26, Qtr 3, Item# 125

 

  The Vendor will provide approved commissary items that will allow for the continued sales of food, clothing,

  health/beauty, sundries and electronics to individuals in custody and Correctional Facility Employees.

 

  The short-term nature of our current purchasing cycle does not allow vendors to secure reliable supply chains

  or establish partnerships with BEP certified businesses. Vendors provide new pricing every 4 to 6 weeks and

  must respond quickly to shifting product availability. Without long-term volume commitments, it is not practical

  for the vendors to formalize subcontractor relationships or guarantee consistent opportunities for BEP

  participation. We will continue to pursue BEP inclusion as market conditions stabilize and we realize our

  competitive solicitation for a long-term contract.

 

  This Emergency Purchase has an expected start date of 02/23/2026 through 05/23/2026 with an Original

  Estimated Cost of $600,000.00, using Other Funds.

   Signed By:  Jacenta Wilson, APO

      Vendor:  Keefe Group                                                                           Notary Date:           2/25/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                    $6,000,000.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  126   Corrections, Department of                                                                    File Date:  2/25/2026

  Original Filing – 2/25/2026: FY26, Qtr 3, Item# 126

 

  The Vendor will provide approved commissary items that will allow for the continued sales of food, clothing,

  health/beauty, sundries and electronics to individuals in custody and Correctional Facility Employees.

 

  The short-term nature of our current purchasing cycle does not allow vendors to secure reliable supply chains

  or establish partnerships with BEP certified businesses. Vendors provide new pricing every 4 to 6 weeks and

  must respond quickly to shifting product availability. Without long-term volume commitments, it is not practical

  for the vendors to formalize subcontractor relationships or guarantee consistent opportunities for BEP

  participation. We will continue to pursue BEP inclusion as market conditions stabilize and we realize our

  competitive solicitation for a long-term contract.

 

  This Emergency Purchase has an expected start date of 02/23/2026 through 05/23/2026 with an Original

  Estimated Cost of $6,000,000.00, using Other Funds.

   Signed By:  Jacenta Wilson, APO

      Vendor:  Performance Food Group dba Vistar                                              Notary Date:           2/25/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                    $6,000,000.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  127   Corrections, Department of                                                                    File Date:  2/25/2026

  Original Filing – 2/25/2026: FY26, Qtr 3, Item# 127

 

  The Vendor will provide approved commissary items that will allow for the continued sales of food, clothing,

  health/beauty, sundries and electronics to individuals in custody and Correctional Facility Employees.

 

  The short-term nature of our current purchasing cycle does not allow vendors to secure reliable supply chains

  or establish partnerships with BEP certified businesses. Vendors provide new pricing every 4 to 6 weeks and

  must respond quickly to shifting product availability. Without long-term volume commitments, it is not practical

  for the vendors to formalize subcontractor relationships or guarantee consistent opportunities for BEP

  participation. We will continue to pursue BEP inclusion as market conditions stabilize and we realize our

  competitive solicitation for a long-term contract.

 

  This Emergency Purchase has an expected start date of 02/23/2026 through 05/23/2026 with an Original

  Estimated Cost of $6,000,000.00, using Other Funds.

   Signed By:  Jacenta Wilson, APO

      Vendor:  Union Supply Group                                                                 Notary Date:           2/25/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                    $6,000,000.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  128   Corrections, Department of                                                                    File Date:  2/25/2026

  Original Filing – 2/25/2026: FY26, Qtr 3, Item# 128

 

  The Vendor will provide approved commissary items that will allow for the continued sales of food, clothing,

  health/beauty, sundries and electronics to individuals in custody and Correctional Facility Employees.

 

  The short-term nature of our current purchasing cycle does not allow vendors to secure reliable supply chains

  or establish partnerships with BEP certified businesses. Vendors provide new pricing every 4 to 6 weeks and

  must respond quickly to shifting product availability. Without long-term volume commitments, it is not practical

  for the vendors to formalize subcontractor relationships or guarantee consistent opportunities for BEP

  participation. We will continue to pursue BEP inclusion as market conditions stabilize and we realize our

  competitive solicitation for a long-term contract.

 

  This Emergency Purchase has an expected start date of 02/23/2026 through 05/23/2026 with an Original

  Estimated Cost of $6,000,000.00, using Other Funds.

   Signed By:  Jacenta Wilson, APO

      Vendor:  Walkenhorst's                                                                          Notary Date:           2/25/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                    $6,000,000.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  129   Public Health, Department of                                                                  File Date:  2/10/2026

  Original Filing – 2/10/2026: FY26, Qtr 3, Item# 129

 

  Federal regulations require the Illinois Department of Public Health (IDPH) to maintain a strategic cache of

  emergency medical equipment, pharmaceuticals, and supplies to ensure statewide readiness for public health

  emergencies. These assets must be stored in facilities that meet all applicable local, state, and federal

  requirements, including Current Good Manufacturing Practices (cGMP), to ensure safety, security, and

  usability.

 

 

 

Agiliti Health, Inc. is selected for this emergency procurement because it is the current custodian and

  provider of compliant warehousing services for the State’s emergency medical cache. The vendor’s facility is

  already housing the materials and is equipped with required climate control, security systems, and emergency

  backup infrastructure.

Transitioning the cache to another vendor during this period would require physical

  relocation of federally regulated medical assets, creating unacceptable risk to asset integrity, regulatory

  compliance, and emergency response readiness.

 

 

 

 This emergency procurement is a short-term bridge to ensure uninterrupted warehousing and logistics

  services until the competitively awarded contract is in place.

 

  This Emergency Purchase has an expected start date of 02/08/2026 through 05/08/2026 with an Original

  Estimated Cost of $298,498.60, using Federal Funds.

   Signed By:  Mike Caceres, APO

      Vendor:  Agiliti Health                                                                          Notary Date:           2/10/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                               $0.00                                           $0.00                   $0.00      26 3

   Federal               $298,498.60                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  130   Public Health, Department of                                                                  File Date:  2/11/2026

  Original Filing – 2/11/2026: FY26, Qtr 3, Item# 130

 

  A fourth emergency procurement is necessary to ensure continued maintenance and repair of the State ventilator

   cache following the expiration of the prior emergency contracts.

 

 

 

Agiliti Health Inc. is uniquely qualified to provide these services on an emergency basis due to its established

  expertise and ongoing maintenance of the three hundred sixty five ventilators currently in State inventory. The

  vendor has provided uninterrupted service under the original one year agreement and subsequent emergency

  procurements, has completed inspections, initiated repairs, and maintains detailed service documentation for

  each ventilator.

 

 

 

Transitioning to a new vendor during this emergency period would require full reinspection of all ventilators,

   resulting in estimated costs exceeding ninety five thousand dollars and significant delays in operational

  readiness. Such delays would pose unacceptable risk to public health preparedness and could jeopardize federal

  funding.

 

 

 

This fourth emergency procurement is limited to a ninety day period and is intended solely to maintain

  continuity of critical services while the Illinois Department of Public Health completes and awards a

  competitively bid solicitation, IFB 25-482DPH-FINAN-B-48312, for a long term agreement.

 

  This fourth emergency procurement provides for the continued inspection, preventive maintenance, testing,

  repair, and documentation of three hundred sixty five State owned ventilator units in accordance with

  manufacturer specifications. Services include coordination and installation of replacement parts, performance

  verification, and logistical support necessary to return all ventilators to a fully operational, ready for use

  condition.

 

 

 

Ventilators shall be returned to the Strategic National Stockpile Regional Storage Site warehouse or shipped

  directly to healthcare facilities as required to support emergency response operations.

 

 

 

These ventilators were originally procured by the Illinois Emergency Management Agency and transferred to

   the Illinois Department of Public Health under an intergovernmental agreement. IDPH is responsible for

  ensuring the ongoing maintenance, readiness, and availability of these assets to support statewide public health

  emergency response.

 

 

 

This ninety day fourth emergency agreement ensures continuity of essential services while the agency

  transitions to a new competitively procured contract.

 

  This Emergency Purchase has an expected start date of 02/08/2026 through 05/08/2026 with an Original

  Estimated Cost of $650,973.60, using Federal Funds.

   Signed By:  Mike Caceres, APO

      Vendor:  Agiliti Health                                                                          Notary Date:           2/11/2026


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                               $0.00                                           $0.00                   $0.00      26 3

   Federal               $650,973.60                                                                   $0.00

  131   Public Health, Department of                                                                  File Date:  2/23/2026

  Original Filing – 2/23/2026: FY26, Qtr 3, Item# 131

 

  The Illinois Department of Public Health Office of Preparedness and Response requires emergency courier

  services to transport vaccines, medical countermeasures, and critical medical equipment from the Federal

  Warehouse in East Peoria Illinois to healthcare facilities and public health partners statewide.

Deliveries are

  activated when healthcare facilities experience urgent shortages, outbreak response needs, equipment failure, or

  other public health emergencies that cannot be fulfilled through standard commercial carriers. Shipments

  frequently include temperature sensitive vaccines and therapeutics requiring controlled transport and continuous

  monitoring using portable refrigeration units and data loggers provided by IDPH to maintain product integrity

  and comply with federal handling requirements.

 

 

Services also include transport and recovery of large and sensitive medical equipment, including ultra low

  temperature freezers and similar devices exceeding seven hundred pounds and standard carrier size limits. The

  vendor must provide appropriate vehicles capable of statewide transport and electrical support to maintain

  temperature control during transit.

The vendor must respond within two hours of notification and complete

  delivery within required operational timeframes to prevent disruption of patient care, vaccine administration, and

  emergency response operations.

 

  This Emergency Purchase has an expected start date of 02/20/2026 through 05/20/2026 with an Original

  Estimated Cost of $30,015.00, using Federal Funds.

   Signed By:  Mike Caceres, APO

      Vendor:  Fortune Carrier INC                                                                  Notary Date:           2/23/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                               $0.00                                           $0.00                   $0.00      26 3

   Federal                 $30,015.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  132   Comptroller - Fiscal Officer, Office of the                                                  File Date:  3/11/2026

  Original Filing – 3/11/2026: FY26, Qtr 3, Item# 132

 

  The Illinois Office of Comptroller (IOC) has partnered with Gartner during segments of the ongoing Statewide

  Accounting Management System (SAMS) Modernization Project (SMOD). A previous contract was entered into

   via a National Association of State Procurement Officials (NASPO) master contract and corresponding

  participating addendum that has since expired.  Utilizing the NASPO master contract allowed for shorter term

  engagements that were tailored to meet the immediate needs of the IOC in terms of both scope and length of the

   engagements.

 

 

 

Following a period in the project timeline, the IOC now needs to re-engage Gartner to utilize its expertise in

  data conversion methodology and practice to ensure that the required data conversion is completed within the

  IOC's condensed project timeline window. The IOC was previously informed that the Department of Innovation

   and Technology has been working with Gartner on a new participating addendum to allow utilization of the

  current NASPO master contract since January 2026. The IOC determined that waiting for the completion of the

   participating addendum was preferred over a stand-alone sole source procurement due to the ability to leverage

  the economies of scale cost advantages provided by NASPO pricing. However, completion of the participating

  addendum to engage the NASPO master contract is taking longer than anticipated and the need for cut-over and

  data conversion services is now imminent, necessitating the need for an emergency procurement.

 

 

 

Gartner is honoring the NASPO pricing for this emergency contract. 

 

  The vendor will providing expert guidance for cut-over and data conversion oversight planning and execution.

  In coordination with the Vendor's Cut-over Lead, the vendor will participate in cut-over planning and oversee

  approved cut-over activities and data conversion processes on behalf of the IOC. The vendor's Cut-over and

  Data Conversion Lead will contribute as an active member of the SAMS Modernization Project (SMOD) team,

  applying best practices to support business continuity, data mapping, mock conversion validation and post

  conversion data integrity verification efforts, while managing issue resolution and stakeholder alignment in

  coordination with the SMOD PMO. Progress on key cut-over and data conversion activities will be reported to

  the SMOD Project Manager and stakeholders on a bi-weekly basis.

 

 

 

This emergency procurement allows uninterrupted access to the vendor's services for a period of 90 days.

 

 

 

  This Emergency Purchase has an expected start date of 03/12/2026 through 06/09/2026 with an Original

  Estimated Cost of $198,000.00.

   Signed By:  Ignacio Cuevas, APO

      Vendor:  Gartner, Inc.                                                                            Notary Date:           3/11/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $198,000.00                                           $0.00                   $0.00      26 3


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

   Federal                        $0.00                                                                   $0.00

  133   Innovation & Technology, Department of                                                  File Date:  3/10/2026

  Original Filing – 3/10/2026: FY26, Qtr 3, Item# 133

 

  Select Business Solutions, Inc is the sole owner/publisher of the NOMAD software that must be procured

  immediately to address the emergency conditions. No other company or organization offers NOMAD licensing.

 

 

  NOMAD Software Licensing and associated maintenance. NOMAD Software Licensing Suite includes these

  products: NOMAD, NOMAD Assistant, NOMAD Qlist, NOMAD Collection, NOMAD Application Performance

  Analyzer.

 

 

 

This procurement is for moving the perpetual licenses to the cloud and increasing the license usage. The

  licenses are based on an overarching license and the quantity of of Millions of Instructions per second (MIPS)

  used. This increase is also a product of moving to modern technology, where the hardware will be best

  supported. As it stands, the amount of MIPS being utilized on the mainframe, Z13, is 98. This move will have

  an approximate increased amount of 3041 MIPS which gives a total of usable MIPS of 3139 MIPS utilized.

 

 

This software has been used by the State, on its enterprise mainframes, for nearly two decades. Its

  functionality allows some large state agencies such as Dept of Children & Family Services (DCFS), Illinois Dept

   of Public Health (IDPH), and Illinois Dept of Transportation (IDOT) to facilitate critical administrative

  operations (payroll, human resources, timekeeping, etc). The environment that hosts these applications are in a

  critical state and can no longer be supported as is. The environment is many years out of support and can't be

  safely restarted at this time. An interruption of service to this environment, may render it unusable due to the age

   of the equipment involved. Given the time constraints and critical nature of the systems that rely on this

  software, an emergency procurement to immediately move the licensing to the cloud is the only viable option.

 

  This Emergency Purchase has an expected start date of 03/10/2026 through 06/07/2026 with an Original

  Estimated Cost of $247,500.00.

   Signed By:  Chris Brinkmeyer, APO

      Vendor:  Select Business Solutions, Inc.                                                     Notary Date:           3/10/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $247,500.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  134   Public Health, Department of                                                                  File Date:  5/13/2025

  Original Filing – 5/13/2025: FY26, Qtr 3, Item# 134

 

  The present contract expired May 11, 2025 and IDPH is working on a new procurement.  If the emergency

  contract isn't procured, HIV and Syphilis testing at the Illinois Department of Public Health (IDPH) Carbondale

  Laboratory will no longer be possible due to a lack of testing supplies.

 

 

 

The instruments presently used by IDPH Carbondale Laboratory are manufactured by Abbott Laboratories

  which require manufacturer issued testing kits in order to operate.

 

  The Illinois Department of Public Health Division of Laboratories (IDPH-DOL) uses the Abbott ARCHITECT

  i1000SR for HIV and Syphilis testing. The Abbott ARCHITECT i1000SR is an automated immunoassay analyzer

   designed for clinical laboratories with low to mid-volume testing needs.

 

 

 

These reagents are supplied by Abbott and are specifically designed for use with the ARCHITECT i-series

  instruments, ensuring optimal performance and reliable results. Ancillary reagents such as wash buffers, trigger

  solutions, and pre-trigger solutions are also essential for the instrument's operation.

 

 

 

Proper service and maintenance are crucial for ensuring the continued accuracy, reliability, and uptime of

  the ARCHITECT i1000SR instrument. Consistent maintenance by certified technicians helps to maximize the

  instrument's lifespan, ensure regulatory compliance, and minimize downtime, ultimately supporting efficient

  laboratory operations and reliable patient results.

 

  This Emergency Purchase has an expected start date of 05/12/2025 through 08/09/2025 with an Original

  Estimated Cost of $38,079.50, using Federal Funds.

   Signed By:  Mike Caceres, APO

      Vendor:  Abbott Laboratories                                                                  Notary Date:           5/13/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                               $0.00                                           $0.00                   $0.00      26 3

   Federal                 $38,079.50                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  135   Capital Development Board                                                                    File Date:  3/18/2026

  Original Filing – 3/18/2026: FY26, Qtr 3, Item# 135

 

  The scope of work provides for a complete upgrade of the Evidence Vault ventilation system at Illinois State

  Police Evidence Building.

This includes disconnecting the existing branch ductwork from the existing air

  handling and the removal of the existing exhaust fan unit

serving this space; installing a new 480V/3 phase, 50

  Ton packaged roof top unit to provide 100% outdoor air for comfort cooling

and heating and a dedicated,

  high-plum exhaust system to completely exhaust the vault space. The unit will include new supplemental

 

  structural steel support for roof-mounting and include direct expansion cooling and gas heat, connected to the

  existing Building

Automation System. New ductwork and discharge register will distribute conditioned air to

  the vault. Under an alternate bid, a new Variable Frequency Drive (VFD) will be added to the existing building

  Air Handling Unit for better balance and air volume control

throughout the remainder of the building.

 

  Incorporated documents include the January 2026 Standard Documents for Construction, design documents

  provided by the Architect/

Engineer of record, and quote provided by Henson Robinson Company. Section 01

  29 00 PAYMENT PROCEDURES, will be strictly

followed and adhered to. The sum of all items listed in the

  Contractor Schedule of Values should equal the contract award amount.

Payment amounts will be approved

  based on proof of work actually performed and materials actually used. Construction services

provided under

  this procurement should not exceed $421,340.00, which is a place-holder prior entering into a Construction

  Contract,

without prior authorization from the Capital Development Board in consultation with the Chief

  Procurement Office. Final Actual Costs

will be reported upon project completion and project close-out.

 

  This Emergency Purchase has an expected start date of 03/18/2026 through 06/15/2026 with an Original

  Estimated Cost of $421,340.00.

   Signed By:  Chris Miles, Exec II

      Vendor:  Henson Robinson Co                                                                 Notary Date:           3/18/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $421,340.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  136   Central Management Services, Department of                                            File Date:  3/5/2026

  Original Filing – 3/5/2026: FY26, Qtr 3, Item# 136

 

  This vendor chosen has recently completed the installation of the fire protection for the new underground

  complex and the Facility Manager had worked with them previously with excellent results.  When contacted

  they had the immediate availability to send a representative to start on the project and the knowledge to handle it

  quickly and efficiently.

 

  Fire pump replacement for a failed pump that is 30 years old at the ISP Headquarters building located at J0170,

  800 S. 7th Street, Springfield, IL 62703.

 

  This Emergency Purchase has an expected start date of 03/05/2026 through 06/02/2026 with an Original

  Estimated Cost of $500,000.00.

   Signed By:  Martha Blackwell, Manager

      Vendor:  F.E. Moran, Inc. Fire Protection                                                    Notary Date:           3/5/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $500,000.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  137   Veterans Affairs, Department of                                                              File Date:  3/9/2026

  Original Filing – 3/09/2026: FY26, Qtr 3, Item# 137

 

  llinois Warrior Assistance Program (IWAP) is a warm helpline and high touch holistic resource navigation and

  case management service providing information, resource referrals and support to Illinois Veterans, their

  families and caregivers experiencing emotional challenges associated with PTSD, mild TBI, Military sexual

  trauma, stress, anxiety, depression, addiction and substance abuse, and overall emotional wellness. The program

   has toll-free resource and referral line with access to IWAP consultants to provide telephonic assistance for

  eligible Veterans and their family members.  The agency is seeking to contract with a vendor to provide referral,

   care coordination, counseling, psychotherapy, and where appropriate, facilitate prescription coverage for

  behavioral health medications and other support services for eligible veterans and their family members who are

  seeking counseling related to their military service and associated transitional challenges.  The focus is on

  veterans returning from Iraq and Afghanistan and their families, although assistance to veterans of other

  conflicts is also available through IWAP.  IWAP's intent is not to replace existing service for veterans, but to

  supplement them where gaps currently exist due to increased demand.  IWAP will provide a toll-free resource

  and referral line for eligible veterans and their family members Monday through Friday 9 A.M. to 5 P.M. CST. 

  The vendor must defer emergency and imminent suicide situations or ideations to the National Suicide Hotline

  immediately.  The vendor will refer, as appropriate, all non-counseling related requests to Illinois Joining Forces,

   a State of Illinois initiative, to obtain services and programs for the veteran or his/her family.  The vendor may

  also receive counseling-related referrals from Illinois Veteran Service Officers and other Illinois Joining Forces

  members throughout the State.  As a State program, IWAP will have an Illinois Joining Forces profile on the

  Illinoisjoiningforces.org website for purposes of non-counseling related referrals, for which the vendor will

  serve as point of contact and via which vendor will make non-counseling referrals.  The vendor will maintain a

  comprehensive website that communicates the benefits of the program, as well as operate an online

  communication live chat function manned Monday through Friday 9 A.M. to 5 P.M. CST.

 

 

The current contract ended March 3, 2026. To avoid disruption of critical services, this emergency purchase

  will run from March 4, 2026 to June 1, 2026 while the agency works on developing a long term contract.

 

  This Emergency Purchase has an expected start date of 03/09/2026 through 06/01/2026 with an Original

  Estimated Cost of $84,387.13.

   Signed By:  Leah Thomas, APO

      Vendor:  Illinois Joining Forces                                                                Notary Date:           3/9/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                        $84,387.15                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  138   Human Services, Department of                                                              File Date:  3/10/2026

  Original Filing – 3/10/2026: FY26, Qtr 3, Item# 138

 

  This vendor has provided medical director services for this Center, has experience with the needs of the patients

   and has an available qualified candidate.

 

  The Alton Mental Health Center requires a full time Medical Director with a Board Certified Illinois Physician and

   Surgeon License that includes a specialty in Psychiatry.  The Medical Director will be required to provide

  medical leadership and oversight of the psychiatric services provided at the Center to ensure adequate and

  competent coverage. The Medical Director shall supervise medical staff, maintains overall quality of clinical

  care, and develop and implement policies and procedures. The Medical Director's full time hours will be 40

  hours per week between the hours of 8:00am and 5:00pm, Monday-Friday.

 

  This Emergency Purchase has an expected start date of 03/09/2026 through 06/06/2026 with an Original

  Estimated Cost of $156,000.00.

   Signed By:  Jean Sandstrom, APO

      Vendor:  Annashae                                                                               Notary Date:           3/10/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $156,000.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  139   Student Assistance Commission, Illinois                                                    File Date:  3/1/2026

  Original Filing – 3/1/2026: FY26, Qtr 3, Item# 139

 

  Parchment (Instructure) is the incumbent vendor currently providing electronic transcript services to ISAC

  under a contract that expired on 2/28/2026 (Bidbuy ref# 25-691ISAC-COLAC-P-77920).

 

 

 

ISAC has conducted a competitive procurement (RFP 26-691ISAC-COLAC-B-49281) for these services,

  however, the RFP remains at the award stage due to an unforeseen delay. The RFP was not awarded nor fully

  executed prior to the current contract expiration date.

 

 

Parchment/Instructure is the only vendor capable of providing uninterrupted continuation of these critical

  services during this interim period. Transitioning to a different vendor prior to the completion of the RFP would

  require system integration and institutional coordination with Illinois schools which cannot be accomplished

  without disruption.

 

  The vendor will continue providing Electronic Transcript Services under the existing contract. Services include

  secure processing, management, and electronic transmission of student transcript records; continued hosting

  and maintenance of the established platform; system integrations; and related technical and customer support

  services as currently provided under the contract that has just expired.

 

 

 

This is a comprehensive electronic transcript exchange platform service that allows Illinois high schools to

  electronically submit student transcripts to colleges and universities across the United States as part of the

  students’ college application and enrollment process at no cost to students.

 

   

 

This emergency procurement allows uninterrupted access to the vendor's services for a period of 90 days

  while ISAC finalizes and executed a new contract through the completed competitive procurement process.

 

  This Emergency Purchase has an expected start date of 03/1/2026 through 05/28/2026 with an Original

  Estimated Cost of $153,076.89.

   Signed By:  Biance Morales, APO

      Vendor:  Parchment / Instructure Inc.                                                         Notary Date:           3/1/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $153,076.89                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  140   Capital Development Board                                                                    File Date:  3/12/2026

  Original Filing – 3/12/2026: FY26, Qtr 3, Item# 140

 

  The scope of work provides for the roof replacement at the existing Willow Hall Building located at Alton Mental

   Health Center. The

existing three-story building is located at 4500 College Avenue in Alton, Illinois. The Work

  of the Project is defined by the Contract

Documents and outlines the removal of the existing EPDM roofing

  system and associated materials. New EPDM roofing system and

associated materials are to be installed on all

  levels including the penthouse. Work includes new roof drains tied into the existing pipe

system and new wall-

  mounted roof access ladders.

 

  Incorporated documents include the 2026 Standard Documents for Construction, design documents provided

  by the Architect/

Engineer of record and quote received by Joiner Sheet Metal & Roofing, Inc.. Section 01 29

  00 PAYMENT PROCEDURES, will be strictly

followed and adhered to. The sum of all items listed in the

  Contractor Schedule of Values should equal the contract award amount.

 

  This Emergency Purchase has an expected start date of 03/12/2026 through 06/09/2026 with an Original

  Estimated Cost of $816,575.00.

   Signed By:  Chris Miller, Exec II

      Vendor:  Joiner Sheet Metal & Roofing, Inc.                                                Notary Date:           3/12/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $816,575.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  141   Agriculture, Department of                                                                    File Date:  3/6/2026

 

  Second Filing – 03/06/2026:  FY26,  Qtr 3,  Item # 141

  An Emergency Purchase Extension was received on March 6, 2026 requesting an extension for dates starting

  03/09/2026 to 12/31/2026. The extension expenditure is not assessed and will be charged for time only.

  Reported in the same filing quarter.

 

  Original Filing – 12/11/2025: FY26, Qtr 3, Item# 301

 

  The Grandstand Elevator has been broken down and tools and equipment are stuck on the upper floors, unable

  to retrieve them since, through elevator is the only way to load them, since those equipment and tools are heavy.

   Also, people with disabilities are unable to access the upper floors since the elevator is not working. Some of

  them are not able to perform their daily duties. This is a violation of the ADA federal mandate which requires the

   public buildings to have operated elevators.

KONE will remove all existing wiring, conduit and duct from the

  machine room. New conduit and duct properly sized and constructed for the job requirements will be installed

  (in accordance with applicable codes).

A new curtain of the light will be installed. The curtain of light is an

  electronic sensing device that operates across the entrance. When activated, the curtain of light will prevent the

  doors from closing or cause them to stop and reopen if they are in the process of closing. The doors will remain

   open as long as the flow of traffic continues and will close shortly after the last person passes through the door

   opening. A 3-D type will be provided.

Existing traveling cables will be removed and replaced with new

  traveling cable. In addition to our standard traveling cable, a second traveling cable shall be provided for spare

  wires. Battery backup shall be provided. Battery backup allows passengers to safely exit an elevator in the event

  of a power outage. Hoistway duct KONE will remove all existing wiring, conduit and duct from the hoistway.

  New conduit and duct properly sized and constructed for the job requirements will be installed (in accordance

  with applicable codes). A new cab interior shall be installed that includes a Horizontal Panel Assembly with

  standard 10 wall panels constructed of ½” fire rated particle board and faced with desired Wilsonart standard

  PLAM. The handrail panel is faced with SS #4 and the bottom panel is faced with 5WL material. The panels are

  backed with code compliant backer and banded in black PVC edge banding. The new island ceiling is

  constructed of .125” aluminum substrate and faced with 18-gauge #4 stainless steel material. The new lighting

  system includes 9 round LED down lights (Temp: 3000K and 4 watt LED output produces 269 lumens). New

  handrails for both side walls will be SS #4 finish (2.00” wide x 3/8” solid flat bar with returned ends). New

  bumper rails for both side walls will be SS # 4 finish (4.00” wide x 3/8” solid flat bar with returned ends). All

  reveals to be SS #4 finish and new SS #4 finish cladding shall be installed on the transoms and returns. Pricing

  includes one set of Palmer protection pads. New car door panels shall be provided. The new doors shall be UL

  fire rated 1 ½ hour. Finish will be #4 stainless steel. Two speed side opening. Hatch panel finishing material.

  New hatch door panels shall be provided. KONE ReNova M3 door package includes a new door operator,

  restrictive clutch, car and hoistway door track, car gate switch, car and hoistway hangers, car and hoistway

  door panel adapters, hoistway door interlocks and closers, and hoistway pick up rollers.

 

 

  This Emergency Purchase has an expected start date of 12/09/2025 through 03/08/2026 with an Original

  Estimated Cost of $440,568.00.

   Signed By:  Michelle Grimsley, SPSA


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

      Vendor:  KONE                                                                                   Notary Date:           12/11/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $440,568.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00

  142   Southern Illinois University                                                                    File Date:  3/18/2026

 

  Final Cost Statement

  Latest Filing – 03/18/2026: FY26, Qtr 3, Item# 142

  An Actual Total Cost of FY26, Qtr 3, Item # 142  is $146,269.00 was reported in the same filing quarter.

 

 

  Original Filing – 1/12/2026: FY26, Qtr 3, Item# 313

 

  Purchase of a replacement chiller due to catastrophic failure of Prairie Hall chiller during Winter of 2025.

 

  This Emergency Purchase has an expected start date of 10/11/2025 through 02/01/2026 with an Original

  Estimated Cost of $150,000.00, using Local Funds.

   Signed By:  Matt Brown, Director

      Vendor:  Koch Air LLC                                                                         Notary Date:           1/12/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $146,269.00                                   $146,269.00           $146,269.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  143   Human Services, Department of                                                              File Date:  12/12/2025

 

  Second Filing – 12/12/25:  FY26,  Qtr 3,  Item # 143

  An Emergency Purchase Extension was received on December 12, 2025 requesting an extension for dates

  starting 12/18/2025 to 09/18/2026. The extension expenditure is not assessed and will be charged for time only.

 

 

  Original Filing – 9/19/2025: FY26, Qtr 1, Item# 49

 

  Given the urgency of several large-scale policy changes, the State requires that a vendor who can immediately

  ramp up and initiate support services, who will rapidly become highly knowledgeable about DHS and HFS

  staffing models and impacted policies and programs, and maintain widespread knowledge of emerging and best

  practices in other states. There is a limited pool of vendors with sufficient capacity to meet these needs. As a

  result, a Subject Matter Expert identified five vendors who had the size, resources and knowledge to assist DHS

   and HFS.

An Emergency Request For Quote was sent to these vendors. The State utilized a process an

  abbreviated competitively process which closely mirrored the Request for Proposal process while including

  Business Enterprise Program (BEP) participation. The highest scoring vendor of the four who responded was

  awarded the contract.

This will be a Joint Purchase - DHS is the lead agency and DHS and HFS are the user

  agencies.

 

  In response to federal changes and in line with the State of Illinois’s goal to optimize public benefit enrollment,

  the State seeks a vendor who will assist in producing a coordinated workplan and timeline that:

1) Aligns

  interagency strategic planning on an expedited basis and rapid response planning;

2) Leverages the resources,

  expertise, and networks the State of Illinois can tap into, and;

3) Maximizes agency capacity.

 

  This Emergency Purchase has an expected start date of 09/22/2025 through 12/19/2025 with an Original

  Estimated Cost of $2,074,436.00.

   Signed By:  Jean Sandstrom, APO

      Vendor:  The Boston Consulting Group, Inc.                                                Notary Date:           9/19/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                    $2,074,436.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  144   Capital Development Board                                                                    File Date:  12/16/2025

 

  Fifth Filing – 12/16/2025: FY26, Qtr 3,  Item # 144

  An Emergency Purchase Extension was received on December 16, 2025 requesting an extension for dates

  starting 12/16/2025 to 03/31/2026 at an additional estimated cost of $45,900.00, revising the total estimated cost

   to $95,900.00.

 

  Fourth Filing – 07/18/25:  FY26,  Qtr 1,  Item #53

  An Emergency Purchase Extension was received on July 18, 2025 requesting an extension for dates starting

  07/31/2025 to 12/31/2025. The extension expenditure is not assessed and will be charged for time only.

 

  Third Filing – 12/30/2024:  FY25,  Qtr 3,  Item # 137

  An Emergency Purchase Extension was received on December 30, 2024 requesting an extension for dates

  starting 01/31/2025 to 07/31/2025. The extension expenditure is not assessed and will be charged for time only.

 

 

  Second Filing – 09/16/24:  FY25,  Qtr 1,  Item # 39

  An Emergency Purchase Extension was received on September 16, 2024 requesting an extension for dates

  starting 9/17/2024 to 01/31/2025. The extension expenditure is not assessed and will be charged for time only. 

  Reported in the same filing quarter.

 

  Original Filing – 06/27/2024: FY25, Qtr 1, Item# 309

 

  The scope of work provides for the assessment and repair of the air handling unit blower motor, and other

  ancillary components if required, at the Pontiac Correctional Center Health Care Unit. Temporary cooling

  measures may be required.

 

   Incorporated documents include the March 2009 Standard Documents for Construction & Supplement and any

   design documents provided by the Architect/Engineer of record. Section 01 29 00 PAYMENT PROCEDURES,

  will be strictly followed and adhered to. The sum of all items listed in the Contractor Schedule of Values should

  equal the contract award amount. Payment amounts will be approved based on proof of work actually

  performed and materials actually used. Construction services provided under this

  procurement should not exceed $50,000.00, which is a place-holder prior entering into a Construction Contract,

   without prior authorization from the Capital Development Board in consultation with the Chief Procurement

  Office. Final Actual Costs will be reported upon project completion and project close-out.

 

  In accordance with section 00 21 50 of the Standard Documents for Construction, the General Contractor shall

  perform no less than 20% of work with its own staff. Each other trade shall perform no less than 40% of work

  with its own staff. Work with own staff includes direct labor and supervision, as well as material purchases

  where the material is installed by the contractor.

 

  This Emergency Purchase has an expected start date of 06/20/2024 through 09/17/2024 with an Original

  Estimated Cost of $50,000.00.


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

   Signed By:  Chris Miles, Exec II

      Vendor:  Comtech Holding dba Xcell Mechanical Serv                                   Notary Date:           6/27/2024

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                        $50,000.00            $95,900.00                  $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  145   Capital Development Board                                                                    File Date:  12/18/2025

 

  Second Filing – 12/18/2025:  FY26,  Qtr 3,  Item # 145

  An Emergency Purchase Extension was received on December 18, 2025 requesting an extension for dates

  starting 12/18/25 to 03/31/2027. The extension expenditure is not assessed and will be charged for time only.

 

 

  Original Filing – 10/01/2025: FY26, Qtr 2, Item# 10

 

  The scope of work provides for the replacement of the Armory door control workstation with a new

  touchscreen system including new

software to serve as an HMI to the existing PLC controllers which control

  approximately 40 door locks. The existing PLC controllers are

to remain. The scope of work also includes

  replacing approximately 100 door position switches, approximately 40 intercom stations at

various locations

  across the facility, replacing the Seg Unit door control station, verifying the integrity of the associated wiring,

  replacing damaged wiring, and replacing 2 exterior doors between BY012 and BY017. Provisions for a

  redundant HMI station in the Armory

should be provided to allow for service of the primary HMI.

 

 

Incorporated documents include the January 2025 Standard Documents for Construction and the January

  2025 Design and

Construction Manual. Basic Architectural Services provided under this procurement should

  not exceed $50,000.00, which is a place¬

holder prior to the negotiation of a Professional Services Agreement,

  without prior authorization from the Capital Development Board

in consultation with the Chief Procurement

  Office. Final Actual Costs will be reported upon project completion and project close-out.

 

  This Emergency Purchase has an expected start date of 10/01/2025 through 12/29/2025 with an Original

  Estimated Cost of $50,000.00.

   Signed By:  Chris Miles, Exec II

      Vendor:  Introba, Inc.                                                                            Notary Date:           10/1/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                        $50,000.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  146   Finance Authority, Illinois                                                                      File Date:  12/18/2025

 

  Third Filing – 12/18/2025: FY26, Qtr 3,  Item # 146

  An Emergency Purchase Extension was received on December 18, 2025 requesting an extension for dates

  starting 01/08/2026 to 1/07/2027 at an additional estimated cost of $1,174,463.00, revising the total estimated

  cost to $4,697,852.00.

 

 

  Second Filing –04/01/2025: FY25, Qtr 4,  Item # 167

  An Emergency Purchase Extension was received on April 1, 2025 requesting an extension for dates starting

  04/08/2025 to 01/08/2026 at an additional estimated cost of $2,348,926.00, revising the total estimated cost to

  $3,523,389.00.

 

  Original Filing – 1/10/2025: FY25, Qtr 3, Item# 103

 

  • Tasks for the initial program development and implementation stage, which are currently in-development,

  include: 

1. supporting the process for selecting financial assistance recipients by developing tools for

  identifying compliant project proposals and, where necessary, tools for competitive ranking   

2. coordinating

  inter-agency efforts and developing inter-agency agreements  

3. assisting development and implementation of

  IFA’s lending strategy, which includes loan product design, operational lending strategy development,

  supporting outreach to disadvantaged communities, supporting applicants in accessing services, supporting IFA

  with loan intake, developing bridge financing strategies for multiple IFA and non-IFA loan and financial

  assistance products in coordination with IFA partner agencies  4. supporting the development of IFA’s internal

  loan origination and servicing operations, including customer support and technical assistance  

5. developing

  data collection and reporting tools to assist with federal data and compliance reporting obligations   

6.

  developing education materials on grid resiliency and timelines for participation in programs  

7. supporting

  process for requests for projects/proposals process, including the development and refinement of application

  processes, outreach, technical assistance, organizational scoring and selection   

8. supporting communication

  about program opportunities and public engagement  

9. establishing workforce development strategies in

  coordination with existing workforce development programs of partner agencies   

10. providing technical

  assistance to potential and actual applicants, and supporting the development of technical assistance tools and

  resources.

 

  This Emergency Purchase has an expected start date of 01/08/2025 through 04/07/2025 with an Original

  Estimated Cost of $1,174,463.00, using Federal Funds.

   Signed By:  Christoper Meister, Exec Director

      Vendor:  Climate Infrastructure Group-CIG                                                 Notary Date:           1/10/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                               $0.00                                           $0.00                   $0.00      26 3


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

   Federal             $1,174,463.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  147   Capital Development Board                                                                    File Date:  12/19/2025

 

  Fourth Filing – 12/19/2025:  FY26,  Qtr 3,  Item # 147

  An Emergency Purchase Extension was received on December 19, 2025 requesting an extension for dates

  starting 12/31/2025 to 06/01/2026. The extension expenditure is not assessed and will be charged for time only.

 

 

 

  Third Filing – 12/16/2024: FY25, Qtr 2,  Item # 88

  An Emergency Purchase Extension was received on December 16, 2024 requesting an extension for dates

  starting 12/31/2024 to 12/31/2025 at an additional estimated cost of $115,405.00, revising the total estimated

  cost to $215,405.00.

 

  Second Filing – 01/16/2024:  FY24,  Qtr3  Item # 140

  An Emergency Purchase Extension was received on January 63, 2024 requesting an extension for dates starting

  01/20/2024 to 12/31/2024. The extension expenditure is not assessed and will be charged for time only.

 

 

  Original Filing – 10/23/2023: FY24, Qtr 2, Item# 108

 

  Immediate expenditure is necessary to repair and stabilize the Hotel Florence Annex masonry walls to remove a

  threat to public health and safety. While the collapse of the south wall of the Hotel Florence Annex will be

  contained within a secured light well, the DNR must access this light well to repair areas of the Hotel Florence

  Proper to prevent water infiltrating into the older structure. The potential for collapsing masonry prohibits

  contractors moving forward with repairs or DNR staff removing weed trees and other standard maintenance

  within the light well. Furthermore, the collapse of the Hotel Florence Annex masonry walls may damage the

  Hotel Florence proper; immediate expenditure is also necessary for repairs to State property to protect against

  further damage to State property.

 

  Therefore, DNR has requested that CDB provide an assessment of the Hotel Florence Annex under an

  emergency declaration to determine what can be done to remedy the situation so that DNR can continue to

  make repairs to the Hotel Florence and to alleviate any public health/safety concerns.

 

  This project began through the emergency selection of an Architect/Engineer (“A/E”); this exempts the selection

   from a 14-day solicitation required through Qualifications-Based Selection (“QBS”). Considering the time

  frames needed for the selection, negotiation and execution of an A/E contract, an assessment and potential

  design services under the existing processes would likely not begin forseveral months. For this reason, an

  emergency purchase is necessary to provide an expedited assessment and potential design services to support

  shoring and/or repair work to the Hotel Florence Annex wall as quickly as possible.

  Wiss, Janney, Elstner Associates, Inc., located in Chicago, IL, was selected because the firm has experience

  working with CDB and DNR on direct selection projects including CDB project #102-311-102, the firm is

  located close to the project site and has the capabilities to perform the work, and they are willing to provide

  expedited assessment and potentially design services for this emergency work.

 

  The project scope provides for an engineering assessment of the existing structural and life safety conditions of


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  Hotel Florence Annex, specifically focusing on the south wall. The inspection shall be performed by a firm with

  specific expertise in structural engineering inspections of historic (subject to Illinois Historic Preservation

  Agency) buildings, utilizing drones for accessing areas deemed hazardous

  to human occupancy. This inspection should address the feasibility and safety of continued use of the building

  and include an evaluation of different shoring and stabilization methods that can remain in place until a

  permanent solution can be initiated.

 

  Incorporated documents include the March 2009 Standard Documents for Construction & Supplement and the

  March 2009 Design and Construction Manual & Supplement. Basic Architectural Services provided under this

  procurement should not exceed $100,000.00, which is a place-holder prior to the negotiation of a Professional

  Services Agreement, without prior authorization from the Capital Development Board in consultation with the

  Chief Procurement Office. Final Actual Costs will be reported upon project completion and project close-out.

 

  In accordance with section 00 21 50 of the Standard Documents for Construction, the General Contractor shall

  perform no less than 20% of work with its own staff. Each other trade shall perform no less than 40% of work

  with its own staff. Work with own staff includes direct labor and supervision, as well as material purchases

  where the material is installed by the contractor.

 

  This Emergency Purchase has an expected start date of 10/23/2023 through 01/20/2024 with an Original

  Estimated Cost of $100,000.00.

   Signed By:  Chris Miles, Exec II

      Vendor:  Wiss, Janney,Elstner Assoc, Inc.                                                   Notary Date:           10/23/2023

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $100,000.00          $215,405.00                  $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  148   Human Services, Department of                                                              File Date:  12/22/2025

 

  Second Filing – 12/22/2025: FY26, Qtr 3,  Item # 148

  An Emergency Purchase Extension was received on December 22, 2025 requesting an extension for dates

  starting 01/01/2026 to 12/31/2026 at an additional estimated cost of $806,429.96, revising the total estimated

  cost to $1,074,999.96.

 

 

  Original Filing – 10/1/2025: FY26, Qtr 2, Item# 6

 

  Ivan Ware & Son, Inc can provide boilers that meet the exact specifications for the project. DHS contacted 4

  other vendors registered in BidBuy as capable of providing Boiler rentals. One other vendor responded but the

  equipment they proposed as available for immediate rental did not match the required psi percentage, the voltage

  and plug size or the proper MBH/HR for output rate.

 

  Rental of Five (5) trailer mounted domestic/heating hot water mobile boilers

 

  This Emergency Purchase has an expected start date of 10/01/2025 through 12/31/2025 with an Original

  Estimated Cost of $268,570.00.

   Signed By:  Jean Sandstrom, APO

      Vendor:  Ivan Ware & Sons, Inc.                                                              Notary Date:           10/1/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $268,570.00        $1,074,999.96                  $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  149   Capital Development Board                                                                    File Date:  12/30/2025

 

  Third Filing – 12/30/2025: FY26, Qtr 3,  Item # 149

  An Emergency Purchase Extension was received on December 30, 2025 requesting an extension for dates

  starting 12/31/2025 to 05/31/2026 at an additional estimated cost of $113,363.08, revising the total estimated

  cost to $658,363.08.

 

 

  Second Filing –05/20/25:  FY25,  Qtr 4,  Item # 171

  An Emergency Purchase Extension was received on May 20, 2025 requesting an extension for dates starting

  05/20/2025 to 12/31/2025. The extension expenditure is not assessed and will be charged for time only.

 

  Original Filing – 2/20/2025: FY25, Qtr 3, Item# 116

 

  The scope of the Facade Stabilization project at the Hotel Florence Annex includes emergency repairs to the

  south exterior masonry wall of the building, which is currently in a severely deteriorated and potentially unstable

  condition. The contractor will install shoring on the interior of the building adjacent to the south wall as needed

  to facilitate repairs to the load-bearing masonry wall and the adjacent building framing. Masonry repairs will

  include partial masonry wall reconstruction, brick replacement, repointing, steel lintel replacement, limestone

  window sill replacement, helical anchor installation, and sealant replacement. Limited repairs to the building

  framing may include steel/cast iron painting at framing locations that will be embedded into the south wall, steel

  bearing plate replacement, isolated structural steel/cast iron repairs, and isolated concrete slab repairs. Additional

   miscellaneous scope items include isolated roof repairs to mitigate a leak in the southwest corner of the

  building, and provision and operation of an aerial lift for close-up inspection of the north, east, and west facades

   by the Architect/Engineer. Please refer to the drawings, specifications, and bid form for a more detailed

  description of the work. Asbestos Abatement may be required as specified in the contract documents.

 

  Incorporated documents include the January 2025 Standard Documents for Construction & Supplement, design

   documents provided by the Architect/Engineer of record, and quote received by Berglund Construction

  Company. Section 01 29 00 PAYMENT PROCEDURES, will be strictly followed and adhered to. The sum of all

   items listed in the Contractor Schedule of Values should equal the contract award amount. Payment amounts

  will be approved based on proof of work actually performed and materials actually used. Construction Services

  provided under this procurement should not exceed $545,000.00, which is a place-holder prior to entering into a

   Construction Contract, without prior authorization from the Capital Development Board in consultation with the

   Chief Procurement Office. Final Actual Costs will be reported upon project completion and project close-out.

 

  This Emergency Purchase has an expected start date of 02/20/2025 through 05/20/2025 with an Original

  Estimated Cost of $545,000.00.

   Signed By:  Chris Miles, Exec II

      Vendor:  Berglund Construction Co.                                                          Notary Date:           2/20/2025


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $545,000.00          $658,363.08                  $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  150   Capital Development Board                                                                    File Date:  1/7/2026

 

  Third Filing – 01/07/2026: FY26, Qtr 3,  Item # 150

  An Emergency Purchase Extension was received on January 7, 2026 requesting an extension for dates starting

  02/27/2026 to 08/31/2026 at an additional estimated cost of $39,579.03, revising the total estimated cost to

  $1,117,989.03.

 

  Second Filing – 08/11/25:  FY26,  Qtr 1,  Item # 61

  An Emergency Purchase Extension was received on August 11, 2025 requesting an extension for dates starting

  08/31/2025 to 02/27/2026. The extension expenditure is not assessed and will be charged for time only.

 

 

  Original Filing – 6/03/2025: FY25, Qtr 4, Item# 126

 

  The project provides for improving drainage systems at the East Moline Correctional Center. The upgrades will

  focus on key areas such as storm sewers, curbs, replacement of security fence with lighting, embankments,

  and erosion control to prevent flooding, stabilize slopes, and enhance stormwater management. These

  improvements are crucial for preventing ongoing flooding issues and protecting

  the infrastructure at the facility.

 

  Incorporated documents include the January 2025 Standard Documents for Construction and any design

  documents provided by the Architect/Engineer of record. Section 01 29 00 PAYMENT PROCEDURES, will be

  strictly followed and adhered to. The sum of all items listed in the Contractor Schedule of Values should equal

  the contract award amount. Payment amounts will be approved based onproof of work actually performed and

  materials actually used. Construction services provided under this procurement should not

  exceed $1,078,410.00, which is a place-holder prior entering into a Construction Contract, without prior

  authorization from the Capital Development Board in consultation with the Chief Procurement Office. Final

  Actual Costs will be reported upon project completion and project close-out. Monthly Progress Status Reports

  and all pay applications will be provided to CDB and the CPO.

 

  This Emergency Purchase has an expected start date of 06/03/2025 through 08/31/2025 with an Original

  Estimated Cost of $1,078,410.00.

   Signed By:  Chris Miles, Exec II

      Vendor:  Miller Trucking & Excavating Co.                                                 Notary Date:           6/3/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                    $1,078,410.00        $1,117,989.03                  $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  151   State Police, Illinois                                                                              File Date:  1/12/2026

 

  Fourth Filing – 01/12/2026:  FY26,  Qtr 3,  Item # 151

  An Emergency Purchase Extension was received on January 12, 2026 requesting an extension for dates starting

  01/17/2026 to 04/16/2026. The extension expenditure is not assessed and will be charged for time only.

 

  Third Filing – 10/01/25:  FY26,  Qtr 2,  Item # 57

  An Emergency Purchase Extension was received on October 1, 2025 requesting an extension for dates starting

  10/17/2025 to 01/16/2026. The extension expenditure is not assessed and will be charged for time only.

 

  Second Filing – 07/07/25:  FY26,  Qtr 1,  Item #58

  An Emergency Purchase Extension was received on July 7, 2025 requesting an extension for dates starting

  07/16/2025 to 10/16/2025. The extension expenditure is not assessed and will be charged for time only.

 

  Original Filing – 4/15/2025: FY25, Qtr 4, Item# 113

 

  The Illinois State Police (ISP) Training Academy has an immediate need for an on-site food service vendor

  under a contractual agreement. The current contract is being canceled because it does not include language

  allowing for price increases related to prevailing wage adjustments. Due to these issues and to ensure the

  fairness and transparency of the procurement process, the existing contract must be canceled and a new

  solicitation initiated.

 

 

 

Given the ISP Training Academy's ongoing operations—with two Cadet classes currently in-house and four

  more incoming—the need for uninterrupted food service is critical. DAT is working to issue a new multi-year

  IFB during this emergency period. Arena Food Service, the current contractor and long-time service provider,

  has supported the Academy for many years. To avoid disruption of essential services, ISP is requesting to

  continue emergency service with Arena until a new competitively awarded contract is established.

 

  This Academy is residential, law enforcement training facility and an integral part of the operation is dependent

  upon food service.  During training, officers are engaged in strenuous physical training endeavors as well as an

  intensive study program.  Team building is a major component of the training and there is no time scheduled for

  students to leave the Academy for meals.  The intensive training requires special consideration to ensure that

  nutritionally balanced meals are served in a timely manner to all students.  The ISP is seeking to secure an

  emergency three (3) month procurement for food service contract until a new contract can be established.

 

  This Emergency Purchase has an expected start date of 04/17/2025 through 07/15/2025 with an Original

  Estimated Cost of $433,028.16.

   Signed By:  Jasmin Dixon, Exec Dir

      Vendor:  Arena Food Services                                                                 Notary Date:           4/15/2025


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $433,028.16                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  152   Corrections, Department of                                                                    File Date:  1/20/2026

 

  Second Filing – 01/20/2026: FY26, Qtr 3,  Item # 152

  An Emergency Purchase Extension was received on January 20, 2026 requesting an extension for dates starting

  01/21/2026 to 01/20/2027 at an additional estimated cost of $343,420,000.00, revising the total estimated cost to

   $425,420,000.00

 

 

  Original Filing – 10/23/2025: FY26, Qtr 2, Item# 7

 

  Given the urgent need to ensure adequate uninterrupted healthcare services during the development of a new

  procurement, the State determined that it would be in its best interest to transition services to a new contractor.

  Centurion was selected based on its successful transitions in large state systems, such as Florida and Georgia,

  jurisdictions comparable to Illinois in terms of complexity and scale. In these other states, Centurion has been

  able to rapidly achieve targeted staffing numbers in order to ensure high-quality medical and mental health

  services.  As explained in the June EPS and July EPS, IDOC considered whether it could use a more

  competitive process of source selection.  However, such competition was not practicable.  

 

As described in

  the July EPS, IDOC and Centurion contemplated a 90-day transition, during which Centurion would plan to

  assume responsibility for comprehensive medical and mental health services for individuals in custody.

  However, despite weeks of effort to negotiate with Wexford to continue to provide services during that 90-day

  period, it became apparent by July 21, 2025, that a contract with Wexford for services beyond July 29 would

  not be immediately forthcoming.  As a result, IDOC issued the July EPS on July 24, 2025, and Centurion began

  providing comprehensive medical and mental health services on July 30, 2025.  

 

Because Centurion is now

  providing health services in IDOC facilities, IDOC has selected Centurion for this EPS to ensure continuous

  medical care for the individuals in IDOC custody.

 

Vendor is to provide the medical, dental, vision, audiology, pharmaceutical and mental health services for

  individuals in custody at specified State correctional centers. Under the direction of the IDOC Medical Director

  and the IDOC Chief of Mental Health Services and according to the program definitions and specifications as

  outlined in this contract, Vendor is to arrange and provide for services on-site and as necessary off-site at local

  hospitals, outpatient facilities and consultative physician offices. Agency recognizes that methods of delivery of

  these services may differ from methods used to provide services to members of the general public, but the care

  and services Vendor provides should be similar. It is the intent of Agency for all individuals to receive adequate

  and medically necessary health care services regardless of place of assignment or disciplinary status. Vendor

  will provide these services at the following correctional centers beginning with the effective date of this

  contract: Big Muddy, Centralia, Danville, Decatur, Dixon, East Moline, Elgin, Graham, Hill, Illinois River,

  Jacksonville, Joliet Treatment Center, Joliet Inpatient Treatment Center, Kewanee, Lawrence, Lincoln, Logan,

  Menard, Murphysboro, Pinckneyville, Pontiac, Robinson, Shawnee, Sheridan, Southwestern, Stateville,

  Taylorville, Vandalia, Vienna, and Western Illinois.

 

  This Emergency Purchase has an expected start date of 10/23/2025 through 01/20/2026 with an Original

  Estimated Cost of $82,000,000.00.

   Signed By:  Jacenta Wilson, APO


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

      Vendor:  Centurion of Illinois                                                                  Notary Date:           10/23/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                  $82,000,000.00     $425,420,000.00                  $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  153   Toll Highway Authority, Illinois State                                                       File Date:  12/8/2025

 

  Final Cost Statement

  Latest Filing – 12/08/25: FY26, Qtr 3, Item # 153

  The Actual Total Cost of FY26, Qtr 3, Item#  153  is $1,199,834.68, with the final contract term ending.

 

 

  Second Filing – 08/20/25:  FY26,  Qtr 1,  Item # 92

  An Emergency Purchase Extension was received on August 20, 2025 requesting an extension for dates starting

  08/28/2025 to 12/31/2025. The extension expenditure is not assessed and will be charged for time only.

 

 

  Original Filing – 5/29/2025: FY25, Qtr 4, Item# 125

 

  ***The Illinois Tollway is a user-free system and receives no state or federal funds for maintenance and

  operations.

 

  Perform structural repairs, including bridge beam replacement; removal and replacement of bridge deck and

  pavement, parapets, and raised median, pavement marking, and maintenance of traffic, including temporary

  concrete barrier. The underside of the Illinois Route 83 (IL 83) bridge over I-88 was struck by a construction

  excavator being hauled by a truck/trailer traveling westbound on I-88. The impact caused severe damage to the

  bridge, resulting in lane closures on IL 83 and I-88.

 

  This Emergency Purchase has an expected start date of 5/30/2025 through 08/27/2025 with an Original

  Estimated Cost of $2,000,000.00, using Other Funds.

   Signed By:  Eric Occomy, Chief Contract Services

      Vendor:  Lorig Construction Co.                                                               Notary Date:           5/29/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                    $2,000,000.00                                 $1,199,834.68        $1,199,834.68      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  154   Public Health, Department of                                                                  File Date:  12/15/2025

 

  Final Cost Statement

  Latest Filing – 12/15/25: FY26, Qtr 3, Item # 154

  The Actual Total Cost of FY26, Qtr 3, Item#  154  is $627,009.65, with the final contract term ending.

 

  Original Filing – 09/15/2025: FY26, Qtr 1, Item# 48

 

  Groupware Technologies, Inc. (GTI) is the sole authorized provider of the Provide Enterprise® software and

  the only vendor capable of supplying the full range of licensing, hosting, maintenance, and technical support

  required by the Illinois Department of Public Health (IDPH). The Provide Enterprise® platform is a proprietary,

  integrated case management and surveillance system used by IDPH to monitor HIV incidence and prevalence,

  manage client care for more than 48,000 Illinois residents, and administer critical Ryan White Part B services.

 

 

GTI holds exclusive rights to the software, system upgrades, security patches, and technical expertise

  necessary to maintain and operate Provide Enterprise®. No other vendor can legally or technically provide these

  services, nor can they replicate the proprietary interfaces that connect the system to pharmacies, Medicare

  TROOP, healthcare providers, and other electronic medical record systems.

 

 

The selection of GTI ensures uninterrupted continuity of HIV/AIDS care coordination, prevention, and

  surveillance services. Any attempt to transition to a different vendor or system would require a complete

  replacement of the platform, migration of highly sensitive health data, redevelopment of system interfaces, and

  extensive retraining of IDPH staff and partner organizations. This process would take years, impose significant

  costs, and cause unacceptable disruptions to essential public health services.

For these reasons, Groupware

  Technologies, Inc. is the only vendor that can meet the State’s immediate and ongoing needs for Provide

  Enterprise® software and related services.

 

  Groupware Technologies, Inc. (GTI) will provide the Illinois Department of Public Health (IDPH) with the full

  range of proprietary Provide Enterprise® software services and support necessary to maintain uninterrupted

  HIV/AIDS case management, prevention, and surveillance operations.

  The scope of services includes:

• Annual Data Hosting and Business Continuity Services – secure server hosting,

  disaster recovery, and system uptime assurance.

 

• Server Licensing and Support – renewal and maintenance of

  Provide Enterprise® application server licenses.

• User License, Maintenance, and Support Fees (per user) –

  software access, updates, bug fixes, and technical support.

• Imaging Support Services – management and

  support of the integrated imaging/document system.

• 270/271 Eligibility Verification Transactions – real-time

  Medicaid/insurance eligibility verification.

• Contracted Pharmacy Interface Support – maintenance and

  troubleshooting of pharmacy data exchanges.

• Medicare TROOP Interface Support – management of Medicare

  True Out-of-Pocket (TROOP) cost-sharing interface.

• Report Writing and Custom Programming (per hour) –

  development of custom reports, queries, and enhancements.

• Implementation Support – technical services

  required for upgrades, configuration, or system changes.

 

These supplies and services are essential to ensure

  IDPH’s HIV/AIDS Care, Surveillance, and Prevention Sections can continue using the Provide Enterprise®

  platform without disruption, thereby safeguarding critical public health functions and service delivery for over

  48,000 Illinois residents.

 

 

 

  The Illinois Department of Public Health (IDPH) conducted a review of potential opportunities to utilize Business

   Enterprise Program (BEP)-certified vendors for this procurement. The following steps were taken:

1. BidBuy

  Vendor Search – IDPH searched the BidBuy system and the State of Illinois BEP vendor directory for


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  contractors certified to provide case management software, database hosting, licensing, and technical support

  services.

2. Market Scan – IDPH reviewed the marketplace for IT vendors that might offer comparable services

  or subcontracting opportunities related to hosting, software maintenance, or user support.

3. Direct Outreach –

  IDPH consulted with the Agency Procurement Office and internal procurement staff to determine whether any

  BEP-certified vendors were authorized resellers, distributors, or subcontractors for the Provide Enterprise®

  software.

4. Assessment of Subcontracting Potential – IDPH evaluated whether ancillary services (such as

  hosting or programming support) could be subcontracted to a BEP vendor without disrupting the integrity and

  security of the Provide Enterprise® system.

Results: No BEP-certified vendors were identified who are authorized

   to sell, support, or maintain the Provide Enterprise® software. Because Groupware Technologies, Inc. (GTI) is

   the sole authorized provider, no opportunity exists to competitively bid this procurement or to subcontract core

  services to a BEP-certified firm.

 

  This Emergency Purchase has an expected start date of 09/16/2025 through 12/14/2025 with an Original

  Estimated Cost of $700,000.00, using Federal Funds.

   Signed By:  Mike Caceres, APO

      Vendor:  Groupware Technologies, Inc.                                                      Notary Date:           9/15/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                               $0.00                                           $0.00                   $0.00      26 3

   Federal               $700,000.00                                                          $627,009.65


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  155   Capital Development Board                                                                    File Date:  1/7/2026

 

  Final Cost Statement

  Latest Filing – 01/07/2026: FY26, Qtr 3, Item # 155

  The Actual Total Cost of FY26, Qtr 3, Item#  155  is $128,356.87, with the final contract term ending.

 

 

  Third Filing – 11/04/2025: FY26, Qtr 2,  Item # 47

  An Emergency Purchase Extension was received on November 04, 2025 requesting an extension for dates

  starting 12/31/2025 to 03/31/2026 at an additional estimated cost of $3,956.87, revising the total estimated cost

  to $128,356.87.

 

  Second Filing – 04/15/25:  FY25,  Qtr 4,  Item # 159

  An Emergency Purchase Extension was received on April 15, 2025 requesting an extension for dates starting

  05/10/2025 to 12/31/2025 The extension expenditure is not assessed and will be charged for time only.

 

 

  Original Filing – 2/10/2025: FY25, Qtr 3, Item# 100

 

  The scope of work provides for interior and exterior repairs to the existing Vocational Building. Demolition

  required to complete the repairs includes partial removal of the interior slab-on-grade and removal of drywall and

   finishes as needed to complete the repairs. Interior repairs include backfilling voids under the slab-on-grade,

  repainting non-load bearing CMU partition walls, replacing cracked CMU, minor ceiling repairs, replacing

  carpeting and base boards, and painting after repairs are completed. Additionally, work will be needed in the

  Mechanical Room to repair an existing electrical service that was damaged during concrete coring. The work

  includes additional demolition of the concrete slab-on-grade to replace approximately 6-7' of ¾" dia. rigid steel

  conduit, installing a floor junction box rated for high traffic areas and replacing (4) #10-12 wires (size to be

  verified by GC) spliced from the floor box back to the existing

  panel. The Client Agency will assist the GC with identifying the correct items and sizes prior to construction.

 

  Incorporated documents include the January 2025 Standard Documents for Construction, design documents

  provided by the Architect/Engineer of record and quote received by Samron Midwest Contracting, Inc. Section

  01 29 00 PAYMENT PROCEDURES, will be strictly followed and adhered to. The sum of all items listed in the

  Contractor Schedule of Values should equal the contract award amount.

  Payment amounts will be approved based on proof of work actually performed and materials actually used.

  Construction Services provided under this procurement should not exceed $124,400.00, which is a place-holder

   prior to entering into a Construction Contract, without prior authorization from the Capital Development Board

  in consultation with the Chief Procurement Office. Final Actual Costs will be reported upon project completion

  and project close-out.

 

  This Emergency Purchase has an expected start date of 02/10/2025 through 05/10/2025 with an Original

  Estimated Cost of $124,400.00.

   Signed By:  Chris Miller, Exec II


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

      Vendor:  Samron Midwest Contracting                                                       Notary Date:           2/10/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $124,400.00          $128,356.87         $128,356.87           $128,356.87      26 3

   Federal                        $0.00                                                                   $0.00

  156   Central Management Services, Department of                                            File Date:  1/14/2026

 

  Final Cost Statement

  Latest Filing – 01/14/2026: FY26, Qtr 3, Item #156

  The Actual Total Cost of FY26, Qtr 3, Item# 156   is $61,106.75, with the final contract term ending.

 

  Original Filing – 8/15/2025: FY26, Qtr 1, Item# 34

 

  An Emergency was declared on 5/15/25 on a Chiller that went down at Y0108, 10956 Dickson Mounds Rd,

  Lewistown, IL 61542.  The chiller could not be repaired and required the rental of a 200Ton chiller immediately

  to protect the artifacts stored at the museum.  Since we were unable to get the original emergency extended and

   we need the chillers on site through the end of the season, while CDB determines a course of action, we are

  using the same Vendor from the original emergency to avoid having to pay additional delivery and set up fees if

  we were to try and find another Vendor.  Being in the middle of the hot season, most vendors do not have this

  size of chiller available at this time for rent.

 

  Vendor will rent the State a 200 Ton chiller for the 2026 summer/fall season to protect the artifacts housed at

  the Dickson Mounds Museum.  They will also be responsible for the removal of the chiller when the need no

  longer exists.

 

  This Emergency Purchase has an expected start date of 08/13/2025 through 11/10/2025 with an Original

  Estimated Cost of $52,888.10.

   Signed By:  Martha Blackwell, Manager

      Vendor:  Carrier                                                                                  Notary Date:           8/15/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                        $52,888.10                                    $61,106.75            $61,106.75      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  157   Corrections, Department of                                                                    File Date:  1/14/2026

 

  Final Cost Statement

  Latest Filing – 1/14/2026: FY26, Qtr 3, Item # 157

  The Actual Total Cost of FY26, Qtr 3, Item# 157  is $1,196,422.51, with the final contract term ending.

 

 

  Third Filing – 09/17/2024: FY25, Qtr 1,  Item #87

  An Emergency Purchase Extension was received on September 17, 2024 requesting an extension for dates

  starting 09/23/2024 to 04/22/2025 at an additional estimated cost of $331,453.43, revising the total estimated

  cost to $763,492.09

 

  There was a Second Filing from 3/23/2024 to 09/22/2024 at an additional cost of $284,102.94 revising total

  estimated cost to $432,038.66.  THIS EP B-42026 CAN NOT BE FOUND.  9/27/2024 KJL

 

 

  Original Filing – 12/27/2023: FY24, Qtr 3, Item# 3

 

  The vendors for this type of rental are limited and this is a specialty service. 

 

  Aggreko will be providing rental of three (3) boilers for Shawnee CC.  They will also be changing out the wire

  for the new boilers and updating it up to code.

 

  Shawnee CC looked for Vendor to meet this type of emergency and was only able to find Agrekko in our area.

 

 

  This Emergency Purchase has an expected start date of 12/23/2023 through 03/22/2024 with an Original

  Estimated Cost of $147,935.72.

   Signed By:  Sandy Robinson II, Purchasing Manager

      Vendor:  Aggreko                                                                                Notary Date:           12/27/2023

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $147,935.72          $763,492.09       $1,196,422.51        $1,196,422.51      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  158   Transportation, Department of                                                               File Date:  1/14/2026

 

  Final Cost Statement

  Latest Filing – 01/14/2026: FY26, Qtr 3, Item # 158

  The Actual Total Cost of FY26, Qtr 3, Item# 158   is $312,000.00, with the final contract term ending.

 

 

  Original Filing – 10/24/2025: FY26, Qtr 2, Item# 12

 

  On 10/03/25, District 7 was inspecting a railroad crossing improvement on US 45 in Wayne County south of

 

  Fairfield. There were no issues noted that day. A heavy rainstorm occurred overnight, and a sinkhole was

 

  noticed the next morning by the railroad crew. It is located on the west side of US 45 between the main tracks

 

  and the side rail in the shoulder area. It w as determined that the 24” storm sewer underneath the rail had

 

  collapsed. It is assumed the vibratory roller played a part in the collapse, but the pipe w as installed in the 50’s.

 

SCOPE:

  District 7 proposes the scope to replace the entire run from inlet to headwall on the east and west sides of US

 

  45. We assume the storm sewer on the east side is in similar condition given the age. T he work would also

 

  include some incidental HMA surfacing and curb and gutter replacement.

  The estimate for this work is $750,000

 

  With the storm sewer going under the RR track s, the RR has a requirement for steel casing pipe boring under

 

  the tracks. Norfolk Southern has provided D7 with 2 potential contractors that can perform this work up to

  their

specifications

  .

  Using one of the trusted RR contractors allows for quick coordination and eliminates any issues that may arise

 

  regarding RR Liability Insurance or Right of Entry.

 

  Services are to include installation of storm sewer by boring underneath the railroad and encasing in steel. Work

 

will also include curb & gutter replacement and incidental HMA surfacing. Supplies include 36" Storm Sewer

 

CLASS A TYPE 2,trench backfill, subbase granular m aterial, HMA, Traffic Control and concrete.

 

  This Emergency Purchase has an expected start date of 10/24/2025 through 01/22/2026 with an Original

  Estimated Cost of $750,000.00.

   Signed By:  David Buzzard, Dist 7 Operations Eng.

      Vendor:  Howard Contracting LTD                                                           Notary Date:           10/24/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $750,000.00                                   $312,000.00           $312,000.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  159   Human Services, Department of                                                              File Date:  1/15/2026

 

  Final Cost Statement

  Latest Filing – 1/15/2026: FY26, Qtr 3, Item # 159

  The Actual Total Cost of FY26, Qtr 3, Item#  159  is $161,840.51, with the final contract term ending.

 

  Original Filing – 09/05/2025: FY26, Qtr 1, Item# 43

 

  Nichols Enterprises, LLC is a ServPro vendor experienced in mold testing and mold remediation. The Center

  required immediate testing as mold was visible in several areas in their residential homes and the vendor was able

   to respond immediately to help address this problem.

 

  The vendor will complete air quality testing and provide air scrubbers for the Center's 7 residential homes where

   mold has been detected at elevated levels.  Once heating season starts, the vendor will complete the initial

  remediation of the mold in these residential homes followed by further testing to evaluate the mold levels.

 

  This Emergency Purchase has an expected start date of 09/02/2025 through 11/30/2025 with an Original

  Estimated Cost of $250,000.00.

   Signed By:  Jean Sandstrom, APO

      Vendor:  Nichols Enterprises, LLC                                                            Notary Date:           9/5/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $250,000.00                                   $161,840.51           $161,840.51      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  160   Central Management Services, Department of                                            File Date:  2/27/2026

 

  Final Cost Statement

  Latest Filing – 02/27/2026: FY26, Qtr 3, Item# 160

  An Actual Total Cost of FY26, Qtr 3, Item # 160  is $2,204.00 was reported in the same filing quarter. 26/3

 

 

  Original Filing – 2/5/2026: FY26, Qtr 3, Item# 337

 

  The current PRV has failed and needs replaced to prevent severe plumbing damage ie. burst pipes, appliance

  failure, water hammer at the Peoria State Garage, J0936, 6510 W. US Highway 150, Edwards, IL 61528.

 

  The building's main pressure reducing valve needs to be replaced.  This needed to be done ASAP in order to

  keep the pipes from blowing out of the bottom of the building due to 105psi water pressure that is currently

  coming through (ideal is 60, 85 is high).

 

  This Emergency Purchase has an expected start date of 02/04/2026 through 05/04/2026 with an Original

  Estimated Cost of $2,750.00.

   Signed By:  Martha Blackwell, Manager

      Vendor:  Prairie State Plumbling & Heating Inc.                                            Notary Date:           2/5/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                         $2,750.00                                      $2,204.00              $2,204.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  161   Capital Development Board                                                                    File Date:  2/5/2026

 

  Third Filing – 02/05/2026: FY26, Qtr 3,  Item # 161

  An Emergency Purchase Extension was received on February 5, 2026 requesting an extension for dates starting

  03/24/2026 to 01/24/2027 at an additional estimated cost of $2,955,270.21, revising the total estimated cost to

  $4,790,270.21.

 

 

  Second Filing – 05/28/2025:  FY25, Qtr 4, Item # 188

  An Emergency Purchase Extension was received on May 28, 2025 requesting an extension for dates starting

  06/24/2025 to 03/24/2026. The extension expenditure is not assessed and will be charged for time only. 

  Reported in the same filing quarter.

 

 

  Original Filing – 3/27/2025: FY25, Qtr 4, Item# 151

 

  The scope of work is to make the current operational elevator cars that are currently under temporary City

  permit arrangements (E3, 4, 9, 10, 11) code compliant, as indicated in Chicago Elevator Bureau’s (CEB) code

  violation and 2025 PA/SD reports, and repair the currently shut down elevator E5 to expedite the work in the

  other elevators.

 

  This Emergency Purchase has an expected start date of 03/27/2025 through 06/24/2025 with an Original

  Estimated Cost of $1,835,000.00.

   Signed By:  Chris Miles, Exec II

      Vendor:  Parkway Elevators                                                                    Notary Date:           3/27/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                    $1,835,000.00        $4,790,270.21                  $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  162   Capital Development Board                                                                    File Date:  1/22/2026

 

  Second Filing – 01/22/2026: FY26, Qtr 3,  Item # 162

  An Emergency Purchase Extension was received on January 22, 2026 requesting an extension for dates starting

  02/03/2026 to 07/31/2027 at an additional estimated cost of $50,000.00, revising the total estimated cost to

  $231,227.00.

 

  Original Filing – 11/06/2025: FY26, Qtr 2, Item# 8

 

  The scope of work provides for removing approximately 229,000 square feet of low-slope roofing and

  insulation down to the sloped

roof deck on the west roof of IEMA Rochelle Warehouse (Building Number

  IEMA002-0001) and installing a new fully adhered single-ply

roofing system with a coverboard and insulation

  that meet the Illinois Stretch Energy Code. The scope also includes new drain flashings,

eliminating any

  abandoned HVAC equipment, removing and replacing the gutters, and installing new metal trim, and all

  necessary

accessories. The existing roof assembly is a single ply membrane, over 1” of insulation board, over an

  asphalt BUR with pea gravel, over a

pour gypsum/lightweight concrete, on steel deck. The scope of work also

  includes removing and replacing any damaged metal decking.

The scope of work assumes 50% metal deck

  replacement. Hazardous materials may be encountered.

 

  Incorporated documents include the January 2025 Standard Documents for Construction and the January 2025

  Design and

Construction Manual. Basic Architectural Services provided under this procurement should not

  exceed $1,500,000.00, which is a placeholder prior to the negotiation of a Professional Services Agreement,

  without prior authorization from the Capital Development Board

in consultation with the Chief Procurement

  Office. Final Actual Costs will be reported upon project completion and project close-out.

 

  This Emergency Purchase has an expected start date of 11/06/2025 through 02/03/2026 with an Original

  Estimated Cost of $1,500,000.00.

   Signed By:  Chris Miles, Exec II

      Vendor:  Valdes Engineering Co.                                                              Notary Date:           11/6/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                    $1,500,000.00          $231,227.00                  $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  163   Innovation & Technology, Department of                                                  File Date:  1/30/2026

 

  Third Filing – 01/30/2026: FY26, Qtr 3,  Item # 163

  An Emergency Purchase Extension was received on January 30, 2026 requesting an extension for dates starting

  02/01/2026 to 04/30/2026 at an additional estimated cost of $700,000.00, revising the total estimated cost to

  $2,076,111.50.

 

 

  Second Filing – 07/31/2025: FY26, Qtr 1,  Item #60

  An Emergency Purchase Extension was received on July 31, 2025 requesting an extension for dates starting

  07/31/2025 to 01/31/2026 at an additional estimated cost of $688,055.75, revising the total estimated cost to

  $1,376,111.50.

 

 

  Original Filing –5/1/2025: FY25, Qtr 4, Item# 119

 

  The majority of the analog phone systems still in place are in locations such as Department of Correction

  penitentiaries and Department of Human Services facilities. The loss of phone systems risks both residents and

  state staff. This vendor has historically held this contract and is able to continue these services while the state

  issues a competitive solution. This vendor already has required security clearances to enter the locations with

  analog phone systems in place.

 

  Installation/Move, Add, Change (MAC) requests and Maintenance services for the states remaining analog phone

   systems listed in Attachment A. This includes warranty, replacement, and move, add, change request. The

  vendor will handle all facets of maintenance for the systems.

 

  This Emergency Purchase has an expected start date of 05/01/2025 through 07/30/2025 with an Original

  Estimated Cost of $688,055.75.

   Signed By:  Chris Brinkmeyer, APO

      Vendor:  Ficek Elec & Communication Systems, Inc.                                     Notary Date:           5/1/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $688,055.75        $2,076,111.50                  $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  164   Capital Development Board                                                                    File Date:  1/28/2026

 

  Final Cost Statement

  Latest Filing – 01/28/2026: FY26, Qtr 3, Item #164

  The Actual Total Cost of FY26, Qtr 3, Item# 164  is $293,097.39, with the final contract term ending.

 

 

  Second Filing – 09/19/25:  FY26,  Qtr 1,  Item # 110

  An Emergency Purchase Extension was received on September 19, 2025 requesting an extension for dates

  starting 10/8/2025 to 01/08/2026. The extension expenditure is not assessed and will be charged for time only.

 

 

  Original Filing – 07/11/2025: FY26, Qtr 1, Item# 311

 

  The scope of work is to provide emergency construction services to replace the failed transformer. F.W.

  Electric is to procure , install, and

maintain the operations of an appropriate sized rental generator to provide

  temporary power to the affected buildings until a new

transformer and all ancillary components are installed

  and tested to ensure normal operations can continue. Incorporated documents include the January 2025

  Standard Documents for Construction and the design and specifications provided by the A/E of record and

 

  approved by CDB. Services provided under this procurement should not exceed $500,000.00, which is a place-

  holder prior to entering

into a Construction Contract, without prior authorization from the Capital Development

  Board in consultation with the Chief

Procurement Office

 

  This Emergency Purchase has an expected start date of 07/11/2025 through 10/9/2025 with an Original

  Estimated Cost of $500,000.00..

   Signed By:  Marcy Joerger, Admin Programming

      Vendor:  F.W. Electric, Inc                                                                     Notary Date:           7/11/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $500,000.00                                   $293,097.39           $293,097.39      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  165   Capital Development Board                                                                    File Date:  2/9/2026

 

  Final Total Converted to BIOS

 

  Final Cost Statement

  Latest Filing – 02/09/2026: FY26, Qtr 3, Item # 165

  The Actual Total Cost of FY26, Qtr 3, Item# 165  is $.00, (convert to BIOS) with the final contract term

  ending.

 

 

  Original Filing – 10/01/2025: FY26, Qtr 2, Item# 9

 

  The scope of work provides for the removal of debris and plant growth in high side and low side gutters and

  clean existing gutter drain

heads and reinstallation. Re-caulk all skylights in their entirely and replace one

  cracked skylight glass pane. The scope of work also

includes replacement of the heat tracing and lightning

  protection systems and replacing the heat trace controller panels in mechanical

room. Recertifying the lightning

   protection system once installed will be required. Further, repairs/replacement of all failing snow

guards is

  included in the scope.

 

  Incorporated documents include the January 2025 Standard Documents for Construction. Section 01 29 00

  PAYMENT PROCEDURES,

will be strictly followed and adhered to. The sum of all items listed in the

  Contractor Schedule of Values should equal the contract award

amount. Payment amounts will be approved

  based on proof of work actually performed and materials actually used. Construction

Services provided under

  this procurement should not exceed $400,000.00, which is a place-holder prior to entering into a Construction

 

  Contract, without prior authorization from the Capital Development Board in consultation with the Chief

  Procurement Office. Final

Actual Costs will be reported upon project completion and project close-out.

 

  This Emergency Purchase has an expected start date of 10/01/2025 through 12/29/2025 with an Original

  Estimated Cost of $50,000.00.

   Signed By:  Chris Miles, Exec II

      Vendor:  EXP U.S. Services, Inc.                                                              Notary Date:           10/1/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                        $50,000.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  166   Transportation, Department of                                                               File Date:  1/28/2026

 

  Final Cost Statement

  Latest Filing – 01/28/2026: FY26, Qtr 3, Item # 166

  The Actual Total Cost of FY26, Qtr 3, Item# 166  is $496,800.00, with the final contract term ending.

 

 

  Original Filing – 08/12/2025: FY26, Qtr 1, Item# 25

 

  The fix for this issue requires removal of the scale, cutting the deteriorated wall down to good concrete,

 

  reforming new pit walls, repouring the wall, and installing a new scale in the newly poured pit. A new scale is

 

  required because when we remove an existing scale, there is a high probability that the scale platform will twist

 

or become damaged causing the scale to weigh incorrectly ithe future.

 

  This Emergency Purchase has an expected start date of 08/12/2025 through 11/10/2025 with an Original

  Estimated Cost of $750,000.00.

   Signed By:  Kyle Armstrong, EO

      Vendor:  Fairbanks Scales                                                                      Notary Date:           8/12/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $750,000.00                                   $496,800.00           $496,800.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  167   Eastern Illinois University                                                                      File Date:  1/27/2026

 

  Final Cost Statement

  Latest Filing – 1/27/2026: FY26, Qtr 3, Item # 167

  The Actual Total Cost of FY26, Qtr 3, Item# 167  is $115,924.20, with the final contract term ending.

 

 

  Original Filing – 11/07/2025: FY26, Qtr 2, Item# 26

 

  The current fire alarm system in Buzzard Hall lost enunciation function and no longer provides in-building alarms

   in the case of a fire. Getz Fire Equipment Company will provide alarm systems.

 

  This Emergency Purchase has an expected start date of 11/10/2025 through 02/09/2026 with an Original

  Estimated Cost of $115,924.00.

   Signed By:  Megan Wells, Director of Purchasing

      Vendor:  Getz Fire Equipment Co.                                                            Notary Date:           11/7/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $115,924.00                                   $115,924.20           $115,924.20      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  168   University of Illinois Urbana-Champaign  (Under SIU)                               File Date:  1/22/2026

 

  Final Cost Statement

  Latest Filing – 01/22/2026: FY26, Qtr 3, Item # 168

  The Actual Total Cost of FY26, Qtr 3, Item#  168  is $130,000.00, with the final contract term ending.

 

 

  Original Filing – 5/9/2025: FY25, Qtr 4, Item# 147

 

  The University previously sought to purchase this bucket truck on two separate occasions. The first attempt

  was issued under a competitive solicitation #BJB126. However, we were unable to proceed due to challenges in

  meeting the specific specifications required for the truck. The second attempt, under bid number BJB133, was

  impacted by extended manufacturer lead times and changes in supplier availability. We now have a time-

  sensitive opportunity to purchase the bucket truck we are currently leasing for $130,000. The current lease  is

  set to expire on June 23, 2025. If we were to place an order for a new truck today, the cost would be

  approximately $156,596 with an estimated delivery time of up to 15 months. Furthermore, continuing to lease a

  truck during this waiting period would incur additional costs of approximately $146,400. Purchasing the current

   leased truck allows the University to avoid these unnecessary costs and delays. Given the current conditions,

  the university would like to take advantage of a quick purchase its the most cost-effective and efficient solution.

   The University believes it is in the state's best interest to proceed with a quick purchase.

 

  One Versa-lift SST37EIH-02 bucket truck with a B&G (manufacturer) 108”SB service body, and Ford F450

  chassis. 

 

  This Emergency Purchase has an expected start date of 05/06/2025 through 07/12/2025 with an Original

  Estimated Cost of $130,000.00, using Self-Supporting Funds.

   Signed By:  Aaron Rosenthal, AVC

      Vendor:  Utility Sales & Service & USSI Rentals                                          Notary Date:           5/9/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $130,000.00                                   $130,000.00           $130,000.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  169   Governors State University                                                                    File Date:  1/29/2026

 

  Final Cost Statement

  Latest Filing – 01/29/2026: FY26, Qtr 3, Item # 169

  The Actual Total Cost of FY26, Qtr 3, Item# 169 is $44,260.95, with the final contract term ending.

 

 

  Second Filing – 10/22/25:  FY26,  Qtr 2,  Item # 53

  An Emergency Purchase Extension was received on October 22, 2025 requesting an extension for dates starting

   10/30/2025 to 01/27/2026. The extension expenditure is not assessed and will be charged for time only.

 

 

  Original Filing – 7/10/2025: FY26, Qtr 1, Item# 3

 

  Other Funds - Student Tech Fees

 

  This vendor is an expert in the field of Managed Security Operations that focuses on monitoring, detecting,

  analyzing, and responding to cybersecurity threats.  Additional supporting documents are attached.

 

  Managed security services, ensuring continuous monitoring (24/7/365) of the University’s network, servers,

  and computing infrastructure, will address current audit findings and ensure the University complies with federal

   laws regarding cybersecurity and administrative capability.  Additional supporting documents are attached.

 

  This Emergency Purchase has an expected start date of 08/01/2025 through 10/29/2025 with an Original

  Estimated Cost of $30,000.00.

   Signed By:  Lannie Brown-Simon, Asst VP Procurement

      Vendor:  Sentinel Technologies                                                                Notary Date:           7/10/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                        $30,000.00                                    $44,260.95            $44,260.95      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  170   Illinois State University                                                                         File Date:  1/28/2026

 

  Final Cost Statement

  Latest Filing – 01/28/2026: FY26, Qtr 3, Item # 170

  The Actual Total Cost of FY26, Qtr 3, Item# 170  is $166,219.21, with the final contract term ending.

 

  Original Filing – 5/12/2025: FY25, Qtr 4, Item# 149

 

  Centennial East - South Windows Replacement: Complete condition assessment and temporary repairs

  necessary to stabilize the building, and replacement of the roof, soffit, and eaves. Construction services will

  include the management, supervision, coordination of all construction activities, and all subcontractor work to

  complete the window replacement of (29) existing windows with ISU facility standard compliant windows.

  Improvements to the existing window sills, exterior and interior finishes adjacent to the windows. Window roller

   shades will also be installed at all replaced windows.

 

  History: The Centennial East building was built in 1959. The south facade windows are original and have

  outlived their useful life. The building envelope is negatively impacted by the original window’s subpar humidity

  control and insulation capabilities. A recently completed project has replaced (3) of the original windows.

  Currently there are a few windows partially broke and in need of repair. This window replacement will also

  support the larger Wonsook Kim College of Fine Arts project by upgrading the windows in the first-floor rooms

   that are proposed to be renovated.

 

  This Emergency Purchase has an expected start date of 05/12/2025 through 06/08/2025 with an Original

  Estimated Cost of $166,500.00, using Academic Enhancement Funds.

   Signed By:  Stacy Brown, IDP

      Vendor:  Midwest Construction Professionals                                               Notary Date:           5/12/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $166,500.00                                   $166,219.21           $166,219.21      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  171   Southern Illinois University                                                                    File Date:  1/28/2026

 

  Final Cost Statement

  Latest Filing – 01/28/2026: FY26, Qtr 3, Item # 171

  The Actual Total Cost of FY26, Qtr 3, Item# 171  is $340,340.00, with the final contract term ending.

 

  Original Filing – 11/04/2025: FY26, Qtr 2, Item# 17

 

  vendor was selected during the CDB design phase of the Health Sciences Building, items need to be obtained to

  prevent any further delays to classes and student experiences.

 

  Hospital-grade ultrasound machines to strengthen our nursing program and provide students with hands-on

  experience using clinical equipment. They will aide in the training of both our Undergraduate and Graduate

  Nursing programs.   These devices and their related storage requirements are integrated into the training facilities

   in the building.

 

  This Emergency Purchase has an expected start date of 11/04/2025 through 06/30/2026 with an Original

  Estimated Cost of $340,340.00.

   Signed By:  Matt Brown, Director of Purchasing

      Vendor:  FujiFilm Sonosite Inc.                                                                Notary Date:           11/4/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $340,340.00                                   $340,340.00           $340,340.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  172   Southern Illinois University                                                                    File Date:  1/28/2026

 

  Final Cost Statement

  Latest Filing – 01/28/2026: FY26, Qtr 3, Item # 172

  The Actual Total Cost of FY26, Qtr 3, Item# 172  is $158,142.80, with the final contract term ending.

 

 

  Original Filing – 11/4/2025: FY26, Qtr 2, Item# 16

 

  Vendor was selected during the CDB design phase of the Health Sciences Building, items need to be obtained to

  prevent any further delays to classes and student experiences.

 

  Medical event simulation devices for procedures like CPR,  defibrillator use,  human body models that mimic

  ailments, related equipment and programmable sensors that will aide in the training of both our Undergraduate

  and Graduate Nursing programs.   These devices and their related storage requirements are integrated into the

  training facilities in the building.

 

  This Emergency Purchase has an expected start date of 11/04/2025 through 06/30/2026 with an Original

  Estimated Cost of $158,142.80.

   Signed By:  Matt Brown, Director of Purchase

      Vendor:  Limbs & Things                                                                       Notary Date:           11/4/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $158,142.80                                   $158,142.80           $158,142.80      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  173   Southern Illinois University                                                                    File Date:  1/28/2026

 

  Final Cost Statement

  Latest Filing – 01/28/2026: FY26, Qtr 3, Item # 173

  The Actual Total Cost of FY26, Qtr 3, Item# 173  is $106,475.65, with the final contract term ending.

 

 

  Second Filing – 11/07/25:  FY26,  Qtr 2,  Item # 69

  An Emergency Purchase Extension was received on November 7, 2025 requesting an extension for dates

  starting 11/18/2025 to 02/17/2026. The extension expenditure is not assessed and will be charged for time only.

 

 

 

  Original Filing – 8/22/2025: FY26, Qtr 1, Item# 37

 

  Using  Local Funds

 

  Combined with Nixon being the oniy authorized service center for the Kohler Diesel generator in our area,they

  also had the best price

on the replacement radiator.

 

  Nixon will drain the complete system, remove radiator, repair all coolant leaks at the front of the engine which

  will include water pump,

thermostats, remove manifolds and re-seal. Repair all fuel rail manifolds and gaskets.

  Replace all rubber hoses and clamps and install the new radiator. Fill the system with new coolant. Perform a

  complete service on the engine, and repair leaking oil seal. See Service

 

  This Emergency Purchase has an expected start date of 08/22/2025 through 11/17/2025 with an Original

  Estimated Cost of $112,371.78 using Local Funds.

   Signed By:  Eric Massey, Dir of Procurement

      Vendor:  Nixon Power Services LLC                                                         Notary Date:           8/22/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $112,371.78                                   $106,475.65           $106,475.65      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  174   Children and Family Services, Department of                                             File Date:  3/11/2026

 

  Final Cost Statement

  Latest Filing – 03/11/2026: FY26, Qtr 3, Item# 174

  An Actual Total Cost of FY26, Qtr 3, Item #174  is $645,393.64 was reported in the same filing quarter.

 

 

  Original Filing – 2/17/2026: FY26, Qtr 3, Item# 359

 

  DSN staff are responsible for preparing the actual federal quarterly Title IV-E claims for Foster Care, Adoption

  Assistance, Guaardianship Assistance, and Prevention Services Grant Program.  The SFY 2026 projection for

  this claiming is $399.8 Million.  In addition, DSN also prepares the quarterly TANF claim which brings in $68.8

  Million annually to DCFS.  Currently, no one in DCFS has the knowledge to prepare and submit those claims.  

  In addition to the quarterly claims, DSN assist in the calendar year end claim reports for Title IV-B subpart 1

  and subpart 2, Chafee Independent Living and Chafee Education and Training vouchers (Approximately $30

  million reported on).

 

 

 

DSN also reviews all Adoption Assistance and Guardianship Assistance subsidy agreements prior to the

  finalization of the adoption or guardianship in Court.  DSN has detected consistently detected 25% or higher

  error rates that would make the subsidy case ineligible for as long as that subsidy case remained open

  (approximately 15 years); and DSN makes sure those errors are corrected prior to finalization of the subsidy

  agreement in Court (once finalized, no changes can be made).  This function preserves tens of millions in

  Adoption and Guardship IV-E subsidy claims.

 

 

 

DSN also provides audit assistance: Audit Liaison for both Federal Title IV-E Foster Care Eligibility Audits

  and the Annual Statewide Single Audit conducted by KPMG.  For both of those audits, DSN staff pull all case

  files and review for accuracy and completeness.  Where case files are missing information, DSN will seek

  alternative sources to complete the file such as court orders or court transcripts.  For the KPMG Single Audit,

  they also respond to all claiming questions, funneling the responses through the DCFS Audit Liaison.

 

  The Illinois Department of Children and Family Services is declaring an emergency contract need due to the

  connection between I.T. systems and federal claiming. DCFS requires maintenance and development of

  complex application system software and databases supporting federal program eligibility and claiming.  The

  Department requires continuing I.T. application software services to develop, enhance, and support the

  computer systems which support these initiatives, and to parallel the policy changes and enhancements

  necessary to further these programs. To meet this need, the Department requires professional services for the

  maintenance and support of these related systems.

 

The Vendor must be prepared to adapt existing federal

  claiming programs as the Department transitions to new systems.

 

 

 

The vendor must also support systems, applications and programs associated with federal claiming.  This

  includes maintenance and development of complex applications system software and databases.

 

 

 

The Vendor must provide support of Related IT Application Systems – Web and Mainframe.

 

  The Vendor must provide technical support of Federal claiming related IT application systems: they are the


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  Federal Financial Participation (MARS FFP) Applications, the Emergency Assistance Claiming Systems, the

  Medical Assistance System, Managed Care and associated inter-agency coordination, Child Support Interface,

  the Home of Relative System/Certified Homes, the Trust Accounting System, the Subsidy Tracking System,

  CWCA Packet Tracking System, Clearance Tracking System, the Court Tracking System,  the Title IV-E and

  Title IV-B Claim Development System (CARS).These application systems are very complex and requires a

  vendor with strong programming skills required to support these systems, but also understand the intricacies

  involved with the policy requirements.

 

  The Vendor must provide support in preparing, reviewing, and analyzing case and supportive documentation for

   federal and state audits as well as providing on-site assistance during the actual audits pertaining to Foster Care,

   Adoption, or Guardianships, preparing materials for review by auditors, identifying areas "at risk" and assisting

  the state in the development of defenses for cases, including interpretation of state policies and practices.

 

  Consultants will provide ongoing assistance to CAPU, EDU, Technical Support Unit, Child Support, Licensing

  and Background Check Unit, Contract analysis for claiming, APME, Subsidy Support Unit, joint development

  with DCFS OITS / DoIT MARS / CYCIS IT staff, Youthcare, HFS and DHS Staff, DCFS Legal Staff, Budget

  and Finance Staff and Operations as it relates to federal program eligibility and/or claiming.

 

  This Emergency Purchase has an expected start date of 02/26/2026 through 05/25/2026 with an Original

  Estimated Cost of $762,111.00.

   Signed By:  Devin McQuillan, APO

      Vendor:  Diversified Services Network                                                       Notary Date:           2/17/2026

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $762,111.00                                   $645,393.64           $645,393.64      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  175   Natural Resources, Department of                                                           File Date:  2/27/2026

 

  Second Filing – 02/27/2026:  FY26,  Qtr 3,  Item # 175

  An Emergency Purchase Extension was received on February 27, 2026 requesting an extension for dates

  starting 03/01/2026 to 05/29/2026. The extension expenditure is not assessed and will be charged for time only.

 

 

 

  Original Filing – 12/1/2025: FY26, Qtr 2, Item# 31

 

  This procurement (DNR File Number 4-26-077) will provide the material, equipment, and labor to replace the

  roof on the Grand Marias Golf Course Clubhouse located with in Frank Holten State Park. The roof is beyond

  its serviceable life and needs to be replaced. The shingles and flashings are deteriorated and causing water

  infiltration into the building. The infiltration is causing water damage to drywall, ceilings, and new carpet that

  was installed in the last couple of months.  Continued water exposure can also cause black mold in the walls,

  which would require further mitigation if that is allowed to occur.  IDNR has tried to patch areas of the roof

  and are going to put tarps on the roof in the interim.

 

  This Emergency Purchase has an expected start date of 12/01/2025 through 02/28/2026 with an Original

  Estimated Cost of $166,600.00.

   Signed By:  Maurice Mosley, Manager III

      Vendor:  Tori Construction                                                                     Notary Date:           12/1/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $166,600.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  176   Human Rights, Department of                                                                File Date:  2/6/2026

 

  Second Filing – 02/06/2026:  FY26,  Qtr 3,  Item # 176

  An Emergency Purchase Extension was received on February 6, 2026 requesting an extension for dates starting

  02/08/2026 to 05/09/2026. The extension expenditure is not assessed and will be charged for time only.

 

 

  Original Filing – 11/07/2025: FY26, Qtr 2, Item# 25

 

  Legal advice to the Commission relating to constitutional law, civil rights law, immigration law, and legal issues

  impacting the work of government. Legal guidance regarding legal issues and risks the Commission must

  address due to ongoing and potential litigation relating to the actions of federal officers in “Operation Midway

  Blitz.”

 

  This Emergency Purchase has an expected start date of 11/10/2025 through 02/07/2026 with an Original

  Estimated Cost of $125,000.00.

   Signed By:  Allison Macfarlane, Chief of Staff

      Vendor:  Hughes Socol Piers Resnick & Dym, Ltd                                         Notary Date:           11/7/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $125,000.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  177   Human Services, Department of                                                              File Date:  2/19/2026

 

  ThirdFiling – 02/19/2026:  FY26,  Qtr 3,  Item # 177

  An Emergency Purchase Extension was received on February 19, 2026 requesting an extension for dates

  starting 03/29/2026 to 09/28/2026. The extension expenditure is not assessed and will be charged for time only.

 

 

  Second Filing – 08/08/2025: FY26, Qtr 2,  Item # 71

  An Emergency Purchase Extension was received on August 8, 2025 requesting an extension for dates starting

  09/29/2025 to 03/28/2026 at an additional estimated cost of $168,000.00, revising the total estimated cost to

  $336,000.00.

 

 

  Original Filing – 07/03/2025: FY26, Qtr 1, Item# 15

 

  Emergency procurement needed to provide a Medical Director for Chester Mental Health Center. This vendor

  has been providing services for our Medical Director however their contract expired on 6/30/2025. 

 

  Staffing services needed to provide a full time Medical Director for Chester Mental Health Center. The

  contractor shall screen and present a physician with an Illinois Physician and Surgeon License with a specialty

  in Psychiatry. Board Certification is required to provide medical leadership and oversight of the psychiatric

  services provided at the Center to provide services to Chester Mental Health Center to ensure adequate and

  competent coverage. The physician serves as the Medical Director and supervises medical staff, maintains

  overall quality of clinical care, and develops and implements policies and procedures. Services shall be provided

  in accordance with the Scope of Work in the contract. Routinely, full time hours will be 40 hours per week

  between the hours of 8:00am and 5:00pm, Monday-Friday.

 

  This Emergency Purchase has an expected start date of 07/01/2025 through 09/28/2025 with an Original

  Estimated Cost of $168,000.00.

   Signed By:  Jean Sandstrom, APO

      Vendor:  Annashae                                                                               Notary Date:           7/3/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $168,000.00          $336,000.00                  $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  178   Transportation, Department of                                                               File Date:  2/26/2026

 

  Second Filing – 02/26/2026: FY26, Qtr 3,  Item # 178

  An Emergency Purchase Extension was received on February 26, 2026 requesting an extension for dates

  starting 03/01/2026 to 05/31/2026 at an additional estimated cost of $90,000.00, revising the total estimated cost

   to $1,274,125.00.

 

  Original Filing – 12/5/2025: FY26, Qtr 2, Item# 41

 

  The selected vendor had a contract for the last two years that just expired and is very familiar with our process.

    This will help minimize delays and ensures immediate availability.  

 

  De-icer for the winter months to ensure the state roads are safe.

 

  This Emergency Purchase has an expected start date of 12/01/2025 through 02/28/2026 with an Original

  Estimated Cost of $1,184,125.00.

   Signed By:  Omolara Erewele, APO

      Vendor:  SNI Solutions                                                                          Notary Date:           12/5/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                    $1,184,125.00        $1,274,125.00                  $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  179   Capital Development Board                                                                    File Date:  2/25/2026

 

  Fifth Filing – 02/25/2026: FY26, Qtr 3,  Item # 179

  An Emergency Purchase Extension was received on February 25,2026 requesting an extension for dates starting

   02/28/2026 to 08/31/2026 at an additional estimated cost of $6,095,815.96, revising the total estimated cost to

  $13,260,263.63.

 

 

  Fourth Filing – 09/29/2025: FY26, Qtr 2,  Item # 51

  An Emergency Purchase Extension was received on September 29, 2025 requesting an extension for dates

  starting 09/30/2025 to 02/28/2026 at an additional estimated cost of $2,260,217.58, revising the total estimated

  cost to $7,164,447.67.

 

 

  Third Filing – 08/28/25: FY26, Qtr 1,  Item # 84

  An Emergency Purchase Extension was received on August 28, 2025 requesting an extension for dates starting

  8/31/2025 to 09/30/2025 at an additional estimated cost of $3,904,230.09, revising the total estimated cost to

  $4,904,230.09.

 

 

  Second Filing – 10/15/24:  FY25,  Qtr 2,  Item # 41

  An Emergency Purchase Extension was received on October 15, 2024 requesting an extension for dates starting

   10/20/2024 to 08/31/2025. The extension expenditure is not assessed and will be charged for time only.

 

 

  Original Filing – 07/23/2024: FY25, Qtr 1, Item# 9

 

  The scope of work provides for expedited construction services identified by the Architect/Engineer and

  approved by CDB as needing immediate action to allow the facility to reoccupy the building and continue

  operations as quickly as possible. The Architect/Engineer will provide design assistance to the contractor to start

   immediate repairs. Repairs not identified as emergency in nature will be completed under a separate contract.

  Temporary solutions such as renting equipment and/or providing temporary utilities may be required.

 

  Incorporated documents include the March 2009 Standard Documents for Construction & Supplement and any

  design documents provided by the Architect/Engineer of record. Section 01 29 00 PAYMENT PROCEDURES,

  will be strictly followed and adhered to. The sum of all items listed in the Contractor Schedule of Values should

  equal the contract award amount. Payment amounts will be approved based on proof of work actually

  performed and materials actually used. Construction services provided under this

  procurement should not exceed $1,000,000.00, which is a place-holder prior entering into a Construction

  Contract, without prior authorization from the Capital Development Board in consultation with the Chief

  Procurement Office. Final Actual Costs will be reported upon project completion and project close-out.

 

  In accordance with section 00 21 50 of the Standard Documents for Construction, the General Contractor shall

  perform no less than 20% of work with its own staff. Each other trade shall perform no less than 40% of work

  with its own staff. Work with own staff includes direct labor and supervision, as well as material purchases


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  where the material is installed by the contractor.

 

  This Emergency Purchase has an expected start date of 07/23/2024 through 10/20/2024 with an Original

  Estimated Cost of $1,000,000.00.

   Signed By:  Chris Miles, Exec II

      Vendor:  F.H. Paschen, SN Nielsen & Assoc LLC                                         Notary Date:           7/23/2024

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                    $1,000,000.00       $13,260,263.63                  $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  180   Capital Development Board                                                                    File Date:  3/2/2026

 

  Fourth Filing – 03/2/2026: FY26, Qtr 3,  Item # 180

  An Emergency Purchase Extension was received on March 2, 2026 requesting an extension for dates starting

  03/31/2026 to 06/30/2026 at an additional estimated cost of $439.00, revising the total estimated cost to

  $114,256.00.

 

  Third Filing – 11/13/25: FY26, Qtr 2,  Item # 62

  An Emergency Purchase Extension was received on November 13, 2025 requesting an extension for dates

  starting 12/31/2025 to 3/31/2026 at an additional estimated cost of $23,837.00, revising the total estimated cost

  to $113,817.00.

 

 

  Second Filing – 04/11/2025:  FY25,  Qtr 4,  Item # 156

  An Emergency Purchase Extension was received on April 11, 2025 requesting an extension for dates starting

  04/21/2025 to 12/31/2025. The extension expenditure is not assessed and will be charged for time only.

 

 

  Original Filing – 1/22/2025: FY25, Qtr 3, Item# 101

 

  The scope of work provides for the design and implementation of temporary repairs to the HVAC control

  system in Housing Unit #15 and the Vocational Building to regulate temperatures to the maximum extent

  practical. The scope also includes an engineering assessment with recommendations, cost estimates, and lead

  times on equipment, for the installation of a new DDC system for Housing Unit #15 and the Vocational Building

 

 

  Incorporated documents include the January 2025 Standard Documents for Construction and the January 2025

  Design and Construction Manual. Basic Architectural Services provided under this procurement should not

  exceed $100,000.00, which is a placeholder prior to the negotiation of a Professional Services Agreement,

  without prior authorization from the Capital Development Board in consultation with the Chief Procurement

  Office. Final Actual Costs will be reported upon project completion and project close-out.

 

  This Emergency Purchase has an expected start date of 01/22/2025 through 04/21/2025 with an Original

  Estimated Cost of $100,000.00.

   Signed By:  Chris Miles, Exec II

      Vendor:  Henneman Engineering                                                              Notary Date:           1/22/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $100,000.00          $114,256.00                  $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  181   Capital Development Board                                                                    File Date:  2/19/2026

 

  Third Filing – 02/19/2026:  FY26,  Qtr 3,  Item # 181

  An Emergency Purchase Extension was received on February 19, 2026 requesting an extension for dates

  starting 02/28/2026 to 05/30/2026. The extension expenditure is not assessed and will be charged for time only.

 

 

  Fourth Filing – 11/14/2025: FY26, Qtr 2,  Item # 45

  An Emergency Purchase Extension was received on November 4, 2025 requesting an extension for dates

  starting 11/19/2025 to 02/28/2026 at an additional estimated cost of $30,033.00, revising the total estimated cost

   to $485,033.00.

 

  Third Filing – 09/09/25: FY26, Qtr 1,  Item # 85

  An Emergency Purchase Extension was received on September 9, 2025 requesting an extension for dates

  starting 09/30/2025 to 11/19/2025 at an additional estimated cost of $200,000.00, revising the total estimated

  cost to $455,000.00.

 

  Second Filing – 03/13/2025: FY25, Qtr 3,  Item # 129

  An Emergency Purchase Extension was received on March 13, 2025 requesting an extension for dates starting

  03/23/2025 to 07/02/2025 at an additional estimated cost of $55,000.00, revising the total estimated cost to

  $155,000.00.Reported in the same filing quarter

 

  Original Filing – 1/29/2025: FY25, Qtr 3, Item# 302

 

  REVISED (1/29/2025) The scope of work provides for dehumidification, selective demolition, and mold

  remediation to include the removal of all damaged building materials and drying the structure to industry

  standards.

   Incorporated documents include the March 2009 Standard Documents for Construction & Supplement. Section

   01 29 00 PAYMENT PROCEDURES, will be strictly followed and adhered to. The sum of all items listed in the

   Contractor Schedule of Values should equal the contract award amount. Payment amounts will be approved

  based on proof of work actually performed and materials actually used. Construction services provided under

  this procurement should not exceed $100,000.00, which is a place-holder prior entering into a Construction

  Contract if needed, without prior authorization from the Capital Development Board in consultation with the

  Chief Procurement Office. Final Actual Costs will be reported upon project completion and project close-out.

 

  In accordance with section 00 21 50 of the Standard Documents for Construction, the General Contractor shall

  perform no less than 20% of work with its own staff. Each other trade shall perform no less than 40% of work

  with its own staff. Work with own staff includes direct labor and supervision, as well as material purchases

  where the material is installed by the contractor.

 

  This Emergency Purchase has an expected start date of 12/24/2024 through 03/23/2025 with an Original

  Estimated Cost of $100,000.00.


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

   Signed By:  Chris Miles, Exec II

      Vendor:  Servpro of Kankakee                                                                 Notary Date:           1/29/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $100,000.00          $485,033.00                  $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  182   Illinois State University                                                                         File Date:  2/24/2026

 

  Third Filing – 02/24/2026:  FY26,  Qtr 3,  Item # 182

  An Emergency Purchase Extension was received on 02/24/2026 requesting an extension for dates starting

  02/26/2026 to 05/27/2026. The extension expenditure is not assessed and will be charged for time only.

 

  Second Filing – 11/25/2025: FY26, Qtr 2,  Item # 70

  An Emergency Purchase Extension was received on November 25, 2025 requesting an extension for dates

  starting 11/27/2025 to 02/25/2026 at an additional estimated cost of $-(270,000.00), revising the total estimated

  cost to $180,000.00.

 

 

  Original Filing – 8/26/2025: FY26, Qtr 1, Item# 36

 

  Using Bond Revenue (University Housing Budget)

 

  Vendor has familiarity with the campus and the project, as well as the ability to immediately mobilize to provide

  the cohesive design-build construction services to rapidly mitigate the issue. Subcontractor KED/Bluestone

  Consultants is also familiar with our buildings, processes and our construction guidelines.

 

  Provide and engineered solution and contruction services to remedy failed systems at Wattterson towers

  including bridge heaters at elevator lobbies and expansion tanks for hydronic systems. Piping that has failed is

  not accessible and has been valved off. Immediate fixes are needed before winter weather to prevent freezing

  and further breaks. Alternate routes for piping is required.

 

  This Emergency Purchase has an expected start date of 08/26/2025 through 08/15/2026 with an Original

  Estimated Cost of $450,000.00, using Bond Revenue (University Housing Budget).

   Signed By:  Stacy Brown, Director of Purchases

      Vendor:  Reliable Mechanical                                                                  Notary Date:           8/26/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $450,000.00          $180,000.00                  $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  183   Illinois State University                                                                         File Date:  2/25/2026

 

  Third Filing – 02/25/2026: FY26, Qtr 3,  Item # 183

  An Emergency Purchase Extension was received on February 25, 2026 requesting an extension for dates

  starting 03/02/2026 to 05/31/2026 at an additional estimated cost of $96,500.00, revising the total estimated cost

   to $296,500.00.

 

  Second Filing – 06/17/25:  FY25,  Qtr 4,  Item #208

  An Emergency Purchase Extension was received on June 17, 2025 requesting an extension for dates starting

  06/24/2025 to 11/01/2026. The extension expenditure is not assessed and will be charged for time only.

 

 

  Original Filing – 4/1/2025: FY25, Qtr 4, Item# 314

 

  Recent structural evaluations and an increased frequency in interior damage caused by water intrusion, ISU is

  seeking an expeditious approval and execution of the project to repair the integrity of the Fell Hall roof.  There

  are several areas where the shingles are missing and the substrate is exposed to the elements.  There are also

  several locations where birds and bats have accessed and nested in the interstitial spaces through rotted voids in

  the soffits and eaves.  Water intrusion into a building is often a catalyst for conditions that compromise building

  materials as well as creating negative impacts to indoor air quality. 

 

  Illinois State University now believes the roof replacement is an urgent project. Subsequently, the university has

  requested and received an updated proposal from P.J. Hoerr and Bailey Edward Design to perform a condition

  assessment and minor repairs so that the building can be stabilized, and a proper scope of work can be

  developed to remedy the current condition of the facility.

  [please see attachment for additional details]

 

  Complete condition assessment and temporary repairs necessary to stabilize the building, and replacement of the

   roof, soffit, and eaves.

 

  This Emergency Purchase has an expected start date of 04/01/2025 through 11/1/2025 with an Original

  Estimated Cost of $200,000.00, using Academic Enhancement Funds.

   Signed By:  Stacy Brown, Int Dir of Purchases

      Vendor:  PJ Hoerr Inc.                                                                           Notary Date:           4/1/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $200,000.00          $296,500.00                  $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  184   Capital Development Board                                                                    File Date:  3/4/2026

 

  Third Filing – 03/04/2026:  FY26,  Qtr 3,  Item # 184

  An Emergency Purchase Extension was received on March 4, 2026 requesting an extension for dates starting

  05/15/2026 to 12/31/2026. The extension expenditure is not assessed and will be charged for time only.

 

  Second Filing – 07/15/2025: FY26, Qtr1,  Item # 62

  An Emergency Purchase Extension was received on July 15, 2025 requesting an extension for dates starting

  08/02/2025 to 05/15/2026 at an additional estimated cost of $15,000.00, revising the total estimated cost to

  $515,000.00.

 

  Original Filing – 5/5/2025: FY25, Qtr 4, Item# 103

  The scope of work provides for removing and replacing two (2) centrifugal liquid chillers in the penthouse

  mechanical room, four (4) rooftop cooling towers including structural supports, nine (9) associated primary,

  secondary, and condensing water pumps, three (3) variable frequency drives, any necessary piping

  modifications and associated electrical and controls work. The work will require the removal and replacement of

   a portion of the existing exterior masonry wall of the penthouse to provide necessary access for removal and

  installation of equipment. Provisions shall be made to maintain the integrity of the roof during construction. The

  scope shall also include provisions for a temporary chiller while the work is being completed.

 

  Incorporated documents include the January 2025 Standard Documents for Construction and the January 2025

  Design and Construction Manual. Basic Architectural Services provided under this procurement should not

  exceed $500,000.00, which is a placeholder prior to the negotiation of a Professional Services Agreement,

  without prior authorization from the Capital Development Board in consultation with the Chief Procurement

  Office. Final Actual Costs will be reported upon project completion and project close-out.

 

  This Emergency Purchase has an expected start date of 05/05/2025 through 08/02/2025 with an Original

  Estimated Cost of $500,000.00.

   Signed By:  Chris Miles, Exec II

      Vendor:  RTM Engineering Consultants LLC                                               Notary Date:           5/5/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $500,000.00          $515,000.00                  $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  185   Illinois State University                                                                         File Date:  2/25/2026

  Second Filing – 02/25/2026:  FY26,  Qtr 3,  Item # 185

  An Emergency Purchase Extension was received on February 25, 2026 requesting an extension for dates

  starting 03/02/2026 to 05/31/2026. The extension expenditure is not assessed and will be charged for time only.

 

 

  Original Filing – 11/25/2025: FY26, Qtr 2, Item# 32

 

  Recent structural evaluations and an increased frequency in interior damage caused by water intrusion, ISU is

  seeking an expeditious approval and execution of the project to improve the integrity of the building exterior to

  include sealants and associated infrastructure to make the building more water tight.  Water intrusion into a

  building is often a catalyst for conditions that compromise building materials as well as creating negative impacts

   to indoor air quality.  Illinois State University's Environmental Health and Safety (EHS) has responded to

  numerous occupant concerns/complaints regarding water damage to the exterior walls and surfaces around the

  windows.    In most cases, EHS has utilized indoor air quality monitoring equipment to verify water intrusion

  conditions from the migration of water into the building from the outside.  In several of those situations, EHS

  has had to direct Building Mechanics to remove drywall and other impacted building materials due to water

  damage and pervasive mold spore colonization.  In 2024 Western Waterproofing provided the lowest cost and

  most competitive quote for the replacement of the exterior facade sealants and a water repellent application and

  they are willing to honor the 2024 unit pricing with for this project. In the spring of 2024, FPDC requested

  quotes from Western Waterproofing, Otto Baum, Armor Seal, and Kedmont where we sent out the scope of

  work (joint sealants and water repellent) for the Wilkins Hall – South elevation (it was leaking the worst). 

  Western Waterproofing was the low quote so they were issued a contract.  Over the summer of 2024 the work

  was completed and since then, measures were taken to confirm the effectiveness of prescribed repairs.  The

  effort was a success.  The plan now is to perform the same repairs to the remainder of the elevations on

  Wilkins, Haynie, and Wright dormitories. 

 

  Replacement of the exterior pre-cast concrete panel to panel sealants and panel to window sealants along with a

  water repellent application to the remainder of the elevations on Wilkins, Haynie, and Wright dormitories. [please

   see attachment for additional details]

  Extension Justification missed

 

  This Emergency Purchase has an expected start date of 12/1/2025 through 03/01/2026 with an Original

  Estimated Cost of $727,860.00, using Bond Reserve Account Funds.

   Signed By:  Stacey Brown, int Director of Purchases

      Vendor:  Western Waterproofing Co dba Western Specialty Cont                       Notary Date:           11/25/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $727,860.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  186   University of Illinois Urbana-Champaign  (Under SIU)                               File Date:  2/11/2026

  Second Filing – 02/11/2026:  FY26,  Qtr 3,  Item #186

  An Emergency Purchase Extension was received on February 11,2026 requesting an extension for dates starting

   02/18/2026 to 08/01/2026. The extension expenditure is not assessed and will be charged for time only.

 

  Original Filing – 11/21/2025: FY26, Qtr 2, Item# 27

 

  The university has experienced a critical failure of the heating, ventilation, and air conditioning (HVAC) system

  at the College of Medicine West Tower (909), 1819 W Polk, Chicago, IL 60612. The energy recovery wheel

  has failed and cannot rotate properly. This failure is causing excessive strain on the associated HVAC

  components. If the issue is not addressed immediately, continued operation will lead to further mechanical

  damage to state-owned equipment, potential loss of conditioned air capacity, and possible failure of compressors

   or other critical systems. This subsequent failure will result in significant additional repair costs, extended

  downtime, and disruption to building operations. Kraemer Contracting Group Inc (KCG) is the only vendor

  currently available and qualified to perform this work.

 

  KCG will provide all labor, tools, equipment, and materials necessary to remove and replace the failed energy

  recovery wheel located in building 909. Due to limited building access, the contractor will disassemble the

  existing wheel on-site to allow removal without the use of a crane. KCG will then transport the new replacement

   wheel to the mechanical room, disassemble it as needed, and reassemble it in place.

 

  This Emergency Purchase has an expected start date of 11/20/2025 through 02/17/2026 with an Original

  Estimated Cost of $115,000.00, using Other Funds.

   Signed By:  Aaron Rosenthal, Asst Vice Chancellor

      Vendor:  Kraemer Contracting Group                                                         Notary Date:           11/21/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $115,000.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  187   Capital Development Board                                                                    File Date:  3/4/2026

  Third Filing – 03/04/2026:  FY26,  Qtr 3,  Item # 187

  An Emergency Purchase Extension was received on March 4, 2026 requesting an extension for dates starting

  05/15/2026 to 12/31/2026. The extension expenditure is not assessed and will be charged for time only.

 

  Second Filing – 07/07/2025:  FY26,  Qtr 1,  Item # 55

  An Emergency Purchase Extension was received on July 7, 2025 requesting an extension for dates starting

  08/02/2025 to 05/15/2026. The extension expenditure is not assessed and will be charged for time only.

 

 

  Original Filing – 5/5/2025: FY25, Qtr 4, Item# 102

 

  The scope of work provides for removing and replacing two (2) centrifugal liquid chillers in the penthouse

  mechanical room, four (4) rooftop cooling towers including structural supports, nine (9) associated primary,

  secondary, and condensing water pumps, three (3) variable frequency drives, any necessary piping

  modifications and associated electrical and controls work. The work will require the removal and replacement of

   a portion of the existing exterior masonry wall of the penthouse to provide necessary access for removal and

  installation of equipment. Provisions shall be made to maintain the integrity of the roof during construction. The

  scope shall also include provisions for a temporary chiller while the work is being completed.

 

  Incorporated documents include the 2025 January Standard Documents for Construction and any design

  documents provided by the architect/engineer of record. Section 01 29 00 PAYMENT PROCEDURES, will be

  strictly followed and adhered to. The sum of all items listed in the Contractor Schedule of Values should equal

  the contract award amount. Payment amounts will be approved based on proof of work actually performed and

  materials actually used. Construction services provided under this procurement should not

  exceed $4,000,000.00, which is a place-holder prior entering into a Construction Contract, without prior

  authorization from the Capital Development Board in consultation with the Chief Procurement Office. Final

  Actual Costs will be reported upon project completion and project close-out.

 

  This Emergency Purchase has an expected start date of 05/05/2025 through 08/02/2025 with an Original

  Estimated Cost of $4,000,000.00.

   Signed By:  Chris Miles, Exec II

      Vendor:  Henson Robison Co.                                                                  Notary Date:           5/5/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                    $4,000,000.00                                           $0.00                   $0.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  188   Environmental Protection Agency                                                            File Date:  3/10/2026

 

  Final Cost Statement

  Latest Filing – 03/10/2026: FY26, Qtr 3, Item # 188

  The Actual Total Cost of FY26, Qtr 3, Item# 188  is $41,275.00, with the final contract term ending.

 

  Original Filing – 2/22/2024: FY24, Qtr 3, Item# 55

 

  IEPA requires the expertise of consulting firms to assist in writing a Priority Climate Action Plan by the March

  1, 2024 deadline and subsequently will need assistance in writing the CPRG Implementation Grant Submission

  by the April 1, 2024 deadline.

 

   

 

Absolute Angels Consulting, LLC has the skills and experiences necessary for this work. They have

  experience specializing in steering the renewable energy, cleantech, and infrastructure sectors towards

  sustainable practices. Absolute Angels Consulting, LLC has experience collaborates with a diverse array of

  stakeholders—including utilities, non-profits, technology firms, and policymakers—to shape cleantech policy at

  both state and federal levels while also helping clients respond to funding opportunities across various

  competitive grant programs. Given our tight timeline for the CPRG plan to be submitted, IEPA is enlisting

  services from two vendors who will need to work together. Absolute Angels Consulting, LLC has previously

  worked with our other vendor, The Accelerate Group, which will ensure a smooth process across vendors for

  developing our plan submission.

 

   

 

Contracting with Absolute Angels Consulting, LLC will better position IEPA for success with the Climate

  Pollution Reduction Grant application and process.

 

  • Assist IEPA in preparation and timely submission of one or more Climate Pollution Reduction Grants (CPRG)

  Implementation Grants either for the State of IL only or as part of one or more national/regional applications.

  The Priority Climate Action Plan Submission is due March 1, 2024, and the CPRG Implementation Grant

  Submission is due April 1, 2024.

• Review of any and all work IEPA has completed related to the CPRG including

  Phase 1 planning and Phase 2 implementation

• If necessary, organize and support IEPA in stakeholder workshops

   around CPRG submissions

• Support in writing of grant submission and assembly of project budgets

• Other

  support as required/requested by the IEPA to submit the most competitive CPRG application(s) feasible for

  maximum benefit for the people of Illinois. 

 

  This Emergency Purchase has an expected start date of 02/22/2024 through 05/21/2024 with an Original

  Estimated Cost of $50,050.00, using Federal Funds.

   Signed By:  Jake Poeschel, Chief Financial Officer

      Vendor:  Absolute Angels Consulting                                                        Notary Date:           2/22/2024

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                               $0.00                                           $0.00                   $0.00      26 3


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

   Federal                 $50,050.00                                                            $41,275.00

  189   Education, State Board of                                                                      File Date:  2/10/2026

  Final Cost Statement

  Latest Filing – 02/10/2026: FY26, Qtr 3, Item # 189

  The Actual Total Cost of FY26, Qtr 3, Item# 189  is $317,910.89, with the final contract term ending.

 

 

  Original Filing – 3/14/2024: FY24, Qtr 3, Item# 60

 

  Lanter Distributing, LLC has been providing these services for the Illinois State Board of Education via a

  contract. The vendor has the knowledge and expertise to provide these services. ISBE has released multiple

  Invitations for Bids for these services in prior years and Lanter Distributing has been the only responding bidder.

   

 

  The vendor will efficiently receive; warehouse; and deliver USDA Foods, including dry, cooler, and frozen

  foods. The intended recipients are approved public and private nonprofit schools, correctional facilities,

  emergency disaster-relief agencies, summer food services programs, and other such entities as may be

  approved.

 

  ISBE is not seeking a BEP goal on this solicitation. This contract will be paid 100% with federal funding. ISBE

  searched the State of Illinois Commission on Equity and Inclusion website to find registered BEP vendors under

  the appropriate NIGP codes. There are only 2 registered BEP certified vendors. Both registered vendors are not

  located within the state of Illinois.

 

  This Emergency Purchase has an expected start date of 03/12/2024 through 06/09/2024 with an Original

  Estimated Cost of $1,100,000.00.

   Signed By:  Jason Perry, Director

      Vendor:  Lanter Distributing LLC                                                             Notary Date:           3/14/2024

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                               $0.00                                           $0.00                   $0.00      26 3

   Federal             $1,100,000.00                                                          $317,910.89


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  190   Agriculture, Department of                                                                    File Date:  2/10/2026

 

  Final Cost Statement

  Latest Filing – 02/10/2026: FY26, Qtr 3, Item # 190

  The Actual Total Cost of FY26, Qtr 3, Item# 190  is $494,124.00, with the final contract term ending.

 

  Original Filing – 06/04/2025: FY25, Qtr 4, Item# 128

 

  This is revenue generating contact. - Other Funds

 

  Vendor will have the exclusive privilege and rights to pour and distribute alcohol beverages at State Fair

  Grandstand Building and Multipurpose Arena on the Illinois fairgrounds during the 11-day fair. The hours of

  operation will be from 12:00 PM to Midnight. All the alcohol pouring areas will open and close at that time,

  unless is differently specified by the agency. Vendor will follow the laws and not sell any alcohol beverage to

  people under 21, while at the same time monitoring that people under 21 do not enter the tent, unless

  accompanied by their parents. Alcohol must be sold in sealed containers, such as, aluminum cans, plastic

  bottlers and plastic cups. Glass and Styrofoam are not allowed. Only plastic cups will be allowed on the

  Track/SRO area. Vendor will have to pay the Illinois Department of Agriculture, a percentage made by the

  alcohol sales.

 

  This Emergency Purchase has an expected start date of 05/29/2025 through 08/26/2025 with an Original

  Estimated Cost of $350,000.00, using Other Funds.

   This is a revenue generating contract.

   Signed By:  Michelle Grimsley, SPSA

      Vendor:  National Ambus dba American Business Club                                   Notary Date:           6/4/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $350,000.00                                   $494,124.00           $494,124.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  191   Illinois State University                                                                         File Date:  2/10/2026

 

  Final Cost Statement

  Latest Filing – 02/10/2026: FY26, Qtr 3, Item # 191

  The Actual Total Cost of FY26, Qtr 3, Item# 191  is $1,060,860.96, with the final contract term ending.

 

 

  Second Filing – 05/29/2025:  FY25,  Qtr 4,  Item # 191

  An Emergency Purchase Extension was received on May 29, 2025 requesting an extension for dates starting

  06/15/2025 to 08/01/2025. The extension expenditure is not assessed and will be charged for time only.

 

 

  Original Filing – 2/26/2025: FY25, Qtr 3, Item# 118

 

  The project scope includes the replacement of all the concrete stairs and landings in both stair towers of the

  School St. Parking deck. Also included: any necessary repairs to existing steel stringers and supports, new

  lighting, connecting conduit and wire, repair and patch steel splice plates where needed on pre-cast wall panels.

  New hollow metal doors and frames and all levels, paint the entire inside of the stairwells.

 

  The stairs at School St. Parking deck are degrading quickly. The steel pans that support the cast in place

  concrete stairs are corroding in several areas to the point where the steel is gone and concrete is exposed. This

  will eventually open up to the point where falling concrete will become a likely overhead hazard. If this begins to

   happen it will render the stairs unsafe to use. Since both stair towers are degrading at the same pace and show

  the same conditions it is likely that both stair towers will become unsafe to use. At that point the parking deck

  will have to be shut down. This parking deck is essential to the Parking & Transportation office at ISU. It

  provides a significant amount of parking for faculty, staff, and students. This parking deck is the largest parking

   area for the southeast portion of campus. Not having this deck would interrupt a revenue stream for our

  Parking and Transportation office as well as put a strain on adjacent street parking that is not designed to

  support the parking needs.

 

  This Emergency Purchase has an expected start date of 3/15/2025 through 08/01/2025 with an Original

  Estimated Cost of $1,300,000.00, using Parking & Transportation Reserves Funds.

   Signed By:  Stacy Brown, Interim Director

      Vendor:  Core Construction                                                                     Notary Date:           2/26/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                    $1,300,000.00                                 $1,060,860.96        $1,060,860.96      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  192   Corrections, Department of                                                                    File Date:  2/23/2026

 

  Final Cost Statement

  Latest Filing – 02/23/2026: FY26, Qtr 3, Item # 192

  The Actual Total Cost of FY26, Qtr 3, Item#  192  is $57,430,173.62, with the final contract term ending.

 

 

  Original Filing – 5/6/2025: FY25, Qtr 4, Item# 143

 

  Vendor is to provide the medical, dental, vision, audiology, pharmaceutical and mental health services to

  individuals in custody at specified State correctional centers. Under the direction of the IDOC Medical Director

  and the IDOC Chief of Mental Health Services and according to the program definitions and specifications as

  outlined in this contract, Vendor is to arrange and provide for services on-site and as necessary off-site at local

  hospitals, outpatient facilities and consultative physician offices. IDOC recognizes that methods of delivery of

  these services may differ from methods used to provide services to members of the general public, but the care

  and services Vendor provides should be similar. It is the intent of the Department for all individuals to receive

  adequate and medically necessary health care services regardless of place of assignment or disciplinary status.

  Vendor will provide these services at the following correctional centers beginning with the effective date of this

  contract: Big Muddy, Centralia, Danville, Decatur, Dixon, East Moline, Graham, Hill, Illinois River, Jacksonville,

  Joliet Treatment Center, Joliet Inpatient Treatment Center, Kewanee, Lawrence, Lincoln, Logan, Menard,

  Murphysboro, Pinckneyville, Pontiac, Robinson, Shawnee, Sheridan, Southwestern, Stateville, Taylorville,

  Vandalia, Vienna, and Western Illinois.

 

The Vendor will continue to supply medical, dental, vision, audiology,

  pharmaceutical and mental health services for individuals  at the specified correctional centers. The Illinois

  Department of Corrections is in contract negotiations after award of a competitively solicited RFP.

 

  The Illinois Department of Corrections has made efforts to ensure that Wexford Health Source, Inc. maintains

  the 11% BEP goal established under this emergency. 

Boswell Pharmacy Services, LLC, Affinity Pharmacy

  Care, LLC, CarePath Integrated Health, LLC, 3 R Healthcare Products, Precise Specialties, Mid Central Medical

  Inc., Chardonnay Dialysis, LLC, Comfort Care Medical Supply, ProAlliance Corp, Target Office Products,

  Professional Mgt Enterprises, Inc, Jubilee Medical Services PLLC

 

  This Emergency Purchase has an expected start date of 05/01/2025 through 07/29/2025 with an Original

  Estimated Cost of $71,800,000.

   Signed By:  Jared Brunk, CAO

      Vendor:  Wexford Health Sources, Inc.                                                       Notary Date:           5/6/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                  $71,800,000.00                               $57,430,173.62       $57,430,173.62      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  193   Human Services, Department of                                                              File Date:  2/24/2026

 

  Final Cost Statement

  Latest Filing – 02/24/2026: FY26, Qtr 3, Item # 193

  The Actual Total Cost of FY26, Qtr 3, Item# 193  is $24,853.31, with the final contract term ending.

 

  Original Filing – 8/19/2025: FY26, Qtr 1, Item# 44

 

  This vendor has a Master Contract for repair and maintenance of generators has provided maintenance services

  for the Center's generators.  They had a generator available and were able to immediately deliver and install.  The

   generator at the Center is totally disabled and in need of repair.  If the Center encounters a power outage, there

  would be no air conditioning, domestic hot water or power in the Boiler House, Main Dietary, Mechanical

  Building, Community Building and Administration Building.  Rental of a temporary generator is required until the

  main generator can be repaired by the warranty vendor.

 

  Rental of one (1) 500kw generator, 50' camlock cable and pig tails.  Rental includes delivery, labor to connect,

  labor to disconnect and removal.

 

  This Emergency Purchase has an expected start date of 08/19/2025 through 11/16/2025 with an Original

  Estimated Cost of $24,853.31.

   Signed By:  Stacy Howlett, COO

      Vendor:  SEPs, Inc.                                                                              Notary Date:           8/19/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                        $24,853.31                                    $24,853.31            $24,853.31      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  194   Capital Development Board                                                                    File Date:  3/3/2026

 

  Final Cost Statement

  Latest Filing – 03/03/2026: FY26, Qtr 3, Item # 194

  The Actual Total Cost of FY26, Qtr 3, Item# 194  is $39,634.99, with the final contract term ending.

 

  Original Filing – 11/19/2025: FY26, Qtr 2, Item# 19

 

  The scope of work provides for an environmental assessment and the subsequent remediation of mold and

  possibly any asbestos

containing materials which could be impacted by the cleaning and or removal of building

  materials and associated HVAC equipment.

The scope shall also include providing cost estimates for all

  remediation efforts including any repairs necessary resulting from the

remediation of mold. Repairs may

  include but are not limited to fire rated construction and finishes.

 

  Incorporated documents include the January 2025 Standard Documents for Construction and the January 2025

  Design and

Construction Manual. Basic Architectural Services provided under this procurement should not

  exceed $100,000.00, which is a placeholder prior to the negotiation of a Professional Services Agreement,

  without prior authorization from the Capital Development Board

in consultation with the Chief Procurement

  Office. Final Actual Costs will be reported upon project completion and project close-out.

 

  This Emergency Purchase has an expected start date of 11/19/2025 through 02/16/2026 with an Original

  Estimated Cost of $100,000.00.

   Signed By:  Chris Miles, Exec II

      Vendor:  Primera Engineers, Ltd                                                               Notary Date:           11/19/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $100,000.00                                    $39,634.99            $39,634.99      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  195   Education, State Board of                                                                      File Date:  3/5/2026

  Final Cost Statement

  Latest Filing – 03/05/2026: FY26, Qtr 3, Item #  195

  The Actual Total Cost of FY26, Qtr 3, Item# 195  is $423,536.00, with the final contract term ending.

 

 

  Original Filing – 6/3/2024: FY24, Qtr 4, Item# 28

 

  The vendor, as directed by ISBE, will efficiently receive and provide dry, cooler, and frozen storage of USDA

  Foods shipped to the State throughout the Summer for preparation of delivery in the Fall when school begins. 

  Minimal delivery may occur as required.  Intended recipients are USDA program approved public and private

  nonprofit schools, summer food program participants, correctional facilities, and emergency disaster-relief

  agencies.  

 

  This Emergency Purchase has an expected start date of 06/10/2024 through 08/21/2024 with an Original

  Estimated Cost of $1,100,000.00, using Federal Funds.

   Signed By:  Jason Perry,

      Vendor:  Lanter Distributing LLC                                                             Notary Date:           6/3/2024

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                               $0.00                                           $0.00                   $0.00      26 3

   Federal             $1,100,000.00                                                          $423,536.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  196   Natural Resources, Department of                                                           File Date:  3/6/2026

 

  Final Cost Statement

  Latest Filing – 03/06/2026: FY26, Qtr 3, Item # 196

  The Actual Total Cost of FY26, Qtr 3, Item#  196  is $1,493,500.00, with the final contract term ending.

 

 

  Original Filing – 7/14/2023: FY24, Qtr 1, Item# 20

 

  Morrow Brothers Ford, Inc. holds the State of Illinois Master Contract for light, medium and heavy duty trucks.

   

   

 

Morrow Brother's contacted IDNR the week of July 9, 2023 and advised that fifty (50) 2023 Interceptor F-

  150's were delivered unexpectedly.  If IDNR does not procure these as quickly as possible they will be sold to

  other units of governments leaving a law enforcement agency severely under equipped.   IDNR is making good

  business judgment and immediately taking advantage their availability.  Not securing these vehicles would cause

  a public safety concern and be a disservice to residents of Illinois.

   

 

Recent information from master contract holders and CMS has left the future unknown.  Supply chain

  constraints for fleet vehicles is expected to continue for the foreseeable future. 

 

  Twenty-Five (25) Interceptor F-150's

 

  There are fifty (50) Ford F-150 Interceptors currently on the Vendor's lot.  There is no opportunity to include

  Business Enterprise Program contractors on this purchase.  The current Master Contract did not contain a BEP

  subcontracting goal requirement nor is the one (1) BEP vendor registered under NIGP Code 072-02, Class 2

  Trucks, a dealership. 

 

  Morrow Brothers Ford, Inc. holds the State of Illinois Master Contract for light, medium and heavy duty trucks.

    IDNR and the Master Contract vendor have been unable to secure all of the vehicle needed over the past few

  years due to supply chain constraints.  Current guidance from both the Vendor and CMS state that the future in

  unknown.

 

  This Emergency Purchase has an expected start date of 07/14/2023 through 09/30/2023 with an Original

  Estimated Cost of $1,500,000.00.

   Signed By:  Eric Michael, Procurement Manager

      Vendor:  Morrow Brothers Ford, Inc                                                          Notary Date:           7/14/2023

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                    $1,500,000.00                                 $1,493,500.00        $1,493,500.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  197   Human Services, Department of                                                              File Date:  3/9/2026

  Final Cost Statement

  Latest Filing – 03/09/2026: FY26, Qtr 3, Item # 197

  The Actual Total Cost of FY26, Qtr 3, Item# 197  is $53,403.16, with the final contract term ending.

 

 

  Original Filing – 11/10/2025: FY26, Qtr 2, Item# 24

 

  AKSA USA Central is the vendor who provided and installed the Center's main generator through a CDB funded

  project two (2) years ago.  The main generator broke down again and the vendor was called out to access the

  issue.  The vendor reported the repairs the generator requires are going to take time to complete.  If the Center

  encounters a power outage during this time, there would be no air conditioning, domestic hot water or power in

  the Boiler House, Main Dietary, Mechanical Building, Community Building and Administration Building. 

  Therefore immediate rental of a temporary generator is required until the main generator can be repaired.  AKSA

   USA Central was already on site and was able to immediately deliver and install a temporary generator.

 

 

 

The Center declared an emergency on 08/19/2025 due to this generator breaking down.  The repairs were

  finished and the generator removed back in September ending services with that vendor.

 

  Rental of one (1) 500kw generator, 50' camlock cable and pig tails.  Rental includes delivery, labor to connect,

  labor to disconnect and removal.

 

  This Emergency Purchase has an expected start date of 11/06/2025 through 02/03/2026 with an Original

  Estimated Cost of $54,523.16.

   Signed By:  Jean Sandstrom, APO

      Vendor:  AKSA USA Central                                                                  Notary Date:           11/10/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                        $54,523.16                                    $53,403.16            $53,403.16      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  198   Corrections, Department of                                                                    File Date:  3/12/2026

  Final Cost Statement

  Latest Filing – 03/12/2026: FY26, Qtr 3, Item # 198

  The Actual Total Cost of FY26, Qtr 3, Item# 198  is $5,570,187.74, with the final contract term ending.

 

 

  Second Filing – 08/22/25:  FY26,  Qtr 1,  Item # 88

  An Emergency Purchase Extension was received on August 22, 2025 requesting an extension for dates starting

  08/23/2025 to 11/24/2025. The extension expenditure is not assessed and will be charged for time only.

 

 

  Original Filing – 5/28/2025: FY25, Qtr 4, Item# 123

 

  The Vendor is able to provide needed commissary items to the Illinois Department of Corrections for its

  Individual in Custody and Correctional Facility Employees.

 

  The Vendor will provide approved commissary items that will allow for the continued sales of food, clothing,

  health/beauty, sundries and electronics to individuals in custody and Correctional Facility Employees

 

  The short-term nature of our current purchasing cycle does not allow vendors to secure reliable supply chains

  or establish partnerships with BEP certified businesses. Vendors provide new pricing every 4 to 6 weeks and

  must respond quickly to shifting product availability. Without long-term volume commitments, it is not practical

  for the vendors to formalize subcontractor relationships or guarantee consistent opportunities for BEP

  participation. We will continue to pursue BEP inclusion as market conditions stabilize and we realize our

  competitive solicitation for a long-term contract.

 

  This is a zero dollar contract, the State does not fund the expenses.

 

  This Emergency Purchase has an expected start date of 05/25/2025 through 08/22/2025 with an Original

  Estimated Cost of $6,000,000.00, using Other Funds.

   Signed By:  Jared Brunk, CAO

      Vendor:  Performance Food Group dba Vistar                                              Notary Date:           5/28/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                    $6,000,000.00                                 $5,570,187.74        $5,570,187.74      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  199   Arts Council                                                                                       File Date:  3/10/2026

 

  Final Cost Statement

  Latest Filing – 03/10/2026: FY26, Qtr 3, Item # 199

  The Actual Total Cost of FY26, Qtr 3, Item# 199   is $92,882.34, with the final contract term ending.

 

  Original Filing – 2/8/2024: FY24, Qtr 3, Item# 31

 

  Carahsoft is the vendor who implemented the Salesforce platform a few year ago and has worked with the

  agency to ensure the platform is user-friendly and it is aligned with the grant programs. It is critical to

  implement the changes to our grant program system, our grant program will launch on February 15, 2024 due

  to the time sensitive we do not have time for a competitive procurement.  Carahsoft will update our Salesforce

  platform to ensure our agency has the ability to mirror the updated grant structure, Carahsoft has a clear

  understanding of what the agency is looking for which saves time.  The updates include the ability to sort

  applicants by county, add necessary fields on the applicant and agency platform.  Create reports aligning the

  structure, having disciplines as secondary, add new record types for applications and reviews.

 

  In the past Illinois Arts Council grants have been reviewed, and divided by discipline, which included panel

  review, score ranking, etc.  Now the agency is re-structuring and updating the grants guidelines with an updated

   structure on how the grants are reviewed, awarded, and focusing on an easier streamline for constituents.  

  The agency is seeking service hours to ensure Salesforce platform is aligned with the grant structure which

  includes adding / removing fields, restructuring the grants data and creating reports that will benefit our program

   directors who are expected to be out in field more.

 

  This Emergency Purchase has an expected start date of 02/09/2024 through 02/29/2024 with an Original

  Estimated Cost of $92,882.34

   Signed By:  Sandra Velazquez, CFO

      Vendor:  Carahsoft                                                                               Notary Date:           2/8/2024

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                        $92,882.34                                    $92,882.34            $92,882.34      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  200   Children and Family Services, Department of                                             File Date:  3/11/2026

 

  Final Cost Statement

  Latest Filing – 03/11/2026: FY26, Qtr 3, Item # 200

  The Actual Total Cost of FY26, Qtr 3, Item#  200  is $91,875.00, with the final contract term ending.

 

 

  Original Filing – 11/18/2025: FY26, Qtr 2, Item# 33

 

  The Department of Children and Family Services (DCFS) is responsible for protecting children who are

  reported to be abused or neglected and to increase their families' capacity to safely care for them; providing for

  the well-being of children in care; providing appropriate, permanent families as quickly as possible for those

  children who cannot safely return home; supporting early intervention and child abuse prevention activities and

  working in partnerships with communities to fulfill this mission.

 

 

 

DCFS is responsible for providing an array of community level services, preventative services and

  protective services for the children and families of Illinois. The Purpose of Part 132 Medicaid Community

  Mental Health Services (MCMHS) Program is to facilitate the establishment of a comprehensive and coordinated

   continuum of community-based programs, sensitive to the needs of local communities, for persons with or at

  risk for a diagnosis of mental illness; to effectuate the Division of Mental Health's role as the federally-

  recognized State Mental Health Authority with statutory mandates to plan, fund and monitor community-based

  mental health programs, to promote the availability of culturally relevant, evidence-based, developmentally

  appropriate, trauma-informed mental health programs across the lifespan;  to maximize the effectiveness and

  quality of programs to ensure cost efficiency and best possible outcomes in natural settings that reduce the use

  of institutional care and to establish criteria for certification and recertification of Comprehensive Community

  Mental Health Centers (CMHC) and other entities seeking to offer programs directly funded by DCFS.

 

 

 

Funding is crucial for providers engaged with foster homes, group homes, residential facilities, etc. DCFS

  requires help in many ways including helping them complete all the steps necessary to bill for Medicaid services.

   To bill they must be Medicaid certified. Once certified, DCFS helps them through all the next steps culminating

  in contracting with the Managed Care Organizations (MCOs), so they can claim for services rendered. DCFS

  helps them optimize their time by assisting them with making documentation concise, optimizing billing

  opportunities and connecting them to resources. All providers must be Medicaid certified in Illinois to bill for

  MCMHS services. Without Medicaid certification, providers are not eligible to contract with the MCOs, which

  accounts for approximately 80% of all Medicaid individuals in the state (and the vast majority of DCFS

  children). For times when a provider is not registered with an MCO like YouthCare, DCFS gives them

  information about how much they can help them through the steps. For instance, if a child needs mental health

  services in an area where there are no mental health resources close by, they work to get agencies on board

  with certification so an option can be opened for the children.

 

 

 

Once all policies and procedures are determined to meet Medicaid Part 132 requirements, DCFS assists in

  completing the MCMHS application and schedule a site visit to the provider. DCFS visits the provider to ensure

  required physical site standards are met using the Site Walkthrough Checklist. If everything is in order, the

  provider sends their application materials to DCFS for final review. When the materials are fully compliant,

  DCFS sends the provider the DCFS Initial Certification for a Provisional Certificate. Once approved DCFS


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  informs the provider of the necessity to enroll in the IMPACT system and provides them assistance in starting

  that process if the provider does not have an NPI number and or is not enrolled in the IMPACT system. DCFS

  helps the providers obtain a NPI and enroll in the IMPACT system. Once this is completed and the provider

  receives their contract from the Medicaid Care Organization (MCO), they can start billing for MCMHS services.

 

 

  DCFS reached out to the vendor regarding BEP participation. As of today’s date, the answer is a no. There are

  currently no BEP vendors with NIGP Code 946-10 which employ staff who meet the required bachelor’s

  degree and three years of clinical experience which is required by this contract.

 

 

 

DCFS ran a Goal setting sheet for a different NIGP code of 917-48 for Data Processing Services and this

  resulted in a 0% BEP vendor goal for 58 potential vendors that could meet our agencies needs.  This was also

  approved by CEI on 11/24/25 for the IFB competitive solicitation.

 

  This Emergency Purchase has an expected start date of 11/28/2025 through 02/25/2026 with an Original

  Estimated Cost of $91,875.00.

   Signed By:  Devin McQuillan, APO

      Vendor:  The Infant -Parent Institute, Inc.                                                    Notary Date:           11/18/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                        $91,875.00                                    $91,875.00            $91,875.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  201   Corrections, Department of                                                                    File Date:  3/12/2026

 

  Final Cost Statement

  Latest Filing – 03/12/2026: FY26, Qtr 3, Item # 201

  The Actual Total Cost of FY26, Qtr 3, Item# 201  is $21,111,833.04, with the final contract term ending.

 

  Third Filing – 05/23/2025: FY25, Qtr 4,  Item #184

  An Emergency Purchase Extension was received on May 23, 2025 requesting an extension for dates starting

  05/25/2025 to 11/24/2025 at an additional estimated cost of $30,000,000.00, revising the total estimated cost to

  $42,000,000.00.

 

  Second Filing – 05/23/2024: FY24, Qtr 4,  Item # 69

  An Emergency Purchase Extension was received on May 23, 2024 requesting an extension for dates starting

  05/25/2024 to 05/24/2025 at an additional estimated cost of $24,000,000.00, revising the total estimated cost to

  $30,000,000.00.

 

  Original Filing – 2/26/2024: FY24, Qtr 3, Item# 46

 

  ***This is a zero dollar contract, the State does not fund the expenses.

 

  The Vendor is able to provide needed commissary items to the Illinois Department of Corrections for its

  Individual in Custody and Correctional Facility Employees.

 

  The Vendor will provide approved commissary items that will allow for the continued sales of food, clothing,

  health/beauty, sundries and electronics to individuals in custody and Correctional Facility Employees.

 

  This Emergency Purchase has an expected start date of 2/26/2024 through 05/24/2024 with an Original

  Estimated Cost of $6,000,000.00.

   Signed By:  Jacenta Wilson, APO

      Vendor:  Union Supply Group                                                                 Notary Date:           2/26/2024

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                    $6,000,000.00       $42,000,000.00     $21,111,833.04       $21,111,833.04      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  202   Corrections, Department of                                                                    File Date:  3/12/2026

 

  Final Cost Statement

  Latest Filing – 03/12/2026: FY26, Qtr 3, Item # 202

  The Actual Total Cost of FY26, Qtr 3, Item# 202 is $19,907,351.95, with the final contract term ending.

 

  Third Filing – 05/23/2025: FY25, Qtr 4,  Item #185

  An Emergency Purchase Extension was received on May 23, 2025 requesting an extension for dates starting

  05/25/2025 to 11/24/2025 at an additional estimated cost of $12,000,000.00, revising the total estimated cost to

  $42,000,000.00.

 

 

  Second Filing – 05/16/2024: FY24, Qtr 4,  Item # 70

  An Emergency Purchase Extension was received on May 16, 2024 requesting an extension for dates starting

  05/25/2024 to 05/24/2025 at an additional estimated cost of $24,000,000.00, revising the total estimated cost to

  $30,000,000.00.

 

 

  Original Filing – 2/26/2024: FY24, Qtr 3, Item# 47

 

  ***This is a zero dollar contract, the State does not fund the expenses.

 

  The Vendor is able to provide needed commissary items to the Illinois Department of Corrections for its

  Individual in Custody and Correctional Facility Employees.

 

  The Vendor will provide approved commissary items that will allow for the continued sales of food, clothing,

  health/beauty, sundries and electronics to individuals in custody and Correctional Facility Employees.

 

  This Emergency Purchase has an expected start date of 02/26/2024 through 05/24/2024 with an Original

  Estimated Cost of $6,000,000.00.

   Signed By:  Jacenta Wilson, APO

      Vendor:  Keefe Group                                                                           Notary Date:           2/26/2024

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                    $6,000,000.00       $42,000,000.00     $19,907,351.95       $19,907,351.95      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  203   Corrections, Department of                                                                    File Date:  3/12/2026

 

  Final Cost Statement

  Latest Filing – 03/12/2026: FY26, Qtr 3, Item # 203

  The Actual Total Cost of FY26, Qtr 3, Item# 203  is $4,050,110.58, with the final contract term ending.

 

  Third Filing – 05/23/2025: FY25, Qtr 4,  Item # 186

  An Emergency Purchase Extension was received on May 23, 2025 requesting an extension for dates starting

  05/25/2025 to 11/24/2025 at an additional estimated cost of $12,000,000.00, revising the total estimated cost to

  $42,000,000.00.

 

  Second Filing – 05/16/2024: FY24, Qtr 4,  Item # 72

  An Emergency Purchase Extension was received on May 16, 2024 requesting an extension for dates starting

  05/25/2024 to 05/24/2025 at an additional estimated cost of $24,000,000.00, revising the total estimated cost to

  $30,000,000.00.

 

 

  Original Filing – 2/26/2024: FY24, Qtr 3, Item# 49

 

  ***This is a zero dollar contract, the State does not fund the expenses.

 

 

  The Vendor is able to provide needed commissary items to the Illinois Department of Corrections for its

  Individual in Custody and Correctional Facility Employees.

 

  The Vendor will provide approved commissary items that will allow for the continued sales of food, clothing,

  health/beauty, sundries and electronics to individuals in custody and Correctional Facility Employees.

 

  This Emergency Purchase has an expected start date of 02/26/2024 through 05/24/2024 with an Original

  Estimated Cost of $6,000,000.00.

   Signed By:  Jacenta Wilson, APO

      Vendor:  Walkenhorst's                                                                          Notary Date:           2/26/2024

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                    $6,000,000.00       $42,000,000.00       $4,050,110.58        $4,050,110.58      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  204   Corrections, Department of                                                                    File Date:  3/12/2026

  Final Cost Statement

  Latest Filing – 03/12/2026: FY26, Qtr 3, Item # 204

  The Actual Total Cost of FY26, Qtr 3, Item# 204  is $98,175.38, with the final contract term ending.

 

  Third Filing – 05/23/2025: FY25, Qtr 4,  Item # 187

  An Emergency Purchase Extension was received on May 23, 2025 requesting an extension for dates starting

  05/25/2025 to 11/24/2025 at an additional estimated cost of $12,000,000.00, revising the total estimated cost to

  $42,000,000.00.

 

  Second Filing – 05/16/2024: FY24, Qtr 4,  Item # 73

  An Emergency Purchase Extension was received on May 16, 2024 requesting an extension for dates starting

  05/25/2024 to 105/24/2025 at an additional estimated cost of $24,000,000.00, revising the total estimated cost to

   $30,000,000.00.

 

 

  Original Filing – 3/15/2024: FY24, Qtr 3, Item# 61

 

  The Vendor is able to provide needed commissary items to the Illinois Department of Corrections.

 

  The Vendor will provide approved commissary items that will allow for the continued sales of food, clothing,

  health/beauty, sundries and electronics to individuals in custody.

 

  The amount of this expenditure is 6,000,000. This is a zero dollar contract, the State does not fund the

  expenses.

 

  This Emergency Purchase has an expected start date of 03/15/2024 through 05/24/2024 with an Original

  Estimated Cost of $6,000,000.00. That is not a State or Federal funded expense.

   Signed By:  Jacenta Wilson, APO

      Vendor:  E-Ford Commissary Inc                                                              Notary Date:           3/15/2024

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                    $6,000,000.00       $42,000,000.00           $98,175.38            $98,175.38      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  205   Veterans Affairs, Department of                                                              File Date:  3/20/2026

 

  Final Cost Statement

  Latest Filing – 03/20/2026: FY26, Qtr 3, Item # 205

  The Actual Total Cost of FY26, Qtr 3, Item# 205  is $293,423.47, with the final contract term ending.

 

 

  Original Filing – 06/20/2025: FY26, Qtr 1, Item# 21

 

  Using State Grant Funding

 

  Vendor is capable of immediate service and installation of facility security cameras, wiring of cameras, and

  start-up of cameras for the Chicago Veterans Home. Security Cameras are to be installed into facility to ensure

  the health and safety of the residents and staff.

 

  Vendor is to provide required wiring, equipment, and labor to install 134 security cameras, applicable hard

  drives, and switches throughout the interior and exterior of the facility. Vendor will ensure proper placement and

   field of view for all cameras to ensure proper monitoring of facility to mitigate safety risks and hazards,

  security of the facility and common areas, and elopement prevention. The Chicago Veterans Home currently

  does not have an actively working Security Camera System to prevent elopement and protect the safety of

  resident, staff, and vistors.

 

  This Emergency Purchase has an expected start date of 06/20//2025 through 09/18/2025 with an Original

  Estimated Cost of $275,000.00, using State Grant Funds.

   Signed By:  Stephanie Heckenkamp, CFO

      Vendor:  Seconds Matter Safety Solutions                                                   Notary Date:           6/16/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $275,000.00                                   $293,423.47           $293,423.47      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  206   Veterans Affairs, Department of                                                              File Date:  3/20/2026

 

  Final Cost Statement

  Latest Filing – 03/20/2026: FY26, Qtr 3, Item # 206

  The Actual Total Cost of FY26, Qtr 3, Item# 206  is $625,487.01, with the final contract term ending.

 

 

  Second Filing – 02/27/2025: FY25, Qtr 3,  Item # 163

  An Emergency Purchase Extension was received on February 27, 2025 requesting an extension for dates

  starting 03/14/2025 to 09/13/2025 at an additional estimated cost of $1,000,000.00, revising the total estimated

  cost to $1,300,000.00.

 

  Original Filing – 12/15/2024: FY25, Qtr 2, Item# 25

 

  Vendor will act as the Project Manager, will continue to oversee the Agencies transition with in the the newly

  designed and developed facility kitchen at Illinois Veterans Home of Quincy (IVHQ). The staff will need

  professional guidance and direction in order to ensure a smooth transition of services and new processes.

  Vendor will direct Agency Staff as needed in the transition of services. Vendor will be the point of contact for

  all services related to the Dietary transition. Vendor will be the point of contact and will provide direction to all

  Agency staff regarding all aspects of the dietary transition from the former service to the new innovative

  service. Vendor will provide services including, but not limited to, conducting test dietary operations; overseeing

   and training Agency staff and assessing IDVA dietary operations to ensure applicable standards are met;

  drafting and reviewing policies and procedures for dietary operations. Vendor will attend meetings as requested.

  Vendor will provide updates weekly or as requested to identified staff, including but not limited to; the Senior

  Home Administrator, Home Administrator and Assistant Director. Develop and present in-service training and

  education for Facility’s personnel on a quarterly basis or more frequently as requested by facility and document

  each presentation. Assist in the development of appropriate food service department policies and procedures.

  Provide other services as requested by food service management and operation.

 

  This Emergency Purchase has an expected start date of 12/15/2024 through 03/13/2025 with an Original

  Estimated Cost of $300,000.00.

   Signed By:  Amanda Gray, APO

      Vendor:  Arena Food Service, Inc.                                                            Notary Date:           12/15/2024

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $300,000.00        $1,300,000.00         $625,487.01           $625,487.01      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  207   Agriculture, Department of                                                                    File Date:  3/18/2026

 

  Final Cost Statement

  Latest Filing – 03/18/2026: FY26, Qtr 3, Item # 207

  The Actual Total Cost of FY26, Qtr 3, Item# 207   is $118,540.00, with the final contract term ending.

 

  Original Filing – 11/22/2024: FY25, Qtr 2, Item# 20

 

  The Illinois Department of Agriculture has been needing ans searching vehicles for the inspectors at the Illinois

  Department of Agriculture. Our department has many inspectors that travel throughout Illinois to inspect food,

  animals, meat, eggs, and many other items. The bureaus have hired many new inspectors recently due to the

  need to complete the task of inspection on time. These workers need vehicles, while at the same time 10

  vehicles have been retired due to the high milage and the damages that they have occurred. Without these

  vehicles, our workers won't be able to do the job. Section 20-30(d) of the Illinois Procurement Code and the

  CPO-GS Administrative Rules [44ILL. Adm. Code 1.2030(c)] provide that the use of the Emergency method of

  source selection may be used to make a "quick purchase" in situations when "items are available on the spot

  market or at discounted prices for a limited time so that good business judgment mandates a "quick purchase"

  immediately to take advantage of the availability and price". The emergency spot market method of procurement

   was chosen over a competitive solicitation because of the amount of time a competitive selection could take and

   given the current market environment, vehicle dealerships are unlikely to hold multiple vehicles on their lots

  without a guarantee of award. The Department of Agriculture has done research and made and effort to utilize

  the master contract. However, the vendor on the master contract did not have the inventory in stock.

 

  Landmark Ford INC was the only vendor that could provide the Department of Agriculture with three (3) Ford

  Escapes Hybrids in a very short time. Finding a vendor to provide inventory has been difficult. The Department

  of Agriculture has doen research to fidn a vendor and Landmark Ford INC was able to meet our needs.

 

  This Emergency Purchase has an expected start date of 11/22/2024 through 02/21/2025 with an Original

  Estimated Cost of $118,240.00.

   Signed By:  Michelle Grimsley, APO

      Vendor:  Landmark Ford, Inc.                                                                  Notary Date:           11/22/2024

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $118,240.00                                   $118,540.00           $118,540.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  208   Toll Highway Authority, Illinois State                                                       File Date:  3/12/2026

  Final Cost Statement

  Latest Filing – 03/12/2026: FY26, Qtr 3, Item # 208

  The Actual Total Cost of FY26, Qtr 3, Item# 208 is $1,050,511.78, with the final contract term ending.

 

  Fourth Filing – 07/02/25:  FY26,  Qtr 1,  Item # 59

  An Emergency Purchase Extension was received on July 2, 2025 requesting an extension for dates starting

  07/08/2025 to 08/07/2025. The extension expenditure is not assessed and will be charged for time only.

 

 

  Third Filing –03/13/25: FY25, Qtr 4,  Item #169

  An Emergency Purchase Extension was received on March 13, 2025 requesting an extension for dates starting

  04/07/2025 to 07/07/2025 at an additional estimated cost of $500,000.00, revising the total estimated cost to

  $1,062,500.00.

 

 

  Second Filing – 03/06/2025:  FY25,  Qtr 3,  Item #165

  An Emergency Purchase Extension was received on March 6, 2025 requesting an extension for dates starting

  03/08/2025 to 04/07/2025. The extension expenditure is not assessed and will be charged for time only.

 

 

  Original Filing – 11/25/2024: FY25, Qtr 2, Item# 19

 

  XX - Other Funds - The tollway does not operate on State -appropriated funds.  Procurement are funded

  through toll revenue.

 

  The mission of the ITS maintenance team is to keep the ITS equipment operating at a level which supports

  traffic, incident management, and law enforcement. This system contributes to the safety, mobility, and security

   of the Tollway. Its continuous, reliable operation is vital for continued, efficient traffic and incident

  management. Meade will be responsible for maintaining the following devices:

· Full matrix Dynamic Message

  Signs and Lane Control Signs

· TCP/IP communications networks (including fiber optic, wireless IP radio and

  digital cellular links)

· Roadside Closed Circuit Television (CCTV) with PTZ and zoom (both analog and HD

  Digital)

· Traffic monitoring devices (microwave and magnetic sensors)

· Roadway Weather Information Systems

   with snow/ice detection on pavement, automatic high speed vehicle weighing systems

· Additional traffic

  management field equipment as determined by thTollway.

 

  The new replacement Invitation for Bid solicitation (B-38650) should be published in the next few weeks,

  allowing us to receive bids from all interested contractors. However, given the time constraints and the

  significant value of inventory--worth hundreds of thousands of dollars--currently being stored with our existing

  vendor, any abrupt changes at this stage could have a detrimental impact on the agency.  

 

  This Emergency Purchase has an expected start date of 12/08/2024 through 03/07/2025 with an Original

  Estimated Cost of $562,500.00, using Other Funds through toll revenue.


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

   Signed By:  Eric Occomy, APO

      Vendor:  Meade, Inc.                                                                             Notary Date:           11/25/2024

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $562,500.00        $1,062,500.00       $1,050,511.78        $1,050,511.78      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  209   Commerce Commission, Illinois                                                              File Date:  3/23/2026

 

  Final Cost Statement

  Latest Filing – 03/23/2026: FY26, Qtr 3, Item # 209

  The Actual Total Cost of FY26, Qtr 3, Item# 209  is $121,993.90, with the final contract term ending.

 

  Second Filing – 08/21/2025: FY26, Qtr 1,  Item # 86

  An Emergency Purchase Extension was received on August 21, 2025 requesting an extension for dates starting

  09/16/2025 to 1/31/2026 at an additional estimated cost of $50,000.00, revising the total estimated cost to

  $190,436.25.

 

  Original Filing – 06/18/2025: FY25, Qtr 4, Item# 136

 

  The ICC executed a small purchase with emergency conditions contract for court reporting services. Deposition

   Solutions LLC dba Lexitas was awarded the contract. This vendor has been consistent in meeting the needs of

  the ICC. The needs and services to be provided during this 90-day emergency purchasing period are to remain

  identical to the needs and services the incumbent vendor is/has already performed.

Additional Background

  Information:  ICC utilizes these services to fulfill statutory requirements per Section 10-102 of the Illinois Public

   Utilities Act. The Act requires, among other things, verbatim transcription of Commission meetings by a court

  reporter. Further 83 Ill. Adm. 200.580 requires, among other things, that all Commission hearings shall be

  transcribed by a court reporter.

 

 

 

There is currently no CMS master contract for these services. Once a master contract is executed, the ICC

  will make a transition to the state contract.

 

  The ICC requires court reporting services on an ongoing basis to fulfill statutory requirements and to secure

  accurate records of various complex proceedings and meetings. The vendor shall provide court reporters who

  will take verbatim dictation of various proceedings, and hearings, and provide ICC with a certified typewritten

  verbatim transcription, including a record of appearances.

 

  This Emergency Purchase has an expected start date of 06/18/2025 through 09/15/2025 with an Original

  Estimated Cost of $140,436.25.

   Signed By:  Megan Seitzinger, APO

      Vendor:  Deposition Solutions LLC dba Lexitas                                            Notary Date:           6/18/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $140,436.25          $190,436.25         $121,993.90           $121,993.90      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  210   Natural Resources, Department of                                                           File Date:  1/20/2026

 

  Final Cost Statement

  Latest Filing – 01/20/2026: FY26, Qtr 3, Item# 210

  An Actual Total Cost of FY26, Qtr 3, Item # 210 is $9,852.52 was reported in the same filing quarter.

 

  Original Filing – 10/17/2025: FY26, Qtr 2, Item# 4

 

  The Agency would like to move forward with immediate mold remediation as soon as possible. This project

  would include retaining a mold remediation contractor for the following:

- Removal and cleaning activities for

  the basement, lobby, and first floor of the hotel as identified in the MEC Investigation Report,

- Removal of

  impacted drywall throughout the basement,

- Removal & disposal of ceiling tiles in the basement,

- Cleaning

  & disinfecting remaining building materials in the basement, fiberglass insulation over balconies, and impacted

  wooden support beams,

- Cleaning ducts (internal & external).

   Signed By:  Erick Huck, Div. Mngr. of Statewide Operations

      Vendor:  Nichols Enterprises dba SERVPRO                                               Notary Date:           10/17/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $300,000.00                                      $9,852.52              $9,852.52      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  211   Healthcare and Family Services                                                               File Date:  1/15/2026

 

  Final Cost Statement

  Latest Filing – 01/15/2026: FY26, Qtr 3, Item# 211

  An Actual Total Cost of FY26, Qtr 3, Item # 211  is $90,388,185.40 with the final contract term ending..

 

 

  Fourth Filing – 11/18/2024: FY25, Qtr 2,  Item # 70

  An Emergency Purchase Extension was received on November 18, 2024 requesting an extension for dates

  starting 1/1/2025 to 12/31/2025 at an additional estimated cost of $53,000,000.00, revising the total estimated

  cost to $208,444,000.00.

 

 

  Third Filing – 04/16/2024: FY24, Qtr 4,  Item # 47

  An Emergency Purchase Extension was received on April 16, 2024 requesting an extension for dates starting

  06/30/2024 to 12/31/2024 at an additional estimated cost of $24,000,000.00, revising the total estimated cost to

  $155,444,000.00.

 

 

  Second Filing – 08/03/2023: FY24, Qtr 2,  Item # 154

  An Emergency Purchase Extension was received on August 3, 2023 requesting an extension for dates starting

  09/30/2023 to 06/30/2024 at an additional estimated cost of $108,399,600.00. revising the total estimated cost to

   $131,444,000.00.

 

 

  Original Filing – 06/29/2023: FY24, Qtr 2, Item# 139

 

  Dental Program Administrator will expire on 06/30/2023.  30 ILCS 500/20-60(a) limits the duration of contracts

   to ten (10) years inclusive of renewals and extensions, and as of its expiration date of 06/30/2023, this contract

   will be at the ten-year mark.  As such, HFS intends to establish an emergency contract from 07/01/2023

  through an anticipation end date of 11/01/2023 to allow time  to complete the competitive process.

 

 

 

Efforts to establish a new contract have been ongoing since November 2021.  The requisition was approved

   on 11/16/2021, and the first attempt to competitively procure was bid 23-478HFS-DIREC-B-26285, published

  03/30/2022, with a bid opening date of 06/16/2022.  After the bid opening, it was determined that the solicitation

   did not provide for consideration of all factors of significance to the State and bid B-26285 was canceled on

  12/01/2022.

 

 

 

The next bid, 23-478HFS-DIREC-B-35003, was published on 02/23/2023 with a bid opening of 03/30/2023.

   The notice of award for B-35003 was published on 06/09/2023, which started the 14-day protest period. A

  protest was received by the Chief Procurement Officer (CPO) on 06/23/2023, which has paused the

  procurement until further notice when the CPO will issue the determination.

 

   

 

Due to circumstances outside of HFS' control, HFS is declaring an emergency to ensure the continuity of

  services. . Dentaquest has agreed to a 90-day emergency contract to ensure that there is no lapse in service. 


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  Any break in service would be extremely detrimental to the Department of Healthcare and Family Services and

  their constituents who rely on these dental services.  This 90-day emergency should allow time to resolve the

  protest and complete the competitive process.  We intend to cancel the emergency contract when the new

  contract is executed.

 

  The terms of this Contract shall be for the Dental Program of the Illinois Medical Assistance Program (MAP)

  regarding customers who receive services on a fee-or-service (FFS) basis including: ensuring that a customer

  receives necessary covered dental services; referring customers for dental care to those providers willing to

  accept customers in their practice; assisting customers with appointment assistance, monitoring access to care

  and ensuring that Early and Periodic, Screening, Diagnostic, and Treatment (EPSDT) participation for oral

  health increases; referring customers for transportation services to and from dental appointments; acting as

  prior approval agent; education and outreach, appeals, and adjudicating MAP claims. Vendor must also provide

  assistance and outreach to enrolled dental providers, including provider enrollment assistance, provider appeals,

  etc.

 

  DentaQuest intends to meet a BEP goal of 5%, which was approved by the State of Illinois Commission on

  Equity & Inclusion previously under 23-478HFS-DIREC-B-35003. 

 

  15M0000049 Dental Program Administrator will expire on 06/30/2023.  30 ILCS 500/20-60(a) limits the

  duration of contracts to ten (10) years inclusive of renewals and extensions and as of its expiration date of

  06/30/2023, this contract will be at the ten-year mark.  As such, HFS will need to establish an emergency

  contract from 07/01/2023 through 11/01/2023 to allow time for the completion of the competitive process.

 

  This Emergency Purchase has an expected start date of 07/01/2023 through 09/29/2023 with an Original

  Estimated Cost of $12,044,400.00, using State & Federal Funds.

   Signed By:  Devin McQuillan, APO

      Vendor:  DentaQuest of Illinois LLC dba DentaQuest                                     Notary Date:           6/29/2023

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                  $12,044,400.00     $208,444,000.00     $90,388,185.40       $90,388,185.40      26 3

   Federal                                                                                                 $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  212   Capital Development Board                                                                    File Date:  1/12/2026

 

  Final Cost Statement

  Latest Filing – 1/12/2026: FY26, Qtr 3, Item# 212

  An Actual Total Cost of FY26, Qtr 3, Item # 212  is $1,823,666.87 with the final contract term ending..

 

  Second Filing – 09/16/2025:  FY26,  Qtr 2,  Item #49

  An Emergency Purchase Extension was received on September 16, 2025 requesting an extension for dates

  starting 09/16/2022 to 10/19/2023. The extension expenditure is not assessed and will be charged for time only.

 

 

 

  Original Filing – 6/30/2022: FY23, Qtr 1, Item# 8

 

  The Capital Development Board ("CDB") was notified by the Illinois Department of Corrections ("IDOC") that

  the boiler controls in the Boiler House have stopped functioning in most cases and the facility cannot tell the

  status at any given time. It is reported that many of the probes, meters, gauges,and sensors throughout the

  system are currently not operable.These controls require consistent adjustment and calibration to ensure the

  existing boilers, are operating efficiently. The controls on two water tube boilers have not been calibrated since

  they were installed causing each boiler to run inefficiently. The existing boiler controls have been in operation

  since they were installed in 1994. Maintenance personnel are only able to monitor internal temperatures,

  pressures, and output factors by "sight & sound only" causing a life & safety issue.

 

  The scope of work provides for expedited design services to support repair work at the Boiler House to include

  a bid package for limited and temporary roofing, window and lighting repair work, and separate design

  documents for upgrades to the boilers and controls.

  Incorporated documents include the March 2009 Standard Documents for Construction & Supplement and the

  March 2009 Design and Construction Manual & Supplement. Basic Architectural Services provided under this

  procurement should not exceed $100,000.00, which is a place-holder prior to the negotiation of a Professional

  Services Agreement, without prior authorization from the Capital Development Board in consultation with the

  Chief Procurement Office. Final Actual Costs will be reported upon project completion and project close-out.

  In accordance with 30 ILCS 500/50-35,all contractors, and each subcontractor to be used whose

  contract/subcontract exceeds an annual value of $50,000, shall submit financial disclosures and certifications as

  a material term of the contract. In accordance with section 00 21 50 of the Standard Documents for

  Construction,the General Contractor shall perform no less than 20% of work with its own staff. Each other

  trade shall perform no less than 40% of work with its own staff. Work with own staff includes direct labor and

  supervision, as well as material purchases where the material is installed by the contractor.

  Additionally,Governor Pritzker has issued Executive Order 2022-14 containing additional mitigations to address

  the COVID-19 pandemic. This includes an indoor mask requirement and vaccinations for those working at

  Illinois Department of Corrections (IDOC) facilities. These requirements apply to this project.

 

  This Emergency Purchase has an expected start date of 06/27/2022 through 09/24/2022 with an Original

  Estimated Cost of $100,000.00.


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

   Signed By:  Chris Miles, Exec II

      Vendor:  Ross & Baruzzini, Inc.                                                               Notary Date:           6/30/2022

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $100,000.00                                 $1,823,666.87        $1,823,666.87      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  213   Natural Resources, Department of                                                           File Date:  3/6/2026

  Final Cost Statement

  Latest Filing – 03/06/2026: FY26, Qtr 3, Item # 421

  The Actual Total Cost of FY26, Qtr 3, Item# 421 is $80,120.00, with the final contract term ending.

 

  Second Filing – 08/26/2024:  FY26,  Qtr 3,  Item # 213

  An Emergency Purchase Extension was received on August 26, 2024 requesting an extension for dates starting

  08/31/2024 to 11/30/2024. The extension expenditure is not assessed and will be charged for time only.

 

 

  Original Filing – 06/04/2024: FY25, Qtr 2, Item# 18

 

  The Agency is moving forward to replace all failed/failing sprinkler heads due to IDNR's technical contractor,

  Primera, sampling the sprinkler heads and determining in May of 2024 that two out of three of the remaining

  625 heads had failed and that 1/3 of the remaining heads that have not yet failed are eminently at risk of failure in

   the short-term.

 

 

 

The project will include:

 

- Draining down the sprinkler system

- Identification of remaining failed/failing

  (approximately 625) sprinkler heads

- Remove & replace like-for-like characteristics new sprinkler heads (K-

  factor, response time, temperature rating, etc.)

- Refill sprinkler system

- Patch & Paint to match adjacent

  existing wall/ceilings.

- Replace Damaged ceiling tiles.

- Lift Rental

- Fire Watch provided during all times

  when the sprinkler system is out of service (so the building can remain in operation)

 

  Due to emergent need, as well as the specialized sprinkler head replacement expertise required for this

  emergency project, including potential risk to public life, health & safety, the Agency acted swiftly by selecting

  a Vendor that has previously mobilized to replace sprinkler heads at this location (Dependable Fire Equipment,

  Inc.) and that can work quickly to rectify this emergent need. Therefore, the agency's focus is to protect the

  health, safety and well being of citizens visiting and staying at Illinois Beach, and, while recognizing and

  supporting the importance of diversifying contracts, in this particular instance, felt it was in the best interest of

  the agency, the State of Illinois and the citizens visiting Illinois Beach to use the vendor who had performed

  sprinkler head replacements at the site previously.

 

  This Emergency Purchase has an expected start date of 06/04/2024 through 08/30/2024 with an Original

  Estimated Cost of $100,000.00.

   Signed By:  Erick Huck, Division Manager

      Vendor:  Dependable Fire Equipment, Inc.                                                  Notary Date:           6/4/2024

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $100,000.00                                    $80,120.00            $80,120.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  214   Natural Resources, Department of                                                           File Date:  3/6/2026

  Final Cost Statement

  Latest Filing – 03/06/2026: FY26, Qtr 3, Item #214

  The Actual Total Cost of FY26, Qtr 3, Item# 214 is $80,120.00, with the final contract term ending.

 

  Second Filing – 08/26/2024:  FY26,  Qtr 3,  Item # 420

  An Emergency Purchase Extension was received on August 26, 2024 requesting an extension for dates starting

  08/31/2024 to 11/30/2024. The extension expenditure is not assessed and will be charged for time only.

 

 

  Original Filing – 06/04/2024: FY25, Qtr 2, Item# 18

 

  The Agency is moving forward to replace all failed/failing sprinkler heads due to IDNR's technical contractor,

  Primera, sampling the sprinkler heads and determining in May of 2024 that two out of three of the remaining

  625 heads had failed and that 1/3 of the remaining heads that have not yet failed are eminently at risk of failure in

   the short-term.

 

 

 

The project will include:

 

- Draining down the sprinkler system

- Identification of remaining failed/failing

  (approximately 625) sprinkler heads

- Remove & replace like-for-like characteristics new sprinkler heads (K-

  factor, response time, temperature rating, etc.)

- Refill sprinkler system

- Patch & Paint to match adjacent

  existing wall/ceilings.

- Replace Damaged ceiling tiles.

- Lift Rental

- Fire Watch provided during all times

  when the sprinkler system is out of service (so the building can remain in operation)

 

  Due to emergent need, as well as the specialized sprinkler head replacement expertise required for this

  emergency project, including potential risk to public life, health & safety, the Agency acted swiftly by selecting

  a Vendor that has previously mobilized to replace sprinkler heads at this location (Dependable Fire Equipment,

  Inc.) and that can work quickly to rectify this emergent need. Therefore, the agency's focus is to protect the

  health, safety and well being of citizens visiting and staying at Illinois Beach, and, while recognizing and

  supporting the importance of diversifying contracts, in this particular instance, felt it was in the best interest of

  the agency, the State of Illinois and the citizens visiting Illinois Beach to use the vendor who had performed

  sprinkler head replacements at the site previously.

 

  This Emergency Purchase has an expected start date of 06/04/2024 through 08/30/2024 with an Original

  Estimated Cost of $100,000.00.

   Signed By:  Erick Huck, Division Manager

      Vendor:  Dependable Fire Equipment, Inc.                                                  Notary Date:           6/4/2024

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                      $100,000.00                                    $80,120.00            $80,120.00      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026

  215   Innovation & Technology, Department of                                                  File Date:  1/5/2026

 

  Final Cost Statement

  Latest Filing – 01/05/2026: FY26, Qtr 3, Item # 215

  The Actual Total Cost of FY26, Qtr 3, Item# 215  is $30,096,630.34, with the final contract term ending.

 

  Original Filing – 12/08/2025: FY26, Qtr 2, Item# 30

 

  The Department requires services which fulfill the State’s private telecommunications network, voice and data

  services required to perform our critical mission.  The scope of services covered is wide-ranging services

  (including but not limited to Transport services, Private Fiber, Internet  Egress, DDOS, Local Voice, Long

  Distance, Conferencing and Other Services) which will enable governmental units and qualified not-for-profit

  agencies to purchase telecommunications services as to be specified in the resulting contract. This contract will

  not include Plain Old Telephone Service (POTS).

 

  This emergency contract with AT&T contains a goal that only applies to 10% of the applicable services. Of this

   10% there is a 5% goal that requires subcontracting out to businesses owned and controlled by minorities,

  women, and persons with disabilities. The scope of this goal was reduced due to the fact that the majority of the

   services on this contract are for connectivity which can not be subcontracted out.

 

 

 

While the case may be different for other permitted users establishing their own contracts for services with

  this vendor, the State does not anticipate that there will be any significant construction projects done as part of

  this emergency, since the state intends to primarily use this contract to allow for the uninterrupted usage of

  already-established circuits.

 

  This Emergency Purchase has an expected start date of 12/12/2025 through 03/11/2026 with an Original

  Estimated Cost of $30,000,000.00.

   Signed By:  Chris Brinkmeyer, APO

      Vendor:  AT & T Enterprises LLC                                                            Notary Date:           12/8/2025

                                Original                Revised              Paid To                Actual

                                Estimate               Estimate                  Date                  Final Cost                                 FY                    QTR

      State Cost:                  $30,000,000.00                               $30,096,630.34       $30,096,630.34      26 3

   Federal                        $0.00                                                                   $0.00


                                 LIST OF EMERGENCY PURCHASE STATEMENTS

                             FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                           January 1, 2026 through March 31, 2026